Electricity Industry Bill

Power Sector Reform and Investment Comparing Uganda with Kenya and Tanzania

Reforming Power Markets: Lessons from Five Developing Countries presented at: Workshop on Power Sector Reform: Rio de Janeiro, 5-6 April 2004

Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises

Market structure in Saudi Arabia

Workshop on Regional Electricity Trade and Market Development

Obstacles to Trade and Compatibility of Market Rules in Southeast Europe

Review of the Reform and Privatization of the Power Sector in Nigeria. Peter Kieran Dar es Salaam January 31, 2014

Executive Summary Federal Government Economic Recovery and Growth Plan Power Sector Reforms Power Sector Constraints and Challenges

Developing the Power Sector through Private Investment in Mongolia. Edgar Saravia Program Manager

ENERGY REGULATION BOARD

Generation investment in a liberalised electricity market. 28 March 2008

Electricity Sector Regulatory Developments, Opportunities and Challenges

PUBLIC UTILITIES REGULATORY COMMISSION (PURC), GHANA 2018 ELECTRICITY MAJOR TARIFF REVIEW DECISION

IPP Project Development

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

Regional Power Market Challenges and Opportunities from Nepalese perspective

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

solutions for infrastructure

Update on the Roadmap for Nigerian Power Sector Reform

Supply Adequacy Mechanisms and Cross-Border Contracts in the Central American Regional Electricity Market

Electricity Markets and Principle Market Design Models

INVESTMENT OPPORTUNITIES in Central Asia Power Sector

solutions for infrastructure

Regional Liquidity Support Facility Mitigating risks for private investments in Renewable Energy in Sub-Sahara Africa.

PPA & REFIT. by Andile Gxasheka, RE Specialist. NERSA South Africa

How the Post-Cotonou Agreement can support EU investment and private sector development in ACP countries

Traders perspective on the World Bank Report for development of the Bulgarian power market. En.Trading 017 Seminar Sofia, Bulgaria

EgyptEra Regulatory Framework to Develop RES Projects in Egypt

The South African Grid Code. Transmission Tariff Code. Version 9.0

The Nordic Market Model 10 Years of Experience

Theory, principles and institutions in energy regulation

Power Sector Reform India The Long Road Ahead

MYPD3 Application Gauteng January 2013

Washington Utilities and Transportation Commission

Meeting Africa s Power Challenges

MYPD3 Application January 2013

Viridian Group Investments Limited. Consolidated Financial Statements 31 March 2016

Work Programme Nordic Energy Regulators (NordREG)

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA

Power Purchase Agreement (PPA) Guidelines. Zambia Lusaka August 7 to

THE ELECTRIC MARKET OF ITALY: REGULATORY

Hedging Policy Statement. Summary

Ben Donovan Partner Dewey & LeBoeuf South Africa

Support mechanisms for RES-e

POWER SECTOR REFORM AND SUBSIDIES. Budak Dilli ESMAP KNOWLEDGE EXCHANGE FORUM GENEVA October 2018

The IMF & MCC requirements to Ghana

Tariffs and Tariff Design Promoting Access to the Poor

Preparing Renewable Energy Power Purchase Agreements in the Middle East and North Africa: Questions to Ask

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Hungary. Andrea Jádi Németh and Péter Garancsi. bpv Jádi Németh Attorneys at Law

The Question of Sovereign Guarantee for the Development of Electricity Generation in Ethiopia

The state of the power sector in Africa: Re-assessing regulation, investment and sector performance

Verve Energy Review. August 2009

UKRAINE S ELECTRICITY MARKET TRANSFORMATION THE WAY FROM PRODUCER TO CONSUMER

The Role of Commercial Banks and Private Sector in NAMA Design and Implementation. Rodrigo Violic Head of Project Finance, Banco BICE

LICENSE FOR DISTRIBUTION SYSTEM OPERATOR ISSUED TO: KOSOVO ELECTRICITY DISTRIBUTION AND SUPPLY COMPANY J.S.C Registration number: ZRRE/Li/Tr_06/17

Key lessons from South Africa s Renewable Energy IPP Programme

ELECTRICITY ACT, 2005

Opportunities & Challenges by. Nadeem Babar Orient Power Company Ltd. November 2015

TRANSMISSION TARIFF METHODOLOGY FOR THE WEST AFRICAN POWER POOL

Viridian Group Investments Limited. Consolidated Financial Statements 31 March 2018

Fortum in Russia. Tapio Kuula. Senior Vice President Fortum Corporation. Capital Markets Day

Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region

Scope and policy options for Framework Guidelines on Harmonised transmission tariff structures. -Public Hearing -

KOSOVO ENERGY CORPORATION J.S.C. Generation Division, TPP Kosova B

A HIGH LEVEL RED FLAG REVIEW OF THE NIGERIAN ELECTRIC SUPPLY INDUSTRY

Rating Methodology Government Related Entities

Comments on CEPA s draft conclusions in relation to European transmission tariffs

TOWARDS A COMPETITIVE ELECTRICITY MARKET: THE BERTHING OF ELIGIBLE CUSTOMERS

USAID-Funded Nepal Hydropower Development Project (NHDP)

Role of Policies, Regulations and Laws to Promote Investment in the South Asian Power Sector Bhutan

Emerging Market Attractiveness Index (for hydropower IPPs) Tyson Weaver- Researcher Centre for Sustainable Energy Studies, Norway

Regional Transmission Organization Frequently Asked Questions

GUIDELINES FOR ASPIRING NEW GENERATION APPLICANTS

Notice of Entering into a Compact with the Federal Democratic Republic of Nepal

World Bank s Energy Infra-SAP: The Case of Vietnam. ESMAP Knowledge Exchange Forum, London November 30 th 2017

Liberalizing Electricity Markets. Energy vs economic policy. EU Energy Directives. Politically acceptable liberalisation requires:

BP International. Energy- intensive industry. yes

ASIAN DEVELOPMENT BANK

Finland. Katri Joenpolvi, Ville Hailikari and Mikko Pirttilä. Krogerus

CHARGING METHODOLOGY STATEMENT FOR THE ELECLINK INTERCONNECTOR

NERC/NOPR/CN04606 NIGERIAN ELECTRICITY REGULATORY COMMISSION PUBLIC NOTICE

World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects. Workshop Program

GET FIT Programme. Energy Sector Working Group. Maputo, 25 May Julia Crause Infrastructure, Southern Africa KfW Development Bank

Policies and regulations for private sector renewable energy mini-grids. Abu Dhabi, 3 November 2016

Public Private Partnerships IFC s Global Experience

MULTI-YEAR TARIFF ORDER

Can The EU Be An Example To Turkish Electricity Market Liberalisation?

Cross Border Electricity Trade

Water Security and Dams Rehab. Workshop

PPAs and Tariff Design

Eskom 2018/19 Revenue Application

REA response to Consultation on Minima and Maxima in the CfD Allocation Process

MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA

Is 2016 a game changer for renewable investment?

Designing Energy Markets for the Future

La Régie de l énergie Demande de Hydro-Québec Dossier R Hydro-Québec tariff application. Evidence of Darrell Bishop

Transcription:

Ghana Power Sector Review of Reform Programme Ray Tomkins (ECA) ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0)20 7604 4545 / fax +44 (0)20 7604 4547 www.eca-uk.com Workshop on 7 February 2003, Accra 1 (C) 2003. Economic Consulting Associates Ltd

Aims and Scope ECA s consulting assignment: Assist the Government of Ghana (GoG) to take stock of the power sector reform measures to date Advise on further development of institutional reforms Scope: analysis of power sector restricted to review of previous documents and 1 week visit We were not required to carry out any new analysis of performance 2 (C) 2003. Economic Consulting Associates Ltd

Drivers for Change Increase access to electricity Improve efficiency to keep prices as low as possible Increase management effectiveness and accountability Promote private sector investment: to help meet financing requirement for the growth, including electrification attract private investors while minimising the future requirement for GoG guarantees This needs a more modern structure for the industry, a market, and a strong regulatory framework 3 (C) 2003. Economic Consulting Associates Ltd

Status of reform programme 1997 reform proposal Indicative time Create 5 distribution concessions (Distco), privatise Large consumers. Rationalise and establish basis for bilateral contracts with IPPs VRA - unbundling into 4 main activities ECG set up a holding company for 5 DistCos Not done EC considering new definition of eligible consumers VRA has started some work on separating accounts Not done Establish separated activities as business units Put in place performance contracts for ECG and VRA Establish regulators and regulatory framework Issue regulations and technical rules for the grid and creation of wholesale market Not done Not done 2 regulators established with 2 acts, limited development of regulatory framework Not done 4 (C) 2003. Economic Consulting Associates Ltd

Creating a Wholesale Market Regulated Market Non-Regulated Market Imp orts/ Expo rts G G Hydro IPPs G Central Market Functions Franchise Consumers VRA DistCos Disco TSO Balancing Market Eligible Eligible Consumers Consumers 5 (C) 2003. Economic Consulting Associates Ltd

Current Situation VRA is the main producer and buyer of electricity, as well as operator of the transmission system VRA is a dominant market player, this is a potential barrier to competition and market development 6 (C) 2003. Economic Consulting Associates Ltd

What is a Market? An electricity market is defined by: Who are the sellers Who are the buyers How they trade 7 (C) 2003. Economic Consulting Associates Ltd

Options for Sellers Sellers in Ghana will be VRA (hydro plant, and thermal plant), importers, new hydro and private thermal IPPs Short term competition is not possible with current generation configuration too few power plants to operate a pool Ghana is too risky for merchant power plants Competition might be possible in 10 years 8 (C) 2003. Economic Consulting Associates Ltd

Options for Buyers Must be creditworthy...... to be able to guarantee financing for IPP (15 year bankable projects) The Tico project developed by CMS is reported to have a high ROE due to perceived risk Three potential buyers for privately financed power : VRA Large customers Distribution companies 9 (C) 2003. Economic Consulting Associates Ltd

1. VRA as Offtaker If VRA procured future thermal power plants VRA s current role as single buyer/seller would continue indefinitely VRA is the most creditable buyer, but investors likely to continue to seek government guarantees This is the single buyer market model Need to kick-start the market 10 (C) 2003. Economic Consulting Associates Ltd

2. Large Consumers as Offtakers Private participants should have open access to the transmission network at fair and cost-reflective prices VRA as transmission owner must be regulated: Transmission charges must be costreflective No discrimination between users PURC should ensure transmission charges do not over-recover costs one option is full unbundling of VRA another option is the accounting separation of VRA with third party access (TPA) 11 (C) 2003. Economic Consulting Associates Ltd

Market Model: Bilateral Contracts with Balancing Market Regulated Market Non-Regulated Market Imports /Exports G G Hydro IPPs G VRA Central Market Functions TSO Balancing Market Franchise Consumers DistCos Disco Disco Eligible Consumers Eligible Consumers 12 (C) 2003. Economic Consulting Associates Ltd

Is Unbundling of VRA Necessary? Full unbundling of VRA would ensure level playing field for IPPs Why not unbundle VRA immediately? cost of restructuring would be high still not certain that IPPs would come First step should be: Accounting separation and functional separation of system operator Creation of market rules and grid code Strong regulation If this fails, move rapidly to complete unbundling 13 (C) 2003. Economic Consulting Associates Ltd

Eligible Consumers Large consumers meeting the criteria (5 MW) for eligibility in the unregulated market Energy Commission is considering a change of eligible customer definition What is most important is the percentage share of the market opened to competition and the number of customers Will the eligible customers be large enough to support financing of next generation plant? 14 (C) 2003. Economic Consulting Associates Ltd

Trading Arrangements (Market Rules) Competition in this market is for bilateral contracts A potential new entrant must aim to deliver lower average prices than those from VRA Issue: VRA currently has the benefit of the existing hydro generation and could under-cut a new thermal plant Result: VRA ends up building next thermal plant even though IPP s plant could have been cheaper 15 (C) 2003. Economic Consulting Associates Ltd

Competition for Contracts and Cost of Generation VRA currently sells at a bundled price The hydro is priced at financial cost - low cost thermal plant is high cost But VRA s price would be lower than IPPs One possibility is: all contracts including hydro (other than VALCo) priced at no less than LRMC hydro-based contract offered to IPPs and large customers offer different wholesale tariffs the windfall profit on hydro could be applied to rural electrification or transmission investments Problem: it could raise prices Opportunity: but offset by recycling the windfall profit Benefit: IPPs can compete with VRA on equal terms 16 (C) 2003. Economic Consulting Associates Ltd

Contracts Require Balancing An IPP and the set of large customers they supply can never exactly match the generation to the load. Shortfall VRA must supply the balancing service and recover its costs (part of market rules) Spill 17 (C) 2003. Economic Consulting Associates Ltd

3. DistCos as Offtakers Could DistCos to be one of the principle offtakers? Might not be viewed as strong creditable counter parties by IPPs ECG is facing major challenges, eg losses, revenue collection etc management strength is key factor Strong requirement for regulation of power procurement at least cost Horizontal unbundling into several companies is more likely to weaken the distribution companies as buyers Market model: multiple single buyers 18 (C) 2003. Economic Consulting Associates Ltd

Way Forward Create opportunity for large consumers to contract with IPPs This would require non-discriminatory transmission prices and fair access provision of balancing market must be able to compete against VRA on fair basis Strengthen DistCos so they become credible counter-parties in future Longer term there are opportunities in the regional market (WAPP) 19 (C) 2003. Economic Consulting Associates Ltd

Generation Issues 20 (C) 2003. Economic Consulting Associates Ltd

Introduction Who will build the next thermal plant? VRA is facing almost no reserves In 2000, system has 1250 MW of capacity with generating capability of 7960 GWh compared to a requirement of 1380 MW and 8340 GWh of energy Even after building of T2 energy will still be constrained by water GoG wants private sector participation, however problems have occurred with CMS project The AES project has not progressed 21 (C) 2003. Economic Consulting Associates Ltd

Competition in Electricity Markets 3 arenas: between existing generators for dispatch in the short term ( pool ) for long term contracts between generators and large customers for new entry between investors Short term - difficult due to small number of plants and highly predictable merit order Long term bilateral market requires competing wholesale suppliers and eligible customers 22 (C) 2003. Economic Consulting Associates Ltd

Competition in a pool 9 8 7 6 Average cost c/kwh Now: not possible 5 4 3 2 1 0 0 1 200 400 600 800 1000 1200 1400 1600 2 9 Akosombo Kpong Nangbeto Tako Tico Load 8 Average cost c/kwh in 10 years: maybe possible 7 6 5 4 3 2 1 0 0 1 500 1000 1500 2000 2500 3000 2 Akosombo Kpong Nangbeto New 1 New 2 New 3 New 4 Tako New 5 New 6 New 7 Tico New 8 Load 23 (C) 2003. Economic Consulting Associates Ltd

Options for Creating Competition for Bilateral Contracts Privatisation of Takodari 1 New Imports New thermal power plants contracted to parties other than VRA VRA required to contract some of their capacity to independent wholesale suppliers (VIPPs) 24 (C) 2003. Economic Consulting Associates Ltd

New Generation Preferred option is new IPPs/eligible customers Requires effective TPA (access) Single buyer model has failed in several countries If VRA procures an IPP, should pursue an open competitive tender approach Why should VRA be the producer of last resort? because it is dominant generator 25 (C) 2003. Economic Consulting Associates Ltd

Transmission Issues 26 (C) 2003. Economic Consulting Associates Ltd

Transmission Open Access is critical Bilateral contract market is the preferred option, therefore TPA is essential Must establish an independent System Operator (functional unbundling) Transmission (wires business) can stay with generation Accounting separation is difficult to achieve, therefore tough regulation is essential 27 (C) 2003. Economic Consulting Associates Ltd

Transmission Prices High transmission charges would discourage new IPPs In other countries, integrated utilities try to load their costs onto transmission charges VRA benchmark of 0.9c/kWh is high (but not highest) compared to other countries PURC should approve major investments in advance Wheeling charge is only half but customer pays total 0.9 Calculation must be transparent 28 (C) 2003. Economic Consulting Associates Ltd

Transmission Access Conditions for fair open access: Legal access right Planning (intentions of third parties to be considered) Congestion management rules System operation and ancillary services Public announcement of network capacities and availability Independent governance of rules (technical and market rules) 29 (C) 2003. Economic Consulting Associates Ltd

Responsibility for planning VRA currently has responsibility Indicative planning must be done centrally even in a market The SO should assume responsibility security of supply regular and transparent planning transmission investments subject to approval Regulator/GoG to instruct VRA to carry out investment if there is a shortage of IPP capacity 30 (C) 2003. Economic Consulting Associates Ltd

VRA s Role in the New Market Arrangements 31 (C) 2003. Economic Consulting Associates Ltd

Current Situation VRA is the main producer and single buyer of electricity VRA owns the hydro capacity and Takoradi 1 thermal power plant VRA buys power from Takoradi 2 under a PPA with CMS Energy VRA buys imports from CIE VRA owns the transmission system and offers bulk electricity for sale at bundled prices VRA has a small distribution activity VRA has non-core activities VRA is the dominant player In the medium term, VRA will be fully unbundled 32 (C) 2003. Economic Consulting Associates Ltd

Generation Short term: Focus on hydro investments Role in thermal generation should be restricted: support development of markets by providing balancing services prevented from under-pricing hydro Principal buyer for competitively tendered thermal power projects (only if instructed by government) Act as supplier of last resort Longer term: divest thermal plant 33 (C) 2003. Economic Consulting Associates Ltd

Transmission and System Operation Implement accounting separation Functional separation of SO Transmission assets continue to be owned by VRA VRA s transmission function should then be strongly regulated prices access SO should operate system according to technical and market rules Long term: could divest transmission 34 (C) 2003. Economic Consulting Associates Ltd

Distribution There is no strong reason for VRA to retain a role in distribution (through NED) The future of NED should be considered along with the restructuring of ECG 35 (C) 2003. Economic Consulting Associates Ltd

Gas VRA has taken a role in development of WAGP As a principal buyer of gas it is likely to be involved in the guaranteeing of the gas purchase No strong justification for VRA to be involved in gas supply Must fully separate gas activities from power generation PURC to ensure IPPs are offered gas on non-discriminatory terms 36 (C) 2003. Economic Consulting Associates Ltd

Distribution Issues: Distribution Restructuring, Tariffs and Electrification 37 (C) 2003. Economic Consulting Associates Ltd

Current Situation Two entities, ECG and NED Large customers can, in theory, choose supplier Some management areas to improve: losses, collections etc Shortage of investment What is agreed? PSP can help improve: management performance capital for network expansion establish distcos as creditworthy buyers Some re-organisation of ECG needed 38 (C) 2003. Economic Consulting Associates Ltd

How Many Companies? Advantage of 1 Distco is: the avoidance of major restructuring financial strength and ability to crosssubsidise Advantages of more than 1 Distco: presence of more than 1 investor differentiation between urban and rural areas (create focused RE entity) management closer to problem ECG proposes several business units with management autonomy Issue: Restructure first? = delay Opportunity: Attract private partner to assist with restructuring 39 (C) 2003. Economic Consulting Associates Ltd

Attracting Private Operators To attract strong private sector participant should be 1 or 2 separate companies, ie larger companies Private sector can help, but which way? What form of private sector participation (PSP)? Management contract Strategic investor (eg 25% of shares) Concession Full privatisation 40 (C) 2003. Economic Consulting Associates Ltd

Management Contracts and Strategic Investors Opportunities for management strengthening - bring in private operator (utility, not consultant) But many well-known problems with some management contracts Design contract very carefully - good incentives Many options: Performance based incentive contract Management contractor not allowed to be investor First select Strategic Investor (SI), then require them to do management contract for 3 years 41 (C) 2003. Economic Consulting Associates Ltd

One Possible Approach Select SI, grant option to buy 25% in 3 years Immediately must undertake management contract, steps: year 1, service contract to reorganise year 2, performance based contract year 3, allowed to buy shares at option price subject to satisfactory performance of management contract How many DistCos? 2 DistCos: 1 focused on existing urban and industrial customers, commercial operation, no subsidies 1 on RE, focused output-based subsidies for investment and to cover lifeline tariff 42 (C) 2003. Economic Consulting Associates Ltd

Tariffs Major constraint of low tariffs has been substantially removed: PURC has a transitional plan for tariff increases In 2003 tariff levels will be raised by approximately 11% and reviewed adjustment mechanism to take account of fuel prices and inflation, but needs improving Tariffs do not cover electrification investment requirement Lifeline block is too low to cover operating costs in some areas Need targeted subsidy to compensate utility for lifeline tariff 43 (C) 2003. Economic Consulting Associates Ltd

Rural Electrification RE should be a key part of reform process RE has generally been implemented by external funds RE has not been strongly supported A benefit of stronger RE would be to make reform more acceptable Need focused RE entity Targeted subsidies for capital subsidies should be transparent if necessary, also for lifeline tariff block Issue: What form should RE entity be: an independent fund a utility with RE focus 44 (C) 2003. Economic Consulting Associates Ltd

Regulation and Sector Management Board Management Committee Licensing Tariffs Regulation Admin Issuing licenses Tariff rules Monitoring Finance Amending licences Price approvals Enforcement Public Relations Legal services Economic analysis Disputes IT, computers Financial analysis Industry codes Human Relations Market supervision 45 (C) 2003. Economic Consulting Associates Ltd

Regulatory Risk Strong regulatory framework required to implement a market Why 2 regulatory bodies? Is 2 better than 1? Split of regulation between two bodies weakens rather than strengthens regulation Main concerns for private investors: Split of regulatory function increases regulatory risk lack of independence inadequate dispute resolution procedures 46 (C) 2003. Economic Consulting Associates Ltd

Roles of Regulators The differences: Energy Commission (EC) not independent, arm of government PURC independent EC focuses on advice to Minister, plans, resource utilisation, technical issues PURC focuses on fair play between utilities and consumers, prices and competition = the market Therefore functions requiring independent regulation and balance between participants should be done by PURC 47 (C) 2003. Economic Consulting Associates Ltd

Regulatory Functions Roles of the MOE, PURC and EC need to be clarified and rationalised Policy making and advice, responsibility of the MOE Licensing, continue to be carried out by the Commission for now, although PURC could assume this role in future PURC may need to use licensing to enforce competition in the market 48 (C) 2003. Economic Consulting Associates Ltd

Functions of Regulation Technical standards - EC Customer service quality standards - PURC Technical standards of performance - EC Tariffs - PURC Promotion of indigenous resources and network development - EC Oversight of the development of the market and competition -PURC Technical rules ( grid code ) - EC Market rules - PURC 49 (C) 2003. Economic Consulting Associates Ltd

Independence Independence is necessary to protect interest of consumers and producers Private investors want to see regulators make independent decisions Key conditions for sufficient measure of regulatory independence: terms for appointment and dismissal terms for funding of the organisation PURC needs a source of independent funding 50 (C) 2003. Economic Consulting Associates Ltd

Weakening of Regulatory Framework PURC s functions include the setting of tariffs, the promotion of competition and the monitoring of standards of performance. Limitations include: standards of performance overlap between PURC and EC PURC does not have power to set standards removal or suspension of licence can only be recommended to EC PURC must set uniform tariff but does not have the power to create financial mechanism to compensate loss of revenues to distribution areas (subsidies) 51 (C) 2003. Economic Consulting Associates Ltd

Dispute Resolution Energy Commission Act: disputes in relation to licensing referred as a complaint to the Minister Minister s decision may be challenged in court Public Utilities Regulatory Commission Act Complaints initially submitted to PURC PURC determines own procedures for investigating complaints No provision for appeal or dispute against the decisions of PURC Need mediation and arbitration steps 52 (C) 2003. Economic Consulting Associates Ltd

Key Issues for Discussion Restructuring of VRA What criteria to apply for success (of gradualist approach) or failure (hence need to fully unbundle) Restructuring of distribution transitional management contract, then Strategic Investor, or direct to Strategic Investor If more than one DistCo, how to define their territory, size and role Regulation which steps to strengthen the regulatory framework? 53 (C) 2003. Economic Consulting Associates Ltd

Ghana Power Sector Review of Reform Programme Ray Tomkins (ECA) ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0)20 7604 4545 / fax +44 (0)20 7604 4547 www.eca-uk.com Workshop on 7 February 2003, Accra 54 (C) 2003. Economic Consulting Associates Ltd

Privatisation Sale of all or some of the equity to a private investor Advantages kick start the reform process improve creditworthiness of distribution clear governance situation creates strongest incentives for efficiency improvements Disadvantages little experience of privatisation in Africa current climate among international investors is weak no certainty that a privatisation transaction would succeed today price for assets would be lower than if distcos were in a stronger shape 55 (C) 2003. Economic Consulting Associates Ltd

Concessions Concession can be viewed as being positioned between a management contract and privatisation Advantages some investment risk immediately transferred improve credit-worthiness of distribution innovative benefit sharing formulations Disadvantages similar uncertainties to those with privatisation hard to adjust the concession contract later dispute risk insufficient interest 56 (C) 2003. Economic Consulting Associates Ltd