Consultation Paper. Ninth Electricity Tariff Review ETR9 ( )

Similar documents
Consultation Paper. Ninth electricity tariff review ETR9 ( )

Kosovo Energy Regulatory Office Rule on Distribution System Operator Pricing (DSO Pricing Rule)

Consultation Report on Maximum Allowed Revenues. Second Regulatory Period ( )

Weighted Average Cost of Capital (WACC) Consultation Paper ( )

RULE ON SUPPLIER OF LAST RESORT

KOSOVO ENERGY CORPORATION J.S.C. Proposal for Maximum Allowed Revenues for the Fourth Relevant Year of ETR7 (for 2016)

INDICATIVE VALUES OF WACCOCTOBER2011

AND CONNECTION TAXES

LICENCE FOR PUBLIC ELECTRICITY SUPPLIER KOSOVO POWER CORPORATION J.S.C. Division of Supply

Consultation Paper. The Seventh Electricity Tariff Review ETR7 ( ) Provisional Evaluation KEK Generation Detail DISCLAIMER

Analysis of feed-in tariffs for small hydro-plants CONSULTATION PAPER

FINAL EVALUATION. 22 March The Seventh Electricity Tariff Review ETR7 ( ) KEK Generation Detail

PRINCIPLES ON DETERMINATION OF DISTRIBUTION USE OF SYSTEM TARIFFS AND CONNECTION TAXES

Pristina, 09 February 2017 ERO Code: V_882 _2017. The Board of Energy Regulatory Office, Based on:

KOSOVO ENERGY CORPORATION J.S.C. Generation Division, TPP Kosova B

LICENSE FOR DISTRIBUTION SYSTEM OPERATOR ISSUED TO: KOSOVO ELECTRICITY DISTRIBUTION AND SUPPLY COMPANY J.S.C Registration number: ZRRE/Li/Tr_06/17

Case study in cost recovery and tariff implications

METHODOLOGY ON DETERMINATION OF TRANSMISSION SYSTEM OPERATOR TARIFFS. -TUOS Tariff Methodology-

Energy Regulatory Office. Regulatory Issues Tariffs and Service Quality

Kosovo KEDS Privatization A CASE STUDY

The Impact of TPP Kosova e Re in Electricity Tariffs GAP INSTITUTE

Disputes and the Resolution Process

Publishing date: 30/10/2018 Document title: ACER Report Methodologies Target Revenue of Gas TSOs. We appreciate your feedback

Response to ERO Consultation paper on Loss reduction target_2017

Decision on modifications to Generation Licences and Electricity Supply Licences. Decision Paper

DECISION ON MODIFICATIONS TO THE ELECTRICITY INTERCONNECTOR OPERATOR LICENCE

Global Settlement the Residual Meter Volume Interval Proportion

Austrian Power Grid Comments to ACER consultation

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2)

SUMMARY OF THE ASSESSMENT OF THE COMMENTS FROM THE PUBLIC CONSULTATION OF REGARDING PRICE OF THE SERVICES OF ACCESS TO INTERCONNECTION LINES

Energy Regulatory Office of Kosovo

Economics of Price Regulation

Baltic Harmonised Imbalance Settlement Model Document

Daily Imbalance Charge Calculation Methodology

Wholesale Electricity Market Monitoring Report for the Energy Community Contracting Parties and Georgia

AUDIT REPORT ON THE ANNUAL FINANCIAL STATEMENTS OF THE CIVIL AVIATION AUTHORITY FOR THE YEAR ENDED 31 DECEMBER 2017

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS

Table of Contents List of Figures...3 List of Tables...3 Definitions and Abbreviations...4 Introduction...7

TABLE OF CONTENTS... 2

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 59 / 13 14

Dogana e Kosovës CONTRACT NOTICE. According to Article 40 of Law No. 04/L-042 on Public Procurement of the Republic of Kosovo,

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

CLARIFICATION AND MODIFICATION OF THE DECISION ON REGULATORY ACCOUNTING RULES (TELECOMMUNICATIONS)

Feed in Tariff (FIT) Terms and Conditions

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. [Docket No. IC ]

Domestic Feed in Tariff (FIT) Terms and Conditions

NOTIFICATION. No.HPERC/dis/479: Shimla the 30 th March, 2012

Branch Name Commerce Commission Wellington NEW ZEALAND 27 June 2011 ISBN:

Direct Dial: August Our Ref: MP No P125

IGCC Participation Elia

MERC (MULTI YEAR TARIFF) (FIRST AMENDMENT) REGULATIONS, 2017 STATEMENT OF REASONS

Terms and Conditions related to Balancing

The 16/17 gas year is the second year for which forecast tariffs have been calculated at entry and exit points.

Audit based on the agreement for the project financed from funds allocated by the World Bank

METHODOLOGY DETERMINING PRICES FOR ACCESS AND TRANSMISSION OF NATURAL GAS THROUGH THE GAS TRANSMISSION NETWORKS OWNED BY BULGARTRANSGAZ EAD

EirGrid & SONI Ancillary Services and Procurement Policy

every precaution is taken to ensure the accuracy of this information the Central Bank of Swaziland shall not be liable to any person for inaccurate

Cummins India. Growth/margin bottoming. Source: Company Data; PL Research

ANNEX F THE FINANCIAL PROPOSAL

Advice Notice No. 21

DEPARTAMENTI I TREGTISË/ DEPARTAMENT ZA TRGOVINE/DEPARTMENT OF TRADE

Summary of Modifications to the Designated Suppliers Program September 29, 2006

SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014

EUROPEAN COMMISSION EUROSTAT. Ex-ante advice on the statistical treatment of the PPP project Court infrastructure

Analysis of Cross Border Transmission Gas Tariffs between Portugal and Spain. - Public Hearing -

Zyra e Ministrit / Kancelarija Ministra / Cabinet of the Minister. Ministers Heads of Budget Organisations Officials of Budget Organizations

Agreement on Access to the Wholesale Market for Electrical Power in Norway

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

Grid Code Issue Paper

Integrated Single Electricity Market (I-SEM)

Georgian National Electricity Regulatory Commission

NUMBER 96 APRIL Coincident indicator (Ita-coin) and Italian GDP (1) (percentage changes) ECONOMIC ACTIVITY AND EMPLOYMENT

Exchange of views on TRQs

Main Indicators for the Finnish Economy

Gas Networks Ireland Allowed Revenue and Transmission Tariffs 2017/18 Decision Paper

ACTIVATION PURPOSES BSG. 7 March 2017

Features of tariffs in electricity sector in Serbia

CEER Workshop on Power Losses European experiences in the treatment of losses / Summary of a survey among NRAs

The National Water and Sewerage Commission through the power vested by the Water and Sewerage Act of 2005 Chapter 9.03 of the Revised Laws of St.

Ministry of Finance January March 2016

Pre Energisation Data Information Note

LAW No.9936 Date

2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No.

Tariff for Virtual Reverse Flow Product at Moffat

INTER-MUNICIPAL BUSINESS LICENCE

IBRD Lending Rates and Spreads Applicable January 1, 2013

NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (FEES PERTAINING TO TARIFF STANDARDS AND PROCEDURE) REGULATIONS, 2002

BANKA QENDRORE E REPUBLIKES SË KOSOVËS CENTRALNA BANKA REPUBLIKE KOSOVA CENTRAL BANK OF THE REPUBLIC OF KOSOVO. Financial Stability Report

UNOFFICIAL TRANSLATION. Market Code MARKET CODE

Tariff order for Tata Steel for FY

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

UNC 0686 (Urgent): Removal of the NTS Optional Commodity Rate with adequate notice. UNC Modification

Main Indicators for the Finnish Economy

COMMISSION REGULATION (EU)

Draft. COMMISSION REGULATION (EU) No /

EUROPEAN COMMISSION EUROSTAT

The headlines for the August 2011 consumer prices index (CPI) are:

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Extension Of The Definition Of ECVAA Systems to include the centrally provided communications network.

Introducing Albanian electricity market. AFEER 4 th annual conference Sokol Spahiu AAES Chairman

Transcription:

ZYRA E RREGULLATORIT PËR ENERGJI ENERGY REGULATORY OFFICE REGULATORNI URED ZA ENERGIJU Consultation Paper Ninth Electricity Tariff Review ETR9 (2015 2016) Calculation of the Maximum Allowed Revenues For Public Electricity Supplier (PES) DISCLAIMER This Consultation Paper has been prepared by ERO for the purpose of receiving potential comments from stakeholders. It does not represent a decision by the ERO and should not be interpreted as such. 9 March 2015 Adresa: Rr. Hamdi Mramori Nr. 1, 10000 Prishtinë, Kosovë Tel: 038 247 615 lok. 101, Fax: 038 247 620, E-mail: info@ero-ks.org, web: www.ero-ks.org

Table of Contents 1 Introduction... 3 2 Maximum Allowed Revenues of the Public Electricity Supplier (PES)... 3 2.1 S factor and interest rate for adjustments... 4 2.2 The applicable Rate of Inflation... 4 2.3 PES Adjustments... 4 2.3.1 Adjustments for uncontrolled costs (Insurance)... 4 2.3.2 License fee... 4 2.3.3 Allowed Operating and Maintenance Costs... 5 2.3.4 Allowed Depreciation... 5 2.4 Imbalance costs for PES... 5 2.5 Allowed Working Capital Costs (WCLCt)... 5 2.6 Loss adjustment for ETR8... 6 2.7 KREV... 6 3 Summary... 7 i

Abstract Energy Regulatory Office (ERO) is currently conducting the Regular Adjustment and Annual Update process of the Maximum Allowed Revenue (MAR) of the Regulated Companies in the Electricity Sector on behalf of the Ninth Electricity Tariff Review (ETR9). Under this process, ERO will update the MAR of the Public Electricity Supplier (PES) and will adjust the MAR of the Regulated Generator (KEK), Transmission, System and Market Operator (KOSTT), Distribution System Operator (DSO) based on the figures set on the Periodic Review conducted under ETR7. This Consultation Paper presents ERO s assessment of the Maximum Allowed Revenues (MAR) of the Public Electricity Supplier. Alongside this report, ERO will publish their assessment of the Wholesale Power Costs (WHPC) and the MAR s of KOSTT, DSO and PES. Stakeholder comments ERO strongly believes that public consultation is at the heart of effective regulatory policy. ERO hereby presents the Regulated Companies and Consumers with the opportunity to examine the evidence and views presented in this Consultation Paper, with which they may disagree, and to comment on them by correcting a factual error, putting forward counterarguments or providing new data which ERO may not have already considered. Parties who wish to express their opinions on ERO s position are invited to submit their comments in writing to ero.pricing tariffs@ero ks.org no later than 23 March2015. Alternatively, comments can be mailed to: Zyra e Rregullatorit për Energji Departamenti për Tarifa dhe Çmime Rr. Dervish Rozhaja Nr. 12 Prishtinë, 10000, Kosovë Related Documents ERO s final evaluation of PES MAR under ETR7 ERO s Wholesale Power Cost Consultation Paper under ETR8 ERO s Extraordinary Review Consultation Paper KEDS PES application submitted under the third Regular Adjustment process (ETR9) Rule on Public Electricity Supplier Pricing (PES Pricing Rule) http://eroks.org/tarifat/2013/proceset%20e%20shqyrtimit/eng/ev aluation_dso_pes_22_march_2013.pdf http://eroks.org/tarifat/2014/fpee_kalkulimet_e_te_hyrave_te_le juara_maksimale_raporti_perfundimtar_shte8_final.pdf http://eroks.org/tarifat/2014/raport_vleresues_shqyrtimi_i_jashtz akonshem_10_8_2014.pdf http://eroks.org/rregullat/rregullat_2011/english/pes_pricing_rul e.pdf 2

1 Introduction The Energy Regulatory Office is currently in the process of conducting the Ninth Electricity Tariff Review for the Public Electricity Supplier (PES) and the Regular Adjustment for the Third Relevant Year of the ETR7 Tariff Review for the Regulated Generator (KEK), Transmission, System and Market Operator (KOSTT) and the Distribution System Operator (DSO). The Maximum Allowed Revenues of the PES are set for a one year period but the Input Values, which are used in calculating the MAR of the PES, are set during Input Values Reviews such as the Periodic Review process under ETR7 and are fixed for a prolonged period of time. The MAR of the PES is reset during each Annual Update to correct for differences between forecast and actual costs, under or over recovery of MAR in the Relevant Year due to differences between forecast and actual billing and under or over recovery of MAR due to differences between forecast and actual wholesale power costs and forecast and actual pass through costs, subject to any sharing between the PES and Regulated Customers of imbalance costs and export revenues. During this Annual Update process, ERO will not review the input values which were set during the last Input Values review. Instead, ERO will: 1. Calculate the Wholesale Power Purchase Costs which include the cost of purchasing power from the Regulated Generators, Imports and the Retail Margin. These are updated to reflect the difference between allowed and actual power purchase costs in the previous Regulatory Period; 2. Calculate the Allowed Retail Costs of the Public Electricity Supplier, which include the costs of operating and maintaining the PES activity, corporate costs, depreciation allowances and other reasonable costs of the PES; 3. Set the new PES MAR by including the difference between allowed and actual billing in the previous Regulatory Period; 4. Set the new Retail Tariffs; 2 Maximum Allowed Revenues of the Public Electricity Supplier (PES) The Pricing Rules state that the PES MAR is set in a process of three different phases: Phase I: Determination of import costs. During this phase, the PES submits to the Regulator its own proposal of the import costs necessary to cover energy demand at least 80 days before the start of the forthcoming Relevant Year. At the same time, the Regulated Generator submits to the PES their application for the Regular Adjustment of the Regulated Generator MAR for the second Relevant Year. Phase II: Determination of retail costs. During this phase, the PES submits to the Regulator their proposal of the Retail Costs to be recovered within the next year. This includes allowed Operating and Maintenance costs, allowed corporate costs, allowed depreciation and any other costs which are reasonably incurred by the PES in providing retail services to Regulated Customers; Phase III: Determination of Maximum Allowed Revenues and Regulated Tariffs. During this phase, the Public Supplier submits to ERO its proposal for the MAR of PES for the forthcoming Relevant Year. 3

2.1 S factor and interest rate for adjustments According to Schedule 1 Article 2.1 of the PES Pricing Rule, the interest rate applicable to the MAR of PES in any Relevant Year is calculated based on EURIBOR plus S% where S is a value determined by the Regulator at Annual Updates which reflects the premium payable by the licensee for short term loans. This is different from the principle applied in the other Pricing Rules 1 where the S value is set during Periodic Reviews and is kept constant throughout the Regulatory Period. ERO has reset the S value for adjustments of the Public Electricity Supplier as follows: The Kosovo Lending Rate has been obtained from the Kosovo Central Bank s Monthly Statistics Bulletin Table 14.2 (ODC Effective Interest Rates loan interest rates) 2. The value obtained is the investment business loan rate for loans up to 1 year. This value for January 2014 is 13.08%. The final interest rate for adjustments is the value for December 2014 (10.8%) less the EURIBOR for December 2014 (0.330% 3 1 year EURIBOR for December 2014) + 0.252% (the current EURIBOR rate 4 ) = 10.72%. 2.2 The applicable Rate of Inflation As required by the Pricing Rules, ERO used the Harmonized Index of Consumer Prices (HICP) for all items in the Eurozone to calculate the annual applicable inflation rate for PES. The resulting inflation rate is 0.43%. according to Eurostat. 2.3 PES Adjustments 2.3.1 Adjustments for uncontrolled costs (Insurance) KEDS have requested an allowance of 0.16 million to recover the costs of insuring their employees with a monthly cost of 13.92 per employee. KEDS claims that the contract was signed before the takeover of KEDS by the private investor (Kosovo Calik Limak Energy). ERO has adjusted PES MAR to include the insurance costs. 2.3.2 License fee KEDS have requested an adjustment to compensate for the difference in license fees payable for the volume of imports purchased under ETR8 (the forecast allowed cost by ERO under ETR8 was 01 million whereas the actual costs incurred by KEDS were 0.094 million. The difference has been compensated with interest). 1 http://bqk kos.org/repository/docs/2015/bqk BMS%20nr%20160.pdf 2 http://bqk kos.org/repository/docs/2015/bqk BMS%20nr%20160.pdf 3 http://www.euribor rates.eu/euribor rate 12 months.asp 4 Euribor rate for 19 February 2015 (http://www.euribor rates.eu/euribor rate 12 months.asp) 4

2.3.3 Allowed Operating and Maintenance Costs The allowed Operating and Maintenance costs have been updated to reflect the DSO PES Personnel Transfer agreement by which a considerable number of customers moved from the supply business to the DSO. This resulted on a deduction of O&M costs of 7.6 million from PES and an addition of the same value to the DSO with a zero net impact on tariffs. Allowed OPMCt was also updated to reflect the health insurance allowance, as under ETR8 and to compensate for differences between forecast and actual HQ allocation charges. The final OPMCt allowance of PES is, therefore, 6.7 million. 2.3.4 Allowed Depreciation The Depreciation allowance set for the second Relevant Year was based on ERO s review of the PES capital expenditure plan for the next five relevant years. The depreciation allowance for the second Relevant Year was calculated to be 0.3 million. PES allowed depreciation will include an annual inflation allowance of 0.43% to the previously allowed depreciation allowance. The final value of allowed depreciation of the PES will, therefore, be 0.3 million. 2.4 Imbalance costs for PES During 2015, KOSTT will introduce a balancing mechanism. Under this, generators and suppliers who are in imbalance (actual supply or demand does not match nominated volumes) will be required to pay the costs incurred by KOSTT in compensating for this. In the PES Pricing Rule, ERO allows for the PES to recover the actual costs in the previous year of resolving any such imbalances subject to an imbalance sharing factor. Where this factor is less than 100%, it means the PES has cannot full recover its imbalance costs to give it an incentive to minimize these (ie, by minimizing imbalances). During 2015, ERO will monitor the accuracy of the PES s demand forecasts and consequent nominations of demand. Where these are consistently inaccurate by significant amounts, forcing KOSTT to take actions to balance supply and actual demand, ERO will consider setting a sharing factor of less than 100% in 2016 (which will apply to the recovery of the PES s imbalance costs incurred in 2015). This is to provide an incentive for the PES to accurately forecast demand once the balancing mechanism commences operation. 2.5 Allowed Working Capital Costs (WCLCt) Article 11 of the PES Pricing Rule stipulates that the Public Electricity Supplier should be allowed to recover working capital costs. Working Capital costs will be calculated using the cost of financing this working capital (EURIBOR + S%) plus the sum of allowed retail costs, allowed wholesale energy costs, allowed wholesale capacity costs and pass through costs. The formula for calculating the WCLC allowance is provided in Paragraph 2.1 of Schedule 1 of the PES Pricing Rule: WCLC= (1 / 12) * I t * (RETR t + WHPC t + PSTC t NTFR t ) Where I t is the interest rate for the Relevant Year t calculated based on EURIBOR plus S%, where S is a value to be determined by the 5

Regulator at Annual Updates and which reflects the premium payable by the licensee for short term loans RETR t WHPC t PSTC t NTFR t is allowed retail Costs in Relevant Year t is allowed wholesale power costs in Relevant Year t is Pass Through Costs in Relevant Year t is non tariff revenues in Relevant Year t The resulting final WCLC to be recovered by PES is 1.9 million. 2.6 Loss adjustment for ETR8 According to the Rule on Public Electricity Supply Pricing (PES Pricing Rule), the Energy Regulatory Office should deduct revenues from sales of losses to the TSO and the DSO from the Maximum Allowed Revenues of PES in order to avoid a situation in which the PES recovers the cost of losses twice. The Pricing Rules are set up to work in the following manner (The same principle holds for the DSO and the TSO losses): The Public Electricity Supplier pays the allowed Wholesale Power Costs through the recovery of revenues retained from charging retail tariffs to regulated customers; The DSO MAR is set up in a way so as to allow the DSO to recover sufficient revenues to compensate PES for the level of losses which ERO allows the DSO to recover; If the DSO cannot meet the allowed loss target, and PES is therefore obliged to purchase more energy to input into the grid to meet the bottom demand, then the DSO obliged to pay PES for the additional value of energy (because of a higher value of losses than that allowed by the ERO, thereby incurring a loss). This payment is done by adjusting the DSO MAR downwards in the next year such that the PES fees payable to the DSO are reduced; In calculating the PES MAR, the revenues that PES receives from the sales of losses is deducted in order to avoid covering the cost of the losses twice. However the value of the losses deducted should be the total expected loss revenues for the Relevant Year (LSSAt x REUEt x WHEAt) rather than the final loss value which, according the formula on Paragraph 2.4 of Schedule 1 of the DSO Pricing Rule, takes into account adjustments between allowed and actual values of the previous Relevant Year as well. Deducting the total value of allowed DSO losses (LSSCt) from PES MAR, as under ETR8, effectively returns any benefits gained by reducing losses from the DSO to the PES. The PES MAR has therefore been adjusted to reflect the fact that the revenues PES receives from sales of losses are deducted before adjustments, as explained above, rather than after adjustments. The argument is valid for both DSO and TSO loss calculations. 2.7 KREV One of the key elements affecting the MAR of the Public Electricity Supplier (but also that of the DSO and TSMO) is the difference between the Maximum Allowed Revenues (MAR) and the Actual 6

Regulated Revenues (ARR). This difference is recovered by applying the KREV formula, as defined in Article 5 paragraph 3.2 and Annex 1 paragraph 2.4 of the PES Pricing Rule. The resulting KREV calculation under ETR8, after interest, is 33.78 million. 3 Summary The final MAR value for the sector for the Second Relevant Year is 256.7 million. Allowed Retail Costs (Article 10 of the PES Pricing Rule) have been estimated to be 6.7 million. This allowance has included an adjustment for health insurance, HQ reallocation and license fee costs. Allowed Pass through costs (PSTCt) for payments to the DSO and the TSO are 93.6 million. Allowed Revenues from sales of losses to the TSO and the DSO are 30.8 million. Working Capital costs are 1.9 million. Total Wholesale Power Costs are 149.6 million. Allowed Bad Debts are 13.2 million. The allowances are summarized in Table 6. Table 1 Allowed Retail Costs, Pass through Costs and Sales Revenues of the PES PES MAR ETR8 Allowed ETR8 Reviewed ETR9 Proposed Indexation parameters Efficiency Factor % 0.00% 0.00% 0.00% Profiling Factor 0.00 0.00 0.00 HICP % 0.70% 0.70% 0.97% Euribor % 0.60% 0.60% 0.25% S factor % 12.54% 12.54% 10.47% It % 13.14% 13.14% 10.72% Allowed Retail Costs (RETRt) OPMC t = OPMC t 1 * (1 + CPI t 1 ) * (1 E t )* (1 P t ) m 12.4 12.4 6.7 Adjusted OPEX without HQ m 10.7 DEPCt = DEPCt 1 * (1 + CPIt 1) * (1 Pt) m 0.20 0.2 0.3 Health Insurance Allowance m 0.2 0.2 0.0 HQ Reallocation Allowance m 1.3 1.3 2.9 Licence allowance m 0.1 0.1 0.11 PES DSO Personnel Transfer m 0.0 0.0 7.6 Inter company charge m 0.3 Pass through Costs (PSTCt) KOSTT fees m 17.8 18.0 22.8 DSO fees m 63.9 66.4 70.7 81.7 93.6 Revenues from Sales of Losses to TSO and DSO 7

TSO Revenues m 3.3 3.5 3.1 DSO Revenues m 23.8 26.3 27.6 27.1 Working Capital Costs (WCLCt) WCLC= (1 / 12) * It * (RETRt + WHPCt + PSTCt NTFRt) m 2.2 2.3 1.9 Wholesale Power Costs (WHPC) WHPC m 142.3 154.0 149.6 Retail Margin m Retail Margin Adjustment m 0.0 0.0 Licence fee Licence fee m 0.0 0.0 0.0 Non Tariff Revenues (NTFR) Non tariff Revenues (NTFRt) m Bad Debt Allowance (BDTA) BDTA % 5% 5% 5% BDTA m 12.0 12.6 13.2 BDTA Adjustment m 0.3 0.3 KREVt PES KREVt m 15.4 15.4 33.7 DSO KREVt m 3.0 3.0 3.1 TSMO KREVt m 0.2 0.2 1.5 Other Adjustments Uncontrolled costs adjustment (Insurance) m 0.2 0.2 Uncontrolled costs adjustments (HQ reallocation) m 1.3 1.3 Licence fee (Imports) m 0.0 0.0 ETR8 DSO losses adjustment m 6.1 ETR8 TSO losses adjustment m 0.3 PES MAR PES MAR m 240.0 252.4 256.7 8

9