Lesotho Highlands Water Project. Phase II Construction Contracts Procurement Rules (T TENTE DM Phase II) 29 th May 2017

CONTENTS. Phase I Phase II Costs Implementation program

Ola Busari. Acting CEO, TCTA. 18 April 2018

Evaluating tenders offers

Presentation of the TCTA Strategy for 2012 to 2013

Framework agreements. Framework agreement. Figure 1: Call-offs over the term of a framework contract. Package / batch /

PART A INVITATION TO BID YOU ARE HEREBY INVITED TO BID FOR REQUIREMENTS OF THE

TCTA. Raw Water Resource Infrastructure Model

PART I PRELIMINARY 1. These Regulations may be cited as the Public Procurement and Disposal (Preference and Reservations) Regulations, 2011.

The Director-General National Treasury Private Bag X115 PRETORIA 0001

Yellow cells denote information required to be entered. Grey cells denote no information should be entered.

DEPARTMENT OF PUBLIC WORKS

Presentation to Parliamentary Portfolio Committee 11/19/10 11

STANDARD TENDER DOCUMENTS FOR PROCUREMENT OF WORKS (MINOR CONTRACTS)

Procurement Approval Form (Refer to OpsPedia for forms appropriate to requested action)

ANNEXURE F TENDER EVALUATION AND SCORING

ANNEX VIII b STANDARD FORMATS AND TEMPLATES

REQUEST FOR INSPECTION

REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL SERVICES. Issued February 19, 2018 Responses due March 5, 2018 at 3 pm local time

TENDERING PROCEDURES

Legal Provisions in Procurement PUBLIC PROCUREMENT AND ASSET DISPOSAL ACT, 2015

i TELECOMMUNICATIONS (UNIVERSAL SERVICE FUND) REGULATIONS, 2008 ARRANGMENT OF REGULATIONS PART I PRELIMINARY PART II UNIVERSAL SERVICE FUND

REQUEST FOR PROPOSALS FROM SERVICE PROVIDERS FOR LEGAL SERVICES TO BE PROVIDED TO TRADE AND INVESTMENT KWAZULU-NATAL

RESULTS OF THE 2011 SURVEY OF THE. cidb CONSTRUCTION INDUSTRY INDICATORS MARCH Prepared by: Prof. HJ Marx

REQUEST FOR QUOTATION [RFQ]

NOTICE INVITING TENDER (NIT)

TRANSFORMATION POLICY

Procurement of Works & User s Guide

PENNSYLVANIA TURNPIKE COMMISSION

LOCAL CONTENT. Tanzania - Petroleum

REQUEST FOR QUOTATION. Request Details

REPUBLIC OF KENYA BOMET COUNTY BOMET COUNTY ASSEMBLY SECOND ASSEMBLY-FIRST SESSION THE COMMITTEE ON ROADS, TRANSPORT AND PUBLIC WORKS REPORT

Outreach Seminar: Business Opportunities in World Bank-Funded Projects FY 2014

New Development Bank Procurement Policy

REQUEST FOR QUOTATIONS (RFQ)

JACOBUS MICHIEL DU PLOOY I N D I C T M E N T. 1. The Accused is Jacobus Michiel Du Plooy, an adult male, South African, of 4 Hill

Danida Business Finance. Rules for Procurement

Universal Service Fund. (A company setup under Section 42 of the Companies Ordinance 1984) Request for Submission of Proposals (RFP) For

ANTI-DISCRIMINATION POLICY of the SCHOOL DISTRICT OF PHILADELPHIA ADOPTED NOVEMBER 14, 2007

INVITATION TO SUBMIT QUOTATIONS

1.12 Date of budget revision submission: Enter the month and year the budget revision was submitted for approval Prepared by: Enter the name of

Code of Conduct for The Sixth AP Fund

The Fund is governed by Illinois Compiled Statutes, which can be viewed at:

DETERMINATION OF LESOTHO ELECTRICITY COMPANY (Pty) Ltd s APPLICATION FOR A TARIFF INCREASE FOR 2010/11

PENNSYLVANIA TURNPIKE COMMISSION. Reference No

REQUEST FOR QUOTATION (RFQ)

DIRECT SALE OF CRUDE OIL AND DIRECT PURCHASE OF PETROLEUM PRODUCT (DSDP)

Restoring confidence in South Africa to oil wheels for growth Dimanche, 05 Août :10 - Mis à jour Dimanche, 05 Août :12

Provision of Janitorial & Related Services

South African Airways RFQ GSM032/2018. South African Airways. RFQ GSM 032/2018 Request for Quotation for Wine/Bottle Openers

Assignment of Consultants

An EMPOWERDEX Guide. The Codes of Good Practice. Codes Definitions

EIB Procurement Policy and Best Practice

NOTICE INVITING TENDER (NIT)

The Government of the Republic of South Africa and the Government of the Kingdom of Lesotho (hereinafter called "the Parties");

ALL AGENCY SERVICE CONTRACT PROCUREMENT GUIDELINES Adopted by the Board on March 21, 2018

"PREVIEW COPY ONLY" TRANSNET SOC LTD. REQUEST FOR QUOTATION [RFQ] No RME JHB 213/2014. TRANSNET FREIGHT RAIL RME, a division of

REQUEST FOR QUOTATION (RFQ) YOU ARE HEREBY INVITED TO SUBMIT OFFER TO THE DENEL CORPORATE OFFICE

Water Finance and Investment in South Africa

Managerial Accountability in Budget Execution. Bill Dorotinsky Sector Manager, World Bank Co-lead, Global Expert Team on Public Sector Performance

TERMS OF REFERENCE FOR THE APPOINTMENT OF A SERVICE PROVIDER FOR THE RENTAL OF XEROX DOCUMENT MANAGEMENT SCANNERS FOR THE NATIONAL LOTTERIES

NOTICE INVITING TENDER (NIT)

APPLICATION FOR PRE-QUALIFICATION OF CONTRACTORS/ APPLICATORS FOR TERRACE WATERPROOFING WORKS IN BANK S RESIDENTIAL FLATS AT GHATKOPAR (E), MUMBAI

CONSTRUCTION INDUSTRY DEVELOPMENT REGULATIONS. GN 692 in GG of 9 June as amended by

Procurement Guidelines for AFD- Financed Contracts in Foreign Countries. Agence Française de Développement

THE RUSSIAN PRESIDENCY IN G20: PRIORITIES AND GENERAL APPROACHES

Middlesex-London Health Unit Procurement Protocols

UK Joint Ventures: Sanctions And Corruption Risks

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

RESPONSE TO QUERIES (To Form Part of the Bid Document)

INVITATION TO TENDER FOR THE CO-ORDINATION OF THE STUDENT ENTERPRISE AWARDS

PENNSYLVANIA TURNPIKE COMMISSION

int Republic of Cameroon Redacted Report Lorn Pangar HydroPower Project WORLD BANK GROUP World Bank IFC MIGA Official Use Only Integrity

COST OF MOTOR INSURANCE

REQUEST FOR QUALIFICATIONS. For LEGAL SERVICES. April 26, 2017

PREFERENCE POINTS CLAIM FORM IN TERMS OF THE PREFERENTIAL PROCUREMENT REGULATIONS 2017

REQUEST FOR PROPOSALS (RFP)

VALUE FOR MONEY ASSESSMENT BLUEWATER HEALTH REDEVELOPMENT PROJECT

XII. Public Private Partnerships for Public Transport Investments

PROCUREMENT POLICY. EDD Revision Date: 8/24/00 WDB Review Date: 6/21/07; 12/20/07; 12/17/15 EXECUTIVE SUMMARY: Purpose:

BLACK ECONOMIC EMPOWERMENT ALERT

Procurement of Small Works

Applied Workshop on Preparing Infrastructure Projects 21 th - 25 th March Bangkok DAY 2

GUIDELINE FOR ASSESSMENT OF LOCAL GOVERNMENTS ON THE MINIMUM CONDITIONS AND PERFORMANCE MEASURES TO ACCESS THE LDG

South African Airways

RESULTS OF THE 2010 SURVEY OF THE. cidb CONSTRUCTION INDUSTRY INDICATORS MAY Prepared by: Dr HJ Marx

Subsection Policies (policy #)

Phone: Fax: Website: Application for Registration as a Contractor

SOUTH AFRICAN NATIONAL PARK REQUEST FOR QUOTATION

2 nd November About the Institutions

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Standard Request for Proposals Selection of Consultants

University Estates: Facilities Planning & Facilities Management

Tender Specifications attached to the Invitation to tender

Inform Practice Note #16

REQUEST FOR SUPPLIER QUALIFICATION

Procurement Federal Programs

Licensed Financial Service Provider PROPOSAL FORM. ANNUAL PROFESSIONAL INDEMNITY INSURANCE For DESIGN & CONSTRUCT / TURNKEY CONTRACTORS

BOROUGH OF STROUDSBURG

FOR OFFICLAL USE ONLY

Transcription:

LESOTHO HIGHLANDS WATER PROJECT PHASE II PROCUREMENT RULES FOR CONSTRUCTION CONTRACTS

CONTENTS Legal Framework Funding Procurement Objectives and Principles Implementation Guidelines Concluding Remarks

LEGAL FRAMEWORK

LEGAL DOCUMENTS LHDA Order No 23 of 1986 as amended LHWP Treaty of 1986 and Protocols Phase II Agreement of 2011 Applicable Lesotho laws

THE LHWP TREATY The Treaty commits the two Governments to the implementation of Phase 1 and subjects other phases to negotiations Provisions of the 1986 Treaty and its Protocols remain valid unless otherwise amended by the Phase II Agreement

PHASE II AGREEMENT Procurement Article 10: Competitiveness, transparency, cost effectiveness and quality Order of Preference order: Lesotho, South Africa, SADC Lesotho and RSA: Infrastructure work on 50:50 Lenders: Own procurement rules may apply

FUNDING

COST ALLOCATION Government of Lesotho Responsible for all costs related to the hydropower component GoL Secured Grant from the World Bank for Further Feasibility Studies RSA Government Responsible for all costs related to the water transfer component RSA Government Has mandated TCTA to source funding on its behalf.

TCTA MANDATE Vaal River System - LHWP Lesotho Highlands Water Project - AMD Acid Mine Drainage 1. Capex for the new schemes (LHWP II & AMD-LTS) 2. Repayment of the existing LHWP debt

FUNDING STRATEGY Three sources of funding 1. Vaal River System Users Tariff 2. Fiscal transfers from Mining Levy 3. New debt

FUNDING MIX Three sources of debt funding 1. Main funding source RSA Debt Capital Market 2. Secondary funding source Bank and DFIs 3. Liquidity support Commercial paper and revolving credit facilities

PROCURMENT OBJECTIVES AND PRINCIPLES

PROCUREMENT OBJECTIVES To maximize procurement opportunities To minimize the utilization of imported goods, skills and labour To maximize skills & technology transfer

PROCUREMENT PRINCIPLES

CONTRACTOR PROCUREMENT FRAMEWORK

ROLES AND RESPONSIBILITIES Employer (LHDA): Sets policies and strategy Consultants: Design and construction monitoring Contractor: Construction to design specification and quality Consultant will propose specifics for each contract

CONTRACT PACKAGING Strategy is to maximize participation of Lesotho and RSA contractors (especially Black-owned entities) So one consultant may manage one or more construction contracts The LHDA Procurement Policy limits the number and cumulative value of contracts that can be awarded to a single organization

FORM OF CONTRACT Major Contracts FIDIC (Harmonized Version Pink Book) Medium - GCC or FIDC Short Form (Green Book) Architectural & Building - JBCC

ELIGIBILITY ADVANCE INFRASTRUCTURE MAIN WORKS AND OTHER All roads Power and telecommunications Housing infrastructure Diversion tunnels Restricted to contractors registered in Lesotho and RSA only Polihali Dam Polihali Transfer Tunnel Major bridges No restrictions but preference requirements will apply

EVALUATION GUIDELINES STEP 1 ADMINISTRATIVE COMPLIANCE CHECK BASIS PASS / FAIL STEP 2 QUALITY EVALUATION Basis Pass / Fail to attain required threshold points STEP 3 - PRICE AND PREFERENCE EVALUATION BASIS POINTS Tenders which fail steps 1 or 2 will be rejected regardless of price

PREFERENCE SCORING OWNERSHIP/JV PARTICIPATION Lesotho and RSA registered companies (Including Black-owned) EMPLOYMENT Basotho and RSA Black people As % of total man hours/days/months PROCUREMENT Goods and services from Lesotho and RSA Black-owned companies As % of tendered sum ENTERPRISE DEVELOPMENT Training of Lesotho & RSA Black-owned companies As % of tendered sum SKILLS DEVELOPMENT Training of Basotho and RSA Black people As % of tendered sum

IMPLEMENTATION GUIDELINES

STEP 1 ADMINISTRATIVE COMPLIANCE The following will be considered during the Compliance Check Registration Company Registration Certificate(s) Tax Registration Valid Tax Clearance Certificate(s) Tax Compliance LHDA Rating Based on CIDB Rating and/or Rating as per Lesotho Ministry of Public Works / Roads Directorate (see next Slide). Declarations - LHWP Anti-Corruption Policy - Recent or current litigation - Autonomy of Government Owned Entity - Sanction or debarring of entity or country of origin by funding, government or UN agencies

LHDA RATING/CATEGORISATION FINANCIAL CAPACITY Best annual turnover from previous 5 years and available capital PROFESSIONAL STAFF Minimum number of professionals staff in the relevant technical discipline SIMILAR CONTRACTS Largest completed contract in the last 5 years in similar works The LHDA rating is aligned with CIDB and the Ministry of Public Works in Lesotho

LHDA RATING/CATEGORISATION

STEP 2 QUALITY ASSESSMENT Methodology Contractor key work methods Financial capacity Detailed analysis Resourcing Human and plant resources Qualifications Any conditions that accompany the tender Contractual distortions / Manipulations - Deviations

STEP 2 EVALUATION CRITERIA Each item is assessed by rating the submission on a 1-5 scale RATING POINTS Poor 1 Weak 2 Adequate 3 Good 4 Outstanding 5 TENDERERS WHO DO NOT ACHIEVE A SCORE OF 70% WILL NOT BE CONSIDERED FOR STEP 3

STEP 3 PREFERENCE EVALUATION OWNERSHIP/JV PARTICIPATION Minimum threshold value for participation of Lesotho National (LN) and RSA Black -owned (BO) companies will be specified. Failure to meet the specified minimum will be a disqualifying criteria. For example, if the specified minimum for: LN = 30% of the JV Share and BO = 20% of the RSA Share of the JV Points = 1 point for every 2% share above the specified minimum

STEP 3 PREFERENCE EVALUATION EMPLOYMENT Minimum threshold value for participation of Lesotho National (LN) and RSA Black Individuals (BI) will be specified for each of the following, Management, Supervisory and Women and Youth. (People with Disabilities Where appropriate) Failure to meet the specified minimum will be a disqualifying criteria. Example, if the specified minimum for a category is: LN = 30% of the total man-hours for that category BI = 20% of the total man-hours for that category Points = 1point for every 5% above the specified minimum UNSKILLED LABOUR WILL BE 100% FOR LESOTHO NATIONALS

STEP 3 PREFERENCE EVALUATION PROCUREMENT Minimum threshold value for procurement of goods and services from Lesotho Nationals (LN) and RSA Black-owned companies (BO) will be specified. Failure to meet the specified minimum will be a disqualifying criteria. A Procurement Plan is required as part of the submission Example, if the specified minimum is: LN = 10% of the tendered sum BI = 10% of the tendered sum Points = 1point for every 1% above the specified minimum

STEP 3 PREFERENCE EVALUATION ENTERPRISE DEVELOPMENT Minimum threshold value for training of Lesotho Nationals (LN) and RSA Black-owned companies (BO) will be specified. Failure to meet the specified minimum will be a disqualifying criteria. An Enterprise Development Plan is required as part of the submission Example, if the specified minimum is: LN = 10% of the tendered sum BO = 10% of the tendered sum Points = 1 point for every 1% above the specified minimum

STEP 3 PREFERENCE EVALUATION SKILLS DEVELOPMENT Minimum threshold value for training of Lesotho Nationals (LN) and RSA Black Individuals (BO) will be specified. Failure to meet the specified minimum will be a disqualifying criteria. A Skills Development Plan is required as part of the submission Example, if the specified minimum is: LN = 1% of the Tendered Sum BI = 1% of the Tendered Sum Points = 2.5 points for every 1% above the specified minimum ACCREDITATION IS CRITICAL

STEP 3 FINANCIAL EVALUATION The points for price will be calculated according to the following formula: Where : Pm is the Lowest Tendered Price that passed Step 2 P is the Tendered Price under consideration A is the unweighted points for Price

STEP 3 WEIGHTING OF POINTS The 80:20 principle will apply for contracts with an estimated value of < LSL 100 million: Where : 80 is for Price and 20 is for Preference The 90:10 principle will apply for contracts with an estimated value of > LSL 100 million: Where : 90 if for Price and 10 is for Preference