RECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget.

Similar documents
RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET

SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT

SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR AUGUST 20, 2015

SACRAMENTO AREA FLOOD CONTROL AGENCY. For the Fiscal Year Ended June 30, 2013

SACRAMENTO AREA FLOOD CONTROL AGENCY. For the Fiscal Year Ended June 30, 2015

Presented by: Connie Perkins, PE, CFM April 20, 2016

Development Fee Program: Comparative risk analysis

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps

APPENDIX E ECONOMICS

Sutter Butte Flood Control Agency

SUBJECT: LAND USE PLANNING POLICY WITHIN THE 100 YEAR FLOODPLAIN (REPORT #2)

1. INTRODUCTION TECHNICAL MEMORANDUM

Financing Requirements Schedule- FY Final Budget Sacramento Area Flood Control Agency Operations & Maintenance District No.

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES

COMPREHENSIVE ANNUAL FINANCIAL REPORT

Item No. 1 Public Comments on Non-Agenda Items: There were no comments on non-agenda items from members of the public.

SACOG Board of Directors

Fresno, California FINANCIAL STATEMENTS. For the Year Ended June 30, 2017

SITES Project Overview

Abstract. An assessment of the benefits of DWR s levee inspection program in California s Central Valley

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter

GENERAL PLAN AMENDMENT # FLOOD HAZARDS

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development

Finance and Insurance Committee Item 6a January 7, 2019

Attachment A 09 Final Budget Adjustments Summary-All Depts ( )

This survey is expected to take approximately 20 minutes and must be completed in one session.

Gov's Planning Estimates Project Title Rank Fund Project Requests for State Funds

This survey is expected to take approximately 20 minutes and must be completed in one session.

FIVE YEAR CIP SUMMARY

COMPREHENSIVE ANNUAL FINANCIAL REPORT. For The Fiscal Year Ending June 30, 2017 West Sacramento, California

King County Flood Control District 2015 Work Program

COUNTY OF SACRAMENTO CALIFORNIA

SUTTER BUTTE FLOOD CONTROL AGENCY

SUTTER BUTTE FLOOD CONTROL AGENCY

Stormwater Utility Fund Delivery of Services

AGENDA DATE: June 21, 2017 ITEM NO: 13. Zone 7 adopted its first two-year budget for fiscal years FY in June of 2016.

A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety

Community Development Department

Meeting the Nation s Levee Challenges

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update

Item 13: Consideration of a resolution to approve an update to the WCA Billable Rates for FY 18/19.

Mitigation Banking Factsheet

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Peer Review Plan. Bastrop Interim Feasibility Study. Lower Colorado River Basin, Texas

Georgia Silver Jackets Team

COMMUNITY CERTIFICATIONS

STORMWATER MANAGEMENT FUND Department of Environmental Services

2011 MT Floods Damages and Recovery Options

Water Resources Engineering Division Public Works City of Colorado Springs

Marin County Flood Control & Water Conservation District. Zone No. 3 Advisory Board Meeting

National Flood Risk Management Program

Local Damage Assessment. Pocket Guide

Adequate Progress Report

A Flood Mitigation Plan for the Non-Tidal N.J. Section of the Delaware River Basin. Warren County Planning Workshop (2 nd Meeting) March 7, 2007

2018 WASHOE COUNTY BALLOT QUESTION WC 1

East Hartford. Challenges

King County Flood Control District Flood Risk Reduction Work Program and Accomplishments

AGENDA SUWANNEE RIVER WATER MANAGEMENT DISTRICT FINAL PUBLIC HEARING ON THE FISCAL YEAR 2019 BUDGET OPEN TO THE PUBLIC

Testimony of the National Association of Flood And Stormwater Management Agencies. Water Resources Development Act of 2012

DuPage County East Branch DuPage River Resiliency Project. Benefit Cost Analysis

EXHIBIT C. Credits. Credit Establishment and Tracking. Credit Transfer Agreement. Credit Ledgers

Total Budget Year 1 - FY Estimated Project Specific Funding. External Deliver Project Contrib Cost Contrib Balance Cost

[Letter to be printed on official Levee Sponsor letterhead]

The Breadth of the Planning Portfolio

Tim Youmans, Georgette Lorenzen, and Allison Shaffer. Subject: Natomas Basin Habitat Conservation Plan; EPS #10175 Date: May 29, 2001

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination

SCW IMC Report - Year 3 Page 1 of 22

Figure 4-1. ARB IRWMP Governance Structure

County of Yolo PLANNING AND PUBLIC WORKS DEPARTMENT. PLANNING COMMISSION STAFF REPORT April 14, 2011

OFFICE OF THE GENERAL COUNSEL

San Bernardino County Flood Control District Continuing Disclosure

U.S. Army Corp of Engineers

Executive Summary Levee Engineering Assessments September 26, 2014

HOUSE SPONSORSHIP. Bill Summary

*How Federal Policy. Causes Flood Disasters. Leslie A. Bond, CFM LA Bond Associates

Urban Level of Protection Adequate Progress Report

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option

IMPLEMENTING AGREEMENT. for the BAY DELTA CONSERVATION PLAN. by and among THE UNITED STATES FISH AND WILDLIFE SERVICE

Discovery Report. Cache River Watershed, Alexander, Johnson, Pulaski, and Union Counties, Illinois

Floodplain Management Plan

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FY Biennial Budget Request St Louis, South SWCD

Marin County Flood Control and Water Conservation District FLOOD CONTROL ZONE 5 ADVISORY BOARD MAY 15, 2014 STAFF REPORT

University Drive Flood Risk Management Project Phase I 58 th Ave S to 500 S of 64 th Ave S City of Fargo Project FM-15-C1

[Bank Name] Mitigation Bank CA BEI template_pdt FINAL Draft dot

Comprehensive Flood Management Plan. City of Sacramento Department of Utilities

INVESTMENT CONSULTING SERVICES NATOMAS BASIN CONSERVANCY REQUEST FOR PROPOSALS (RFP) September 3, 2010

SACRAMENTO CENTRAL GROUNDWATER AUTHORITY. A Joint Powers Authority

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS

FY2014/15 Approved Budget. SECTION 22 Citywide and Community Support

GLENN-COLUSA IRRIGATION DISTRICT AUDITED FINANCIAL STATEMENTS. September 30, 2017 and 2016

Urban Level of Protection 2017 Annual Adequate Progress Report Update

Governmental Laws, Rules and Policies, Are They Keeping Up With Restoration Objectives? INTERCOL 9 June 6, 2012

A Little Less Conversation a Little More ACTION! Louie Greenwell, GISP, CFM T&M Associates Carey Johnson KY Division of Water

Exhibit I SETTLEMENT AGREEMENT BETWEEN CITY OF TACOMA, KING COUNTY AND FRIENDS OF GREEN RIVER

FRIENDS OF THE RIVER. Independent Auditor s Report and Financial Statements. Year Ended December 31, 2015

LAFCo 509 W. WEBER AVENUE SUITE 420 STOCKTON, CA 95203

MEMORANDUM OF AGREEMENT BETWEEN THE U.S. FISH AND WILDLIFE SERVICE AND THE U.S. ARMY CORPS OF ENGINEERS

Transcription:

ITEM 5 Agenda of August 18, 2016 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Jason D. Campbell, Deputy Executive Director (916) 874-7606 APPROVING FINAL FISCAL YEAR 2016-17 BUDGET OVERVIEW: This item presents the Fiscal Year 2016-17 Final Budget which reflects an aggressive approach to pursuing the Board s policy of reducing the most severe flood risks in the Sacramento area as quickly as possible. RECOMMENDATION: Staff recommends the Board adopt Resolution No. 2016-089 approving SAFCA s Fiscal Year 2016-17 Final Budget. MEASURES/EVALUATION: Not applicable. FISCAL IMPACT: The proposed Final Budget anticipates $81.3 million in expenditure appropriations to be funded by prior year fund balances, aid from local government, State aid, Bond Anticipation Notes, proceeds, assessments, development impact fees and a fund balance reserve release. ENVIRONMENTAL IMPACT: Not applicable. BACKGROUND On June 18, 2016, the Board adopted the proposed Fiscal Year (FY) 2016-17 Budget based on projected year end fund balances and expenditures. Now that the books for the prior fiscal year have been closed, staff recommends that the Board adopt the FY 2016-17 Final Budget taking into consideration the actual fund balance numbers and changes in the projected FY 2016-17 expenditures. The proposed Final Budget identifies SAFCA s continued costs to close out the non-federal phase of the Natomas Levee Improvement Program (NLIP) and ramp up efforts on the Federal portion of the Natomas Basin Project; improve area levees along the Lower American River (LAR); continue with the last phase of construction for the South Sacramento Streams Office 916-874-7606 Fax 916-874-8289 1007 7 th Street, 7 th Floor Sacramento, CA 95814-3407

Page 2 Group (SSSG) Project; continue ongoing improvements to Folsom Dam; operate and maintain area flood control facilities and related mitigation features; and carry out the Agency s planning and general administration activities. The Final Budget includes funding for continuing to close out the NLIP s Sacramento River East Levee construction contracts; processing reimbursement payments for utility pole relocation costs; completing NLIP real estate acquisition proceedings; and fulfilling NLIP environmental permit conditions by planting, establishing and providing for the long-term maintenance of required habitat mitigation features. The budget also includes costs to continue the efforts on the Federal phase of the program, with the U.S. Army Corps of Engineers (USACE) as lead. The budget for flood control improvements within the Consolidated Capital Assessment District (CCAD) outside of Natomas reflects SAFCA s share of the estimated cost for the USACE to construct Federal project improvements to Folsom Dam; improving the levees along the LAR; and continuing with the Florin Creek channel improvements in the south Sacramento area. The budget also includes carry over funding for non-federal improvements along the LAR (creation of fish and wildlife habitat at River Mile 0.5) and the Florin Creek Multi-use Basin in the South Sacramento area (construction of a detention basin just west of Highway 99). These actions are being funded largely through State grants and will complement Federal efforts to reduce flood risks in these areas. The Florin Creek Multi-use Basin Project will contribute to removing several hundred homes from the FEMA 100-year floodplain. The remainder of the budget covers SAFCA s contribution to the cost of operating and maintaining area levees and environmental features; responding to anticipated deficiencies in the levee systems along the lower Sacramento River (Pocket area) and Arcade Creek in North Sacramento; managing the Development Impact Fee (DIF) Program; and carrying out SAFCA s planning and general administration activities, including debt financing. DISCUSSION The capital project and operational activities included in SAFCA s FY 2016-17 Final Budget proposal of $81.3 million is discussed below and is shown in Exhibits A-E. SAFCA s contribution to these activities will be funded by one of the following sources: the Operations & Maintenance Assessment District No. 1, former North Area Local Project Capital Assessment District No. 2, Consolidated Capital Assessment District, Natomas Basin Local Assessment District, and Development Impact Fee funds. The following discussion is organized around these funding sources. Operation and Maintenance Assessment District No. 1 Fund (O&M) $15.3 Million in Expenditures The budget for the O&M fund covers a wide range of expenditures including general administration, planning, and operations and maintenance activities for FY 2016-17 expenditures. The O&M fund includes $2.6 million for SAFCA s Salaries and Benefits for 17 Full Time Equivalent (FTE) staff to perform the administrative operations, general planning and

Page 3 administration of programs and to provide project management and oversight of flood improvement efforts. The proposed budget does not include any increases in the Board approved salary ranges for each position. However, it does include funding for a Cost of Living Adjustment (COLA) and step increases for eligible employees per previously Board approved policies and procedures. There are currently two vacant Board approved positions that are anticipated to be filled during FY 2016-17. The proposed $4.4 million in services and supplies expenditures supports Agency wide expenses such as liability insurance, office rent, assessment district administration and general legal services. Staff proposes ongoing efforts to improve Agency data management and the continued performance of operations and maintenance activities for mitigation sites and drainage pumping facilities that can t be attributed to other Agency assessment funds. The O&M budget includes $564,000 in other charges of which $397,000 is for annual bond debt service payments on the Series 1996 Subordinated O&M Bonds and $135,000 in payments are to other agencies for services provided. Finally, the O&M fund includes $7.8 million in fund balance operating transfers to the CCAD fund to support previously approved project activities and improvement programs. The O&M Fund is projected to receive $7.3 million in revenue during FY 2016-17. $6.3 million is from assessments and the remaining $1.0 million is generated from labor and overhead charged to projects funded by other Agency funds. The proposed Final Budget for the O&M fund provides an ongoing general reserve of $2.1 million and $1.6 million in unrestricted fund balance. For detail supporting this narrative, please see Exhibit A to Resolution No. 2016-089. North Area Local Project Capital Assessment District No. 2 Fund (NALP) $5.4 Million in Expenditures Although most levee improvements and floodplain land acquisitions have been completed, some performance obligations remain. These obligations include completing miscellaneous NALP construction and floodplain restoration work and completing real property acquisitions in the Dry Creek, Robla Creek and Magpie Creek Diversion Channel floodplains. For FY 2016-17, $20,000 in expenses have been projected for Construction Services and Support. The remaining $5.5 million is a fund balance transfer to the CCAD fund to support previously approved project activities and improvement programs. The proposed Final Budget for the NALP fund provides $47,338 in unrestricted fund balance. For detail supporting this narrative, please see Exhibit B to Resolution No. 2016-089. Consolidated Capital Assessment District Fund (CCAD) $51.3 Million in Expenditures This fund covers costs associated with implementation of capital improvement projects that are described in the CCAD Engineer's Report, operations and maintenance activities for improvements within the assessment district, and right-of-way activities that are necessary to support project efforts. A summary of projects and operations activities is included in Attachment 1 to Exhibit C of Resolution No. 2016-089. CCAD expenditures include $29.2

Page 4 million in services and supplies where over $20 million is accounted for by construction contracts and engineering services. Other charges include $16.1 million for contracts with other agencies primarily in relation to agreements with the U.S. Army Corps of Engineers (USACE), California Department of Water Resources (DWR), Reclamation District No. 1000 (RD1000) and American River Flood Control District (ARFCD). Furthermore, expenditures include $5.9 million in Land Acquisition Costs necessary to support Federal programs in Natomas, along the American River and the Magpie Creek Diversion Channel. The primary source of funding for the $51.3 million in CCAD expenditures is $21.5 million in Operating Transfers In from other SAFCA funds. In addition, the proposed budget includes the use of $4.0 million in CCAD Fund balance. Projected FY 2016-17 CCAD revenues include $25.8 million with $13.8 million from intergovernmental sources and $3.0 million from assessments. In order to support the continued Folsom Dam Modifications Project, staff has approached the City of Sacramento regarding the issuance of Bond Anticipation Notes (BANs) pending the sale of bonds for the Consolidated Capital Assessment District No. 2. SAFCA is looking to execute a sale of up to $9.0 million in BANs. The proposed Final Budget for the CCAD fund provides $330,340 in unrestricted fund balance. For additional detail supporting this narrative, please see Exhibit C to Resolution No. 2016-089 Development Impact Fee Fund (DIF) $5.0 Million in Expenditures This fund covers costs for services related to ongoing administration of the DIF Program, including payment of annual Reclamation District No. 1600 assessments, Yolo County taxes and flood insurance premiums associated with SAFCA s agreement with the Sacramento Valley Conservancy on preserving agricultural lands in the Elkhorn Basin. Expenditures include $365,000 in Services and Supplies primarily for the provision of engineering and other professional services for relocation planning efforts associated with the Bryte Landfill. In addition, $375,000 in contracts with other agencies to support the Memorandum of Agreement to Support the Sacramento River Flood Control General Reevaluation Report. Furthermore, $4.3 million in fund balance is proposed to be transferred to CCAD Fund to support ongoing project activities. Revenues are conservatively projected at $1,000,000 in DIF proceeds during FY 2016-17. The proposed Final Budget for the DIF fund provides $399,970 in unrestricted fund balance. For additional detail supporting this narrative, please see Exhibit D to Resolution No. 2016-089. Natomas Basin Local Assessment District Fund (NBLAD) $4.0 Million in Expenditures Expenditures in the NBLAD budget will fund engineering services necessary to prepare the tax roll and levy the NBLAD assessments in FY 2016-17 as well as charges from the Sacramento

Page 5 County Auditor Controller for servicing the NBLAD fund. The primary expense is a $4.0 million transfer out to the CCAD fund to support ongoing project activities. Revenues are projected at $16,000 in Net Assessment proceeds during FY 2016-17. For additional detail supporting this narrative, please see Exhibit E to Resolution No. 2016-089. FINANCIAL IMPLICATIONS The FY 2016-17 Final Budget anticipates the following means of financing for the five SAFCA funds: Means of Financing: Fund 325A -- Operations & Maintenance Expenditures $15.3 million Revenue: $7.3 million $7.0 million General Reserve Decrease: $1.0 million Fund 325C -- NALP Capital Fund Expenditures $5.4 million $0.7 million General Reserve Decrease: $4.7 million Fund 325 E -- CCAD Fund Expenditures $51.3 million Revenue: $25.8 million $4.0 million Operating Transfers In: $21.5 million Fund 325 F -- DIF Fund Expenditures $5.0 million Revenue: $1.0 million $2.7 million General Reserve Decrease: $1.3 million Fund 325 G -- NBLAD Fund Expenditures $4.0 million $4.0 million POLICY IMPLICATIONS The proposed FY 2016-17 Final Budget reflects an aggressive approach to pursuing the Board s policy of reducing the most severe flood risks in the Sacramento area as quickly as possible by leveraging available local, State and Federal funds. The budgeted expenditures include local and State funds to continue to progress the Federal portion of the work on the levees protecting the Natomas Basin. The budgeted expenditures also include SAFCA s contributions to ongoing Federal projects to modify Folsom Dam, improve the levees along the LAR, and continue channel improvements along Florin Creek in the South Sacramento area; and for a series of smaller non-federal projects that will be funded largely by State grants. Finally, the budgeted expenditures include funds for SAFCA to continue with design and to initiate construction contracts on the Levee Accreditation Program for the levee systems outside of Natomas.

Page 6 RECOMMENDATION Staff recommends the Board adopt Resolution No. 2016-089 approving SAFCA s Fiscal Year 2016-17 Final Budget. JClr/Item 5_2017FinalBud.bd.doc Attachment(s)