Exhibit 1 to Part 3 Project-Specific Terms

Similar documents
Exhibit 1 to Part 3 Project-Specific Terms

EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR

INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Effective Date: April 23, 2018

responsibility of Tenant and/or Construction Contractors or Construction Subcontractors to pay.

EDUCATION AND ADVANCED EDUCATION (PUBLIC SCHOOL DISTRICTS AND PUBLIC POST SECONDARY INSTITUTIONS) OWNER INSURED CONSTRUCTION PROJECTS

Rail Owner Controlled Insurance Program Manual

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO.

AIA Document A101 TM 2017 Exhibit A

Insurance Requirements

OREGON STATE UNIVERSITY

OCIP Contract Language

INSURANCE EXHIBIT TO CONSTRUCTION AGREEMENT Insurance Requirements Owner Controlled Insurance Program

MASTER SUBCONTRACT AGREEMENT

Document A Exhibit A Insurance and Bonds

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.

BUILDING SERVICES AGREEMENT

ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A

AMENDMENT OF SOLICITATION REQUEST FOR PROPOSALS (RFP) ADDENDUM No. 1. Issued: May 23, 2016

SAMPLE. Insurance Exhibit. Design-Build Subcontractor s Insurance Requirements

Required Insurance Language for PRF Construction Contracts

ANNEX A Standard Special Conditions For The Salvation Army

W.E. O Neil Construction Co. of Arizona c/o (Project Coordinator) 4511 E. Kerby Avenue Phoenix, AZ Fax (480)

PART 3. Comprehensive Agreement Between Department and Design-Builder

Document A141 TM Exhibit B. Insurance and Bonds. for the following PROJECT: (Name and location or address)

KING COUNTY LIBRARY SYSTEM WHITE CENTER LIBRARY FURNITURE PROJECT

EXHIBIT B. Insurance Requirements for Environmental Contractors and/or Consultants

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT TEMPORARY ENCROACHMENT PERMIT

RENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #:

Construction of the Leased Premises

SAMPLE. Insurance Exhibit. Design-Builder s Insurance Requirements

CITY OF RICHMOND SHORT FORM $25 per class.

SECTION SUPPLEMENTARY CONDITIONS

TERREBONNE PARISH CONSOLIDATED GOVERNMENT INSURANCE REQUIREMENTS CONTRACTORS

Center Township Butler County, Pennsylvania REQUEST FOR PROPOSALS AND QUALIFICATIONS FOR PROFESSIONAL ENGINEERING SERVICES

Exhibit D Insurance Exhibits. Document No. E-INSWD Second Edition, 2010 Design-Build Institute of America Washington, DC

MINIMUM INSURANCE REQUIREMENTS FOR CLOSING OF VHDA CONSTRUCTION FINANCING

SANDY CITY CENTENNIAL PARKWAY SANDY, UTAH DEPARTMENT OF ADMINISTRATIVE SERVICES DIVISION OF PURCHASING MARCH 2017

EXHIBIT B. Insurance Requirements for Construction Contracts

ADM.21 INSURANCE AND INDEMNITY REQUIREMENTS FOR CONTRACTS

SMALL ORDERS TERMS AND CONDITIONS - BLANKET

ADDENDUM A. Subcontractor Insurance Requirements

REQUIRED AT PROPOSAL STAGE:

Contractor s Insurance Requirements

ROCHESTER SCHOOLS MODERNIZATION PROJECT PHASE 2b School Without Walls Commencement Academy INSURANCE REQUIREMENTS

Request for Proposal Public Warning Siren System April 8, 2014

SUBCONTRACT (SHORT FORM)

PROFESSIONAL SERVICES AGREEMENT For Project Description, Project #

Real Property Services Questions and Answers Posted to DASNY.org 2/21/19

MCGOUGH STANDARD INSURANCE REQUIREMENTS

AIA Document A101 TM 2017 Exhibit A

Drexel University Independent Contractor Service Provider Agreement. Name: [ ] Limited Liability Company [ ] Professional Corporation

ITHACA COLLEGE EQUIPMENT LEASE MASTER AGREEMENT. 1. TERM: This Agreement is effective from (insert dates for a three year period).

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - COST PLUS FEE WITH AN OPTION FOR A GUARANTEED MAXIMUM PRICE

Town of Manchester, Connecticut General Services Department. Request for Proposals for Fingerprinting Services 17/18-85.

SUPPLEMENTARY AND SPECIAL TERMS AND CONDITIONS FOR MINOR PROJECTS

REQUEST FOR PROPOSALS (RFP) No. LHFC_RT2017_0818_3 BUILDING DEMOLITION SERVICES REQUEST FOR PROPOSALS FOR DEMOLITION SERVICES

PHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016

INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i

Subcontractor Insurance Requirements Certificate Holder VCI Construction, LLC 1921 W. Eleventh Street, Upland CA 91786

ATTACHMENT to Part 3 Article 5 PROVISION FOR INTERIM MILESTONES AND NO EXCUSES INCENTIVES

OGC-S Owner-Contractor Construction Agreement

TOWN OF BURLINGTON PURCHASING DEPARTMENT New Four Stage Breathing Air Compressor Contract #17S

5.0 TERREBONNE PARISH CONSOLIDATED GOVERNMENT, DEFINED.

VIRGINIA BEACH SPORTS CENTER CIP PPEA RFQ for the City of Virginia Beach INTERIM AGREEMENT

SUBCONTRACTOR AGREEMENT

CASTAIC LAKE WATER AGENCY STANDARD CONTRACT RISK TRANSFER PROVISIONS, GENERAL CONDITIONS and REQUIRED INSURANCE for

SAMPLE SUBCONTRACTOR AGREEMENT

CLAIMS ADMINISTRATION SERVICES AGREEMENT

NOTICE OF REQUEST FOR PROPOSALS FOR PUBLIC COFFEE SERVICE AT THE CHAPEL HILL PUBLIC LIBRARY TOWN OF CHAPEL HILL, NORTH CAROLINA

PART 3. Lump Sum Design-Build Agreement Between Department and Design-Builder

TERREBONNE PARISH CONSOLIDATED GOVERNMENT MINIMUM INSURANCE REQUIREMENTS PROFESSIONAL SERVICES (ARCHITECTS, ENGINEERS, CONSULTANTS, ETC.

SUBCONTRACTOR INSURANCE REQUIREMENTS Version 3/1/2018

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT PERMANENT ENCROACHMENT PERMIT

Scofield Ridge Homeowners Association

GEORGE MASON UNIVERSITY Student Services Entertainment and Event Agreement

REQUEST FOR PROPOSAL (RFP) for PROFESSIONAL CONSULTING SERVICES. to perform an

EXHIBIT G. Insurance Requirements. [with CCIP]

To: Dr. Robert O Donnell VI-B. Jeanne Knouse. Date: August 18, Dental Service Agreement

STATE OF MINNESOTA MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State University, Mankato/System Office

SUBCONTRACT CONSTRUCTION AGREEMENT

Harbor Department Agreement City of Los Angeles

Standard Form of Agreement Between Contractor and Subcontractor

PROFESSIONAL SERVICES FOR CONSTRUCTION MANAGER AT RISK (CMAR) FOR THE MOBILE DOWNTOWN TERMINAL BROOKLEY AEROPLEX MOBILE, ALABAMA

DOCUMENT SUPPLEMENTARY CONDITIONS

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION

MAJOR SERVICES PROCUREMENT EXHIBIT. This document modifies the Terms and Conditions for Services and Related Materials as follows:

ADDENDUM No. 1. ITB No LED Video Wall. Due: May 25, 2017 at 10:00 A.M. (Local Time)

City of La Center. Small Works REQUEST FOR BID Landscape Maintenance Services

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE


JOLIET JUNIOR COLLEGE REQUEST FOR QUOTATION DIVERSITY & INCLUSION CLIMATE ASSESSMENT

Insurance Requirements. The Bidder shall be required to procure, at its sole cost and expense, all insurance required by this Attachment.

PREQUALIFICATION FORM TRADE CONTRACTOR PREQUALIFICATION FORM

CHEROKEE NATION BUSINESSES, L.L.C. REQUEST FOR PROPOSAL ( RFP ) PROJECT NAME: CNE Ad Agency RFP NUMBER: DATED: TABLE OF CONTENTS

Glenwood/Bell Street Well Pump and Piping Construction

Subcontractor Qualification Statement

Transcription:

Exhibit 1 to Part 3 Project-Specific Terms (Date of Standard Exhibit 1 to Part 3: July 2013) This Exhibit 1 to Part 3 (2013 Lump Sum Design-Build Agreement Between Department and Design-Builder) contains project-specific terms that are hereby incorporated, as identified below, into Part 3, Part 4 (2013 General Conditions of Contract Between Department and Design-Builder), and Part 5 (2013 Division I Amendments to the Standard Specifications General Provisions for Design-Build Contracts Between Department and Design-Builder). Department and Design-Builder hereby agree any provisions in this Exhibit 1 that modify a specific clause of Parts 3, 4, or 5 shall supersede the clause contained in Parts 3, 4, or 5. The Agreement Date is [ ]. The Parties to the Agreement are: VIRGINIA DEPARTMENT OF TRANSPORTATION ( Department ), An agency of the : Virginia Department of Transportation Attention: Chief Engineer 1401 East Broad Street Richmond, VA 23219 DESIGN-BUILDER: [INSERT DESIGN-BUILDER INFORMATION] Project Nos.: US 29 & Rio Road Grade Separated Intersection (0029-002-001) US 29 Widening (0029-002-135) Berkmar Drive Extension (9999-002-900) Project: Virginia Department of Transportation Page 1 of 7

PART 3 2013 LUMP SUM DESIGN-BUILD AGREEMENT BETWEEN DEPARTMENT AND DESIGN-BUILDER 2.1.4 The Department s Request for Proposals (RFP) is dated. 2.1.7 The list of all final modifications to the Proposal is as follows: 5.2.1 The Final Completion Date is October 30, 2017. 5.2.2 The Early Completion and Interim Milestone Date(s) are in accordance with Attachment to Part 3 Article 5. 5.3 Adjustments shall be in accordance with Attachment to Part 3 Article 5. 5.5.1 Liquidated damages for failing to attain Final Acceptance by the Final Completion Date for the Entire Project is in accordance with Attachment to Part 3 Article 5. 5.5.2 Liquidated damages for failing to attain an Interim Milestone Date(s) are in accordance with Attachment to Part 3 Article 5. 6.1 The Contract Price is [written dollar value] Dollars ($[numerical]). 6.3 The identification of eligible Asphalt and/or Fuel and/or Steel price adjustments for this contract is as follows: [LIST ASPHALT and/or FUEL and/or STEEL, if any, eligible price adjustments for the Project] 9.1.1 The Department s Senior Representative is: 9.1.2 The Department s Representative is: 9.2.1 The Design-Builder s Senior Representative is: Virginia Department of Transportation Page 2 of 7

9.2.2 The Design-Builder s Representative is: 11.1.2 The Baseline Schedule shall be submitted within ninety (90) days of Design- Builder s receipt of the Department s Notice to Proceed. PART 3 LUMP SUM AGREEMENT 7.1.5 If Design-Builder fails to make payment to the Subcontractor within the time frame and provisions specified in Section 7.1.3 and 7.1.4 above, the Subcontractor shall notify the Department and the Design-Builder s bonding company in writing. The Design-Builder s bonding company shall be responsible for insuring payment to the Subcontractor. 7.1.6 Pursuant to VA. CODE 2.2-4354, Design-Builder agrees to provide the Department, within five (5) days of the Agreement Date, its federal employer identification number. PART 4 2013 GENERAL CONDITIONS OF CONTRACT BETWEEN DEPARTMENT AND DESIGN-BUILDER 2.2.1 The duration of the Scope Validation Period is one hundred and twenty (120) days. 3.6.3 When contracts are awarded to Design-Builder(s) and/or Separate Contractor(s) for known concurrent construction in a common area, the Design-Builder(s) and/or Separate Contractor(s), in conference with the Department s Representative, shall establish a written joint schedule of operations. The schedule shall be based on the limitations of the individual contracts and the joining of the work of one contract with the others. The schedule shall set forth the approximate dates and sequences for the several items of work to be performed and shall ensure completion within the contract time limit. The schedule shall be submitted to the Department s Representative for review and approval no later than twenty-one (21) days after the award date of the later contract and prior to the first monthly progress meeting. The depressed highway/minor tunnel structure for the US 29 & Rio Road Grade Separated Intersection is subject to review by Virginia Department of Transportation Page 3 of 7

FHWA Headquarters Office in Washington D.C. Any interim design submissions related to the depressed highway/minor tunnel structure will require a twenty-eight (28) day turnaround time. The schedule shall be agreeable to, signed by, and binding on each Design-Builder(s) and/or Separate Contractor(s). The Department s Representative may allow modifications of the schedule when benefit to the Design-Builder(s) and/or Separate Contractor(s) and the Department will result. PART 5 2013 DIVISION I AMENDMENTS TO THE STANDARD SPECIFICATIONS GENERAL PROVISIONS FOR DESIGN-BUILD CONTRACTS BETWEEN DEPARTMENT AND DESIGN-BUILDER 103.06 Documents Required as a Condition to Award The portion of the executed Contract submitted by the Successful Offeror shall include the following documents, unless the filing of any of them at a later date is specifically permitted by the RFP or Contract Documents, provided, however notwithstanding anything to the contrary in the Contract Documents, that the submission of an executed Agreement and Contract Bonds shall always be a precondition to Award (a) (b) (c) (d) (e) Contract: The Agreement executed by the Successful Offeror. Contract Bonds: Contract Bonds shall conform to the requirements of Section 103.05. Affidavits and Documents: Affidavits and documents set forth in the RFP and executed by the Successful Offeror. Progress Schedule: (Not Used) Insurance Coverages and Certificates of Insurance: The Design-Builder shall procure and maintain the insurance coverages required below, in accordance with Paragraph (f) below. Design-Builder shall file certificates of insurance with the Department evidencing the coverages and limits within 15 days after notification of Award of the Contract..1. Workers Compensation and Employer s Liability Insurance, with statutory workers compensation (Coverage A) limits and employer s liability (Coverage B) limits of $1 million bodily injury by accident or disease, each employee. If necessary, coverage shall be extended to cover any claims under the United States Longshoreman s Act and Harbor Workers Act and Jones Act as may be appropriate for the Work..2 Commercial General Liability Insurance, including coverage for premises and operations, independent contractors, personal injury, product Virginia Department of Transportation Page 4 of 7

and completed operations, explosion, collapse and underground, and broad form contractual liability with limits of at least $1 million per occurrence and $2 million aggregate, applicable on a per project basis..3 Automobile Liability Insurance, with a limit of at least $1 million combined single limit for bodily injury and property damage covering all owned (if any), non-owned, hired or borrowed vehicles on-site or off..4 Umbrella/Excess Liability Insurance in excess of the underlying limits noted above for employer s liability, commercial general liability, and automobile liability in the amount of: (a) $5 million per occurrence and in the annual aggregate for Projects with a Contract Price less than $15 million; and (b) $20 million per occurrence and in the annual aggregate for Projects with a Contract Price greater than $15 million..5 Architects/Engineers Professional Liability Insurance, covering Design-Builder s lead design engineer for acts, errors or omissions arising in connection with the Work for not less than: (a) $2 million any one claim and in the aggregate for Projects with a Contract Price less than $50 million; and (b) $5 million any one claim and in the aggregate for Projects with a Contract Price greater than $50 million. Such insurance shall be maintained throughout the duration of any warranty period and for at least three years after the expiration of any warranty period..6 Contractor s Pollution Liability Insurance, to indemnify for bodily injury or property damage or amounts which Design-Builder or its agents, Subcontractors, or employees are legally obligated to pay for cleanup/remediation arising out of the work undertaken pursuant to the Contract Documents. Such insurance shall have minimum limits of $5 million any one claim and in the aggregate and shall remain in full force and effect for five years following Final Completion..7 Builder s Risk Insurance, to provide coverage for physical loss, destruction or physical damage to the work. Such insurance shall cover Design-Builder, the Department, and all Subcontractors and shall be maintained at a limit of at least 100% of the Contract Price. Such insurance shall include replacement cost coverage for materials, supplies, equipment, machinery, and fixtures that are or will be part of the Project. Coverages shall include but are not limited to the following: right to partial occupancy, earthquake, earth movement, flood, transit, temporary and permanent works, expediting expenses, debris removal, offsite storage, soft costs and commissioning and start-up. (f) Insurance Requirements. Design-Builder shall ensure that all insurances required in Paragraph (e) above contain the following provisions: Virginia Department of Transportation Page 5 of 7

.1 With the exception of workers compensation and architect/engineers professional liability insurance, the Department shall be named as an additional insured on all policies. Each such policy shall also include the appropriate severability of interest and cross-liability clauses to allow one insured to bring claim against another insured party..2 All insurance coverages shall be considered primary and noncontributory with regard to other insurances that might be available to Design-Builder or the Department..3 All insurers shall waive rights of subrogation against the Department for any claims covered by insurance required herein..4 Any inadvertent errors or omissions by Design-Builder in procuring the insurance required herein shall in no way prejudice the rights of the Department to collect under such policies..5 Any deductibles shall be the sole responsibility of Design-Builder..6 The insurance shall remain in full force and in effect and will remain in effect for the duration required by the Contract Documents..7 No insurance coverage will be canceled, renewal refused, or materially changed unless at least thirty (30) days prior written notice is given to Department..8 With the exception of workers compensation and automobile liability insurance, the insurance policies shall specifically delete any design-build or similar exclusions that could compromise coverages because of the design-build delivery of the Project. (g) Additional Insurance Requirements.1 Design-Builder shall require all Subcontractors to carry the same insurance, and in the same amounts, required by Paragraphs (e)(1), (e)(2) and (e)(3) above..2 Design-Builder shall file certificates of insurance with the Department evidencing the coverages and limits described above within the times required by Paragraph (e) above. The certificates shall be executed by approved insurance companies authorized to do business in Virginia with a minimum Best Rating of B + or greater, and shall cover the Contract..3 The insurance coverage limits shall not be construed to relieve Design-Builder or Subcontractor(s) of liability in excess of such coverage, Virginia Department of Transportation Page 6 of 7

nor shall it preclude the Department from taking such actions as are available to it under any other provision of the Contract Documents or otherwise in law. DEPARTMENT: Virginia Department of Transportation (Name of Department) (Signature) (Printed Name) Chief Engineer (Title) Date: DESIGN-BUILDER: (Name of Design-Builder) (Signature) (Printed Name) (Title) Date: END OF EXHIBIT 1 to PART 3 PROJECT-SPECIFIC TERMS Virginia Department of Transportation Page 7 of 7