Improving Management Presentations

Similar documents
Presented by: Christy A. Hall, P.E. Interim Secretary of Transportation. January 2016

SCDOT & MPO/COG Planning Partnership. Rebuilding our Roads Performance Management

Developing a Transportation Asset Management Plan

Presented by: Christy A. Hall, P.E. Secretary of Transportation

MoDOT Dashboard. Measurements of Performance

Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA

Bridges and Structures. FHWA Updates. AASHTO (T-18) Technical Committee for Bridge Management, Evaluation, and Rehabilitation.

Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN

Transportation Asset Management Webinar Series Webinar 28: Financial Plans

Fix It First, Expand It Second, Reward It Third. David Levinson, University of Minnesota and Matthew Kahn, UCLA

Tony Mento, P.E. January 2017

Initial Transportation Asset Management Plan

Tools & Methods for Monitoring Performance Results

8 FINANCIAL PLAN AND INVESTMENT STRATEGIES: SUPPLEMENTAL INFORMATION

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

RIDOT The Ten Year Plan, Asset Management, and Innovation Moving Ahead in the 21 st Century

City of Grand Forks Staff Report

Webinar 11 August 12, 2014

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.

Genesee-Finger Lakes Regional Bridge Network Needs Assessment and Investment Strategy

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1

Examples of Decision Support Using Pavement Management Data

Safety Target Meeting Summary 10/3/2017

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT

FHWA Update. Rick Backlund, AICP Division Administrator FHWA Kansas Division. December 6, nd Annual Asphalt Paving Conference

Indiana Transportation Funding Update

RhodeWorks: achieving a state of good repair through asset management

State of Alabama Transportation Infrastructure Funding

Projected Funding & Highway Conditions

Table of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

Joint Appropriations Subcommittee on Transportation

MPO Meeting at DOTD Thursday May 10, 2018

Transportation Infrastructure Funding Assessment and Economic Impact Analysis for the Commonwealth of Kentucky

Bottom Line Series. Delineates Investment requirements for highways, bridges and transit; prepared for AASHTO and APTA and;

Maine Transportation Needs and Financing

Summary Narrative of Amendment 3 to the FFY Transportation Improvement Program for the Northern Middlesex Region

White Paper: Performance-Based Needs Assessment

2016 PAVEMENT CONDITION ANNUAL REPORT

INVESTMENT STRATEGIES

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009

FUNDING AND FINANCE FEDERAL TRANSPORTATION PROGRAMS STATE FUNDING OPTIONS

Governor s Working Group on Highway Funding Tuesday, July 28, 2015

PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE

Alabama Transportation Conference. February 9 th, 2015

Transportation Trust Fund Overview

FINAL REPORT FHWA/IN/JTRP-2005/9 AN ASSESSMENT OF HIGHWAY FINANCING NEEDS IN INDIANA. Kumares C. Sinha Olson Distinguished Professor

Danny Straessle Public Information Officer ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT

Transportation Funding in the Charlotte Region

Wednesday, June 6, 2018

Project 06-06, Phase 2 June 2011

State of New York Office of the State Comptroller Division of Management Audit

Fiscal Year VDOT Annual Budget June 2017

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016

Michigan s Roads Crisis: What Will It Cost to Maintain Our Roads and Bridges? 2012 Update

FY TRANSPORTATION IMPROVEMENT PROGRAM

Maine Transportation Needs and Financing

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017

NCHRP Consequences of Delayed Maintenance

Performance Management Accountability Meeting Data as of October, 2012

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK July 19, 2013

State of Nevada Department of Transportation

FEDERAL FISCAL YEAR TRANSPORTATION IMPROVEMENT PROGRAM

Potential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3

UCI Legislative Update. May 26, 2016 Julie Brown Local Assistance Division

ALL Counties. ALL Districts

Deck Preservation Strategies with a Bridge Management System. Paul Jensen Montana Department of Transportation

TAM ETG Webinar Series Webinar 5: Optimization and Cross-Asset Allocation

Target Formula Re-evaluation

Pavement Preservation

2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits

2016 Boston Region MPO Transportation Improvement Program

2045 Long Range Transportation

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System

Impact of New Highway Bill on Cement Consumption

Asset Sustainability Index

Presents Interstate (IM) and Non-Interstate (FM) Pavement Maintenance Programs

MassDOT Highway ACEC State Markets Conference April 5, Jonathan Gulliver, Highway Administrator John J. Bechard, P.E., Deputy Chief Engineer

2040 Long Range Transportation Plan. Financial Summary

Estimated Financial Summary for the Highway and Bridge Construction Schedule

Danny Straessle. Public Information Officer. Paragould Chamber of Commerce

Intersection Between Oregon s System of Highway Funding and Potential Carbon Policies

21st Century Transportation Committee

Annual Listing of Obligated Projects Federal Fiscal Year 2013

MPO Staff Report MPO EXECUTIVE BOARD: August 16, 2017

Performance-based Planning and Programming. white paper

Performance-Based Planning and Programming Why Is It Important? Northwest TTAP and BIA Symposium Portland, OR March 17, 2015

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing

2012 Boston MPO Transportation Improvement Program

Fiscal Year VDOT Annual Budget June 2018

Transportation Primer

Financial Snapshot October 2014

2018 Annual Report. Highway Department Accomplishments

Interested Parties William E. Hamilton Transportation Needs and Revenue Distribution

Mn/DOT Highway Systems Operations Plan Update. Sue Lodahl, Mn/DOT Andrew Mielke, SRF Consulting Group

JACKSONVILLE URBAN AREA METROPOLITAN PLANNING ORGANIZATION UNIFIED PLANNING WORK PROGRAM AMENDMENT 1 FISCAL YEAR 2018 TABLE OF CONTENTS

Transcription:

Southeastern States Equipment Managers Conference EMTSP Improving Management Presentations 2016 National Conference June 29, 2016 John F. White, PE 803 737 6675

Challenge You have a story to tell. The message is clear. Fleet Age is increasing Repair Cost and Downtime is increasing Replacement cost is increasing Risk of vehicle/equipment breakdown is increasing Change does not happen. What went wrong? Why aren t they understanding? Is it lack of priority? What do they understand? 2

Excerpt from Annual Fleet Operations Report 3

FY 2013 $15M FY 2014 $17M FY 2015 $11M FY 2016 $16M FY 2017 $21M TBD TBD 4

5

Total Units = 8535, Avg 7% Unavailable 733 Max 347 Min 6

7

Total Units = 1187, Avg 9.2% Unavailable 174 Max 65 Min 8

9

Transportation Asset Management Plan 10 Year Performance Estimates Commission Meeting June 16, 2016

Overview The Transportation Asset Management Plan (TAMP) is a performance and risk based decision making tool. The TAMP is designed to assist the agency in analyzing long-term system performance and condition and guide our investment decisions. SCDOT will embrace the TAMP for the entire state-maintained system, regardless of the funding source. 11

Guiding Principles for Investment Strategies Focus on Maintenance and Preservation of existing transportation system. Direct investments based on desired system performance. Use Percent Vehicle Miles Traveled (%VMT) to guide investment decisions. Consider priority networks that support economic competiveness by enhancing the mobility of people and freight. Promote the most efficient use of resources to extend the life of pavements and bridges. 12

How will the TAMP be used? The TAMP is based on a 10-year horizon. Phase 1 is to establish fiscally constrained performance goals for pavements and bridges. Phase 2 will be to establish fiscally constrained performance goals for the remaining elements. The intent is to provide a roadmap for the agency to use to achieve our targeted 10-year performance goals. The TAMP will also serve as a resource for deployment of new funding, regardless of the source. 13

Existing Asset Conditions: Pavements 14

National Highway System 15

National Highway System 2015 Pavement Conditions Interstate System NHS Primaries 25% FAIR 10% POOR 25% GOOD 65% GOOD 42% POOR 33% FAIR 851 Centerline Miles Carries 30% of the Traffic $84 M average annual investment 2752 Centerline Miles Represents 1/3 of the Primary System Carries 26% of the Traffic $46 M average annual investment 16

National Highway System Pavement Condition Color Key Red = Poor (Reconstruction) Yellow = Fair (Rehabilitation) Green = Good (Preservation) 17

Primary System Components 2015 Pavement Conditions NHS Primaries Non-NHS Primaries 42% POOR 25% GOOD 33% FAIR 63% POOR 16% GOOD 21% FAIR 2752 Centerline Miles Carries 26% of the Traffic $46 M average annual investment 6765 Centerline Miles Carries 20% of the Traffic $58 M average annual investment 18

Entire Primary System 2015 Pavement Conditions 19% GOOD 56% POOR 25% FAIR 9517 Centerline Miles Carries 46% of the Traffic $104 M average annual investment 19

Entire Primary System Pavement Condition Color Key Red = Poor (Reconstruction) Yellow = Fair (Rehabilitation) Green = Good (Preservation) 20

Secondary System Components 2015 Pavement Conditions Federal Aid Eligible Secondaries 50% POOR 19% GOOD 31% FAIR Non-Federal Aid Eligible Secondaries 56% POOR 13% GOOD 31% FAIR 10370 Centerline Miles Carries 17% of the Traffic $56 M average annual investment 20657 Centerline Miles Carries 7% of the Traffic $94 M average annual investment 21

10 Year Performance Estimates Pavements Current Conditions PQI (Pavement Quality Index) Asset Categories Centerline Miles % VMT %Good %Poor Ave Annual Historical Expenditure (Millions) Interstate 851 30% 65% 10% $ 84 PRIMARY SYSTEM 9,517 46% 19% 56% $ 104 Non-Interstate NHS 2,752 26% 25% 42% $ 46 Non-NHS Primaries 6,765 20% 16% 63% $ 58 FA Secondaries 10,370 17% 19% 50% $ 56 Non FA Secondaries 20,657 7% 13% 56% $ 94 2016 Yer-end Data 22

10 Year Performance Estimates Pavements Asset Categories Centerline Miles Current Conditions PQI (Pavement Quality Index) % VMT %Good %Poor Ave Annual Historical Expenditure (Millions) 10-yr Performance Estimates Based on FAST Act Budget %Good %Poor 10 Yr Estimated Annual Expenditures (Millions) Interstate 851 30% 65% 10% $ 84 57% 18% $ 90 $ PRIMARY SYSTEM 9,517 46% 19% 56% $ 104 18% 74% $ 131 Non-Interstate NHS 2,752 26% 25% 42% $ 46 24% 60% $ 58 Non-NHS Primaries 6,765 20% 16% 63% $ 58 14% 80% $ 73 FA Secondaries 10,370 17% 19% 50% $ 56 15% 70% $ 56 Non FA Secondaries 20,657 7% 13% 56% $ 94 20% 65% $ 94 2016 Yer-end Data Forecasted Pavement Conditions in 10 years 23

Pavements 851 CL miles, 30% of VMT, Current Investment $84 M, Projected Investment $90 M 24

Pavements 9517 CL miles, 46% of VMT, Current Investment $104 M, Projected Investment $131 M 25

Pavements 10,370 CL miles, 17% of VMT, Current Investment $56 M, Projected Investment $56 M 26

Pavements 20,657 CL miles, 7% of VMT, Current Investment $94 M, Projected Investment $94 M 27

Existing Asset Conditions: Bridges 28

Bridges Most of SC s 8,426 Bridges are in Good Condition Structurally Deficient Bridges However, there are 9% that are Structurally Deficient. These 768 bridges, including 339 Load Restricted bridges, are across the entire system. There is also another 799 bridges across the state that are considered Functionally Obsolete. 29

Bridges (Interstate & Non Interstate NHS) 1,747 bridges, 56% of VMT, Current Investment $56 M, Projected Investment $56 M Poor - Replacement Fair - Rehabilitation Good - Preservation 30

Bridges (Non NHS Primaries & Federal Aid Secondaries) 3,881 structures, 37% of VMT, Current Investment $51 M, Projected Investment $51 M Poor - Replacement Fair - Rehabilitation Good - Preservation 31

Bridges (Non Federal Aid Secondaries) 2,798 structures, 7% of VMT, Current Investment $12 M, Projected Investment $12 M Poor - Replacement Fair - Rehabilitation Good - Preservation 32

10 Year Performance Estimates Bridges Current Conditions NBI Scale % (Nat'l Bridge Inspection) Asset Category Structures % VMT %Good %Poor (%SD) Ave Annual Historical Expenditure (Millions) NHS 1,747 56% 79.9% 5.7% $ 56 Non-NHS 3,881 37% 66.9% 10.5% $ 51 Off-System 2,798 7% 60.0% 9.3% $ 12 33

10 Year Performance Estimates Bridges Asset Category Structures % VMT %Good Current Conditions NBI Scale % (Nat'l Bridge Inspection) %Poor (%SD) Ave Annual Historical Expenditure %Good %Poor *(%SD) 10 Yr Estimated Annual Expenditures (Millions) (Millions) NHS 1,747 56% 79.9% 5.7% $ 56 78% 3.5% $ 56 Non-NHS 3,881 37% 66.9% 10.5% $ 51 67% 7.8% $ 51 Off-System 2,798 7% 60.0% 9.3% $ 12 59% 7.5% $ 12 Jun-16 10-yr Performance Estimate Based on Current Funding Levels * %Poor is equal to %Structurally Deficient 34

TAMP Phase 1: Pavements & Bridges 35

10 Year Performance Estimates Pavements Asset Categories Centerline Miles % VMT %Good %Poor Ave Annual Historical Expenditure (Millions) %Good %Poor 10 Yr Estimated Annual Expenditures (Millions) Interstate 851 30% 65% 10% $ 84 57% 18% $ 90 PRIMARY SYSTEM 9,517 46% 19% 56% $ 104 18% 74% $ 131 Non-Interstate NHS 2,752 26% 25% 42% $ 46 24% 60% $ 58 Non-NHS Primaries 6,765 20% 16% 63% $ 58 14% 80% $ 73 FA Secondaries 10,370 17% 19% 50% $ 56 15% 70% $ 56 Non FA Secondaries 20,657 7% 13% 56% $ 94 20% 65% $ 94 Bridges Asset Category Structures % VMT %Good Current Conditions PQI (Pavement Quality Index) 2016 Yer-end Data Current Conditions NBI Scale % (Nat'l Bridge Inspection) %Poor (%SD) Ave Annual Historical Expenditure 10-yr Performance Estimates Based on FAST Act Budget 10-yr Performance Estimate Based on Current Funding Levels %Good %Poor *(%SD) 10 Yr Estimated Annual Expenditures (Millions) (Millions) NHS 1,747 56% 79.9% 5.7% $ 56 78% 3.5% $ 56 Non-NHS 3,881 37% 66.9% 10.5% $ 51 67% 7.8% $ 51 Off-System 2,798 7% 60.0% 9.3% $ 12 59% 7.5% $ 12 Jun-16 * %Poor is equal to %Structurally Deficient 36

Next Steps Request Commission approval of 10 Year Performance Estimates for the Draft TAMP, Phase 1. (Anticipate updating base performance estimates to reflect 2016 State Funding Bill). Continue along performance journey by moving into Phase 2 of the TAMP to establish targets for the balance of the system performance and condition items. Utilize the TAMP to guide investment decisions and communicate trends for the state s infrastructure. Finalize TAMP after the release of FHWA s Final Rulemaking to comply with federal metrics and submit to FHWA s Division Office. 37