PREPARE FOR FLOODING.

Role of the Flood & Water Management Committee & LCC as Lead Local Flood Authority

Devon Local Flood Risk Management Strategy Update

Flood Investigation Report

Improving the flood resistance of your home. Advice sheet 1: Identifying flood risk

Strategic Flood Risk Assessment for SDCC Development Plan

STRATEGIC FLOOD RISK ASSESSMENT

Flood Investigation Report

Shropshire Local Flood Risk Management Strategy. Summary for Consultation. July 2014

LOW. Overall Flood risk. Flood considerations. Specimen Address, Specimen Town. Rivers and the Sea Low page 4. Historic Flood.

Strategic Flood Risk Assessment

Flood Risk Management New legislation New Duties!

Consider the risks to your own business as well as to your operations

Mapping flood risk its role in improving flood resilience in England

ABI GUIDE TO RESISTANT AND RESILIENT REPAIR AFTER A FLOOD

FLOODING INFORMATION SHEET YOUR QUESTIONS ANSWERED

ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE. 12 January 2004

Flood Response - Tenants Guide

Flood advice. Help and advice to be prepared and stay safe

Good Practice Guide. Technical guidance: Flood risk activity definitions October GPG 220 Document Owner: Flood Risk Strategy.

Development and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016

Strategic Flood Risk Assessment

Flood Risk Management Planning in Scotland: Arrangements for February 2012

eastsussex.gov.uk East Sussex Local Flood Risk Management Strategy

Local Flood Risk Management Strategy

Derry City & Strabane District Council 17th July 2015, 3pm.

Good Practice Guide. GPG 101 Document Owner: Steve Cook. Page 1 of 7.

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP)

ABI RESPONSE TO PITT INTERIM REPORT: OVERVIEW

FLOOD SOLUTIONS Residence

Joint Lincolnshire Flood Risk and Drainage Management Strategy: Draft v.6.0:consultation Draft, : Annexes A-F

Flood Risk Management Strategy. Shetland

Catchment 08. Seminar. All material within and views expressed are those of the presentation author alone.

RAINGAIN. Torbay Flood Risk Management. Dave Stewart. 16 th April 2013

Local Flood Risk Management Strategy for Central Bedfordshire

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee

Canada s exposure to flood risk. Who is affected, where are they located, and what is at stake

Planning and Flood Risk

Britannia Village Flood Control Project

Frequently Asked Questions

Local Flood Risk Management Strategy

Article 23-6 FLOODPLAIN DISTRICT

Managing the Risk and Impact of Regional Flooding

Environment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council

Devon Local Flood Risk Management Strategy Update

Welsh Water for you 1. FloodCare. What you should do, and how we can help when you re flooded. dwrcymru.com PRE 0051

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council

Turriff (Potentially Vulnerable Area 06/07) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Deveron Backgrou

Oban (Potentially Vulnerable Area 01/31) Local authority Main catchment Argyll and Bute Council Knapdale coastal Background This Potentially Vulnerabl

Chelmsford City Council. Level 1 and Level 2 Strategic Flood Risk Assessment. Final Report

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner

RiskTopics. Guide to flood emergency response plans September 2017

Celbridge. Local Area Plan STRATEGIC FLOOD RISK ASSESSMENT

Appeal by Lloyds Bank PLC

Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coas

Understanding the risks, empowering communities, building resilience: the national flood and coastal erosion risk management strategy for England

BIFM Flood Risk Management Guidance

Barnsley MBC. Barnsley. Local Flood Risk Management Strategy. (Appendices) Date September Barnsley MBC - Local Flood Risk Management Strategy

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England

FOR TO THE GAELTACHT LOCAL AREA PLAN MARCH 2013

EMERGENCY CONTACTS. Flood Warning System. Pierce County Contact Information PIERCE COUNTY ALERT! EMERGENCY FLOOD INFORMATION

East Sussex Local Flood Risk Management Strategy

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management

Local Government Group. Preliminary Framework to assist the development of the Local Strategy for Flood Risk Management.

London Borough of Sutton Local Flood Risk Management Strategy Action Draft for Consultation

Flood Risk Assessment. Approved by RECOMMENDATIONS. Professional Opinion

Managing flood risk in Camden The Camden flood risk management strategy Public consultation draft

CHAPTER 10 FLOOD RISK

Resilience to Flooding of Grid and Primary Substations

BLESSINGTON LOCAL AREA PLAN FLOOD RISK ASSESSMENT

Don t Predict. Prevent.

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page

LINCOLNSHIRE COUNTY COUNCIL A DRAINAGE AUTHORITY and what it will mean for Lincolnshire MARK WELSH & DAVID HICKMAN THE LEGISLATION:

Local Flood Risk Management Strategy Bedford Borough Council

River Lugg Internal Drainage Board. Policy Statement on Flood Protection and Water Level Management

Evidence for Environmental Audit Committee Enquiry on Sustainable Housing Submission by Association of British Insurers, May 2004

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION

CONSISTENCY OF REPORTING PERFORMANCE MEASURES REPORTING GUIDANCE SEWER FLOODING

Frequently Asked Questions (FAQs)

Future proofing New and Existing Buildings Flood Resilient Design and Construction Techniques

P art B 4 NATURAL HAZARDS. Natural Hazards ISSUE 1. River Flooding

Bradford District. Local Flood Risk Management Strategy

EFRA Select Committee Enquiry on Climate Change Submission from the Association of British Insurers (ABI), October 2004

Your guide to sewer flooding

Strategic Environmental Assessment

WINTER WEATHER PRECAUTIONS. Risk Directory (December 2016)

Chapter Flood Consequences

Background to the PFRA European Overview - UC9810.5b

A Business Guide to Flood Resilience

LOCAL FLOOD RISK MANAGEMENT STRATEGY FOR HERTFORDSHIRE. STRATEGY (Vision) Part 1 of 4

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP"

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA

Wigan Local Flood Risk Management Strategy

The Planning System and Flood Risk Management Guidelines for Planning Authorities

Homecheck Professional. Flood Risk Assessment PASSED. Overall Flood Risk: LOW RISK IDENTIFIED. Insurability: YES. Flood Report. Professional Opinion

Transcription:

CLARBOROUGH AND WELHAM PARISH COUNCIL A FLOOD PREVENTION AND FLOOD MANAGEMENT STRATEGY FLOOD PREVENTION STRATEGY DRAFT2 5 Sep 2017.docx 1

BACKGROUND Houses, businesses and land within the Parish of Clarborough and Welham have been flooded as a result of surface water flooding on a number of occasions. Parish records show this has occurred several times in the past decades. Most recently there was significant flooding in June 2006 and, to a lesser degree, in June 2014. Flooding of property brings distress to those affected who may be unable to occupy their home for several months; it affects businesses and it is costly even when the loss is insured. Uninsured events can result in loss of home and closure of business. This document is intended to be a reference for parishioners, who may be at risk of flooding of their properties. It is also a record of the actions that may be possible to mitigate the extent of flooding in the Parish. Responsibilities for actions lie with a variety of bodies and these responsibilities are also set out in the document. This document enlarges on the actions the Parish Council agreed to undertake on the adoption of the Neighbourhood Plan. These are copied in Appendix 1 Surface water (also known as pluvial) flooding Surface water flooding occurs when intense rainfall (typically greater than 30mm/hr), often of short duration, is unable to permeate into the ground or enter drainage systems quickly enough, resulting in ponding or overland flows. It can cause considerable problems in built areas. Surface water flooding can also originate from rural areas where high intensity rainfall can run off land without entering land drainage systems. Flooding from surface water can be hazardous due to its depth, velocity of flow and rapid occurrence. It can be difficult to predict and pinpoint, much more so than river or coastal flooding. [Refer here to a map to show the areas affected by the surface water flooding in 2007 and the likely flows of water from the land into the Parish]. Riparian Ownership Landowners, householders and businesses whose property is adjacent to a river or stream or ditch are likely to be riparian owners with responsibilities. If a property adjoins a river or stream then the property owner is likely to be a riparian owner, owning the land up to the centre of the watercourse. The Land Registry details should confirm this. Riparian owners have a right to protect their property from flooding and erosion but in most cases will need to discuss the method of doing this with the Environment Agency (EA). They also have responsibility for maintaining the bed and banks of the watercourse and ensuring there is no obstruction, diversion or pollution to the flow of the watercourse. Full details can be found in the EA document Living on the Edge [include the web link]. In Clarborough and Welham, riparian owners will be those whose properties are adjacent to Howbeck. [are there other watercourses in the Parish where the principle of riparian ownership applies?]. This strategy sets out the actions that may be possible along Howbeck and the impact on riparian owners. 2

Homeowner s Responsibility It is a homeowner s responsibility to protect their property from a flood risk. If a property owner feels their property is at risk of flooding they will be well advised to take as many measures as possible to make their home more flood resilient. Sadly, this will not stop flooding but may limit the amount of damaged caused by any future flooding. (Please see section Responsibilities Homeowner below). Sandbags [Set out how householders can obtain sandbags and sand at short notice. Refer to supply at Village Hall. Note: some District Councils provide free bags to builders merchants and householders can pay for the merchant to deliver sand and bags. Has BDC any such arrangements?] 3

RESPONSIBILITIES Homeowner Bearing in mind the history of flooding in the Parish as well as the changing climatic conditions, it would be prudent to think that flooding will occur again. Therefore, anyone living in properties that have been flooded should consider making their properties more flood resilient which may limit the amount of damage that is caused if and when flooding occurs. There are many products available commercially that will assist householders to make their property more flood-resilient. These measures can be expensive but they may alleviate the eventual cost of repairs: Changing timber floors for concrete ones Laying ceramic tiles instead of linoleum or thermoplastic material Replacing wood skirting boards with flood-proof material Walls re-plastered up to 1 metre above floor level with Limelite Renovating plaster Fitting new downstairs internal doors with frames and linings fitted for easy removal. Installing all main electrical appliances (fridges etc) and kitchen units on plinths Raising electrical sockets above possible flood levels Fitting double check valves to waste systems to prevent backing-up of foul waste Fitting flood proof doors or flood guards on all external doorways Installing flood proof airbricks Maintaining a stock of large plastic boxes, into which valuables, items with a sentimental value and water vulnerable items like books can be placed at short notice. For information, a directory of flood protection products and services is available at http://www.bluepages.org.uk/. The Parish Council does not endorse these products or services. In case of Emergency Identify a place where you, your family and your pets can be safe. Gather essential items together. These include warm clothes, blankets, regular medication, a torch, food supplies, a mobile phone and a battery operated or windup radio. Move electrical items and valuables to a first floor or higher position. Know where to turn off gas, electricity and water supplies at the mains. Cooperate with the emergency services if evacuating your home is necessary. Stay tuned to local radio. Floods can kill. NEVER attempt to walk or drive through any depth of floodwater. Parish Council The Parish Council and local residents play an important role in managing flood risk at the community level. The responsibilities are not statutory and the Parish Council will review its actions in the light of experience and available resources. 4

The Clarborough and Welham Parish Council will: Prepare and revise this Flood Prevention and Flood Management Strategy. Encourage each household in areas of the Parish that have suffered from flooding to have its own flood plan. Appoint and support a local Flood Warden and Deputy Wardens. Monitor local watercourses and drains and report any work that is required Expedite the appropriate authority to complete regular and exceptional maintenance activity required to manage flood risk Gather information on flooding by reporting any flood incidents in the Parish. Find out about Partnership Funding. Under the new partnership funding system, flood alleviation schemes may be able to proceed if additional funding can be raised locally to supplement national funding. Ensure the sand and sand bags in the Village Hall car park are available and replaced when required. Notify Bassetlaw District Council of any elderly, disabled or vulnerable residents who live in property in an area that has suffered from flooding. Ensure the Council will respond to these residents needs in the event of a flood or flood alert. Work with Bassetlaw District Council and Nottinghamshire County Council to identify responsibilities and opportunities associated with flood prevention and management. Through these authorities link with the Environment Agency and any other agency with responsibilities that may impact of flood prevention and management. Also, resolve with these authorities any issues of uncertainty or disagreement. NOTE: The Environment Agency has a pro forma community flood action plan which can be used as a more detailed reminder of the actions to be taken in the community in the event of flood or potential flood Flood Warden The responsibilities of the Flood Warden are broadly: to work on issues and ideas related to flood prevention and management and to report to the Parish Council on progress and barriers to implementation of the Flood Prevention and Management Strategy. In particular, the Flood Warden will: Ensure flooding events have been reported to Bassetlaw District Council Liaise with other Flood Wardens and villages locally to establish any areas for joint action or implementation of best practice Sign up to the Environment Agency s Floodline Warnings. Develop a process to ensure householders in areas of the Parish where flooding has occurred are alerted of any flood warning. Nottinghamshire County Council Nottinghamshire County Council (NCC) is the Lead Local Flood Authority (LLFA) for Nottinghamshire and has a number of roles and responsibilities for flood risk management 5

under the Act, the Regulations and other national legislation. These are displayed on their website and the content at May 2017 is copied in Appendix 2. The County Council also has current projects, which are also copied in Appendix 2 [More work required here: Future plans affecting C&WPC. Need for meeting with NCC] Bassetlaw District Council The responsibilities of the Council are for local land drainage, which can include works to ordinary watercourses and other delegated powers. The Council has a Strategic Flood Risk Assessment of August 2009, which is referred to in the following section on INITIATIVES [More work required here: Other Statutory responsibilities Work with Environment Agency Future plans affecting C&WPC. Need for meeting with Ian Davies] Water Companies The responsibilities of water companies include the management of flooding from sewers. The Environment Agency The responsibilities of the Agency for flooding include main rivers, the sea and reservoirs. None of these are present in the Parish. Highways England The responsibilities of Highways England for flooding include motorways and trunk roads. None of these are present in the Parish. Nottinghamshire County Council is responsible for flooding of other adopted roads. 6

INITIATIVES Neighbourhood Plan The development of the Neighbourhood Plan identified that risk of flooding was a major concern of those responding to the consultation opportunities. The Neighbourhood Plan includes Policy 5: Reducing the risk of flooding. It highlights: 1. Development, which is consistent with other development plan Policies within Clarborough and Welham, will be supported where it can be demonstrated that the scheme will not have a detrimental impact on surface water run-off and sewage discharge networks in the village. 2. Development in flood sensitive areas and those which feed into flood sensitive areas will be designed and constructed to prevent any increase in the level of flood risk on the site. 3. The development proposed should be self-sufficient through the incorporation of Sustainable Urban Drainage Systems. 4. Development will only be permitted where it does not result in the loss of an open watercourse. 5. Development which utilises permeable surfacing will be encouraged The Neighbourhood Plan Justification for a policy on flooding is available in Section 16 of the plan, paragraphs 150 to164 inclusive. This strategy supports these statements about development. Bassetlaw District Council and the Environment Agency 1. The Strategic Flood Risk Assessment of August 2009 refers to Clarborough (and Hayton) and Welham in two separate sections (pages 74 to 77). Maps (Figures 5-19 and 5-20) are displayed which show the flood risk from 3 levels of water (1metre, 0.3m and 0.1m). These maps were also included in the Neighbourhood Plan (Map 9 and Map 10 on pages 59 and 60). Key Points are identified for each area as follows: Key Points from Figure 5-19: Land drainage capacity problems in Hayton and Clarborough are exacerbated by the amount of infill development that has previously taken place. Flood Risk Assessments for development in areas at more risk of surface water flooding should pay particular attention to run-off from surrounding areas, due to the typically clayey and relatively impermeable nature of the ground. The development proposals should be shown not to be at risk of flooding in a 100 yr + climate change rainfall event. Flood Risk Assessments and Drainage Impact Assessments should make reference to the capacity of the receiving drainage network. The proposals should be shown not to be at risk of flooding from overloaded sewers. Development proposals should be shown not to exacerbate the existing sewer capacity problem. The River Idle defended flood outlines for 100 year with climate change and 1000 year events do not encroach on the villages Flood risk associated with smaller watercourses and drains in the villages should be considered in Flood Risk Assessments Key Points from Figure 5-20: Land drainage capacity problems in Welham are exacerbated by the amount of infill 7

development that has previously taken place. Flood Risk Assessments for development in areas at more risk of surface water flooding should pay particular attention to run-off from surrounding areas. The development proposals should be shown not to be at risk of flooding in a 100 yr + climate change rainfall event. Flood Risk Assessments and Drainage Impact Assessments should make reference to the capacity of the receiving drainage network. The proposals should be shown not to be at risk of flooding from overloaded sewers. Development proposals should be shown not to exacerbate the existing sewer capacity problem. Flood risk associated with smaller watercourses and drains in the village should be considered in Flood Risk Assessments These maps and the location of flooding may allow further work on very specific plans for the Parish. [Large scale versions of the maps will be required to be useful for this purpose] 2. Bassetlaw District Council and the Environment Agency have developed a plan to improve the waterflow along Howbeck, below Main Street, in Clarborough. [details required from BDC] Further Research and Future Opportunities Other communities have devised schemes to reduce the risk of flooding. These include: working with landowners and farmers on land usage with the objectives of pooling water and / or reducing the rate of flow of water through watercourses. Facets of this approach include planting, clearing and deepening ditches and several other techniques. engineering the watercourse to include lagoons (pools or lakes) which are created temporarily on land that is otherwise used for farming or recreation re-instating natural features such as dams, reed beds, bogs that may have been lost or removed. These schemes require research to identify specific opportunities. They may then require expert input and therefore may require seed-corn funding to bring to a state where they can be evaluated. In the longer term they will require significant amounts of resource to implement the most practical and effective proposals. Working in partnership with Nottinghamshire County Council, Bassetlaw District Council and other agencies may be one way to win support and resource for new initiatives. Developing expertise in applying for grants and partnership funding will be required. Work with Riparian Owners The existing watercourse(s) may offer the opportunity to prevent flooding if they are improved. Inadequate or inappropriate culverts, aggregation of rubbish along the watercourse, erosion and other developments may all need to be tackled. In some cases, the riparian ownership may be shared with the Parish Council, Bassetlaw District Council or the Highways Section of Nottinghamshire County Council. Two householders may have half the riparian responsibilities where the watercourse is the boundary of their properties. Establishing riparian ownership and identifying where action should be taken may be the first step in working with riparian owners. This may lead into identifying any funds available to support necessary work. Other ideas and schemes There may be other schemes appropriate to the mitigation of risk of flooding in the Parish 8

which are not here identified. They should be explored when identified. A Local Flood Group could be established to act as a creative force to bring ideas to the fore and to monitor the work and ideas set out in this strategy above. Work could be commissioned with other local parishes to save costs and to identify areas of joint interest. 9

APPENDIX 1 Actions agreed by the Parish Council on the adoption of the Neighbourhood Plan in February 2017. The Parish Council will 1. Work with local farmers and landowners to implement flood mitigation measures. 2. Undertake a survey of the village to determine where flooding has affected private and public properties over the last 15 years and the extent to which those properties have been affected. 3. Work with residents to determine an approach to reduce or eliminate this flooding 4. Work with BDC, Nottinghamshire County Council, Environment Agency, DEFRA and any other agencies which are able to assist, to identify the causes of the flooding in the Parish. 5. Work with BDC, Nottinghamshire County Council, Environment Agency, DEFRA and any other agencies which are able to assist, in proposing solutions to the causes of the flooding in the Parish. 6. Work with BDC, Nottinghamshire County Council, Environment Agency, DEFRA and any other agencies which are able to assist, in putting into effect measures which enact those solutions. 10

APPENDIX 2 Nottinghamshire County Council roles, responsibilities and current projects (May 2017) The Council s website states: Nottinghamshire County Council (NCC) is the Lead Local Flood Authority (LLFA) for Nottinghamshire and has a number of roles and responsibilities for flood risk management under the Act, the Regulations and other national legislation. It is responsible for flood risk management from; surface water, groundwater; and ordinary watercourses. Operationally as a LLFA, the County Council; investigates flooding incidents, develops Flood Risk Management solutions where viable and appropriate, is developing a flood risk management asset database, undertakes various land drainage activities, including consenting to works and enforcement on Ordinary Watercourses outside of Internal Drainage Board areas, and, responds to planning applications for major developments as a statutory consultee on local flood risk management and drainage, in accordance with the Town and Country Planning (Development Management Procedure) (England) Order 201525. It is also a Highways Authority and maintains drains and ditches that serve to drain the adopted highway. Current Funding of Flood Risk Management Projects Currently, we make decisions on where to invest using information on recent flooding incidents flood strategy documents, the source of flooding and available resources. Resources vary widely between different organisations, many of which are funded in different ways and have different priorities. For example, We have secured a 5 year budget of budget of 600,000 per annum for capital schemes, following the flooding of 2007 and this includes nationally approved funding for large schemes in Hucknall and Southwell. Funding allocation for schemes are approved by the Transport and Highways Committee; Bassetlaw District Council has recently delivered a scheme on The Canch in Worksop and jointly promoted the North Wheatley scheme with the County Council. They are investigating schemes in other locations, including Retford, Clarborough and North Leverton with Habblesthorpe and are taking forward a flood prevention scheme which involves the diversion of a water channel in Walkeringham; 11