A Guide to Canadian Standard Form of Agreement Between Client and Architect Abbreviated Version Document Seven

Similar documents
A Guide to Standard Form of Agreement Between Client and Licensed Interior Designer

Guide to the Canadian Standard Form of Contract for Architectural Services

Canadian Standard Form of Agreement between Client and Architect Abbreviated Version

Canadian Standard Form of Contract for Architectural Services

AIBC Standard Form of Contract 6C between Client and Consultant

stipulated price contract

Cost plus contract. (with guaranteed maximum price option) Standard construction document CCDC. Canadian construction documents committee

a guide to the use of CCDC stipulated price contract

Review of General Contract Conditions for Capital Projects

AIA Document B141 TM 1997 Part

Document B Instructions

Document B101. Standard Form of Agreement Between Owner and Architect

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT

Document B Instructions Standard Form of Agreement Between Owner and Architect for a Project of Limited Scope

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services

ACEC Document 31 Prime Agreement between Client and Engineer

INSTRUCTIONS TO BIDDERS

PRE-QUALIFICATION #536 HARDWOOD FLOORING CONTRACTORS FOR GYMNASIUM FLOORS

Form of Agreement Between the Client And the Quantity Surveyor

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.)

PRE-QUALIFICATION # 502 FOR ROOFING CONTRACTORS

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent

AGC s Preliminary Commentary to the 2007 Edition of the AIA A201 General Terms and Conditions Document

ANNEX A Standard Special Conditions For The Salvation Army

Standard Form of Agreement Between. Owner and Design-Builder Cost Plus Fee with an Option for a Guaranteed Maximum Price

Request for Quotes (RFQ) For Graphic design services

INSTRUCTIONS TO BIDDERS

Standard Form of Agreement Between Owner and Architect without a Predefined

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address

Conditions of Appointment for an Architect for a Domestic Project 2010 (2012 revision) Incorporating Amendment 1, September 2011

Sub-consultant 2010 (2012 revision)

INSTRUCTIONS TO BIDDERS

Request for Proposal

Three (3) complete copies of each Proposal must be received prior to 3 pm Pacific Time, April 17 th, 2014.

OSE FORM STANDARD MODIFICATIONS TO THE STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER AS CONSTRUCTOR

Whereas the Contractor has entered into an agreement (the "Prime Contract") dated the, 20 with:

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated:

E&O INSURANCE POLICIES

AIA Document A101 TM 2007

Conditions of Contract for PLANT and Design-Build

Document A Instructions

June 2017 BIDDING PROCEDURES No. 90

ARCELORMITTAL DOFASCO G.P. HAMILTON, ONTARIO. Instructions for Bidding

PART INSTRUCTIONS TO BIDDERS

Form F1 Information Required in a Prospectus

CLIENT-PROFESSIONAL PROJECT AGREEMENT FOR ARCHITECTURAL SERVICES BETWEEN CLIENT AND

Office for Capital Facilities

NZS 3915:2005 AMENDMENTS. No. Date of issue Description Entered by, and date

This Webcast Will Begin Shortly

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.)

MANITOBA HOUSING SUPPLEMENTAL CONDITIONS CONTRACT #: XXXX GENERAL

Chapter Survey. Required Contract Elements. Offer and Acceptance

SAMPLE COPY ONLY NOT FOR USE. Client / Architect Agreement (Short Form 2011 Edition) Client Details. Contact Name:

PROPOSAL January 11, 2019

TENDER GRAVEL CRUSHING PWT

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk

PRE-QUALIFICATION #504 FOR PAVING CONTRACTORS

SIGMA Public Procurement Training Manual. Update 2015

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

Scottish Conditions of Appointment of an Architect SCA/2014 (Apr 2015)

Consultant and Managing General Contractor Standard Agreement Form Updates

C 051 Engr s Letter to Owner Concerning Bonds and Insurance. Provisions added for the use of a Warranty Bond

Procedure for Electronic Bid Submission

SARPY COUNTY AND SARPY CITIES WASTEWATER AGENCY

MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES WITNESSETH TERM

RFP# Charter Bus Services

Instruction: Add a reference to this Owner s Rider in 13.2 of the AIA Form B104.

AIA Document A101 TM 2007

NUTRISTEP LICENCE NUTRISTEP LICENCE TERMS OF USE 1. PARTIES 2. PRODUCT 3. OWNERSHIP OF NUTRISTEP 4. AUTHORIZED USES

Request for Proposal RFP # SUBJECT: Ergotron LX

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

INVITATION TO TENDER TENDER FORM

Town of Whitby Terms and Conditions

VILLAGE OF ORLAND PARK (Contract for Small Construction or Installation Project) This Contract is made this day of, 20 by and between the Village

INVITATION TO BID DUNKIN DONUTS PC# Fort Campbell Blvd. Hopkinsville, KY

COUNTY OF COLE JEFFERSON CITY, MISSOURI

Supplement 1 Federal Acquisition Regulation (FAR) Government Contract Provisions

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Welcome to the Model Residential Owner/Design Consultant Professional Service Agreement

STIPULATED PRICE CONTRACT. (the "Owner") and. (the "Contractor") COVERING. (Work Description)

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project

For further information on the AIA s approach to drafting contract documents, see AIA Document M120, Document Drafting Principles.

SETON HALL UNIVERSITY CONTRACT REVIEW CHECKLIST

CONSULTING AGREEMENT STANDARD TERMS AND CONDITIONS

AIA Document A103 TM 2007

STANDARD FORM OF AGREEMENT BETWEEN DESIGN CONSULTANT AND DESIGN SUB-CONSULTANT

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

to the DIRECTOR OF BUILDING CONTROL DEPARTMENT OF JUSTICE TASMANIA on the

SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES

SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

Standard Form of Agreement between Owner and Construction Manager

STANDARD FORM AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER FOR PROFESSIONAL SERVICES. THIS AGREEMENT is made this day of, 20,

This document can be made available in other accessible formats and with communication supports as soon as practicable and upon request.

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

Australian Standard. Subcontract conditions for design and construct. AS (Incorporating Amendment No. 1) AS

KIMA SECURITY INC CONTRACT

Document A201 TM 2007 SP

Transcription:

A Guide to Canadian Standard Form of Agreement Between Client and Architect Abbreviated Version Document Seven Background This guide is written to assist both the Client and Architect in completing the Agreement and to explain some of the more important parts of the document. Written suggestions are welcomed by the Royal Architectural Institute of Canada. Please write to: The Royal Architectural Institute of Canada Suite 330, 55 Murray Street Ottawa, Ontario K1N 5M3 The Abbreviated Version is related to the Canadian Standard Form of Agreement Between Client and Architect Document Six. The Abbreviated Version is intended for use where the more extensive Standard Form of Agreement Between Client and Architect is not practical. Changes from the previous 1997 Version of Document Seven The following summarizes the changes in Document Seven - 2005 edition since it was last issued in 1997: 1. Copyright The RAIC now holds the copyright for this document as well as for all of the national standard contract documents of the architectural profession. The copyright was assigned to the RAIC by the provincial associations of architects in 2004. In order to maintain and publish this document, the RAIC is generating some revenue through the sale of authorization seals. These seals are used in the same manner as CCDC documents. To be permitted to use Document Seven the user must affix an authorization seal to the cover of each copy of the contract containing an original signature. Typically each contract will require two authorization seals one for the contract copy retained by the Client with the Architect s signature and one for copy retained by the Architect with the Client s original signature. Authorization seals may be ordered online through the RAIC website or by telephone, fax or mail. 2. Definitions There have been some minor adjustments to the definitions to ensure that the language corresponds exactly to the wording in Document Six, 2002 edition. New definitions have been added for Architect and Consultant. All definitions are CAPITALIZED and written in italics. This is the same format used in all CCDC documents and in Document Six. 3. Additional Services Additional services are described under Article 2.4 and a new schedule, Schedule B List of Additional Services is appended to the Agreement. Those services that are not checked in the first, left-hand column under Architect s Services in Schedule A are automatically additional services. GUIDE, Document Seven, 2005 release date: April 2005 1 O F 6

4. Completion of Services When an Architect s Services are complete is now clarified under Article 2.6. 5. Liability of the Architect This document, as does Document Nine, asks that a copy of the Certificate of Liability Insurance be affixed to the Agreement indicating the limit to the amount of any claim. If no amount is indicted the limit is $250,000. In addition, a new clause has been added regarding published product information from manufacturers. This clause is similar to the one in Document Six. 6. Hazardous Materials This clause has been expanded to broaden the exclusions. 7. Professional Fees and Reimbursable Expenses The Term Initial Payment has been replaced by the term Retainer as in Document Six. Article 4.9 - Interest is now similar to Document Six. Architects wanted the ability to specify their own interest rates rather than linking them to a bank rate that can be difficult to determine. 8. Schedule A Schedule of Architect s Service and Clients Responsibilities There have been some minor improvements to the Schedule including: 8.1 A new section for Consultants which appears first; 8.2 Changes in the description of some of the services; 8.3 A more comprehensive format for the section, Reviewing and Obtaining Approvals from Authorities Having Jurisdiction. Modifications Modifications can be accomplished by striking out portions which are inapplicable and inserting any revised or additional provisions under Article 5. Both parties are to initial all modifications or amendments made to the Agreement. Please be advised that modifications cannot generally be used to alter or amend requirements, duties and obligations imposed by law and the use of legal assistance in making modifications is encouraged. If Schedule A is revised or replaced with another description of Architect and Client Responsibilities, care must be taken to ensure compatibility with definitions and other clauses in the Agreement. Relation to Construction Contract Consistency between the Client / Architect Agreement and the Construction Contract is essential. This Agreement is written to be used with the CCDC Stipulated Price Contract (CCDC-2) or the Cost Plus Contract (CCDC-3). Legal advice should be obtained if the CCDC documents are to be amended, or if another form of construction contract is to be used. Services The Architect s services and Client s responsibilities set out in Schedule A of the Agreement define the services which the Client and Architect have agreed are necessary for the implementation of the Project. GUIDE, Document Seven, 2005 release date: April 2005 2 O F 6

The Architect s additional services are those services that result from changes in the agreed services, those services for which the Architect s involvement and time cannot be clearly defined or estimated, or where the need for a service is not determined at the time of signing the Agreement. Fees for additional services are invoiced on the basis of hourly rates or any other mutually agreed fee. Authorities Having Jurisdiction It is the Client s responsibility to obtain the necessary consents, approvals, licences and permits. Alternatively, the Client may request the Architect s assistance as an additional service. The Architect reviews statutes, regulations, codes and by-laws applicable to the design of the Project. Where necessary, the Architect reviews the same with the Authorities Having Jurisdiction and incorporates the information pertaining to the construction in the documents, so that the required consents, approvals, licences and permits necessary for the Project can be obtained. However, the Client should acknowledge that as the Project progresses, the interpretation of the authorities having jurisdiction of such statutes, regulations, codes and by-laws may change and differ from the Architect s interpretation in such way as the Architect cannot anticipate reasonably. The provision of services related to changes in the requirements of codes or their interpretation is an additional service. The Architect s services in relationship to the Client s responsibilities for this area can sometimes be difficult to define clearly. The Client and Architect should thoroughly review the Architect s services and Client s responsibilities to clarify the obligations of both parties and these should be tabulated in Schedule A. Even though the Architect s documents may comply with all of the requirements of the Authorities Having Jurisdiction, the Architect cannot guarantee the issuance or the time involved to obtain such consents, approvals, licences or permits. General Review / Field Review & Certification It is essential for the Architect to provide General Review / Field Review services in order to be able to certify performance and payments responsibly. Therefore, it is in the interest of both Client and Architect that the substance of these clauses be clearly understood and respected. The Architect should ensure that the requirements of the applicable Building Code and Provincial / Territorial Association of Architects are always met. Information, Surveys, Reports and Services When the Architect makes arrangements on behalf of the Client for the provision of information, surveys, reports and services by others as described in Schedule A, the Architect should co-ordinate these services with the Client and by written instruction outline the extent of services, the parties to the Agreement, the invoicing procedure and the position of the Architect acting on behalf of the Client. If the Project is an alteration or addition to an existing building, and drawings for the existing building are unavailable, the Architect, or a surveyor, may need to prepare measured drawings. The Client should acknowledge that the Architect cannot be responsible for any conditions which are not exposed or observable at the time of measuring. Client s Budget Contingencies In their review of the budget, the Architect and Client should make certain that it includes reasonable contingencies for: unforeseen site conditions; changes in the work, because they are unpredictable and to a degree inevitable; and other costs (such as special inspection and testing) which may not become known until the Project is under construction; and bidding circumstances, in case the lowest acceptable bid is higher than the Architect s estimate due to delays, availability of contractors, seasonal and climatic conditions, shortages of materials or labour or other reasons. GUIDE, Document Seven, 2005 release date: April 2005 3 O F 6

Estimates of Construction Cost Care should be exercised not only in the preparation of the estimates of Construction Cost but also in all communications about estimates. The term Estimate of Construction Cost is used in Schedule A because it inevitably is the term that will be used in discussion with the Client. It must be remembered, however, that to many people the word estimate means quotation. Paragraph 2.3 makes it clear that the Estimate of Construction Cost is neither a quotation nor a guarantee and Architect should make certain that their Clients understand the term correctly. Fixed Budget Limit The Agreement does not include a condition for a fixed limit of Construction Cost. The establishment of such a limit is unsatisfactory for most Projects as it tends to invite unrealistic expectations by the Client and may expose the Architect to unreasonable risks. If the Agreement is amended requiring the Architect to keep the Construction Cost within a maximum, i.e., with no budget flexibility to allow for cost increases, the Agreement shall: (a) (b) require the client to include contingency amounts in the Construction Budget in order to accommodate design changes, price escalation before bidding, and cost increases during construction; and permit the Architect to determine what materials, equipment, component systems, and types of construction are to be included in the Contract Documents, to make reasonable adjustments in the scope of the Project, and to include alternative prices in the bidding documents to adjust the Construction Cost to the fixed amount. Liability of the Architect The Agreement provides a fixed sum as a limit to claims that the Client may have against the Architect arising out of errors and omissions by the Architect in providing the professional service. This amount should be defined in the Certificate of Insurance appended to the Agreement in Schedule C. Prior to the execution of the Agreement, if the Client wishes to increase this limit, or to obtain special insurance coverage, the Architect will co-operate with the Client to obtain additional coverage at the Client s expense. Termination Expenses The Agreement provides in Article 3.5 that in the event of abandonment or termination the Client will pay the Architect: (a) (b) fees for services performed to the date of abandonment, or termination; reimbursable expenses then due; (c) termination expenses as outlined in paragraph 3.5.4. Dispute Resolution The CCDC rules of mediated and arbitral procedure (refer to CCDC Document 40) were prepared to allow disputes between the Client and the Consultant, the Client and the Contractor, and the Contractor and the Subcontractor - based upon common facts or issues - to be dealt with at one time in consolidated proceedings. The intention is to avoid a multiplicity of proceedings, inconsistent results and unnecessary costs. It is essential for the parties to these various contracts to incorporate similar dispute resolution clauses into all their agreements, if the Architect and the Architect s Consultants are to become part of a Dispute Resolution process. For further information on the Dispute Resolution process, review the CCDC Rules for Mediation and Arbitration of Construction Disputes - CCDC 40. GUIDE, Document Seven, 2005 release date: April 2005 4 O F 6

Completing the Agreement Form Complete the Agreement and complete every item and make duplicate copies. On the RAIC web site, Document Seven is in PDF (Adobe Acrobat s portable document file ) format, accessible to all computer platforms without the purchase of particular software. 1. To use Document Seven, 2005 from the RAIC website: If you do not have Adobe Acrobat, click on the Get Acrobat Reader link on the website and download the free software; Download Document Seven; Complete ALL the sections of the Agreement and insert additional information on separate pages as necessary. Customize the schedules to suit the project and SAVE and print the completed Agreement; For users of Acrobat Reader, the completed printed (hard copy) of the Agreement will be the only one that may be saved; Print copies of the Agreement and affix an Authorization Seal to each copy of the Agreement to be signed and obtain signatures for each copy. Additional file copies may be photocopied. Date: The date represents the first date on which the parties enter into the Agreement. It may be the date that an oral agreement was reached, the date the Agreement was submitted to the Client, the date authorizing action was taken by the Client, or the date of actual execution. No professional services under this Agreement should be performed prior to the date indicated. 2. Identification of Parties Parties to this Agreement should be identified in the capacity in which the Agreement is to be executed: including the name of the firms, the capacity of persons signing, the address of the principal offices and a designation of the legal status of both parties: sole proprietorship, partnership, joint venture, unincorporated association, limited partnership, or corporation, etc. Where appropriate, a copy of the resolution authorizing the individual to act on behalf of the firm or entity should be attached. 3. Professional Fees and Reimbursable Expenses Paragraph 4.2 Insert the amount of the initial payment. Paragraph 4.3 (a) If the fee is percentage based complete: A Percentage fee as defined in 4.4 of Percent and delete (b). (b) (c) (d) If the fee is a Fixed Fee complete: A fixed fee of $ ( dollars) and delete (a). If a Fee using hourly rates is applicable, name categories, Consultants and hourly rates in Article 5.1 Schedule of Hourly Rates. If the Fee is to be a multiple of Direct Personnel Expense or other fee formula, insert this in Other Conditions, including a definition of Direct Personal Expenses. Paragraph 4.5 If applicable, insert the dollar values or percentages of the fees payable for each separate phase of services or delete. GUIDE, Document Seven, 2005 release date: April 2005 5 O F 6

Paragraph 4.7 Reimbursable Expenses Insert the multiplier applied to reimbursable expenses used to cover the costs of administration. For clarity or where it is expected that certain expenses will be incurred frequently, identifying certain fixed rates may be advantageous. For example, list car expenses per kilometre; or facsimile, printing and photocopying expense per item under Other Conditions. Paragraph 4.8.1 Insert the amount of time after which the fees shall be subject to renegotiation or adjustment. If the firm requires periodic adjustments in hourly rates and multiples, this should be added, along with any limitations on the amount of upward adjustment. 4. Article 5 Other Conditions Here insert the following types of provisions: Additional phases, such as pre-design, site analysis or post-construction, and the services provided in each; Identification of additional services; Detailed description of services included in Schedule A where required: e.g. the extent of office and field functions included during the construction and post-construction phases; Description of Consultants, if any, provided under the fee for services; Provision of renderings, models, displays, marketing brochure plans, drawings or other material; Preparation of multiple sets of Construction Documents for separate contracts; Procedure for award of the Construction Contract (i.e., bidding or negotiation); Construction delivery process (single or separate contracts, stipulated sum or cost-plus contracts); Fixed limit of Construction Cost; Modifications to any services or conditions; Modification to insurance coverage; Other conditions. 5. Execution of the Agreement In executing the Agreement, the parties should indicate the capacity in which they are acting. It is unnecessary for the Architect to affix a professional seal to the document. 6. Schedule A All items on Schedule A must be completed as Architect s services or Client s responsibilities, or marked as not applicable. In addition to those mentioned in the Guide under Article 5, add other services, aspects of service or responsibilities which require further clarification such as lists of drawings, number of meetings budgeted with the Client, the users or authorities and any additional details of authority review. Also note, any other Authorities Having Jurisdiction which will require negotiations specifically related to the Project, such as flood plain control, environmental approvals for waste disposal, as well as approvals for site access; service connections and communications, etc. Complete the form under other to clarify that unidentified approvals are the responsibility of the Client, unless requested as additional services. GUIDE, Document Seven, 2005 release date: April 2005 6 O F 6