Progress Update Identified Needs & Capital Plan

Similar documents
Ballot Measures-T Section

APPENDIX A FULL TEXT OF BOND MEASURE

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Building and Site Sinking Fund Millage. Election Date: November 7th 2017

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

Why did we undertake a comprehensive Educational Facility Master Plan?

Local ballot measure: B. Redding School District Bond Measure

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

2019 Capital Projects Plan

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717

REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR

Richland School District

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182

Investing in Our Schools:

Lake Mills Area School District Community Survey Results. Spring 2018

Capital Projects Completed since 1988

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

P R E S E N T E D T O : S O L A N O C O M M U N I T Y C O L L E G E D I S T R I C T G O V E R N I N G B O A R D J U L Y

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE

Board of Trustees Proposition Summary Table of Contents

Burlington Area School District Community Survey Results. Winter 2016

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

School District of Horicon Community Survey Results. Fall 2017

West Bend School District Community Survey Results. Spring 2018

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

Use of State and District Construction Funds

Proposition E: Escondido Union School District $182.1 Million Bond Measure

Public Presentation Capital Bond November 27, 2017

BERKELEY UNIFIED SCHOOL DISTRICT

FY 2017 Stockton University Expenditure Report as of May 31, 2017

Muskego Norway Schools Community Survey Results. Fall 2015

Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013

Springfield High School

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

CH-UH Board of Education Meeting. June 27, 2017

Montville Township Public Schools

CMP Strategy Project Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects)

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2015 * * *

Freedom Area School District Community Survey Results. Fall 2018

Garden City Public Schools Capital Reserve. Presentation to the Board of Education January 10, 2017

FREQUENTLY ASKED QUESTIONS (FAQs)

Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE J BOND AUDIT REPORT. August 31, 2016 * * *

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Plainedge Public Schools Budget Presentation

Understanding the Costs: Frequently Asked Questions

Overview of Public Schools CIP

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

PERRIS ELEMENTARY SCHOOL DISTRICT

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget?

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

Oakfield School District Community Survey Results. Fall 2018

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2016 * * *

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL DRAFT

BERKELEY UNIFIED SCHOOL DISTRICT Berkeley, California. MEASURE I GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2013

Barnesville Public Schools Proposed Building Program

Ballot Measures-LL Section

Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160

School Board of Brevard County, Florida Half-Cent Sales Surtax Round 5 Internal Audit Report Fiscal Year February 20, 2018

Measure G Quarterly Progress Update

Conducting a Facilities Condition Assessment as Part of Your Capital Planning. FEFPA July 5, 2011

Board of Education School Year Budget Update February 27, 2018

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING MAY 15, 2018

Measure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest

Clinton Public Schools Proposed Budget. Maryann O Donnell Superintendent of Schools January 29, 2018

Report to Committee of the Whole May 14, 2012

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

Galloway Township Public Schools

2017 Bond Program Summary

Budget Newsletter. Rush-Henrietta. In This Issue District Budget Proposal. Central School District May 2007

Capital Projects Fund. Board Work Session August 9, 2007

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

City School District of Albany Five Year Facilities Plan 3/14/2019

Two Ballot Proposals. August 8, 2017

Beaver Dam Unified School District Community Survey Results. Spring 2016

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

7th Draft Projected Adopted Proposed. Summary

Facility and Financial Overview. Brandywine Heights Area School District

GENERAL CAPITAL PROGRAM

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2008

Transcription:

Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration

Summary In December 2011 District staff met with CFW to assess District s facilities needs Subsequent to completing a technical assessment of all classrooms, support facilities, and exterior conditions in early 2012, initial school site meetings were conducted between February and March The District s Facilities Advisory Committee meeting was convened to review site needs and provide further stakeholder feedback; District and CFW staff incorporated comments into the plan A summary of projects was developed and presented to the Board on March 26 prior to reengaging the Facilities Advisory Committee to review the District s needs and preliminary program; FAC participants have indicated a general consensus in support of the identified projects and no major objections have been raised to date District and CFW staff have been returning to school sites over the last month and expect to continue meeting with civic leaders, civic and school organizations, and individuals in the District to review the results of the facilities assessment A draft Facilities Assessment and Implementation Plan to review and evaluate the District s facilities needs and financing options has been prepared for the Board s review 1

Meetings to Date Over 170 participants have been engaged to date, with input and feedback incorporated into the planning process; District and CFW staff have had the opportunity to meet with the following groups: Beatty Elementary School Staff and Parents February 6, 2012 Pendleton Elementary School Staff and Parents February 6, 2012 Whitaker Elementary School Staff and Parents February 16, 2012 Facilities Advisory Committee Staff and Parents February 21, 2012 Buena Park Junior High School Staff March 5, 2012 Corey Elementary School Staff and Parents - March 5, 2012 Gilbert Elementary School Staff and Parents March 12, 2012 Emery Elementary School Staff and Parents March 19, 2012 Gilbert Elementary School Staff and Parents April 24, 2012 Beatty Elementary School Staff and Parents April 26, 2012 Facilities Advisory Committee Staff and Parents May 1, 2012 Corey Elementary School Staff and Parents May 3, 2012 Buena Park Junior High School Staff and Parents May 29, 2012 Return visits to Pendleton, Whitaker, and Emery June, 2012 2 2

Plan Recommendations The recommended Facilities Assessment & Implementation Plan was based on achieving key District goals that include: Supporting academic achievement Transforming the school sites by improving their appearance and functionality Enhancing the sustainability of the District s General Fund Based on these goals, the following considerations were made to evaluate the proposed scope of projects at each school site and District-wide: Focus should be on projects with the greatest academic impact Efforts should be made to minimize costs Project costs are estimates, which continue to be refined The proposed improvements, sequencing strategy, and financing have received input and support from the Facility Advisory Committee (FAC) Recommendations from schools sites and FAC members have been based on consensual agreement on the proposed program 3

21 st Century Classroom Transformation The planning process has identified improvements that will contribute to the key goals established and support the educational program as well as contribute to ongoing efforts to maintain or attract ADA The assessment identified the potential to modernize permanent classroom interiors with upgrades that extend the useful life of school facilities and bring their functionality and aesthetics to a level that enhances competitiveness with neighboring districts Research on learning environments have indicated a correlation between modernized classroom spaces and improved learning outcomes Classrooms may be transformed into improved 21 st century learning environments, with improvements that include: Replacement of worn carpeting and flooring Repainting of interiors Reconstruction of cabinetry and writing surfaces Improved Audio/Visual systems that integrate into a Technology Wall Replacement of classroom furniture Improvement of classroom electrical systems to accommodate current needs 4

21 st Century Technology Improvements Federal and State agencies have released guidance to school districts aimed at completing a national transition to digital curriculums over the next five years The conceptual program includes a plan to provide a source of local funding for improved student access to computers and modern technology Technology improvements at each site can be planned to fully integrate state of the art teacher and staff learning tools, such as: Digital textbooks and learning materials on interactive mobile devices that can transform the learning process Collaboration and presentation technology to engage students with vivid images, video and audio Improved site connectivity and infrastructure through pervasive wireless coverage Greater access to a wide range of State-approved digital learning materials 5

Preliminary District-wide Improvements The planning team conducted visual inspections of existing conditions at all sites and developed a comprehensive inventory of the state of existing facilities; this examination encompassed all interior and exterior spaces, utilities, and support features such as parking, vehicular access, and play fields Several projects are needed throughout the District, applying to facilities and equipment at all school sites, including: Improving critical District infrastructure, including phones, wireless internet, security systems, and clock/bell systems Acquiring and implementing state-of-the-art teacher/student instructional technology Repairing or replacing roofing systems and providing deferred maintenance Providing for replacement furniture (classroom furniture, cafeteria tables) Modernization of permanent classroom spaces to improve learning environment Replacement of select portable classrooms Funding is also needed to provide a facilities program reserve to address required but unanticipated needs that may be discovered in future years 6

Buena Park Junior High School: Preliminary Improvements The largest school in the District, Buena Park Junior High was constructed in 1961 and today serves over 1050 students in grades 7 and 8 In addition to District-wide improvements, specific needs identified during the site assessment process as well as input from site stakeholders include: Replacement of classroom sliding doors Replace or modernize administration building and former locker room to establish technology center/lab to enhance school academy program Improve site drainage Kitchen improvements Improvements to selected electrical outlets 7

Beatty Elementary School: Preliminary Improvements Beatty Elementary School was first opened in 1966; the site is the largest elementary school in the District, and serves approximately 1000 students in grades K-6, as well as providing special day pre-school in four classrooms In addition to District-wide improvements, specific needs identified during the site assessment process as well as input from site stakeholders include: Library lighting improvements Rubberized playground surface Replacement of boiler/chiller system Kitchen improvements Additional covered walkways Improvements to selected electrical outlets 8

Gilbert Elementary School: Preliminary Improvements Gilbert Elementary was constructed in 1958 and is the oldest school in the District; today the campus houses approximately 700 students in grades K-6 In addition to District-wide improvements, specific needs identified during the site assessment process as well as input from site stakeholders include: Rubberized playground surface Mitigate playground drainage issues* Improvements to selected electrical outlets Mitigate air conditioning noise with additional vents New fencing behind fire lane that joins Gilbert Elementary & Bellis Park Replacement of deteriorating ramps * Project requires additional analysis to determine technical feasibility 9

Whitaker Elementary School: Preliminary Improvements Whitaker Elementary School was first opened in 1962 and now serves approximately 650 students in grades K-6; the site administration has expressed a desire to develop a media arts academy curriculum In addition to District-wide improvements, specific needs identified during the site assessment process as well as input from site stakeholders include: Rubberized playground Classroom sliding door replacement Site drainage improvements Circulation improvements in parking lot Completion of library bathroom facility* Office modernization Additional covered walkways Kindergarten restroom renovation Improvements to selected electrical outlets * Project requires additional analysis to determine technical feasibility 10

Pendleton Elementary School: Preliminary Improvements Pendleton Elementary School serves approximately 575 students in grades K-6, and is the smallest school site in the District; the school first opened in 1961 In addition to District-wide improvements, specific needs identified during the site assessment process as well as input from site stakeholders include: Improved fencing/screening between campus and neighboring hotel Classroom sliding door replacement Rubberized playground Office reconfiguration and modernization Classroom conversion to science lab Improvements to selected electrical outlets Kindergarten restroom renovation Replacement of deteriorating ramps 11

Corey Elementary School: Preliminary Improvements Arthur F. Corey Elementary School was constructed in 1963 and today serves over 600 students in grades K-6 In addition to District-wide improvements, specific needs identified during the site assessment process as well as input from site stakeholders include: Improvements to selected electrical outlets Rubberized playground Improved exterior lighting Conversion of a classroom into science lab Circulation improvements in north parking lot 12

Emery Elementary School: Preliminary Improvements Emery Elementary was built in 1961; the school serves over 670 students in grades K-6 In addition to District-wide improvements, specific needs identified during the site assessment process as well as input from site stakeholders include: Improvements to selected electrical outlets Rubberized playground Replacement of selected classroom sliding doors Office reconfiguration and modernization Improved playground hard-court areas and installation of new equipment Improved outdoor lighting Staff bathroom addition Replacement of Kindergarten classroom portables Upgraded fencing along campus perimeter 13

Other Projects Projects that can be or have been addressed with existing District funds: Gym A/V system BPJH Cafeteria Lighting Improvements - Corey, Pendleton & Whitaker Upgrade Ramps Gilbert Projects currently not possible due to fiscal constraints: Solar Power District-Wide Louver Screens BPJH & Pendleton Upgraded Running Track BPJH Full Blown Walking Track Corey, Pendleton & Whitaker LCD School Marquee Corey (Note: Costs typically paid by PTA, HSA, etc.) Pave Grass Covered Easement Gilbert Replacement of classroom sinks District-Wide Projects currently not possible due to lack of physical space: Additional Parking Stalls Pendleton 14

Summary of Needed Improvements Schools Projects Est. Minimum Adtl. Critical Needs Needs Net Cost District-Wide D - 1 Technology Support Systems (IT/Phone/Clock/Bell/PA/Security System) $ 1,828,210 $ 300,000 $ 2,128,210 D - 2 Technology Devices for Student/Staff $ 4,938,750 $ - $ 4,938,750 D - 3 Repair/Replace Roofing Systems and Deferred Maintenance $ 2,475,000 $ 900,000 $ 3,375,000 D - 4 Provide Allowance for District Furniture / Equipment Replacement $ 351,500 $ 256,000 $ 607,500 D - 5 Permanent Classroom Modernization $ 4,518,940 $ 2,421,340 $ 6,940,280 D - 6 Replace Select Portables w/ Permanent Classrooms $ - $ 2,307,500 $ 2,307,500 Subtotal $ 14,112,400 $ 6,184,840 $ 20,297,240 Buena Park Jr. High JH - 1 Classroom Sliding Door Replacement at 23 Classrooms $ 191,872 $ - $ 191,872 JH - 2 Establish Multi-use Tech Center/Lab - Replace / Modernize Former Admin. & Locker Bldgs. $ 1,229,700 $ - $ 1,229,700 JH - 3 Kitchen Refurbish $ 46,950 $ - $ 46,950 Subtotal $ 1,468,522 $ - $ 1,468,522 Corey Elementary C - 1 Rubberize Playground $ 115,360 $ 86,240 $ 201,600 C - 2 Improve Outdoor Lighting $ 18,800 $ - $ 18,800 C - 3 Science Lab Conversion $ 86,364 $ - $ 86,364 C - 4 Improve Circulation / Drop-Off in North Parking Lot $ 150,000 $ - $ 150,000 Subtotal $ 370,524 $ 86,240 $ 456,764 Whitaker Elementary W - 1 Rubberize Playground $ 107,120 $ 80,080 $ 187,200 W - 2 Classroom Sliding Door Replacement at 17 Classrooms $ 141,818 $ - $ 141,818 W - 3 Drainage Issues East of the Office $ 50,000 $ - $ 50,000 W - 4 Bus Pick-Up / Drop-Off Lane / Improve Circulation $ 139,500 $ - $ 139,500 W - 5 Complete Library Bathroom $ 50,000 $ - $ 50,000 W - 6 Administration Building Upgrade / Office Modernization $ 225,000 $ 360,000 $ 585,000 W - 7 Additional covered walkways $ 89,050 $ - $ 89,050 W - 8 Renovate kindergarten restroom $ 20,000 $ - $ 20,000 Subtotal $ 822,488 $ 440,080 $ 1,262,568 15

Summary of Needed Improvements Schools Projects Est. Minimum Adtl. Critical Needs Needs Net Cost Gilbert Elementary G - 1 Rubberize Playgrounds $ 14,420 $ 10,780 $ 25,200 G - 2 Improve Field Drainage $ 98,030 $ - $ 98,030 G - 3 New HVAC Vents $ 21,000 $ - $ 21,000 G - 4 New fencing behind the fire lane that joins Gilbert and Bellis Park $ 40,920 $ 8,800 $ 49,720 G - 5 Replace metal ramps $ 12,000 $ - $ 12,000 $ 186,370 $ 19,580 $ 205,950 Beatty Elementary B - 1 Library Lighting Improvements $ 49,641 $ - $ 49,641 B - 2 Rubberize Playgrounds $ 161,638 $ 120,836 $ 282,474 B - 3 Replace Boiler and Chiller for HVAC System $ 400,000 $ 115,000 $ 515,000 B - 4 Kitchen Improvements $ 175,000 $ - $ 175,000 B - 5 Covered Walkway Improvement $ 89,050 $ - $ 89,050 Subtotal $ 875,329 $ 235,836 $ 1,111,165 Pendleton Elementary P - 1 Improve Screening Between Campus and Neighboring Property $ 3,000 $ - $ 3,000 P - 2 Classroom Sliding Door Replacement at 11 Classrooms $ 91,765 $ - $ 91,765 P - 3 Rubberize Playgrounds $ 73,388 $ 54,863 $ 128,250 P - 4 Administration Building Upgrade / Office Modernization $ 368,000 $ 80,500 $ 448,500 P - 5 Science Lab Conversion $ 86,364 $ - $ 86,364 P - 6 Replace metal ramps $ 30,000 $ - $ 30,000 P - 7 Renovate kindergarten restroom $ 20,000 $ - $ 20,000 Subtotal $ 672,516 $ 135,363 $ 807,878 Emery Elementary E - 1 Rubberize Playgrounds $ 26,986 $ 20,174 $ 47,160 E - 2 Classroom Sliding Door Replacement at 15 Classrooms $ 125,134 $ - $ 125,134 E - 3 Administration Building Upgrade / Office Modernization $ 400,000 $ 380,000 $ 780,000 E - 4 Improve Outdoor Lighting $ 18,800 $ - $ 18,800 E - 5 Fencing Upgrades $ 45,988 $ - $ 45,988 Subtotal $ 616,907 $ 400,174 $ 1,017,081 Subtotal - Construction Projects $ 19,125,056 $ 7,502,113 $ 26,627,168 Program Reserve $ 3,336,601 $ 3,027,711 Estimated Cost Escalation $ 1,990,625 $ 2,608,192 Grand Total $ 24,452,282 $ 32,263,072 16

Preliminary Financing Plan The District is evaluating a possible bond measure for the November 2012 ballot In 1998 District voters approved a $13.8 million General Obligation (G.O.) bond to modernize certain facilities; all bonds have been sold, but needs remain The voter approved tax rate for the 1998 bond election is $18 per $100,000 of Assessed Value (A.V.) The tax rate for repayment is determined by the A.V., not market value; A.V. is the value placed on property by the County pursuant to Proposition 13 and is typically much lower than the market value for which a property may be sold The District facilities assessment identified needs at school sites that are beyond the scope of current funding sources; at least $24 million in local funding sources are required to implement planned improvements The District may pursue an extension and increase of its General Obligation bond authorization, generating sufficient proceeds to fund required improvements over time to optimize flexibility and General Fund relief 17

Preliminary Financing Plan In the most recent annual report by the Orange County Auditor-Controller, District A.V. decreased by 0.66% The District has averaged 4.67% A.V. growth over the past decade, though future projections assume a slow return to this historical average Approximately 14% of the District s bonding capacity has been utilized HISTORICAL ASSESSED VALUES BONDING CAPACITY ANALYSIS Year Secured Unsecured Total % Change Fiscal Year 2011/12 2001-02 $2,974,259,855 $393,813,261 $3,368,073,116 2002-03 $3,126,581,051 $378,556,348 $3,505,137,399 4.07% ASSESSED VALUATION 2003-04 $3,332,078,868 $429,898,377 $3,761,977,245 7.33% Secured Assessed Valuation $4,913,428,669 2004-05 $3,651,666,914 $436,561,016 $4,088,227,930 8.67% Unsecured Assessed Valuation $364,108,116 2005-06 $3,999,820,759 $349,074,396 $4,348,895,155 6.38% 2006-07 $4,402,019,710 $398,149,683 $4,800,169,393 10.38% DEBT LIMITATION 2007-08 $4,808,214,983 $360,396,737 $5,168,611,720 7.68% Total Assessed Valuation $5,277,536,785 2008-09 $4,985,850,517 $433,675,440 $5,419,525,957 4.85% Applicable Bond Debt Limit 1.25% 2009-10 $4,944,145,358 $396,335,582 $5,340,480,940-1.46% Bonding Capacity $65,969,210 2010-11 $4,895,884,500 $416,786,846 $5,312,671,346-0.52% Outstanding Bonded Indebtedness $9,364,984 2011-12 $4,913,428,669 $364,108,116 $5,277,536,785-0.66% Average 4.67% NET BONDING CAPACITY $56,604,226 18

Millions Local Funding Options In March, the Board was presented with two financing options that were also discussed during the District s preliminary opinion poll; both received sufficient support from voters Option 1: An extension of the 1998 voter approved tax rate of $18.00 plus an increase of $10, to $28.00 per $100,000 of assessed value; this option generates approximately $32.2 million Option 2: An extension of the 1998 voter approved tax rate of $18.00 plus an increase of $5, to $23.00 per $100,000 of assessed value; this option generates approximately $24.4 million In order to fund the needed improvements, including a full classroom modernization and replacement of select portables, Option 1 would be required $18.0 Prop. 39 G.O. Bond Program Options $12.7 Option 1 - $32.2 million Extend Voter Approved Tax Rate + $5 Option 2 - $24.4 million Extend Voter Approved Tax Rate + $10 $3.4 $4.9 $5.9 $2.8 $4.1 $4.9 Assumptions: Total Bond Series: 4 A.V. Growth for Debt Service: 4% Maximum Term of Bonds: 30 years Series 2013A Series 2017B Series 2021C Series 2025D 19

2012 2015 2018 2021 2024 2027 2030 2033 2036 2039 2042 2045 2048 2051 2054 Millions Billions AV and Debt Service Growth Assessed Valuation growth is anticipated to outpace increases in debt service over the life of a potential bond program The average annual AV growth required to fund debt service over the life of the program is designed to be lower than the District s projected annual average AV growth rate As a result, the District may experience greater AV growth over the life of the bond program, resulting in a larger tax base to repay debt service $10.0 $9.0 $8.0 $7.0 $6.0 $5.0 $4.0 $3.0 $2.0 $1.0 $0.0 $35.0 $30.0 $25.0 $20.0 $15.0 $10.0 $5.0 $0.0 Combined Debt Service Assessed Valuation 20

Next Steps CFW is prepared to conduct a survey of the proposed Plan by gaining input from a representative sample of the entire community To gauge this sentiment and observe any changes in public attitude since the preliminary poll was conducted in August 2011, CFW recommends conducting a voter survey testing the projects contained within the Plan as well as current voter attitudes toward the District and tax tolerance CFW will amend the draft Plan as needed based on District staff and Board feedback Procedures will be developed for selection and retention of professional services necessary to complete the planning, design, bidding and construction of proposed projects within the Plan CFW will develop an action plan to execute a targeted public information effort to present the District s needs to the community CFW will return to the remaining school sites to present the proposed plan and will also be meeting with interested community members, as directed by staff 21

Appendix Preliminary Sources & Uses and Project Phasing are provided in the Appendix as well as the District s Draft Facilities Assessment & Implementation Plan 22

Proposed Preliminary Phasing Plan Phase 1-2013 Bond Sale 1. Modernize all permanent in-use classrooms in District with new fixtures, paint, carpeting, cabinetry and A/V system upgrades 2. Provide funding for 1:1 classroom technology 3. Install integrated VOIP phone, clock/bell/pa, and security system at all sites 4. Install wireless network infrastructure at all sites 5. Critical roofing repairs and deferred maintenance 6. Replace select furniture 7. Install additional electrical outlets in select areas 8. Classroom reconfiguration and science lab conversions Corey and Pendleton Elementary 9. Administration and office reconfiguration and modernization at Emery, Pendleton, and Whitaker Elementary 10. Replace deteriorating boiler/chiller system at Beatty Elementary 11. Replace select portables with permanent classrooms 12. Establish program reserve fund Phase II 2017 Bond Sale 1. Provide funding for refresh of 1:1 mobile classroom devices 2. Reconfigure old locker and admin buildings at BPJH to create tech center/lab 3. Allocate funding for deferred maintenance and roofing repair/replacement Phase III 2021 Bond Sale 1. Provide funding for refresh of 1:1 mobile classroom devices 2. Complete targeted project list at BPJH, Corey and Whitaker Elementary 3. Allocate funding for deferred maintenance and roofing repair/replacement Phase IV 2025 Bond Sale 1. Provide funding for refresh of 1:1 mobile devices 2. Complete targeted project list at Gilbert, Beatty, Pendleton, and Emery Elementary 3. Allocate funding for deferred maintenance and roofing repair/replacement 23

Preliminary Sources & Uses Estimated Sources Est. Amount Total GO Bond Series A (2013) $12,733,864 Series B (2017) $2,815,571 Series C (2021) $4,052,652 Series D (2025) $4,850,195 Total Estimated Sources $24,452,282 Estimated Uses Est. Amount Total Clock/Bell/PA system $818,210 VOIP Phone System $150,000 Wireless Internet Infrastructure $660,000 Security Technology Improvements $200,000 Technology $4,938,750 Roofing/Deferred Maintenance $2,475,000 Furniture replacement $351,500 Permanent Classroom Modernization $4,518,940 Buena Park Junior High Improvements $1,466,772 Corey Elementary Improvements $370,524 Whitaker Elementary Improvements $822,488 Gilbert Elementary Improvements $186,370 Beatty Elementary Improvements $875,329 Pendleton Elementary Improvements $714,516 Emery Elementary Improvements $631,370 Estimated Cost Escalation* $1,935,912 Program Reserve/other projects** $3,336,601 Total Estimated Uses $24,452,282 * Escalation assumes 2% cost inflation for 2013, 4% for 2014, and 5% thereafter, excluding tech ** Cost estimates establish minimum required cost and assume close adherance by design team to scope of work; program reserve to provide for expanded scope or unanticipated needs 24