ESTABLISHMENT OF META-INFORMATION SYSTEM PROJECT OF THE STATE STATISTICAL COMMITTEE OF THE REPUBLIC OF AZERBAIJAN GRANT NUMBER TF

Similar documents
CAPITAL MARKETS MODERNIZATION PROJECT LOAN NUMBER 8024-AZ

JUDICIAL MODERNIZATION PROJECT OF THE REPUBLIC OF AZERBAIJAN CREDIT NUMBER 4209 AZ, 4961 AZ AND LOAN NUMBER 8068 AZ

RAIL TRADE AND TRANSPORT FACILITATION PROJECT OF THE REPUBLIC OF AZERBAIJAN LOAN AGREEMENT NUMBER 7509-AZ

WATER USERS ASSOCIATION DEVELOPMENT SUPPORT PROJECT IDA FINANCING AGREEMENT 4913-AZ AND IBRD LOAN AGREEMENT 8039-AZ

Public Disclosure Authorized

JUDICIAL SERVICES AND SMART INFRASTRUCTURE PROJECT OF THE REPUBLIC OF AZERBAIJAN LOAN NUMBER 8407 AZ

Financial Sector Modernization Project. SECO Grant No TF011975/Component 2

Second National Water Supply and Sanitation Project Implementation Unit under State Amelioration and Water Management Open Joint Stock Company

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

2 6 DEC 2014 HARMONIZATION OF NATIONAL ACTION PLAN TO COMBAT DESERTIFICATION IN ARMENIA AND PREPARATION OF NATIONAL REPORT PROJECT

IMPLEMENTED BY FOREIGN FINANCING PROJECTS MANAGEMENT CENTER OF THE MINISTRY OF FINANCE OF THE REPUBLIC OF ARMENIA

GLOBAL ENVIRONMENT FACILITY SPECIAL CLIMATE CHANGE FUND GRANT No. TF010940

Central Finance and Contracting Unit Ministry of Finance of Albania. Capacity Building Support to Implement the Integrated Planning System (IPS)

Rural Renewable Energy Agency (RREA) Financial Audit Report. for the period from 1 March 2016 to 30 June Project ID: P

IDF GRANT No. TF013658

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized

TRANSPORT REFORM AND REHABILITATION CENTER LOAN NO.7741-GE (THIRD EAST-WEST HIGHWAY IMPROVEMENT PROJECT)

FOREIGN FINANCING PROJECTS MANAGEMENT CENTER OF THE MINISTRY OF FINANCE OF THE REPUBLIC OF ARMENIA

[DF GRANT No. TF Special Purpose Project Financial Statements and Independent Auditor's Report

"Public Institution EMP Management Durabil POP" Project ECAPDEV Grant no.: TF0A2544

Project: Serbia Deposit Insurance Strengthening Project (IBRD Loan No. 8340YF)

Special Purpose Project Financial Statements and Independent Auditor's Report

MDTF GRANT No. TF017411

THE MINISTRY OF HEALTH OF UKRAINE OBLAST HEALTH SECTOR REFORM PROJECT PREPARATION PROJECT, FINANCIAL STATEMENTS

IMPLEMENTED BY FOREIGN FINANCING PROJECTS MANAGEMENT CENTER

"Global Partnership for Education Project (Early Education Project)" Grant No. TF016201, Grant No. TF016209

K For the period from II February 2013 to 16 March 2016

Supreme Audit Office 0 Government of Islamic Republic of Afghanistan

JSDF GRANT FOR THE SUPPORT TO COMMUNITY SEED FUNDS PROJECT

Project Financial Statements and Independent Auditor's Report. People in Need non-governmental organization

Central Asia Hydrometeorology Modernisation Project (Tajikistan) Grant No , Grant No. H679-TJ

Foreign Financing Project Management Center. IDF Grant for Ministry of Finance capacity building project IDF Grant No. TF011907

Special Purpose Project Financial Statements and Independent Auditor's Report

FINANCIAL SCHEDULES Moldova Energy Sector Reform and Efficiency Improvements Project

TECHNICAL ASSISTANCE FOR IMPROVING INVESTMENT CLIMATE AND INSTITUTIONAL STRENGTHENING PROJECT

Financial Statement for the year ended December 31, And Independent Auditors' Report. Public Disclosure Authorized. Public Disclosure Authorized

Additional financing for the Montenegro Energy Efficiency Project - MEEP AF Project ID: P LOAN AGREEMENT No 8324-ME

IT RPORT OF if ATOR GENERA

Disbursement Guidelines For Projects

MUNICIPAL DEVELOPMENT FUND OF GEORGIA LOAN NO.8380-GE GRANT NO.TF (SECOND REGIONAL AND MUNICIPAL INFRASTRUCTURE DEVELOPMENT PROJECT)

OSHC "BARQI TOJIK" Preparation of Proposed Winter Energy Project Advance No. IDA Q9800-TJ

"Implementation of National Strategy for Development of Statistics" Grant No. TF

SPECIAL PURPOSE FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR'S REPORT. YEREVAN April 2016 ARMENIA RENEWABLE RESOURCES AND ENERGY EFFICIENCY FUND

REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION

FOR THE YEAR ENDED 31 DECEMBER 2017

CONSOLIDATED PROJECT FINANCIAL STATEMENTS ENHANCING SMALL AND MEDIUM ENTERPRISES ACCESS TO FINANCE PROJECT. Report on the. of the

NATIONAL WATER RESOURCES MANAGEMENT PROJECT - PHASE 1

IRRIGATION AND LAND MARKET DEVELOPMENT PROJECT IDA CREDIT NUMBER 5456-GE

THE WORLD BA IBRD* IDA I WORLDBANKGROUP. Cable Address: INTBAFRAD U.S.A.

AND AUDITOR'S REPORT

HEALTH RESULTS-BASED FINANCING PROJECT

IBRD LOAN No AM

and independent auditors' report Public Disclosure Authorized

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria

] DISBURSEMENT PROCEDURES

... S... Project Financial Statements and Independent Auditor's Report. Renewable Resources and Energy Efficiency Fund

REPUBLIC OF TURKEY PRIME MINISTRY Undersecretariat of Treasury PROJECT. Implemented by. Financed Under. Report Number 169/7-32/8.

Independent Auditor's Report and Project Financial Statements

MUNICIPAL DEVELOPMENT FUND OF GEORGIA LOAN NO.8148-GE (REGIONAL DEVELOPEMENT PROJECT)

"Additional Financing for Land Registration and Cadastre System for Sustainable Agriculture Project" Grant No. H758-TJ

SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT

Policy on Petty Cash Fund

SPF-FUNDED BUILDING CAPACITY FOR EFFECTIVE LOCAL GOVERNANCE PROJECT SPF GRANT NO. TF IMPLEMENTED BY COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY

Agency for the Delivery of Integrated Services Albania. Citizen-Centric Service Delivery Project (Part 1 b-c, 2 b-c, 3b, 4)

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

SCIENCE AND TECHNOLOGY CENTER IN UKRAINE. Financial Statements for the Year Ended 31 December 2011

PROJECT ((STRENGTHENING EVIDENCE-BASED POLICYMAKING FOR EDUCATION SECTOR PERFORMS IN THE REPUBLIC OF BELARUS>

PROJECT FINANCIAL STATEMENTS IRRIGATION DEVELOPMENT PROJECT FOR THE YEAR ENDED DECEMBER 31, Report on the Republika Srpska part of the.

OFF10A. 1i'L. 11 September 2014

a. Sources and utilization of funds per category, in Euro 1

THE WORLD BANK IBRD * IDA I WORLD BANKGROUP

I OFFICIAL DOCUMENTS. December 27, H.E. Radoje Zugic Minister of Finance Ministry of Finance Stanka Dragojevica Podgorica Montenegro

REPORT ON PROJECT FINANCIAL STATEMENTS OF THE NATIONAL AGENCY FOR FISCAL ADMINISTRATION

WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) MINISTRY OF INFORMATION, COMMUNICATION & INFORMATION TECHNOLOGY (THE GAMBIA)

"'530-8E OFFICIAL DOCUMENTS

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6343-RW. Public Disclosure Authorized. (Housing Finance Project)

April 11, Additional Instructions: Disbursement. Excellency:

Support to Farmers Organisations in Africa Programme (SFOAP) Main Phase Start-up Workshop Fiduciary Aspects Addis Ababa, March 2013

Audited Project Financial Statements. MON: Dzud Disaster Response Project

OFFICIAL DOCUMENTS i. Public Disclosure Authorized

GUIDELINES: ANNUAL FINANCIAL REPORTING AND AUDITING FOR WORLD BANK-FINANCED ACTIVITIES

The State Oil Fund of the Republic of Azerbaijan Financial Statements. Year ended 31 December 2011 Together with Independent Auditors Report

Open Joint Stock Commercial Bank BANK OF BAKU

GOVERNANCE e-transformation PROJECT

Re: Grant for Project Management Capacity Building IDF Grant No. TF Very truly yours, INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

SPECIAL PURPOSE FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR'S REPORT

THE COURT OF ACCOUNTS OF THE REPUBLIC OF MOLDOVA

CASH TRANSFER PILOT FOCUSED ON MATERNAL AND CHILD HEALTH AND NUTRITION PROJECT

Internal Accounting Procedures. Approval / Amendments June 24, 2015 (AGM) Amendment 1 Amendment 2

Freetown GOVERNMENT OF SIERRA LEONE

OFFICIAL Woch DOCUM ENTS

Georgian State Electrosystem JSC. Special Purpose Project Financial Statements for the year ended 31 December 2016

I I I I I I I I I I I. IPublic Disclosure Authorized. I For the Period from 10 February 2016 to 31 December 2016

ANNEX. Objectives, Terms, and Conditions of the Grant

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Montenegro Energy Efficiency Project - MEEP Project ID: P LOAN AGREEMENT No ME

AUDITOR GENERAL'S REPORT

Disbursement Handbook for Public Sector Loans. January 2017

EU NATURA 2000 INTEGRATION PROJECT

Transcription:

ESTABLISHMENT OF META-INFORMATION SYSTEM PROJECT OF THE STATE STATISTICAL COMMITTEE OF THE REPUBLIC OF AZERBAIJAN GRANT NUMBER TF 014110 Special-Purpose Financial Statements and Independent Auditors' Report For the Period since the inception date to April 30, 2016

TABLE OF CONTENTS INDEPENDENT AUDITORS' REPORT 1-2 SPECIAL-PURPOSE FINANCIAL STATEMENTS FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016: Special-purpose balance sheet 3 Statement of cash receipts and payments 4-5 Statement of project activities 6 Statement of designated accounts 7-8 Statement of expenditure and summary sheet withdrawal schedule 9 Notes to the special-purpose financial statements 10-13 Page

BAKERTILLY AZERBAIJAN Audit, Tax and Consulting Dernirchi Tower, 16th floor Khodjaly Avenue, 37 AZ1025, Baku Azerbaijan T:+ 994 (12) 404 7 666 F:+ 994 (12) 404 7 667 office@bakertillyaz wwwbakertilly.az INDEPENDENT AUDITORS' REPORT To the Management of the State Statistical Committee of the Republic of Azerbaijan: We have audited the accompanying Special-Purpose Financial Statements of the Establishment of Meta- Information System Project of the State Statistical Committee of the Republic of Azerbaijan (the "Project"), which comprise the Special-Purpose Balance Sheet as at April 30, 2016, and the Statement of Cash Receipts and Payments, the Statement of Project Activities, the Statement of Designated Accounts and the Statement of Expenditure and Summary Sheet Withdrawal Schedule ("SOE and SSWS") for the period since the inception date to April 30, 2016 and a summary of significant accounting policies and other explanatory notes (collectively referred to as the "Special-Purpose Financial Statements") financed under the International Bank for Reconstruction and Development ("IBRD") through grant agreement number TF 014110. Management's Responsibility for the Special-Purpose Financial Statements Management is responsible for the preparation and fair presentation of these Special-Purpose Financial Statements in accordance with International Public Sector Accounting Standard ("IPSAS"), "Financial Reporting under the Cash Basis of Accounting" issued by International Public Sector Accounting Standards Board of the International Federation of Accountants and relevant provisions of the grant as described in Note 2 to the Special-Purpose Financial Statements and for such internal control as management detennines is necessary to enable the preparation of the Special-Purpose Financial Statements that are free from material niisstatement, whether due to fraud or error. Auditors'Responsibility Our responsibility is to express an opinion on these Special-Purpose Financial Statements based on our audit. We conducted our audit in accordance with International Standards on Auditing, Those standards require that we comply with ethical requirements and plan and perform the audit to obtain reasonable assurance whether the Special-Purpose Financial Statements are free from material misstatement. An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in these Special-Purpose Financial Statements. The procedures selected depend on the auditors' judgement, including the assessment of the risks of material misstatement of the Special-Purpose Financial Statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity's preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity's internal control. An independent member of Baker TIRy International

BAKER TILLY AZERBAIJAN An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates made by management, as well as evaluating the overall presentation of the Special- Purpose Financial Statements. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. Opinion In our opinion, the Special-Purpose Financial Statements give true and fair view of the financial position of the Project as at April 30, 2016, the cash receipts and disbursements on behalf of the Project and transactions passed through the Project's special accounts for the period since the inception date to April 30, 2016 in accordance with IPSAS "Financial Reporting under the Cash Basis of Accounting" and relevant provisions of the credit agreements as described in Note 2 of the Special-Purpose Financial Statements. In addition, with respect to the SOE and SSWS, all payments reported are eligible for financing under the respective grant agreement and adequate documentation have been maintained to support the claims for withdrawal. June 30, 2016

SPECIAL-PURPOSE BALANCE SHEET AS AT APRIL 30, 2016 ASSETS AND CUMULATIVE USES OF FUNDS Note April 30, December 31, December 31, 2016 2015 2014 Cash at bank 3 26 10,463 24,998 Project expenditure 152,087 32,815 2 Accumulated gain from exchange rate differences 37 39 - TOTAL ASSETS AND CUMULATIVE USES OF FUNDS 152,150 43,317 25,000 SOURCE OF FUNDS Project funds 152,150 43,317 25,000 TOTAL SOURCE OF FUNDS 152,150 43,317 25,000 Approved and signed on behalf of the State Statistical Committee of the Republic of Azerbaijan: Yusif Yusifov Project Director Goncha Gasimova Finance Specialist June 30, 2016 June 30, 2016 The notes on pages 10-13 form an integral part of these special-purpose financial statements. 3

STATEMENT OF CASH RECEIPTS AND PAYMENTS FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 OPENING BALANCE IBRD Designated Account (USD) 10,438 24,998 IBRD Designated Account (EUR) 25 - Four months Year ended Since the Cumulative ended December 31, inception April 30, 2016 April 30, 2016 2015 date* to December 31, 2014 TOTAL OPENING BALANCE 10,463 24,998 - ADD: FUNDS RECEIVED IBRD Grant Number TF 014110 Initial deposit to the IBRD Designated Account (USD) - - 25,000 25,000 Direct funding 101,503 7,930-109,433 SOE replenishment 8,343 10,387-18,730 Refund (1,013) - - (1,013) Total IBRD Grant funds 108,833 18,317 25,000 152,150 TOTAL FUNDS RECEIVED 108,833 18,317 25,000 152,150 NET TRANSFERS BETWEEN ACCOUNTS Net transfers between accounts Transfer from the IBRD Designated Account (USD) to the IBRD Designated Account (AZN) (17,646) Transfer from the IBRD Designated Account (18,605) - (36,324) (USD) to the IBRD Designated Account (EUR) - Transfer to the IBRD Designated Account (6,211) - (6,211) (AZN) from the IBRD Designated Account (USD) Transfer to the IBRD Designated Account 17,646 18,605-36,324 (EUR) from the IBRD Designated Account (USD) - 6,211-6,211 Total net transfers between accounts - - LESS: EXPENDITURE IBRD Designated Account TF 014110 (direct funding) 1. Goods (34,262) - - (34,262) 2. Consultants' services (61,887) (7,930) - (69,817) 3. Training (5,354) - - (5,354) Total IBRD Grant Number TF 014110 expenditure (direct funding) (101,503) (7,930) - (109,433) IBRD Designated Account (USD) 1. Incremental operating costs (122) (131) (2) (255) Total IBRD Designated Account (USD) expenditure (bank payments) (122) (131) (2) (255) 4

STATEMENT OF CASH RECEIPTS AND PAYMENTS FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 (Continued) Four months Year ended Since the Cumulative ended December 31, inception April 30, 2016 April 30, 2016 2015 date* to December 31, 2014 IBRD Designated Account (AZN) 1. Goods (5,699) (6,143) - (11,842) 2. Consultants' services (9,715) (1,005) - (10,720) 3. Training (2,218) (11,418) - (13,636) 4. Incremental operating costs (15) (39) - (54) Total IBRD Designated Account (AZN) expenditure (bank payments) (17,647) (18,605) - (36,252) IBRD Designated Account (EUR) 1. Consultants' services - (6,117) - (6,117) 2. Incremental operating costs - (30) - (30) Total IBRD Designated Account (EUR) expenditure (bank payments) - (6,147) - (6,147) TOTAL EXPENDITURE (119,272) (32,813) (2) (152,087) EXCHANGE RATE DIFFERENCE IBRD Designated Account (AZN) 1 - - 1 IBRD Designated Account (EUR) 1 (39) - (38) Total exchange rate difference 2 (39) - (37) CLOSING BALANCE IBRD Designated Account (USD) - 10,438 24,998 IBRD Designated Account (AZN) - - - IBRD Designated Account (EUR) 26 25 - TOTAL CLOSING BALANCE 26 10,463 24,998 * inception date - the effective date of the Project, which is May 8, 2014. Approved and signed on behalf of the State Statistical Committee of the Republic of Azerbaijan: Yusif Yusifov Goncha Gasimova Project Director Finance Specialist June 30, 2016 June 30, 2016 The notes on pages 10-13 form an integral part of these special-purpose financial statements. 5

STATEMENT OF PROJECT ACTIVITIES FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 Four months Year ended Since the Cumulative ended December 31, inception April 30, 2016 April 30, 2016 2015 date* to December 31, 2014 Part 1: Development of the Technical Specifications for the Statistical Metadata System Development 39,532 14,047-53,579 Part 1I: Development of Tools for the Statistical Metadata System 66,903 6,143-73,046 Part III: Testing of Statistical Metadata System and Training 5,132 338-5,470 Part IV: Preparation of Documents and Training 7,705 12,285 2 19,992 Total Expenditure per Project Components 119,272 32,813 2 152,087 * inception date - the effective date of the Project, which is May 8, 2014. Approved and signed on behalf of the State Statistical Committee of the Republic of Azerbaijan: Yusif Yusifov Project Director Goncha Gasimova Finance Specialist June 30, 2016 June 30, 2016 The notes on pages 10-13 form an integral part of these special-purpose financial statements. 6

STATEMENT OF DESIGNATED ACCOUNTS FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 The inception date* IBRD IBRD IBRD Designated Designated Designated Account (USD) Account (AZN) Account (EUR) Add: Project funds received 25,000 - Total receipts 25,000 - Deduct: Project eligible expenditure (2) Total deductions (2) - Closing balance as at December 31, 2014 24,998 - Add: Project funds received 10,387 - - Transfer to the IBRD Designated Account - 18,605 6,211 Total receipts 10,387 18,605 6,211 Deduct: Project eligible expenditure (131) (18,605) (6,147) Transfer from the IBRD Designated Account (24,816) - - Total deductions (24,947) (18,605) (6,147) Effect of exchange rate IBRD Designated Account (EUR) - - (39) Total effect of exchange rate - - (39) Closing balance as at December 31, 2015 10,438-25 Add: Project funds received 8,343 Transfer to the IBRD Designated Account - 17,646 Refund (1,013) - - Total receipts 7,330 17,646 - Deduct: Project eligible expenditure (122) (17,647) Transfer from the IBRD Designated Account (17,646) - - Total deductions (17,768) (17,647) - 7

ESTABLISHMENT OF META-IN FORMATION SYSTEM PROJECT OF THE STATE STATEMENT OF DESIGNATED ACCOUNTS FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 (Continued) IBRD IBRD IBRD Designated Designated Designated Account (USD) Account (AZN) Account (ETR) Effect of exchange rate IBRD Designated Account (AZN) - IBRD Designated Account (EUR) - Total effect of exchange rate - 1_1 Closing balance as at April 30, 2016 966-26 *inception date - the effective date of the Project, which is May 8, 2014. Approved and signed on behalf of the State Statistical Committee of the Republic of Azerbaijan: Yusif Yusifov Project Director Goncha Gasimova Finance Specialist June 30, 2016 June 30, 2016 The notes on pages 10-13 form an integral part of these financial statements. IS

ESTABLISHMENT OF META-IN FORMATION SYSTEM PROJECT OF THE STATE STATEMENT OF EXPENDITURE AND SUMMARY SHEET WITHDRAWAL SCHEDULE FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 Total amounts reimbursed Application for withdrawal No 01 (advance) 25,000 Total applications reimbursed during the period since the inception date* to December 31, 2014 25,000 Application for withdrawal No 02 (Replenishment) 8,343 Application for withdrawal No 03 (Replenishment) 7,930 Application for withdrawal No 04 (Replenishment) 10,387 Total applications reimbursed during the year ended December 31, 2015 26,660 Total applications reimbursed as at April 30, 2016 51,660 * inception date - the effective date of the Project, which is May 8, 2014. Approved and signed on behalf of the State Statistical Committee of the Republic of Azerbaijan: Yusif Yusifov Project Director Goncha Gasimova Finance Specialist June 30, 2016 June 30, 2016 The notes on pages 10-13 form an integral part of these financial statements. 9

ESTABLISHMENT OF META-IN FORMATION SYSTEM PROJECT OF THE STATE NOTES TO THE SPECIAL-PURPOSE FINANCIAL STATEMENTS FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 1. DESCRIPTION OF THE PROJECT Establishment of Meta-Infonnation System Project under the State Statistical Committee of the Republic of Azerbaijan (the "Project") was formed under grant agreement TFO14110 (the "Grant") between the Republic of Azerbaijan (the "Recipient") and the International Bank for Reconstruction and Development ("IBRD") dated May 8, 2014 in the amount of USD 250,000. The Project's original completion date is April 30, 2016. The objective of the Project is to assist State Statistical Committee ("SSC") in creating metadata systems which will improve efficiency and capacity of national statistical system. The Project consists of the following parts: Part 1: Development of the Technical Specifications for the Statistical Metadata System Development Provision of technical assistance to carry out: (a) assessment of the existing statistical business process in SSC; (b) analysis of the existing components of the statistical information system; (c) assessment of the flows and formats linking the components of statistical information system with statistical metadata system; and (d) assessment of the needs and definition of tasks. Statistical Metadata System Part II: Development of Tools for the Part H: Development of Tools for the Statistical Metadata System Provision of goods and consultants' services for: (a) (b) (c) (d) the acquisition of, inter alia, design software tool and other necessary hardware; designing the metadata system and its components; purchasing and installation of the relevant system; and developing of programming software. Part III: Testing of Statistical Metadata System and Training Provision of technical assistance, Training, and consultants' services to carry out: (a) (b) testing of statistical metadata system and its functionalities; and training for SSC staff. Part IV: Preparation of Documents and Training Provision of Training for the users of the statistical metadata system. 10

NOTES TO THE SPECIAL-PURPOSE FINANCIAL STATEMENTS FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 (Continued) 2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES Statement of compliance The Special-Purpose Financial Statements have been prepared on the cash basis of accounting in confonnity with the International Public Sector Accounting Standards ("IPSAS") "Financial Reporting under the Cash Basis of Accounting" issued by the Public Sector Committee of the International Federation of Accountants ("IFAC-PSC") and incorporate the principal accounting policies from the "Guidelines: Annual Financial Reporting and Auditing for World Bank Financed Activities" and Grant. Other basis of preparation criteria The Special-Purpose Financial Statements are prepared under the historical cost basis of accounting. Source funding is recognized when the related cash is received or paid out on the Project's behalf. Expenditure is accounted for on the basis of actual disbursement of funds from the Designated accounts. Foreign currency transactions and translation The Project uses the United States Dollar ("USD") as its functional currency for the following reasons: a) The IBRD's funding is received in USD; and b) Budgets and financial reports for the Project are prepared in USD. Balance sheet monetary items denominated in currencies other than USD have been translated into USD using the exchange rate of the Central Bank of the Republic of Azerbaijan ("CBRA") effective as at appropriate date. All income and expense transactions denominated in currencies other than USD are converted into USD using the exchange rate of the CBRA prevailing on the date of transaction. 3. CASH AT BANK April 30, December 31, December 31, 2016 2015 2014 IBRD Designated Account (EUR) 26 25 - IBRD Designated Account (USD) - 10,438 24,998 Total cash at bank 26 10,463 24,998 11

NOTES TO THE SPECIAL-PURPOSE FINANCIAL STATEMENTS FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 (Continued) 4. DESIGNATED ACCOUNT The Recipient has established a Designated Account at a commercial bank acceptable to the IBRD in accordance with the Loan Agreement. Designated Account is established, managed, replenished and liquidated in accordance with the IBRD's "Project's Operations Manual" and detailed arrangements agreed upon between the Recipient and the TBRD. The Project maintains its Designated Accounts in USD with the International Bank of Azerbaijan (located in the Republic of Azerbaijan). 5. METHOD OF DISBURSEMENT The methods of disbursement used from the inception of the financing up to and including April 30, 2016 were as follows: * Advance - the IBRD may advance proceeds in accordance with Grant into a Designated Account of the Recipient to finance eligible expenditure as they are incurred and for which supporting documents will be provided at a later date. * Direct funding - the IBRD may make payments, at the Recipient's request, directly to a third party for eligible expenditure. * Reimbursement procedure - the IBRD may reimburse the Recipient for expenditure eligible for financing pursuant to the Grant that the Recipient has pre-financed from its own resources. * Commitment procedure - the [BRD may pay amounts to a third party for eligible expenditure under special conunitments entered into, in writing, at the Recipient's request and on terms and conditions agreed between the IBRD and the Recipient. 6. METHOD OF WITHDRAWAL This procedure involves two distinct disbursement procedures used for withdrawing funds under the Loan Agreement: Withdrawal Procedure The World Bank form of Application for Withdrawal shall be used for the followings: * Advance to the Designated Account; * Replenislunent of the Designated Account; * Reimbursements of eligible payments already made by the Borrower from its own resources (if any) - pooling and disbursements made on a basis of Statements of Expenditure (SOE); * Direct Payments to a third party. The financial specialist should prepare the Application for Withdrawal, SOE and SSWS forms, Designated Account reconciliation as required. Any supporting documentation should be attached. These documents should be reviewed by the Project Director. The documents (original) should be passed on to the Ministry of Economy and Industry of the Republic of Azerbaijan (the "MEl") and then to the Ministry of Finance of the Republic of Azerbaijan (the "MOF") to be reviewed and signed by their authorized representatives if required. The documents then should be returned (within 7 working days) to the Project Management Team for sending by courier to the IBRD. 12

NOTES TO THE SPECIAL-PURPOSE FINANCIAL STATEMENTS FOR THE PERIOD SINCE THE INCEPTION DATE TO APRIL 30, 2016 (Continued) The financial specialist should keep an Invoices Voucher List ("VL") to record the invoices approval voucher numbers of transactions included in the application for withdrawal. The TVL should be prepared by the financial specialist, reviewed and approved by the Project Director and filed. If the space available on the application for withdrawal is insufficient to provide all the necessary data, summary sheets should be used. Applications for withdrawal must be submitted in duplicate and should be sequentially numbered. Any major alterations or changes made on the form should be initialled by the authorized representatives to verify that the changes are valid. Special Commitment Procedure To finance the purchase of goods under a project from foreign suppliers, the Borrower frequently needs to open a letter of credit. If commercial bank is unwilling to open or confirm the letter of credit without some guarantee or security, the World Bank at the request of the Borrower, can provide the commercial bank with the guarantee it requires in the form of a special commitment. This procedure nonnally covers major contracts for imported goods. The forms will be prepared by the financial specialist, reviewed by the Project Director and given to the MEI and the MOF for their review and signature of authorized representatives and returned to the Project Management Team. The financial specialist should check that the documents have been signed by the authorized signatories (specimen signatures of which have been previously advised to the IBRD) before sending the documents by courier to the IBRD. 7. OPERATING ENVIRONMENT The Project's principal business activities are within the Republic of Azerbaijan. Laws and regulations affecting entities operating in the Republic of Azerbaijan are subject to rapid changes and the Project's operations could be at certain level of risk due to changes in the political and business environment. 8. EVENTS AFTER REPORTING PERIOD On May 2, 2016 the IBRD made payments, at the Recipient's request, directly to a third party for Consultants' services in the amount of USD 7,819. 13