PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS

Similar documents
Now, therefore, for and in consideration of the mutual covenants and agreements set forth herein, the Parties agree as follows:

MEMPHIS LIGHT, GAS AND WATER INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Standard Interconnection Agreement for Customer-Owned Renewable Generation System

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS

STANDARD INTERCONNECTION AGREEMENT FOR INTERCONNECTED CUSTOMER-OWNED BATTERY SUBSYSTEMS 1 KW OR MORE

STANDARD INTERCONNECTION AGREEMENT FOR TIER 1 RENEWABLE GENERATOR SYSTEMS

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Standard Interconnection Agreement for Customer-Owned Renewable Generation System kw

WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

FIRSTENERGY INTERCONNECTION AGREEMENT

STANDARD INTERCONNECTION APPLICATION FOR NET METERING FACILITIES

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature

NET-ENERGY METER AGGREGATION INTERCONNECTION AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC CUSTOMERS

INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

INTERCONNECTION & NET ENERGY METERING AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC GENERATING FACILITIES

Town of Highlands Board Approved as of May 17, 2012

INTERCONNECTION AND OPERATING AGREEMENT

STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND

STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

Renewable Generation (Category 1-20 kw and less):

FIRSTENERGY INTERCONNECTION APPLICATION/AGREEMENT - PART

Renewable Generation (Category 1 20 kw and less):

Jefferson Energy Cooperative Policy 124 DISTRIBUTED GENERATION POLICY

Public Utility District No. 1 Of Jefferson County

WITNESSETH: WHEREAS, This Agreement does not address the sale of electricity to or from Consumers; and

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

KOSCIUSKO REMC AGREEMENT FOR INTERCONNECTION OF DISTRIBUTED GENERATION

Interconnection of Electric Generators

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems)

PUBLIC SERVICE COMPANY OF NEW MEXICO AGREEMENT NO.

Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

SALEM CITY. NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less

INTERCONNECTION GENERATION AND NET METERING POLICY

SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

Weatherford Municipal Utility System. Distributed Generation Procedures & Guidelines Manual for Customers

2. IDENTITY AND LOCATION OF GC

NET ENERGY METERING AND INTERCONNECTION AGREEMENT

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

CITY OF UKIAH PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES OF 1 KW (KILOWATT) TO 100 KW

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

CAPE HATTERAS ELECTRIC COOPERATIVE

Tier 1 Net Metering and Renewable Resource Interconnection Agreement. Grantee: Abbreviated Legal Description: Assessor s Tax Parcel Number(s):

Taunton Municipal Lighting Plant. This INTERCONNECTION & NET METERING AGREEMENT 1. CUSTOMER ELECTRIC GENERATING SYSTEM

SCHEDULE 72 INTERCONNECTIONS TO NON-UTILITY GENERATION

CARROLL WHITE RURAL ELECTRIC MEMBERSHIP CORPORATION Monticello, Indiana

PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR ELECTRIC GENERATING FACILITES Customer Owned Generation-Distribution Rate (Schedule G-1)

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES)

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview:

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

Application for Interconnection and Net Metering Level 1

SOLAR PV INSTALLATION AT USC BASEBALL STADIUM

Name: City: State: Zip Code: Is the applicant the property owner at the system address? Yes No. City: State: Zip Code: City: State: Zip Code:

South Carolina Standard for Interconnecting Small Generation 100 kw or Less With Electric Power Systems (EPS) (Interconnection Standard)

ENTERGY NEW ORLEANS, INC. STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES LOCATED IN ORLEANS PARISH

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES)

Lane Electric Cooperative, Inc. Eugene, Oregon Policy 311 (Net-Metering Services)

LEVEL 1: STANDARD APPLICATION FORM AND INTERCONNECTION AGREEMENT

Parkland Light & Water Company Park Ave Tacoma, WA 98444

Power Partner Program Agreement. Energy For Tomorrow

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS

Solar: Wind: Total: (AC Nameplate Rating) x (720 hrs/mo) x (0.15 = solar/ 0.10 = wind) Date(s) of Parallel Operation Rebate Expiration

UNITED COOPERATIVE SERVICES. Distributed Generation Procedures & Guidelines Manual for Members

ENTERGY LOUISIANA, LLC STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

7 th Revision of Sheet No. 150 Canceling 6 th Revision WN U-60 of Sheet No. 150

Please Refer to Attached Sample Form

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS

Distributed Generation Basic Interconnection Requirements and Conditions Effective April 1, 2006

Consumer Requirements for Distributed Generation Installation and Interconnection

Please Refer to Attached Sample Form

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Electricity (Net-Metering) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 45 and 46) THE ELECTRICITY (NET-METERING) RULES, 2018

I. Members Applying for New Interconnection/Submission of Plans/Specifications.

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Clark Public Utilities

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION

Interconnection Application and Compliance Form For Photovoltaic Systems Up to 2 MW

Mason County PUD No. 1. Net Energy Metering Interconnection Agreement

MARYLAND STANDARD AGREEMENT FOR INTERCONNECTION OF SMALL GENERATOR FACILITIES WITH A CAPACITY GREATER THAN 10 kw BUT LESS THAN OR EQUAL TO 10 MW

Consumer Requirements for Distributed Generation Installation and Interconnection

Black Hills 2017 Community Solar Garden ( CSG ) RFP Program

PUBLIC SERVICE COMPANY OF NEW MEXICO ELECTRIC SERVICE AGREEMENT NO.

AN APPLICATION FEE OF $50.00 MUST BE SUBMITTED WITH THE APPLICATION. Interconnection Applicant Contact Information. Name: Address:

PEPCO CUSTOMER NET ENERGY METERING CONTRACT. Qualifying facility of 1000 KW or less

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

GARLAND POWER & LIGHT. GP&L s Solar Generation Installation Requirements 2018

INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

Distributed Generation Interconnection Requirements Checklist

Transcription:

BRIGHTRIDGE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS This Interconnection Agreement ( Agreement ) is made and entered into this day of, 20, by BRIGHTRIDGE, herein after referred to as Local Power Company (LPC), a corporation organized under the laws of Tennessee, and who has executed a participation agreement under a TVA-approved generation program and hereinafter referred to as Participant, and WHEREAS, the Participant has requested interconnection services to purchase the output of renewable generation that is owned by the Participant or a third party (see attached Application For Interconnection) at the Participant s presently metered location, which is: Now, therefore, for and in consideration of the mutual covenants and agreements set forth herein, the Parties agree as follows: 1. Scope of Agreement 1.1 This Agreement is applicable to conditions under which the LPC and the Participant agree that one or more generating systems and all related interconnection equipment (described in the Applica t ion For Interconnection of Distributed Generation and attached to this agreement and hereinafter referred to as Qualifying System ) located at Participant s presently metered location with gross power rating of kw and to be interconnected at kv may be interconnected to the LPC s electric power distribution system ( System ). Execution of this agreement allows the Participant to proceed with procurement and installation of the system but Participant is not allowed to proceed with parallel operation until LPC has received a completed electrical inspection, LPC has conducted an onsite inspection and witnessed any required commissioning test or waived such test, and has given Participant written authorization to proceed with parallel operation. 2. Establishment of Point of Interconnection 2.1. The point where the electric energy first leaves the wires or facilities owned by the LPC and enters the wires or facilities provided by Participant is the Point of Interconnection. LPC and Participant agree to interconnect the Qualifying System at the Point of Interconnection in accordance with the LPC s rules, regulations, by laws, and rates (the Rules ) which are incorporated herein by reference and the generator and all related interconnection equipment will comply with the LPC s Distributed Generation Interconnection Procedures. 1

3. General Responsibilities of the Parties 3.1. LPC has reviewed the proposed generation and related equipment as described in the Application for compliance with LPC s Interconnection Procedures and approved the Qualifying System for interconnection based on one of the following conditions: 3.1.1. Qualifying System has been certified as meeting the applicable codes and standards and has passed the Fast Track Screening Process, or 3.1.2. LPC, in agreement with Participant, has conducted additional engineering evaluations or detailed impact studies and any necessary System upgrades or changes identified by these additional studies have been implemented, and Participant has paid for such changes where necessary; 3.2. Participant shall comply with all applicable laws, regulations, zoning codes, building codes, safety rules and environmental restrictions, including the latest version of the National Electrical Code applicable to the design, installation, operation and maintenance of its Qualifying System. 3.3. The Participant shall provide Local Building Code Official inspection and certification of installation forms to the LPC. The certification shall reflect that the code official has inspected and certified that the installation was permitted, has been approved, and has met all electrical and mechanical qualifications. 3.4. After installation, the Participant shall notify the LPC. Prior to parallel operation, the LPC may inspect the Qualifying System for compliance with standards which may include a witness test. LPC must provide written authorization before Participant can begin parallel operation. 3.5. Participant shall conduct operations of its Qualifying System in compliance with all aspects of the Rules and in accordance with industry standard prudent engineering practice and must comply with the latest version of IEEE 519. 3.6. The Participant shall be responsible for protecting its renewable generation equipment, inverters, protective devices, and other system components from damage from the normal and abnormal conditions and operations that occur on the System in delivering and restoring power; and shall be responsible for ensuring that the Qualifying System is inspected, maintained, and tested on an ongoing basis in accordance with the manufacturer s instructions to ensure that it is operating correctly and safely. LPC will have the right to requests and receive copies of the test results. 3.7 TVA may approve any Qualifying System in addition to any LPC approval. 3.8 Participant must utilize a contractor that has the North American Board of Certified Energy Practitioners (NABCEP) Certification Level for solar PV and wind system. 3.9 Participant must utilize a supply side generation delivery setup. This option is referred to as Option 1 by TVA. Consult with LPC for a basic diagram of this setup. 4. Inspection and On Going Compliance 4.1. LPC will provide Participant with as much notice as reasonably practicable; either in writing, e mail, facsimile or by phone as to when LPC may conduct inspection and/or document review. Upon reasonable notice, or at any time without notice in the event of an emergency or hazardous condition, LPC shall have access to the Participant's premises 2

For the purpose of accessing the manual disconnect switch, performing an inspection or disconnection, or, if necessary, to meet LPC s legal obligation to provide service to its customers. TVA may inspect any Qualifying System in addition to LPC inspection. 5. Manual Disconnect Switch 5.1. Participant must install a manual, lockable, visible load break disconnect switch between the generation source and the LPC s system that is visibly marked Participant Generation Disconnect. The disconnect shall be mounted separate from, but adjacent to, the LPC s meter socket. The Participant shall ensure that such manual disconnect switch shall remain readily accessible to LPC, and be capable of being locked in the open position with a single LPC utility padlock. A permanent, weatherproof single line diagram of the facility must be located adjacent to the disconnect switch. Names and current telephone numbers of at least two persons authorized to provide access to the facility that have authority to make decisions regarding the interconnection and operation of the Qualifying System will be included. 6. Disconnection / Reconnection 6.1. LPC may open the manual disconnect switch or disconnect the Participant s meter, pursuant to the conditions set forth in Section 6.2 below, isolating the Qualifying System, without prior notice to the Participant. To the extent practicable, however, prior notice shall be given. If prior notice is not given, LPC shall at the time of disconnection leave a door hanger notifying the Participant that it s Participant owned renewable generation has been disconnected, including an explanation of the condition necessitating such action. As soon as practicable after the condition(s) necessitating disconnection has been remedied, LPC will unlock the disconnect switch so Participant may reenergize the Qualifying System. 6.2. LPC has the right to disconnect the Participant owned renewable generation at any time. Some examples of situations that may require disconnect are: 6.2.1. Emergencies or maintenance requirements on LPC s system; 6.2.2. Hazardous conditions existing on LPC s system due to the operation of the Participant s generating or protective equipment as determined by Distributor; and 6.2.3. Adverse electrical effects, such as power quality problems, on the electrical equipment of LPC s other electric consumers caused by the Participant owned renewable generation as determined by Distributor. 7. Modifications/Additions to Participant owned Renewable Generation 7.1. If the Qualifying System is subsequently modified in order to increase or decrease its gross power rating or any components are changed, the Participant must provide LPC with written notification that fully describes the proposed modifications at least thirty (30) calendar days prior to making the modifications. Further, the Participant must follow the Interconnection Procedures and adhere to the Interconnection Policy. 8. Indemnity 8.1. Participant agrees to release, indemnify, and save harmless LPC, TVA, and the United States of America, and their respective agents and employees from all liability, claims, demands, causes of action, costs, or losses for personal injuries, property damage, or loss of life or property, sustained by Participant, Participant s agents and family, or third parties arising out of or in any way connected with the installation, testing, operation, maintenance, repair, replacement, removal, defect, or failure of Participant s Qualifying System. The obligations of this section 8.1 shall survive termination of this agreement. 3

9. Assignment 9.1. The Interconnection Agreement shall not be assignable by either party without thirty (30) calendar days notice to the other Party and written consent of the other Party, which consent shall not be unreasonably withheld or delayed. 9.2. An assignee to this Interconnection Agreement shall be required to assume, in writing, the Participant s rights, responsibilities, and obligations under this Interconnection Agreement. 10. Insurance 10.1. LPC requires the following levels of Liability Insurance for Personal Injury and Property damage during the entire term of this Interconnection Agreement. Prior to interconnection of the system the Participant shall furnish a properly executed certificate of insurance to BrightRidge, clearly evidencing the required coverage. The certificate shall provide that the insurance coverage shall not be canceled or modified unless and until LPC receives at least thirty (30) days prior written notice. Member shall further replace such certificates for policies expiring during the period its Qualifying System is interconnected with LPC s system. Distributor has the right to refuse to establish or continue the interconnection of Participant s Qualifying System to LPC s system if such insurance is not in effect. 10.2. Generation up to 10 kw Participant maintains an amount of not less than $300,000. 10.3. Generation greater than 10 kw but equal or less than 50 kw Participant maintains an amount of not less than $1,000,000. 11. Effective Term and Termination Rights 11.1. This Agreement becomes effective when executed by both Parties and shall continue in effect as long as the Green Power Provider Agreement and Participation Agreement between LPC and Participant are in effect. This Agreement will be terminated immediately upon the termination of the Green Power Providers Participation Agreement or due to any violation of the National Electric Code or other published safety standards. 12. Entirety of Agreement and Prior Agreements Superseded 12.1. This Agreement, including the Rules, Participation Agreement executed by LPC and Participant, and all attached Exhibits, are expressly made a part hereof for all purposes, constitutes the entire agreement and understanding between the Parties with regard to the interconnection of the Qualifying System of the Parties at the Point of Interconnection expressly provided for in this Agreement. The Parties are not bound by or liable for any statement, representation, promise, inducement, understanding, or undertaking of any kind or nature (whether written or oral) with regard to the subject matter hereof not set forth or provided for herein, in the Participant s Application for Interconnection of Distributed Generation, the Green Power Providers Agreement, Participation Agreement, or other written information provided by the Participant in compliance with the Rules. 13. Interconnection Cost 13.1. Interconnection Participant Application Fee: The non-refundable and non-transferable interconnection application fee covers only the application process for interconnection of each Qualifying System and shall be $500.00 for systems less than 50kW. Qualifying Systems above 50 4

kw will be $1000. Participant must pay this in advance when making application. If a Participant has a solar PV and wind system at the same location, these are viewed as two separate Qualifying Systems. 13. 2 Engineering Analysis: Participant must pay an Engineering Analysis Fee of $200 for a single-phase system and $300 for a three-phase system. 13.3 Interconnection Fee: Participant must pay an interconnection fee based on the size of the Qualifying System. The fee will be $50 per kw based on the Qualifying System rating but in no case will the fee be less than $250. 13.4 Metering Fees: Participant must pay actual cost(s) for the generation meter in advance of interconnection to LPC s distribution system, including replacement meters if needed, during the term of the participation agreement. 13.5 Distribution/Transmission Fees: Participant must pay charges at actual costs as may incurred by the LPC for modification to the distribution/transmission system for Participant s Qualifying System to be interconnected and safely operated in parallel with LPC s electric system. Also, Participant must pay for the installation of transformers, protective devices and other facilities, if required for Participant s Qualifying System to be interconnected. 13.6 Monthly Billing and Meter Fee: Per Qualifying System, LPC will charge a $10 per month fee that will be reflected on the Participant s utility bill until the agreement for the Qualify System terminates or the Qualifying System is shutdown permanently. 14. Notices 14.1 Notices given under this Agreement are deemed to have been duly delivered if hand delivered or sent by United States certified mail, return receipt requested, postage prepaid, to: (a) If to LPC: BrightRidge Attention: President and CEO 2600 Boones Creek Rd. Johnson City, TN 37615 (b) If to Participant: The above listed names, titles, and addresses of either Party may be changed by written notification to the other. 5

(See next page for signature area.) IN WITNESS WHEREOF, the Parties have caused this Agreement to be signed by their respective duly authorized representatives. BrightRidge PARTICIPANT NAME: _ (Printed) BY: (Signature) BY: (Signature) TITLE: TITLE: DATE: DATE: 6