Schedule NEM-V Sheet 1 VIRTUAL NET ENERGY METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES

Similar documents
Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Schedule NEM-V-ST Sheet 1 VIRTUAL NET METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES SUCCESSOR TARIFF

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

SCHEDULE NEM-V-ST Sheet 1

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

b. Benefitting Account(s), each of which:

SCHEDULE VNM-A-ST Sheet 1

Advice 4045-E Issued by Date Filed May 18, 2012 Decision ,

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

ELECTRIC SCHEDULE NEM2VMSH Sheet 1 VIRTUAL NET ENERGY METERING FOR MULTIFAMILY AFFORDABLE HOUSING (MASH/NSHP) WITH SOLAR GENERATOR(S)

Schedule GTSR-GR Sheet 1 GREEN TARIFF SHARED RENEWABLES GREEN RATE

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Schedule GTSR-CR Sheet 1 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Rule 22 Sheet 1 DIRECT ACCESS

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

GENERATING FACILITY INTERCONNECTION AGREEMENT FOR MULTIPLE TARIFFS USING A NEM-ST GENERATING FACILITY SIZED GREATER THAN ONE MEGAWATT.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No E.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Please Refer to Attached Sample Form

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Please Refer to Attached Sample Form

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. ELECTRIC SCHEDULE ET Sheet 1 MOBILEHOME PARK SERVICE

SCHEDULE TOU-M Sheet 1 T

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E*

October 24, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Russell G. Worden Director, Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, CA 91770

Rate W: Applies to customers who were on Rate W as of May 1, A-6: Applies to customers who were on A-6 as of May 1, 2006.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

SCHEDULE DR-SES Sheet 1

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No.

NET METERING CUSTOMER SITED RENEWABLE GENERATION FACILITIES POLICY

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

ELECTRIC SCHEDULE A-10 Sheet 1 MEDIUM GENERAL DEMAND-METERED SERVICE

January 22, Establishment of Smart Energy Program and Modification of Summer Discount Plan in Compliance with Decision

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

STANDARD INTERCONNECTION AGREEMENT FOR TIER 1 RENEWABLE GENERATOR SYSTEMS

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES NET METERING FOR CUSTOMER-OWNED RENEWABLE ENERGY GENERATION RESOURCES OF 1,000 KILOWATTS OR LESS

Old Dominion Power Company 220 West Main Street Louisville, Kentucky ELECTRIC SERVICE VIRGINIA STATE CORPORATION COMMISSION

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Please Refer to Attached Sample Form

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. ELECTRIC SCHEDULE A-1 Sheet 1 SMALL GENERAL SERVICE

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM

STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS

Southern California Edison Revised Cal. PUC Sheet No G Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

SCHEDULE EECC-TOU-A-P Sheet 1

Interconnection Request Application Form for Interconnecting a Certified Inverter-Based Generating Facility No Larger than 20 kw

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No.

No. 47. An act relating to the Vermont Energy Act of (H.56) It is hereby enacted by the General Assembly of the State of Vermont:

June 10, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

RULE 24 Sheet 1 DIRECT PARTICIPATION DEMAND RESPONSE E. DEMAND RESPONSE PROVIDER (DRP) SERVICE ESTABLISHMENT

INTERIM ECONOMIC DEVELOPMENT RATE-ATTRACTION AGREEMENT (Post Resolution E-4675) Form I

The following words and terms shall have the following meanings when used in this Tariff:

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR NON-RESIDENTIAL CUSTOMERS

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

SCE STANDARD CONTRACT LONG TERM POWER PURCHASE POWER PURCHASE CONTRACT BETWEEN SOUTHERN CALIFORNIA EDISON COMPANY AND SELLER

December 11, 2003 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

GUAM POWER AUTHORITY SCHEDULE "M" Standby, Auxiliary, Supplementary or Breakdown Service for Customers with Demands of 200 Kilowatts or More

Portland General Electric Company First Revision of Sheet No P.U.C. Oregon No. E-18 Canceling Original Sheet No

Advice Letters 2311-E and 2311-E-A

May 25, Revisions to Southern California Edison s Critical Peak Pricing Programs for Large Customers with Demands Above 200 kw

Halifax Electric Membership Corporation

POLICY NO I. INTRODUCTION

Interconnection Application and Compliance Form For Photovoltaic Systems Up to 2 MW

Transcription:

Southern California Edison Revised Cal. PUC Sheet No. 55676-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 54511-E* APPLICABILITY Schedule NEM-V Sheet 1 Applicable to Qualified Customers whose Service account(s) are located within a multi-tenant and multi-meter property 1 (Property) which include all residential (whether rental properties or condominiums), and commercial and industrial properties on which an Eligible Generator(s) has been installed at a Service Delivery Point (SDP) and for which the Owner or Operator of the Property contracts with SCE to have all eligible energy produced by the Eligible Generator and exported to the grid supplied to SCE for the sole purpose of providing Allocated Credits to accounts served by the same SDP as the generator within the Property. Customers served under Schedules TOU-GS-1-RTP, TOU-GS-2-RTP, TOU-GS-3-RTP, TOU-8-RTP, and TOU-8-RTP-S are not eligible to participate on this Schedule. This Schedule is available on a first-come, first-served basis until the first of the following events occurs, at which time this Schedule will be closed to new Customers: (a) the total combined rated generating capacity of Renewable Electrical Generating Facilities participating under Schedule NEM and Eligible Generators participating under Schedule NEM-V and Schedule MASH-VNM reaches five (5) percent of SCE s aggregate customer peak demand, as defined in Special Condition 1 (hereinafter referred to as the NEM trigger level, which may never be less than 2,240 megawatts in accordance with Public Utilities Code Section 2827(c)(4)(B)(ii)); or (b) July 1, 2017. Qualified Customers who are receiving service on this Schedule, or who have submitted all documentation necessary for receiving service on this Schedule, prior to the date SCE reaches its NEM trigger level, or July 1, 2017, whichever is earlier, are subject to the transition provisions as provided in Special Condition 15 below. (D) To the extent an Electric Service Provider (ESP) or Community Choice Aggregator (CCA) offers virtual net energy metering services, SCE shall provide applicable NEM-V services under this Schedule to a CCA Eligible Customer-Generator or DA customer consistent with services provided to its bundled service customers. As a condition of receiving service under this Schedule, the CCA or ESP shall be responsible for timely providing the applicable generation related bill charges or credits for each DA or CCA account. Each CCA or DA customer shall look to its CCA or ESP for NEM-V services related to the electric generation charges and credits that result from receiving services under this Schedule. The CCA or ESP shall also be responsible for the applicable generation-related bill credit structure associated with this service option and providing the DA Customer with the applicable generationrelated bill credit. DA and CCA customers are not eligible to receive Net Surplus Compensation (NSC) from SCE. TERRITORY Within the entire territory served. RATES All terms and conditions of the Qualified Customer s Otherwise Applicable Tariff (OAT) will apply except that the Allocated Credits for which this Schedule provides will be applied to the monthly bills for all Qualified Customer Service Accounts designated by the Owner/Operator to receive Allocated Credits. An Allocated Credit is determined by multiplying the kilowatt hours (kwh) that the Eligible Generator delivers to the grid by the allocation percentages designated by the Owner or Operator in the Allocation Request Form for the Benefitting Accounts located on the Property. The Allocated Credit reduces the energy billed to the Qualified Customer, as described in Special Condition 9. 1 Multi-Meter means two or more utility revenue meters participating in the NEM-V program, in addition to the Generating Account meter. Advice 3118-E Megan Scott-Kakures Date Filed Oct 23, 2014 Decision Vice President Effective Nov 22, 2014 1C15

Southern California Edison Revised Cal. PUC Sheet No. 53578-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 49801-E RATES Schedule NEM-V Sheet 2 NSC is equal to the Net Surplus Compensation Rate (NSCR) multiplied by Net Allocated Energy Pursuant to PU Code Section 2827 (h)(4)(a). NSC is designed to compensate participating Service Accounts for energy allocated to them in excess of their total consumption over their Relevant Period, as defined in Special Condition 8. The NSCR is based on the default load aggregation point (DLAP) price. See Special Condition 9.g.for calculation of NSCR. Renewable Energy Credits (RECs) are equal to Renewable Attribute Adder (RAA) multiplied by Net Surplus Energy. See Special Condition 9.h. Account Set up Charges and Administrative Charges will apply as follows: 1. A one-time set up charge per newly established Benefitting Account of $25 and capped at $500 per arrangement. 2. For changes to the Benefitting Account allocation percentage, as described in Special Condition 9.b.(1), there will be no charge for up to one change per Benefitting Account per 12 month period. Subsequent changes to each account within the 12 month period will be charged at $7.50 per account change billed to the Generating Account. 3. Disconnect/Reconnect - SCE will inform the Owner at the site assessment about what reasonable disconnect/reconnect procedure charges they may expect at the time of interconnection. Cost for disconnect/reconnect will vary depending on the number of hours required to complete this work based on factors including but not limited to: grounding or splicing requirements, effect of disconnect on multiple customers, SCE s need to stand by during customer performed work or if the disconnect/reconnect occurs outside normal business hours. This policy and cost variations are consistent with charges for disconnect/reconnect for all customers, not just for Schedule NEM-V. The Disconnect/Reconnect charge could range from $0-$5,000. SPECIAL CONDITIONS 1. Definitions: Except as otherwise defined in Rule 1, terms utilized in the context of this Schedule are defined below: a. Qualified Customer: A Qualified Customer is either: (i) the Owner or Operator of the multitenant, multi-meter Property with one or more separately metered accounts; (ii) an entity authorized by the owner to install and/or operate the generating facility and who will be the IOU s customer of record for the Generating Facility; or (iii) a tenant/occupant of the Property with a separately metered account which is physically connected to the same SDP to which the Eligible Generator is connected. b. Owner: An Owner is the Qualified Customer who has the legal right or rightful claim to ownership of the Property on which one or more Eligible Generator(s) have been installed. c. Operator: An Operator is a Qualified Customer who operates a business by leasing or renting the property from an Owner and who has an Eligible Generator located on the Property. Advice 2975-E Megan Scott-Kakures Date Filed Nov 26, 2013 Decision 11-06-016 Vice President Effective Jan 25, 2014 2C14

Southern California Edison Original Cal. PUC Sheet No. 49802-E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule NEM-V Sheet 3 SPECIAL CONDITIONS 1. Definitions: d. Generating Account: An Eligible Generator interconnected with SCE through a single meter for which the Owner or Operator is an SCE customer. e. Benefitting Account: Each Qualified Customer Service Account which the Owner has designated on the Allocation Request Form to receive an Allocated Credit. The Qualified Customer currently served under Schedule NEM is not qualified to be a Benefitting Account to receive Allocated Credits. f. Arrangement: An individual Generating Account and all associated Benefitting Accounts that will be allocated generation credit from the Generating Account. A customer may have more than one Arrangement, but Generating Accounts and Benefitting Accounts may not be shared across multiple Arrangements. There should be more than one Benefitting Account per Arrangement. g. Eligible Generator: A Renewable Electrical Generating Facility with a capacity of not more than one megawatt that is: (i) located on the Owner or Operator s Property; (ii) interconnected and operates in parallel with the electric grid; and (iii) intended primarily to offset part or all of the combined electrical requirements of all Benefitting Accounts interconnected at the same SDP. If multiple Eligible Generators are connected to the same SDP, as specified in Special Condition 1.b. of this Schedule, they must all be connected to the same meter. Advice 2625-E-A Akbar Jazayeri Date Filed May 4, 2012 Decision Vice President Effective Jun 3, 2012 3C29 E-4481

Southern California Edison Revised Cal. PUC Sheet No. 53579-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 50930-E Schedule NEM-V Sheet 4 SPECIAL CONDITIONS 1. Definitions: h. Renewable Electrical Generation Facility: A facility that generates electricity from a renewable source listed below pursuant to paragraph (1) of subdivision (a) of Section 25741 of the Public Resources Code. These renewable sources are further defined in the California Energy Commission s (CEC s) Renewable Portfolio Standard (RPS) Guidebooks: 2 Biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells using renewable fuels, small hydroelectric generation, digester gas, municipal solid waste conversion, landfill gas, ocean wave, ocean thermal, or tidal current, and any additions or enhancements to the facility using that technology. Customers will be required to sign an affidavit (Form 14-912) certifying that they are an Eligible Customer Generator. In addition a customer using municipal solid waste conversion, fuel cells, or small hydroelectric generation will be required to certify that the following technology specific criteria have been met: (1) For purposes of this schedule, qualifying "solid waste conversion" is defined pursuant to PR Code Section 25741(b). (2) For purposes of qualifying under fuel cells using renewable fuels, the electrical corporation must use fuel that is powered solely with renewable fuel. (3) For purposes of qualifying as a small hydroelectric generation facility, the customer must certify that the facility will neither cause an adverse impact on in stream beneficial uses nor cause a change in the volume or timing of stream flow. 2 Renewables Portfolio Standard (RPS) Eligibility Guidebook: http://www.energy.ca.gov/renewables/documents/#rps. (D) Advice 2975-E Megan Scott-Kakures Date Filed Nov 26, 2013 Decision 11-06-016 Vice President Effective Jan 25, 2014 4C15

Southern California Edison Original Cal. PUC Sheet No. 50931-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 49803-E Schedule NEM-V Sheet 5 SPECIAL CONDITIONS 1. Definitions: i. Aggregate Customer Peak Demand: Aggregate Customer Peak Demand is defined as the highest sum of all customers non-coincident peak demands that occur in any calendar year (i.e., the aggregation, or sum, of each individual customer s peak demand in any calendar year) and is the denominator used in the formula to calculate progress toward reaching the NEM program cap. For this purpose, SCE utilizes load research studies based on a four-year moving average (e.g., 2012 calculations are based on 2007-2010 annual load research data, and 2013 calculations are based on 2008-2011 annual load research data) using 15-minute interval data. Aggregate Customer Peak Demand, when used for determining the NEM program cap, is updated annually but may not decrease below the most recent level determined. 2. Service Delivery Point is as defined in SCE s Rule 16, where SCE's Service Facilities are connected to either Applicant's conductors or other service termination facility designated and approved by SCE. Customer-owned line extensions that deliver power to other meters on the same property are not considered separate Service Delivery Points. (L) (L) Advice 2790-E Akbar Jazayeri Date Filed Oct 4, 2012 Decision 12-05-036 Vice President Effective Nov 3, 2012 5C12

Southern California Edison Revised Cal. PUC Sheet No. 56095-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53580-E Schedule NEM-V Sheet 6 SPECIAL CONDITIONS 3. Contracts: The Owner or Operator must execute the following contract(s) to qualify for this Schedule. a. Net Energy Metering (NEM) Generating Facility Interconnection Application (Form 14-957); b. Virtual Net Energy Metering For Multi-Tenant and Multi-Meter Properties Interconnection Agreement (Form 14-909); and c. Virtual Net Energy Metering For Multi-Tenant and Multi-Meter Properties Allocation Request Form (Form 14-910). d. A Net Surplus Compensation Rate and Renewable Energy Credit Compensation Selection Form (Form 14-906) to certify that the Owner s or Operator s generating facility is a Qualifying Facility pursuant to the Public Utility Regulatory Policies Act of 1978 that is exempt from certification at the Federal Energy Regulatory Commission. Service Accounts receiving NSC are defaulted to the bill credit option. e. Renewable Energy Compensation Form (Form 14-935) at the end of each Relevant Period to receive Renewable Energy Compensation. See Special Condition 9.h. 4. Metering Requirement: The Owner or Operator will be responsible for and will pay all costs associated with the installation by SCE of a Net Generator Output Meter (NGOM) capable of recording generator output in fifteen minute intervals. SCE must approve the location of the net generator output metering equipment. The Owner or Operator using a Performance Based Incentive (PBI) meter for CSI incentives will not be required to install an additional net generation output meter; however, the PBI meter will need to be: (i) a utility owned meter; (ii) a utility read meter where SCE will read the PBI meter data for purposes of providing CSI incentive payment; and (iii) installed in a location approved by SCE. Mutually exclusive of this metering requirement for CSI incentives, the Owner and Operator of a PBI system will need to contract separately for Performance Monitoring and Reporting Service (PMRS) as required by the CSI Program. a. The point of common coupling where the Eligible Generator transfers energy to SCE s grid will be measured (metered) using a single net generator output meter capable of registering the flow of energy in two directions. If the Owner or Operator s existing meter is not capable of measuring the flow of energy in two directions, an appropriate meter will be provided at the expense of the Owner or Operator to provide the information necessary to determine Allocated Credits as provided under this Schedule. No additional load other than incidental load related to the inverters and support of the Eligible Generator(s) may be registered on the generator output meter. Advice 3162-E Megan Scott-Kakures Date Filed Jan 12, 2015 Decision 14-11-001 Vice President Effective Feb 11, 2015 6C9

Southern California Edison Revised Cal. PUC Sheet No. 50933-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 49805-E* Schedule NEM-V Sheet 7 SPECIAL CONDITIONS 4. Metering Requirement: b. Each Benefitting Account will have a standard SCE billing meter. If any Benefitting Account designated to receive Allocated Credits takes service on a time-of-use (TOU) rate schedule, a meter capable of Interval Metering will be required on the Generating Account. c. The cost of the NGOM varies from project to project, depending on the type of meter required to interconnect the particular project. The specific meter depends on several factors, including the generating capacity, the interconnection voltage, the type of realtime communication built in to the meter, and the reporting interval of the specific meter. The cost of the meter is a one-time payment that covers the costs of material, labor, replacement, and maintenance. The table below shows examples of a wide variety of available meters and their costs. This list is not a comprehensive list, and several other meters are available. The particular meter required for a customer s project may not appear on this list, and SCE will work with the customer to determine the specific meter needed for the project. The costs of the meters shown in the table are existing costs and may be updated as needed. Sample Costs By Meter Meter Type Estimated Self-Contained Meter Installation (Interconnection Voltage: 600 V) (Generator Capacity: < 200 kw) $861.68 Self-Contained Three Phase IDR Meter Installation (Interconnection Voltage: 600 V) (Generator $950.44 Capacity: < 200 kw) Instrument-Rated Meter Installation with RTEM* (Interconnection Voltage: 600 V) (Generator $5,322.97 Capacity: 730-860 kw) Primary Instrument rated Meter Installation with RTEM (Interconnection Voltage: 4 kv) (Generator $10,232.7 Capacity: 360-540 kw) 2 Primary Instrument rated Meter Installation with RTEM (Interconnection Voltage: 12 kv) (Generator $13,535.3 Capacity: <1000 kw) 4 * RTEM: Real Time Energy Metering 5. Interconnection Costs: The Owner or Operator of the Eligible Generator must pay all interconnection costs required under Rule 21, including but not limited to re-wiring, trenching, conduit, and other facility costs. 6. Annual Solar Energy Credit: The total energy (in kwhs) estimated to be recorded by the generation output meter and allocated to Benefitting Account at any SDP must not exceed the total estimated energy usage (in kwhs) of the Benefitting Accounts connected to the same SDP for the next twelve months for a new Property, or the previous twelve months recorded energy usage for an existing Property. Compliance with this requirement will be determined when SCE conducts an energy audit of the customer s Property. Advice 2790-E Akbar Jazayeri Date Filed Oct 4, 2012 Decision 12-05-036 Vice President Effective Nov 3, 2012 7C11

Southern California Edison Revised Cal. PUC Sheet No. 53354-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 50934-E Schedule NEM-V Sheet 8 SPECIAL CONDITIONS 7. Generation Limitation: The combined capacity of the Eligible Generator connected to a SDP is limited to the cumulative coincident peak load of all Benefitting Accounts at the SDP. No generator(s) other than Eligible Generator(s), as defined in this Schedule, can be connected behind the single generation output meter used to meter generation allocated under this Schedule. The Owner or Operator is responsible for any costs associated with upgrades to existing facilities necessitated by the install of generation which exceeds the capacity of the existing service connection or distribution circuit. 8. Relevant Period: A twelve-month period, or portion thereof, commencing on the next regularly scheduled meter read date following the Date of written approval of Parallel Operation of the Owner s or Operator s Eligible Generator to SCE s electric system, for purposes of participation in the NEM-V program, and on every subsequent anniversary of that date. Customers may elect to change the start date of their Relevant Period on a one-time prospective basis by completing and returning Form 14-936, NEM One-Time Relevant Period Change Request Form, to SCE. SCE must receive this form at least 60 days prior to the requested start date of the new Relevant Period. When the start date change is effectuated it will cause a shortened existing Relevant Period and the new 12-month Relevant Period will begin. In no case will a Relevant Period extend beyond 12 months. a. If a Qualified Customer terminates service or if the identity of the Qualified Customer changes before the end of a Relevant Period, the Relevant Period for that Qualified Customer s Service Account will consist of that period from the Interconnection Date, or a subsequent anniversary date, until the effective date of termination or change of identity. If the identity of the Qualified Customer changes at the location of an installed Service Account, a new Relevant Period will commence for that Qualified Customer on the next regularly scheduled meter read date following the date the new Qualified Customer takes service under this Schedule, and every subsequent anniversary. b. If an Owner or Operator terminates service under this Schedule for the Property prior to the end of any Relevant Period, the Relevant Period for all associated Benefitting Accounts will end on the effective date of the service termination. c. If a change of Owner or Operator occurs for a Property prior to the end of any Relevant Period, the Relevant Period for the Owner s or Operator s associated Benefitting Accounts will end. The new Owner s or Operator s associated Benefitting Accounts will automatically be placed on this Schedule and a Relevant Period will begin for that new Owner or Operator on the next regularly scheduled meter read date following the date the new Owner or Operator takes service under this Schedule, and every subsequent anniversary. Qualified Customers in individual tenant units will retain their designated Relevant Period as defined prior to the change of ownership. 9. Billing Process: The following billing process will be used: a. Gross Credit: The metered kwh output of the Eligible Generator, delivered to SCE s grid, as metered at the point of common coupling, described in Special Condition 3.a., during the billing period of the Generating Account. Advice 2965-E Megan Scott-Kakures Date Filed Nov 15, 2013 Decision Vice President Effective Dec 15, 2013 8C14

Southern California Edison Revised Cal. PUC Sheet No. 57746-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 50935-E Schedule NEM-V Sheet 9 SPECIAL CONDITIONS 9. Billing Process: b. Allocated Credits: (1) The Owner or Operator determines the percentage of Gross Credit that will be allocated to the individual Benefitting Account(s) on the Virtual Net Energy Metering For Multi-Tenant and Multi-Meter Properties Allocation Request Form (Form 14-910). The owner may designate in the same Allocation Request Form unallocated credit to either the Common Area Account or one Benefitting Account. This is credit that is allocated to a particular unit but not applied to a Qualified Customer s bill due to occupant nonparticipation or unit vacancy. These allocations will become effective on the next regularly scheduled meter read date following the date on which SCE provides the Owner or Operator with written approval to begin parallel operation of the Eligible Generator with the electric grid. If the Owner or Operator wishes to request a change in the allocation percentages, a charge will be assessed as reflected under the Rates section. Revised allocation percentages under this provision will become effective on the next regularly scheduled meter read date that is at least 30 days after SCE receives the allocation request form. (2) The individual allocation of kwhs to each Benefitting Account is calculated by multiplying the Gross Credit by the designated percentage allocation for each individual Benefitting Account. c. Qualified Customer Bill: Qualified Customers served under this Schedule are responsible for all charges of their OAT. Each billing cycle, Allocated Credits, in kwhs, are subtracted from the metered usage. Charges are applied to the resulting kwh according to the provisions of the Benefitting Account s OAT. The bill may therefore reflect either a charge or a credit. For DA and CCA Service Qualified Customers, charges are applied to the resulting kwh difference according to the Delivery Service charge of the customer s OAT. Applicable components of the Cost Responsibility Surcharge (CRS) are also applied to the resulting kwh difference according to the provisions of Schedule DA-CRS or Schedule CCA-CRS. The bill may therefore reflect either a charge or a credit. d. Benefitting Account OAT with Baseline Rates: Allocated Credits are subtracted first from the non-baseline usage, if any, and then subtracted from baseline usage until credits are exhausted. e. Benefitting Account OAT with TOU Rates: Allocated Credits for each TOU period are subtracted from the energy usage for that same TOU period. Advice 3308-E R.O. Nichols Date Filed Nov 13, 2015 Decision Senior Vice President Effective Dec 13, 2015 9C17

Southern California Edison Revised Cal. PUC Sheet No. 57747-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55677-E Schedule NEM-V Sheet 10 SPECIAL CONDITIONS 9. Billing Process: f. Bill Payment: Qualified Customers are required to pay their bill on a monthly basis. Excess credits, in dollars, are carried over to the following billing period, until the end of the Relevant Period. An annual true-up occurs at the end of the Relevant Period, pursuant to PU Code Section 2827(h). Upon completion of the annual true-up, any remaining credits will be retained by SCE and the Qualified Customer will not be entitled to any compensation unless the Owner or Operator has executed the Net Surplus Compensation Rate Selection Form (Form 14-906) to certify that the generating facility is a Qualifying Facility pursuant to the Public Utility Regulatory Policies Act of 1978 that is exempt from certification at the Federal Energy Regulatory Commission. If the Owner or Operator elects such compensation, the Qualified Customer may receive credit or compensation based on a comparison of the Benefitting Accounts allocated energy and metered consumption at the conclusion of the relevant period. Additionally, Special Condition 14 may apply for Residential Customers. The Qualified Customer will continue to receive such compensation for each Relevant Period following the execution of such election, unless the Owner or Operator affirmatively elects to end Net Surplus Energy compensation. The Owner or Operator is eligible to revise their Net Surplus Energy elections, annually, as provided under Rule 12. For DA and CCA Service Qualified Customers, separate annual true-ups of all charges and credits, consistent with the provisions set forth under this Schedule, will be calculated 1) by SCE for the applicable SCE charges and credits and 2) by the ESP or Community Choice Aggregator for the applicable ESP and CCA charges and credits. Upon completion of the annual true-up, any remaining Delivery Service and/or CRS credits will be retained by SCE and the Qualified Customer will not be entitled to any compensation from SCE. DA and CCA Service Qualified Customers are not eligible to receive Net Surplus Compensation (NSC) from SCE. g. NSCR is equal to the simple rolling average of SCE hourly $ per kwh prices from Hour Ending 08 through Hour Ending 17 (7 a.m. to 5 p.m.) for each day for the 12 month period corresponding to the customer s 12 month Relevant Period. The rolling average is calculated on a monthly basis to be effective the first of each month and is applied to all customers with a Relevant Period ending in that month. SCE uses a full 12 months (365 days, or 366 days for leap years) of DLAP price, as published on the (20 th ) day of each month. SCE then calculates the NSCR within five days of the first of the month to allow the CASSO to finalize the day-ahead DLAP prices. This rate will be applied to all eligible net surplus generators, irrespective of their rate class. The NSCR will be posted on SCE s website and updated monthly. (L) Advice 3308-E R.O. Nichols Date Filed Nov 13, 2015 Decision Senior Vice President Effective Dec 13, 2015 10C16

Southern California Edison Revised Cal. PUC Sheet No. 57748-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55677-E Original 53582-E Schedule NEM-V Sheet 11 SPECIAL CONDITIONS: 9. Billing Process: h. The California Energy Commission (CEC) has determined the eligibility of net energy metering customer facilities for the Renewables Portfolio Standard (RPS) and has developed an ownership verification, tracking and certification process for Renewable Energy Credits (RECs) created by net surplus generators, which is set forth in the CEC s RPS Eligibility Guidebook, available at: http://www.energy.ca.gov/renewables/documents/#rps. Pursuant to D.11-06-016, SCE will include a Renewable Attribute Adder (RAA) with the NSC rate if an eligible customer or the customer s aggregator provides a completed Form 14-935 to SCE (see Special Condition 3.e) verifying that the customer; (1) has registered the generation facility at the WREGIS system: (2) has obtained RPS ownership certification from the CEC for the customer s net surplus generation and provides this certification to SCE; and (3) allows for the ownership of the RECs associated with the customer s net surplus electricity to be transferred to SCE. (L) (L) For details on the CEC and WREGIS certification process, refer to the CEC s RPS Eligibility Guidebook, which can be found at the link shown above. The RAA will be calculated using the most recent Western Electricity Coordinating Council (WECC) average renewable premium, based on United States Department of Energy (DOE) published data. The RAA will only be paid to those net surplus generators who provide RECs to SCE. Value of RECs = Net surplus kwhs x RAA. See RATES section. At the conclusion of each Relevant Period, the eligible customer will notify SCE that the customer has transferred in WREGIS the RECs associated with the net surplus generation by completing Form 14-935 and will send the CEC RPS certificate with the form to SCE. The RAA will be updated annually and is available at: https://www.sce.com/wps/portal/home/regulatory/tariff-books/rates-pricingchoices/renewable-energy-credit i. Bill payments made by the Qualified Customer within the relevant period will continue to be applied to the Qualified Customer account. j. Billing information: SCE shall provide each Customer with its net energy consumption information with each regular bill. That information shall include the current monetary balance owed to SCE for the net energy consumed since the start of the current relevant period. Advice 3308-E R.O. Nichols Date Filed Nov 13, 2015 Decision Senior Vice President Effective Dec 13, 2015 11C17

Southern California Edison Revised Cal. PUC Sheet No. 53583-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 50937-E Schedule NEM-V Sheet 12 SPECIAL CONDITIONS 9. Billing Process: j. For purposes of calculation of all customer charges, standby charges, and demand charges, a NEM-V customer will be treated identically as a NEM customer, pursuant to PU Code 2827(g). NEM-V customers who are on an OAT with demand charges, and who wish to receive a demand credit, will need to notify SCE, an incremental billing fee of $400 per month, per account, will be charged. This is a demand credit that is not provided to an NEM customer, since the reduced demand is a function of on-site generation. 10. Demand response payments to NEM-V customers shall be based on the customer s metered usage disregarding any contributions from virtually net metered generation. Similarly, any other demand response programmatic elements that are affected by a customer s load (e.g., program eligibility) should also exclude from consideration any impacts of NEM-V generation. 11. Insurance: Owner/Operator must keep in force the amount of property, common general liability and/or personal liability insurance Owner/Operator has in place at the time they initiate service on this tariff. 12. Release of Information: Owner/Operator agrees that SCE may from time to time release to the California Energy Commission and/or the California Public Utilities Commission information regarding the Owner/Operator s name, the Solar Generating Facility location, its capacity and operating characteristics. 13. Pursuant to Public Utilities Code Section. 2827 (c)(2), any customer with an existing electrical generating facility and meter who enters into a new net energy metering contract shall complete and submit a copy of form 14-903 NEM/MASH-VNM/NEM-V Inspection Report to SCE, unless the electrical generating facility and meter have been installed or inspected within the previous three years. The NEM/MASH-VNM/NEM-V Inspection Report shall be prepared by a California licensed contractor who is not the owner or operator of the facility and meter. A California licensed electrician shall perform the inspection of the electrical portion of the facility and meter and sign the NEM/MASH-VNM/NEM-V Inspection Report. If an inspection is required, the customer shall submit the fully completed NEM/MASH-VNM/NEM-V Inspection Report to SCE within 90 days of the customer becoming the customer of record at this account, or else the customer agrees to disconnect their Generating Facility and inform SCE it no longer will take service on Schedule NEM or MASH-VNM or NEM-V. By signing the interconnection agreement, the NEM/MASH-VNM/NEM-V Inspection Report shall be incorporated into it. Advice 2975-E Megan Scott-Kakures Date Filed Nov 26, 2013 Decision 11-06-016 Vice President Effective Jan 25, 2014 12C16

Southern California Edison Revised Cal. PUC Sheet No. 54512-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 54298-E Schedule NEM-V Sheet 13 SPECIAL CONDITIONS 14. California Climate Credit Cash-Out Provision for Residential Customers: Customers receiving service on a Residential rate schedule receive a semi-annual California Climate Credit from the State of California. In the event that a portion or all of the dollar value of the California Climate Credit cannot be consumed by the end of the Qualified Customer s Relevant Period, one of the following will occur: 1) For Residential Qualified Customers eligible to receive NSC via the separate check option any remaining California Climate Credit balance will be added to the NSC owed the Qualified Customer and sent with the NSC check, or 2) for all other Residential Qualified Customers any remaining California Climate Credit balance will be sent to the Qualified Customer via a separate check after the final billing statement for the current Relevant Period is issued. 15. NEM-V Transition Provisions: This Special Condition is applicable to all Qualified Customers who are receiving service on this Schedule, or who have submitted all documentation necessary for receiving service on this Schedule, prior to the date SCE reaches its NEM trigger level or July 1, 2017, whichever is earlier. a. 20-Year Transition Period. Pursuant to Decision 14-03-041, Qualified Customers who are receiving service on this Schedule prior to the date SCE reaches its NEM trigger level or July 1, 2017, whichever is earlier, are eligible to continue receiving service on this Schedule for a period of 20 years from the original year in which their Eligible Generator was interconnected to SCE s grid, indicated by and measured from the date on which the Qualified Customer initially received permission to operate (PTO) the Eligible Generator from SCE and ending at the conclusion of the Qualified Customer s applicable Relevant Period that ends immediately on or after the 20 th anniversary of the original PTO date. For example, if a Qualified Customer initially received PTO on April 1, 2014, the Qualified Customer is eligible to continue receiving service on this Schedule through the conclusion of the Qualified Customer s Relevant Period ending immediately on or after March 31, 2034. Qualified Customers that complete and submit all required documentation for service on this Schedule to SCE prior to the date that SCE reaches its NEM trigger level or July 1, 2017, whichever is earlier, are eligible for the 20-year transition period, which will commence on the Qualified Customer s PTO date, even if the PTO date is on or after the date SCE reaches its NEM trigger level or July 1, 2017, whichever is earlier. Qualified Customers have the option of transitioning to the successor tariff to this Schedule, subject to the terms and conditions of the successor tariff, prior to the conclusion of their 20-year transition period. However, Qualified Customers electing this option permanently forfeit any of their Eligible Generator s remaining transition period eligibility on this Schedule and may not later change back to receiving service under this Schedule. Advice 3041-E Megan Scott-Kakures Date Filed May 19, 2014 Decision 14-03-041 Vice President Effective Jun 18, 2014 13C15

Southern California Edison Original Cal. PUC Sheet No. 54513-E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule NEM-V Sheet 14 SPECIAL CONDITIONS 15. NEM-V Transition Provisions: b. Modifications. Eligible Generators eligible for the 20-year transition period that are modified and/or repaired on or after the date SCE reaches its NEM trigger level or July 1, 2017, whichever is earlier, shall remain eligible for the remainder of their 20-year transition period as long as the modifications and/or repairs do not increase the Eligible Generator by more than the greater of (1) 10 percent of the Eligible Generator s nameplate rating capacity, as established when the Eligible Generator was originally interconnected, or (2) 1 kw; and provided the modifications and/or repairs do not result in the Eligible Generator exceeding a total generation capacity of 1 MW and the generation limitation as provided in Special Conditions 1.g.iii and 7 of this Schedule. Qualified Customers making modifications and/or additions to their Eligible Generators on or after the date SCE reaches its NEM trigger level or July 1, 2017, whichever is earlier, that exceed the 10 percent or 1 kw limit referenced above have the option of either metering the additions and/or modifications separately under the successor tariff, or having the entire Eligible Generator served under the successor tariff, subject to the terms and conditions established in the successor tariff. c. Transferability. Eligible Generators eligible for the 20-year transition period shall not lose their eligibility if transferred to a new owner, operator, or SCE account, provided the Eligible Generator remains at its original location and the Qualified Customer has not elected or does not elect to transition to the successor tariff. The transfer of an Eligible Generator to a new location is considered a new installation requiring a new interconnection agreement and would not qualify for the 20-year transition period if the relocation occurs on or after the date SCE reaches its NEM trigger level or July 1, 2017, whichever is earlier. d. Energy Storage Systems. To the extent that eligible energy storage systems are considered an addition or enhancement to an Eligible Generator served under this Schedule, the energy storage systems shall be treated in the same way, and subject to the same transition period, as the Eligible Generators to which they are connected. Advice 3041-E Megan Scott-Kakures Date Filed May 19, 2014 Decision 14-03-041 Vice President Effective Jun 18, 2014 14C15