Optimization of flood risk reduction through multiple lines of defence

Similar documents
West Wight Coastal Flood and Erosion Risk Management Strategy Appendix D Flood Risk Modelling and Mapping March 2016

The Use of Individual and Societal Risk Criteria Within the Dutch Flood Safety Policy Nationwide Estimates of Societal Risk and Policy Applications

Moving Policy and Practice from Flood and Coastal Storm Damage Reduction to Risk Management

Method for he Estimation of Loss of Life Caused by Floods in the Netherlands

An advanced method for flood risk analysis in river deltas, applied to societal flood fatality risk in the Netherlands

Cost-benefit analysis for flood protection standards in the Netherlands

Flood Risk and Safety in the Netherlands (FLORIS) the method

Adaptation Practices and Lessons Learned

Okumura, N.; Jonkman, Sebastiaan N.; Esteban, M; Hofland, Bas; Shibayama, T

Risk Based Approaches for Levees in the U.S. and Abroad: Lessons for the NFIP

Recent developments in loss of life and evacuation modelling for flood event management in the UK

Influence of future zoning on flood risks

Mark Voorendt Delft University of Technology, Department of Hydraulic Engineering

The AIR Coastal Flood Model for Great Britain

Canada s exposure to flood risk. Who is affected, where are they located, and what is at stake

Undertaking national flood risk assessment in England, United Kingdom Jonathan Simm

The AIR Inland Flood Model for Great Britian

Risk based design of coastal flood defences - A vietnam case

The AIR Inland Flood Model for the United States

Coastal Flood Hazard and Risk Maps in Denmark. Thorsten Piontkowitz & Laura Storm Henriksen, Danish Coastal Authority

Crediting Adaptation Strategies through the National Flood Insurance Program s Community Rating System Coordinator s Manual

National and regional levee systems analysis in the UK and relevance to USA

Mapping flood risk its role in improving flood resilience in England

Reducing Coastal Risk

Dutch flood protection policy and measures based on risk assessment

STATISTICAL FLOOD STANDARDS

ADVISORY BASE FLOOD ELEVATIONS (ABFEs)

LIFE SAFETY HAZARD INDICATOR

Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program

Integrated Management System For Construction Projects

HRPP 359. Integrated flood risk management progress from the FLOODsite project

Storm Surge Risk and Sea-Level Rise: What the Future May Hold.

Introduction Preparation of a Community Reconstruction Zone Plan

Living with levees: using tolerable risk guidelines in California

in the Netherlands The method in brief

COST BENEFIT ANALYSIS OF URBAN FLOOD PROTECTION

Loss of life due to oods

Broad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1

Risk, Mitigation, & Planning

P art B 4 NATURAL HAZARDS. Natural Hazards ISSUE 1. River Flooding

Catastrophe Risk Modelling. Foundational Considerations Regarding Catastrophe Analytics

SMART Planning Utilizing Risk Assessment Methodologies for Public Safety and Flood Risk Management

DEFINING BEST PRACTICE IN FLOODPLAIN MANAGEMENT

Flood risk management in the Netherlands. Ruben Jongejan

Results from ECA study: Florida

QUANTITATIVE AND QUALITATIVE RISK ASSESSMENTS A HIGHLY NEGLECTED METHODOLOGY

Electronic Documentation Form

Requirements for Mapping Levees Complying with Section of the NFIP Regulations

FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES IN URBAN ENVIRONMENT

Risk Analysis of Bridges to Prioritize Post-Storm Scour Mitigation Plans

This article appeared in a journal published by Elsevier. The attached copy is furnished to the author for internal non-commercial research and

DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. Climate Change Sectoral Adaptation Plan for Flood Risk Management ( )

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA

EFRA Select Committee Enquiry on Climate Change Submission from the Association of British Insurers (ABI), October 2004

The 2004 Gilbert F. White National Flood Policy Forum September 21-22, 2004 FLOOD STANDARDS IN FOREIGN COUNTRIES

Cameron County, TX. Consultation Coordination Officer (CCO) Meeting. Please sign in (sheet at front of the room) Meeting will begin at 9:00

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun

SWIF TO THE RESCUE. Patty Robinson Ike Pace, PE WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY

RISK ASSESSMENT IN TRANSBOUNDARY COOPERATION BETWEEN THE NETHERLANDS AND GERMANY

RESILIENT INFRASTRUCTURE June 1 4, 2016

Flood Solutions. Summer 2018

Development of an Integrated Simulation Model for Flood Risk Evaluation and Damage Assessment

North Atlantic Coast Comprehensive Study: Resilient Adaption to Increasing Risk

Tool 3.5: Subjective Quantified Risk Assessment (sqra) Tool

Queensborough Flood Construction Level (FCL) Review PHASE 1 REPORT. Submitted By:

Decision Support Methods for Climate Change Adaption

IMPROVING TRANSPORTAION INDUSTRY RANDOM VIBRATION TESTS. John Van Baren Phillip Van Baren Vibration Research Corporation Jenison, MI

AIRCURRENTS: NEW TOOLS TO ACCOUNT FOR NON-MODELED SOURCES OF LOSS

Reservoir safety risk assessment a new guide

Karlstad, Sweden. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Damages caused by Flash Floods

Sustainability of Earnings: A Framework for Quantitative Modeling of Strategy, Risk, and Value

GALVESTON COUNTY ECONOMIC RESILIENCE PROFILE

Evaluating the Effectiveness of the Community Rating System: A Comparative Analysis

Appendix L Methodology for risk assessment

INSURANCE AFFORDABILITY A MECHANISM FOR CONSISTENT INDUSTRY & GOVERNMENT COLLABORATION PROPERTY EXPOSURE & RESILIENCE PROGRAM

Building a Resilient Energy Gulf Coast: Executive Report

AN INTEGRATED MASTER PLAN FOR FLANDERS FUTURE COASTAL SAFETY

AIR Worldwide Analysis: Exposure Data Quality

Risk Assessment for Floods Due to Precipitation Exceeding Drainage Capacity

Fluvial Flood Defence Asset Management Plan. Tuesday 11 January Angus Pettit WDR & RT TAGGART

Background to the PFRA European Overview UC10508

Flood risk assessment and management in Slovakia

Simplified Methodology for Urban Flood Damage Assessment at Building Scale using Open Data

Assessment of flood risk accounting for river system behaviour

Risk of Flooding from Rivers and Sea

University of Groningen. Maintenance Optimization based on Mathematical Modeling de Jonge, Bram

The COAST Approach to Adaptation Action for Sea Level Rise and Storm Surge. Samuel B. Merrill, PhD May 20, 2014

STANDARDS FOR MODELLING OF FLOODING IN OPEN COASTS AND LARGE ESTUARIES

Evidence for Environmental Audit Committee Enquiry on Sustainable Housing Submission by Association of British Insurers, May 2004

Heather Tallis TNC Stephen Polasky University of Minnesota

Strategic Flood Risk Assessment. SFRA Report

Abstract. 1 Introduction

The Importance and Development of Catastrophe Models

Flood Risk Management: Modelling blockage and breach scenarios February 2015

PHASE 2 HAZARD IDENTIFICATION AND RISK ASSESSMENT

Costs and benefits of developing nature areas: regional versus national impact

A Method for Estimating Operational Damage due to a Flood Disaster using Sales Data Choong-Nyoung Seon,Minhee Cho, Sa-kwang Song

Community Incentives for Nature-Based Flood Solutions

Stock Market Forecast: Chaos Theory Revealing How the Market Works March 25, 2018 I Know First Research

Transcription:

Delft University of Technology Optimization of flood risk reduction through multiple lines of defence van Berchum, Erik; Jonkman, Sebastiaan N.; Timmermans, Jos; Brody, S.D. Publication date 2017 Document Version Publisher's PDF, also known as Version of record Citation (APA) van Berchum, E., Jonkman, B., Timmermans, J., & Brody, S. D. (2017). Optimization of flood risk reduction through multiple lines of defence. 4-8. Abstract from 7th International Conference on Flood Management 2017, Leeds, United Kingdom. Important note To cite this publication, please use the final published version (if applicable). Please check the document version above. Copyright Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons. Takedown policy Please contact us and provide details if you believe this document breaches copyrights. We will remove access to the work immediately and investigate your claim. This work is downloaded from Delft University of Technology. For technical reasons the number of authors shown on this cover page is limited to a maximum of 10.

Optimization of flood risk reduction through multiple lines of defence Berchum, E.C. van* 1, Jonkman, S.N.*, Timmermans, J.S.*, Brody, S.D.** * Delft University of Technology, Delft, the Netherlands ** Texas A&M University, College Station, TX, USA 1 Delft University of Technology, Faculty of Civil Engineering and Geosciences, Stevinweg 1, 2628 CN Delft, the Netherlands KEYWORDS: Flood defences, flood risk reduction, economic optimization, flood risk modelling INTRODUCTION Floods can have a huge impact on the regions they affect. The impact of these disasters can be reduced with the use of flood risk reduction measures. Flood-prone regions often require a combination of interventions to reduce the risk to an acceptable level. The amount of risk reduction provided by various interventions can be quantified using probabilistic risk analysis. The interdependence between multiple lines of flood defences within the same system can have a large effect on the region. For example, the height and strength of a coastal levee greatly affects the impact of any inland flood risk reduction measures, like vegetation for wave attenuation. This can be investigated with the use of probabilistic risk assessment. However, assessing such flood defence systems can be computationally very intensive, as well as timeconsuming. Although methods have been developed to optimize a single type of intervention (e.g. defences (Kind, 2014; Duipuits and Schweckendiek, 2015)), there are no generic approaches that address combinations of interventions. In this paper, a new model is presented that is able to (1) simulate combinations of flood risk reduction measures and (2) optimize these based on costs, economic risk reduction, and environmental impact. A key feature of the model is the capability to incorporate different types of interventions, including barriers, dikes, wetlands, non-structural interventions, modifications of structures, and buyouts. This is kept computationally workable by using simple, yet realistic representations of the system elements in the form of fragility curves, cost curves, and damage curves. Other aspects such as societal and environmental impacts will be discussed qualitatively and ranked with other indicators.

SIMULATION MODEL The model is built up out of three parts: the Damage Model, the Risk calculation and the Optimization Model. Figure 1 shows how the different parts interact and which actions are included. Figure 1 - Schematization of the interaction between the Damage Model, the Risk Calculation which cycles through the Hydraulic Boundary conditions and the Optimization Model, which cycles through the Flood risk reduction strategies. The Damage Model calculates the construction cost, environmental impact and estimated damage cost for a single storm. This is done by combining three layers of information for the region: the Region lay-out, the Flood risk reduction strategy consisting of the chosen combination of flood risk reduction measures and the Hydraulic boundary conditions. This is illustrated in Figure 2. The impact of a storm on the region and the flood risk reduction strategy is calculated using simplified hydraulic formulas (Jonkman & Schweckendiek, 2015; Van der Meer et al., 2016). Figure 2 The three layers of a region as depicted in the model

The Risk calculation uses this combination to calculate the estimated value of damage. It repeats the calculations from the Damage Model for storms with different return periods. With this information, it is possible to construct a risk curve. The basis is a set of (flood) scenarios with their probablities and consequences (cf. Kaplan and Garrick, 1981) The graph shows the probability of exceedance of an event with a certain damage level. The expected damage can also be computed from this information. How this risk curve is constructed by combining the Damage Model with the Risk calculation, can be seen in figure 2. Figure 3 graphical representation of how the Risk curve (the dotted line) is constructed by combining the results of different damage calculations as part of the Risk calculation. The rectangles illustrate how the total expected value of damage is derived by numerically integrating the risk curve. EVALUATION TOOL The strength of the model is the ability to compare large numbers of strategies with both structural and non-structural flood risk reduction measures, such as levees, oyster reefs, improving evacuation routes, and steering urban development locations. This evaluation is done in the Optimization Model. It provides the input for the Damage Model, analyzes the output, and investigates how the risk profile of the region reacts to different design choices, for example by identifying design trade-offs. By searching for design trade-offs, one could think of trade-offs between project goals (e.g. High environmental scores are hard to achieve in combination with low barrier heights inland ) or trade-offs between design choices (e.g. Placing a relatively low barrier at the coast significantly diminishes the impact of Nature-based solutions in the first protected area ). SYSTEM OPTIMIZATION A stylised case study based on the Houston-Galveston Bay Area in Texas was used to demonstrate the model (van Berchum, 2017). It was able to show how the region reacts to design choices, for example by providing insight into the change of effectiveness of

wetlands around the bay depending on the investments in coastal structures. The case study included both structural and non-structural measures, ranging from levees and storm surge barriers to Nature-based Solutions like wetlands, and spatial planning measures like raising insurance premiums. Figure 3 map of the Galveston Bay Area with implemented and identified possible flood risk reduction measures. The model is designed to be used as a decision-making tool during early phases of a design. Especially during the conceptual design phase, when design choices are impactful and information is scarce, it can provide valuable insights and save precious time and money in finding attractive solutions for reducing risks for high-vulnerability areas threatened by coastal flooding. REFERENCES Kind, J.M. (2014). Economically efficient flood protection standards for the Netherlands. Journal of Flood Risk Management 7(2): 103-117. Zwaneveld, P. and Verweij, G. (2014). Economisch optimale waterveiligheid in het IJsselmeergebied. Technical Report 10, CPB, The Hague, 2014 Dupuits, E.J.C. and T. Schweckendiek (2015). Flood Risk and Economically Optimal

Safety Targets for Coastal Flood Defense Systems. Proceedings of the 12th International Conference on Applications of Statistics and Probability in Civil Engineering (ICASP12), Vancouver, Canada, July 12-15. Kaplan, S., & Garrick, B. J. (1981). On the quantitative definition of risk. Risk analysis, 1(1), 11-27. Berchum, E.C. van (2017). Flood Risk Reduction System Optimization. Application to the Galveston Bay Area. Interim Report. TU Delft, Delft. The Netherlands Van der Meer, J. W., Allsop, N. W. H., Bruce, T., De Rouck, J., Kortenhaus, A., Pullen, T.,... Zanuttigh, B. (2016). Manual on wave overtopping of sea defences and related structures. An overtopping manual largely based on European resreach, but for worldwide application. Retrieved from www.overtopping-manual.com Jonkman, S. N., & Schweckendiek, T. (2015). Flood Defences. Lecture Notes CIE5314. Delft: Delft University of Technology.