Emerging Opportunities in Corporate Finance. Various provisions of CDR Scheme

Similar documents
FROM CENTRAL BANK OF INDIA S.Ravichandran

A PRESENTATION ASHOK GUPTA, SVP, IDBI CAPITAL

Corporate Debt Restructuring (CDR)

Prudential Norms on Income Recognition, Asset Classification and Provisioning pertaining to Advances

Annex -2 Norms on Restructuring of Advances by NBFCs

Framework for Revival and Rehabilitation of Micro, Small and Medium Enterprises

Sub: Framework for Revival and Rehabilitation of Micro, Small and Medium Enterprises (MSMEs)

FRAMEWORK FOR REVIVAL AND REHABILITATION OF MICRO, SMALL AND MEDIUM ENTERPRISES

Corporate Debt Restructuring -- A revival mechanism for companies

Consultants Pvt. Ltd.

RBI/ /131 RPCD.PLNFS. BC.No.31/ / August 19, 2005

RBI/ /528 DNBS (PD) CC.No.371/ / March 21, 2014

INDIAN OVERSEAS BANK SME DEPARTMENT CENTRAL OFFICE POLICY ON NURSING AND REHABILITATION OF SICK MSME UNITS

MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE. No. 39/RN/Ref/October/2016

STATEMENT OF STANDALONE/ CONSOLIDATED AUDITED RESULTS FOR THE QUARTER AND YEAR ENDED MARCH

Policy Framework for Revival and Rehabilitation of Micro, Small and Medium Enterprises

S4A an improvised financial engineering tool to abate NPAs albeit with formidable challenges

Guidelines for rehabilitation of sick small scale industrial units

Takeout Finance Scheme for Financing Viable Infrastructure Projects

Audit of advances & NPA

The Insolvency and Bankruptcy Code, 2016 (IBC)

September 28, Overview of Submission

Basel II Pillar 3 Disclosures ( )

The Chairman of the Audit Committee shall be an independent Director who is elected by the members of the Audit Committee.

PRUDENTIAL NORMS ON INCOME RECOGNITION, ASSET CLASSIFICATION

Issues in Audit and Tax Audit of Banks

RBI / /25 DNBS (PD) CC No. 288 / / July 2, 2012

SUZLON ENERGY LIMITED CIN : L40100GJ1995PLC "SUZLON", 5, SHRIMALI SOCIETY, NEAR SHRI KRISHNA COMPLEX, NAVRANGPURA, AHMEDABAD

* * * The contributions made by S/Shri M. P. Baliga and M. K. Poddar are gratefully acknowledged.

REPORT OF DEBENTURE TRUSTEES FOR THE HALF YEAR ENDED SEPTEMBER, 2013

BANKING SECTOR PERFORMANCE STUDY H1FY14

ONE TIME SETTLEMENT SCHEME

/Head Office. Sl. Rate of Interest (linked with MCLR- Y) MCLR-Y=8.60% w.e.f Category of Advance

IDBI Bank Ltd. Cuffe Parade, Mumbai Ph ,

Sub-Committee of State Level Inter Institutional Committee (SLIIC)-Constitution & Purpose

CASE No. 48 of In the matter of Appointment of Committee for study of subsidy, and related matters.

Guidelines for Formulation, Appraisal and Approval of

FINANCIAL HIGHLIGHTS FOR THE 4 TH QUARTER & FINANCIAL YEAR ENDED 31 ST MARCH 2018

Nirmal Bang Financial Services Pvt. Ltd. POLICY ON DEMAND / CALL LOAN

Resolution of Stressed Assets: Towards the Endgame. Urjit R. Patel

The Tamilnadu Industrial Investment Corporation of Limited, 692, Anna Salai, Nandanam, Chennai

Sub-Committee of State Level Inter Institutional Committee(SLIIC)- Constitution & Purpose

Framework for Revival and Rehabilitation of Micro, Small and Medium Enterprises (FRR for MSMEs)

Sovereign Debt Restructuring: An overview of ongoing work. Benu Schneider

Guidelines related to MSME Sector

Cash Credit Monitoring

A Study on the Debt Recovery Agencies

COMPOUNDING UNDER FEMA BY CA.SUDHA G. BHUSHAN. INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA 25 th July 2015

CONCLUSIONS AND SUGGESTIONS

SEBI (ISSUE OF CAPITAL AND DISCLOSURE REQUIREMENTS) REGULATIONS, 2009 [Previously SEBI (Disclosure and Investors Protection) Guidelines 2000]

INDEPENDENT AUDITOR S REPORT

Insolvency & Bankruptcy Code, 2016 Presented by CA. Avil Menezes on

ECOWRAP MODERN DAY DAVID (NCLT) VS. GOLIATH (ACTIVE COMPANIES) SAGA SBI ECOWRAP

GTL INFRASTRUCTURE LIMITED STATEMENT OF STANDALONE FINANCIAL RESULTS FOR THE QUARTER AND NINE MONTHS PERIOD ENDED DECEMBER 31, 2016

Lending under Consortium Arrangement / Multiple Banking Arrangements

Management s Discussion & Analysis

Forum for Asian Insolvency Reform (FAIR) MAXIMISING VALUE OF NON- PERFORMING ASSETS

D S R M STEELS PRIVATE LIMITED INVITATION FOR EXPRESSIONS OF INTEREST FOR SUBMISSION OF RESOLUTION PLAN IN D S R M STEELS PRIVATE LIMITED

Registration Process of Farmer Producer Organization

Curriculum Vitae. Telephone Work : (91-22) Home : (91-22) Mobile: Work History

Policy on Lending to MSMEs and Rehabilitation of MSMEs

Internal Guidelines on Corporate Governance of Fedbank Financial Services Limited PREAMBLE AND COMPANY S PHILOSOPHY ON CORPORATE GOVERNANCE:

B. Whereas the development of infrastructure requires debt of longer maturity to supplement the debt funds presently available; and

भ रत य रजवर ब क RESERVE BANK OF INDIA

Year ended Sr. Particulars (Audited) (Audited) (Audited) (Audited) (Audited) 1. Interest earned (a)+(b)+(c)+(d)

Decoding Insolvency & Bankruptcy Code

RESTRUCTURING & INSOLVENCY - THE INDIAN SCENARIO. `Extend a helping hand to an entity in distress

Performance Review: Q July 25, 2003

Scheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL)

Insolvency. Corporate Viaticum and Where We Stand in the World: An Analysis

6.4 Exemption for payment of Application Fee and cost of expenditure incurred in providing the

BEFORE THE BUSINESS CONDUCT COMMITTEE OF THE CHICAGO BOARD OPTIONS EXCHANGE, INCORPORATED

Chapter 5 Past efforts at restructuring

Financing Energy Efficiency Projects for SMEs

Idf. Idf Financial Services Private Limited FAIR PRACTICES CODE

DISCLOSURES UNDER PILLAR-3-MARKET DISCIPLINE OF BASEL-III- CAPITAL REGULATIONS FOR THE QUARTER ENDED JUNE 30, 2018

LESSON 16 INSOLVENCY CONCEPTS AND EVOLUTION

Alternatives to Bankruptcy. Options for Corporate Recovery

STRIDES PHARMA SCIENCE LIMITED POLICY ON DETERMINATION OF MATERIALITY OF EVENTS/ INFORMATION FOR DISCLOSURE TO STOCK EXCHANGES

UNDERSTANDING CORPORATE INSOLVENCY UNDER INSOLVENCY AND BANKRUPTCY CODE, 2016

Project Finance An Overview

Guidelines for. Empanelment of external. consultants for Techno- Economic Viability (TEV) Study

Regulatory regime for NBFCs

Performance Review: Q1:FY2003. July 31, 2002

RESERVE BANK OF INDIA

THE ZOROASTRIAN CO-OPERATIVE BANK LTD. CENTRAL OFFICE WORLI MUMBAI POLICY ON COLLECTION OF DUES AND REPOSSESSION OF SECURITY

Liquidity Enhancement Incentive Programme for Equity Derivatives

Liquidity Enhancement Incentive Programme for Equity Derivatives

INTERNAL FINANCIAL CONTROL POLICY

(_NI r- elki 1 iii)05li V. 3TaTTH?V, R 0? C

Annexure I. Checklist on General Internal Controls Controls Sl. No. Branch Replies (Yes/No)

Watching the Insolvency and Bankruptcy Code work

E3-E4 MANAGEMENT TENDER EVALUATION. Date: For internal circulation of BSNLonly

Explain the method of consolidati on. Not Applicable. Not Applicable

Experiences Managing Public Debt in Crisis: The Case of Guyana

Tender Notice No. GETCO/TR-II/TL/66kV/S&E/2338

Aditya Birla Idea Payments Bank Limited. Policy on Customer Compensation

Shriram EPC Ltd. Presentation to AGM 15 th September 2016

BASEL PILLAR 3 DISCLOSURES (CONSOLIDATED) AT DECEMBER 31, 2013

GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS

Transcription:

Emerging Opportunities in Corporate Finance Various provisions of CDR Scheme December 24, 2011 Amar Mainkar AGM, CDR Cell

OBJECTIVES To ensure timely & transparent mechanism for restructuring debts of viable corporate entities facing problems, for the benefit of all concerned. To aim at preserving viable corporates that are affected by certain internal and external factors To minimize the losses to creditors and other stakeholders through an orderly and coordinated restructuring programme.

Legal Basis CDR is a voluntary system based on CDR is a voluntary system based on Debtor Creditor Agreement (DCA) and Inter Creditor Agreement (ICA). DCA & ICA provide the legal basis to the CDR Mechanism

CDR Set Up Standing Forum Core Group Empowered Group CDR Cell

Standing Forum Representative body of all CDR member FIs, Banks Self empowered body Comprises Chairman/ CMDs of all member institutions Lays down policies and guidelines Monitors progress of CDR

Core Group Small group carved out of Standing Forum Comprises Chairmen/ CMDs of IDBI, SBI, ICICI Bank, PNB, BOI, BOB, Chairman, IBA & Dy Chairman, IBA (Representing Foreign Banks) Assists Standing Forum in formulating policies Addresses operational difficulties of CDR Empowered Group Lays down guidelines for workouts

CDR Empowered Group ED level representatives of IDBI, SBI, ICICI Bank as standing members Senior Executives of FIs, banks with exposure in concerned company Executives attending EG meetings should have general authority from their Boards to take decisions

CDR Cell Formats for Flash/Final Report, all CDR and Formats for Flash/Final Report, all CDR and RBI Circulars, Statistical Data etc. Assisting CDR Standing Forum/ Core Group/ Empowered Group Making initial scrutiny of proposals. Especially viability of the case and adherence of RBI guidelines. Placing proposals for consideration of EG

Admission Criterion Loan assets with an aggregate debt outstanding ( inclusive of non fund limits) of Rs 10 crore and above and involving at least two lenders. The case may be referred by a lender with exposure of minimum 20% by value. A corporate can also refer its case with letter of support from a lender or lenders with exposure of 20% by value. Reference of any account / case to CDR Cell is asset classification neutral. Asset of any class can be admitted subject to certain specific stipulations. Other stipulations regarding minimum margin from the Promoters, Personal Guarantee of Promoters, Pledge of promoters holding etc have to be observed.

Admission Criterion (contd) Cases of fraud and misfeasance are ineligible. Cases of willful default may be considered if permitted by Core Group depending on case specifics. BIFR cases are eligible subject to approval of Core Group and with certain additional conditions.

Decision process Decisions in the CDR system are taken on basis of super majority where 75% of lenders by value and 60% of lenders by number have to agree.

Stand-still Period Lenders & borrowers not to initiate or proceed with civil suit Not to approach any authority for any relief Directors not to resign. Documents stand extended. Handholding operations to be extended Status quo ante for asset classification if package approved & implemented within 120 Days.

Outline of the Process Submission of Flash Report scrutiny to ensure benchmarks and admission of the case by Empowered Group. Appointment of Monitoring Institution (MI) & members of Monitoring Committee (MC) Conduct of Joint Lenders Meet (JLM) for finalization of Restructuring Package Approval of Final Restructuring Package by EG. Execution of Master Restructuring Agreement & Trust & Retention Agreement.

Components of Restructured packages Within overall regulatory guidelines applicable, each package is tailor made to suit the corporate needs. Generally the package may involve certain concessions in rate of interest, carving out irregular portion by giving Working Capital Term Loan ( WCTL), granting of Funded Interest Term Loan (FITL), conversion of debt to equity or other debt instruments.

Additional Finance Additional Finance, if any, to be provided by CDR lenders or all lenders on pro rata basis. Preferential claim with respect to cash flows in respect of additional exposures. Waterfall Mechanism is embedded in the MRA and TRA Asset classification benefits for additional exposures as per extant regulatory guidelines. Sharing additional finance compulsory only in Category I cases.

Timeline Initial scrutiny for Flash Report max 30 days Approval of Flash : Next EG Meeting. Approval of Final Package 60/ 90 days Issue of LOA: After confirmation of minutes Approval by individual lenders : 45 days Package Implementation by all : 120 days

Key Financial Benchmarks DSCR - 1.25:1 Return on Capital Employed 5 year G sec + 2% Gap between IRR and cost of capital at least 1% Loan Life Ratio 1.40 Break-even analysis in line with industry Industry indicators EBIDTA, price realization,etc

Monitoring & Follow up CDR Cell ensures regular conduct of CDR Cell ensures regular conduct of meetings of MC and follows up on compliance of various aspects of Restructuring Package approved and also the operational and financial performance of the corporate vis-àvis the projections. MC is a recommendatory body and decisions are made by CDR EG.

Exit from CDR Exit from CDR is possible either due to non compliance / non adherence to the package, external/ industry level factors affecting the package implementation, improved performance of the corporate, merger with larger entity or for any other reason like OTS Upon Exit, Recompense clause would be triggered in certain cases. The sacrifices made by the CDR lenders would have to be recompensed by the corporate.

Major industry-wise classification of CDR approved cases Industry No of cases Aggregate Debt ( Rs in Crores) % share Iron & Steel 28 37461 30.92 Textiles 55 10660 8.80 Fertilizers 8 8454 6.98 Petrochemicals 3 5493 4.53 Sugar 23 6131 5.06 Telecom 8 5427 4.48 Infrastructure 10 5596 4.62 Refineries 1 4874 4.02 Cement 8 5928 4.89

Achievements till date Sr. No. Proposals No.of cases Total Debt (Rs. Crore) 1 Referred 341 164294 2 Approved 259 121150 3 Rejected 48 16698 4 Withdrawn/Exit after approval 116 40978 5 Under Process 34 26446

Current Status of Package Implementation Sr.no Status of implementation No. of cases Debt involved (Rs. crore) 1 Fully implemented 2 Under Implementation 126 75194 17 4978 Total Cases 130 80172

Packages by size of debt ( Rs in Crores) Sr. No. Size of debt No. of Cases Debt involved Avg. Size 1 Up to 50 43 1440 34 2 51 to 100 48 3917 82 3 101 to 500 117 26833 229 4 501 to 1000 24 16923 705 5 1001 to 1500 12 14631 1219 6 Above 1500 15 57406 3827 Total 259 121150 468

Recent Developments. Quote from RBI circular October 7, 2010 The promoter's sacrifice and additional funds required to be brought in by the promoters should generally be brought in upfront. However, if banks are convinced that the promoters face genuine difficulty in bringing their share of the sacrifice immediately and need some extension of time to fulfil their commitments, the promoters could be allowed to bring in 50% of their sacrifice, i.e. 50% of 15%, upfront and the balance within a period of one year.

Support required from Lenders Timely submission of Flash Report and Final Restructuring Report (at least 10 days prior to CDR EG meeting) Regular conduct of MC meetings by MI and timely submission of minutes thereof to apprise CDR EG / facilitate decision by CDR EG Adherence to time lines and conditions mentioned in LOA. Sanctions committed in package and Disbursements thereof to be expedited Part Mandate ( for eg Supporting package but no additional finance ) or change of stand taken at JLM for finalization of package / reference to CDR to be avoided. Deputing of senior executive to attend CDR EG meetings especially when the lender has a case under discussion.

Further information CDR Cell maintains a web site, www.cdrindia.org CDR Cell maintains a web site, www.cdrindia.org which can be visited for circulars, downloads and regular updates.

Amar Mainkar Asst General Manager Speakers Contact Details Corporate Debt Restructuring 19th floor, IDBI Tower World Trade Complex Cuffe Parade, Mumbai 400 005 Phone : 32941088, 66552477 E Mail : cdr.amarmainkar@idbi.co.in

Thank you