P. Thomas 1, D. Fisher 1 & F. Sheikh 2. Abstract

Similar documents
Application of ATO/DAS to Thameslink

The value of ATO for the future operations of Suburban and Regional rail lines with dense traffic. Jacques Poré. Alstom Digital Mobility

ATO over ETCS. Benoit Bienfait (UNISIG) IRSE, 28th Oct

Official Journal of the European Union L 67/13

Development of ATO System for Korea Standardized EMU

Building an ATO roadmap

Load Test Report. Moscow Exchange Trading & Clearing Systems. 07 October Contents. Testing objectives... 2 Main results... 2

Official Journal L 311. of the European Union. Legislation. Non-legislative acts. Volume November English edition. Contents REGULATIONS

An ERA insight: Removing operational barriers. Josef DOPPELBAUER Executive Director

Coverage Planning for LTE system Case Study

Reference: STE/ATO/REQ/001 Issue: 1.0 Date: 31 st July 2017

Chapter 7 A Multi-Market Approach to Multi-User Allocation

Common Safety Methods CSM

INTEROPERABILITY OF THE COMMUNITY RAILWAY SYSTEM I

D4.7: Action planning manager

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of

ALM as a tool for Malaysian business

European Railway Agency Recommendation on the 1 st set of Common Safety Methods (ERA-REC SAF)

Functional Safety Analysis of ETCS DMI

CEF funding for ERTMS deployment in the post-2020 Multiannual Financial Framework

Departmental Spending. Department for Transport

Frequently Asked Questions

COURSE DESCRIPTION LTE RADIO PLANNING AND OPTIMISATION. Format: Classroom. Duration: 5 Day

New signal system for the railway

Instruction (Manual) Document

The evaluation of traffic microsimulation modelling

Project Appraisal Guidelines for National Roads Unit Guidance on using COBALT

Connecting Europe: Trans-European Networks [ :25]

TRADE SIGNALS POWERED BY AUTOCHARTIST

LTE RF Optimization Training

TSHWANE BRT: Development of a Traffic Model for the BRT Corridor Phase 1A Lines 1 and 2

TRADE SIGNALS POWERED BY AUTOCHARTIST

A Summary of Changes to the HS2 Economic Case

TRADE SIGNALS POWERED BY AUTOCHARTIST

Of the tools in the technician's arsenal, the moving average is one of the most popular. It is used to

Statistical dwell time model for metro lines

TRADE SIGNALS POWERED BY AUTOCHARTIST

DRAFT WORKING DOCUMENT ON TARGET2-SECURITIES THE FUNCTIONAL ARCHITECTURE

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT

MAXIMISE THE LEVEL OF SERVICE USING CROSS ASSET PORTFOLIO RENEWALS MANAGEMENT

TABLE OF CORRESPONDENCE BETWEEN COTIF AND EU TERMINOLOGY

STCP 16-1 Issue 005 Investment Planning

Edexcel past paper questions

Accident and Incident Investigation

Pre-sending Documents on the WWW: A Comparative Study

Cost Benefit Analysis of Alternative Public Transport Funding in Four Norwegian Cities

InterCity East Coast franchise award

The new Trans-European Transport Network Policy

ECSG SEPA CARDS STANDARDISATION (SCS) VOLUME STANDARDS REQUIREMENTS

TABLE OF CORRESPONDENCE BETWEEN COTIF AND EU TERMINOLOGY

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1

GO/GN3519. Guidance on Accident and Incident Investigation. Rail Industry Guidance Note for GO/RT3119

Seasonal Pathloss Modeling at 900MHz for OMAN

TRADE SIGNALS POWERED BY AUTOCHARTIST

Razor Risk Market Risk Overview

T2-T2S CONSOLIDATION HIGH-LEVEL SUMMARY OF BUSINESS CHANGES

Report on Internal Control

LTE RF Planning Training LTE RF Planning, Design, Optimization Training

Bullalgo Trading Systems, Inc. Bullalgo Volatility Gauge Study Indicator User Manual Version 1.0 Manual Revision

8 Simulation Analysis of TCP/DCA

Making SEPA a Reality

[Ekeocha*, 5(5): May, 2016] ISSN: Impact Factor: 3.785

OPENING RANGE BREAKOUT STOCK TRADING ALGORITHMIC MODEL

Based on BP Neural Network Stock Prediction

XSG. Economic Scenario Generator. Risk-neutral and real-world Monte Carlo modelling solutions for insurers

Basic Order Strategies

SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 6 Implementation Plan

Options for Fiscal Consolidation in the United Kingdom

User guide Version 1.1

Financial Analysis report on Disposal and Acquisition of Assets by Independent Financial Advisor For. Prepared by

Systems Engineering. Engineering 101 By Virgilio Gonzalez

Scalping Strategy Public Version

Broker FAQ. Program overview. 1. What is my Driving Discount? 4. How does my Driving Discount benefit my customers?

COMMISSION DELEGATED REGULATION (EU) /... of

Jefferies International Limited

(Seventeenth individual Directive within the meaning of Article 16(1) of Directive 89/391/EEC)

Contents A. INTRODUCTION... 2 A1. Purpose, scope and other addressees of the report... 2 A2. Significant organisational changes affecting the NSA...

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION

RAIL INVESTMENT. Making the money go further

A Glimpse of Representing Stochastic Processes. Nathaniel Osgood CMPT 858 March 22, 2011

Budgetary policy in EMU: times to change?

PICS Proforma for the DS1 Physical Layer Interface

PUBLIC FINANCE IN THE EU: FROM THE MAASTRICHT CONVERGENCE CRITERIA TO THE STABILITY AND GROWTH PACT

Progress Report. Rules cleaning-up. Document Type: Report. Document ID: ERA-PRG-006-REP

Module OTM. Working of on-track machines (OTM) GE/RT8000/OTM Rule Book. Issue 7. September 2015

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION. Slovakia. Report prepared in accordance with Article 104(3) of the Treaty

CAR SHARING REGULATIONS

Futures Trading Signal using an Adaptive Algorithm Technical Analysis Indicator, Adjustable Moving Average'

SPAIN Zaragoza Tramway SUMMARY OVERVIEW ZARAGOZA TRAMWAY. Location Zaragoza, Aragón, Spain

Trading Financial Market s Fractal behaviour

Standard Development Timeline

Answering the DCP Questionnaire - CSD's Common Answers and KELER's individual answers

Service Level Agreement

Commission Proposal on Connecting Europe Facility

2. T H R O U G H P U T R A T E S A N D I P A C C E S S 7. R E P A I R S / F A U L T L O G G I N G

Path Loss Prediction in Wireless Communication System using Fuzzy Logic

EACHA Interoperability Framework

To Tax or not to Tax: The case of London Crossrail

DnA Contract BPMN Processes

Transcription:

Computers in Railways XI 193 Evaluation of the capacity limitations and suitability of the European Traffic Management System to support Automatic Train Operation on Main Line Applications P. Thomas 1, D. Fisher 1 & F. Sheikh 2 1 Parsons Group International Ltd, UK 2 Department for Transport, UK Abstract The European Rail Traffic Management System (ERTMS) is the concept by which Europe is moving towards the standardisation of its rail signal control systems. Standardisation focuses on interfaces necessary for interoperability between trainborne and trackside equipment. ERTMS represents a step change for many railways, the vast majority of which are signalled with colour light signals and basic warning systems. ERTMS is specified in a number of different levels, and dependant on the implementation can introduce the benefits of cabsignalling, automatic train protection and future moving block train separation. This paper examines the capabilities and limitations of an ETCS/ERTMS level 2 implementation as specified by the current Technical Specifications for Interoperability for use in high density network locations and the suitability of ETCS/ERTMS to support the integration of an Automatic Train Operation (ATO) overlay. A generic sample section has been developed to analyse the headway constraints within the current ERTMS solution. The conclusions from the study suggest that there are no fundamental constraints preventing a level 2 implementation supporting an operational headway of 24 Trains Per Hour with recovery margin. The use of ATO for a high density application will offer an improved headway performance but will require a level of development and enhancement to the ERTMS functionality and architecture to correctly implement some ATO functionality. A further potential constraint is the capacity of the GSM-R radio communication network. This limitation can be removed by the envisaged migration to packet mode (GPRS) data transmission. Keywords: ERTMS, systems performance, train control systems, GSM-R, ATO. doi:10.2495/cr080201

194 Computers in Railways XI 1 ERTMS implementation in the UK The European Rail Traffic Management System (ERTMS), including the European Train Control System (ETCS) have been developed under the umbrella of the EU Interoperability Directives to facilitate rail interoperability throughout Europe, and to realise the benefits of standardised solutions, and volume procurement in terms of pricing. In recognition of the value, and importance of moving towards standardised systems, the UK has committed itself to the deployment of ETCS, and it will be fitted as the replacement signalling system on asset renewal. ETCS seeks to address a range of operating conditions, and needs throughout Europe, but was originally developed with emphasis on high speed operation. It offers three functional levels: Level 1: Overlay to existing signalling system; movement authority through Eurobalise; train integrity and position by track circuit. Level 2: Cab based signalling; movement authority through GSM-R; train position via Eurobalise; train integrity/occupancy through track-circuits/axle counters. Level 3: Cab based signalling; movement authority through GSM-R; train position via Eurobalise; train integrity on-board; potential for moving block. The system planned for deployment in the UK is Level 2 without line side signal back-up: a full communications based cab-based signalling system. To date, ERTMS/ETCS Level 2 has been implemented on high speed lines within the European Union, and is starting to be implemented on mixed traffic main line railways. In the UK the deployment of ETCS will become a routine activity, relying upon a standardised approach to procurement, system configuration, and installation. 2 Modelling ETCS capability Within the UK ETCS must be capable of providing signalling control for various traffic and operational scenarios, including high density suburban systems such as the new London Crossrail system. Today, such high density suburban systems are also considering the use of Automatic Train Operation (ATO) systems to ensure that their timetable demands can be reliably met. To better understand the limits of ETCS performance, the Department for Transport commissioned a study into an analysis of its capability, and also to determine whether there were any constraints within the system as specified that would prevent it from being integrated with an ATO system. 3 Methodology and basis A bespoke model (CPetcs) was developed to assess the headway constraints by modelling the train throughput capacity through a generic sample section, equipped with an ETCS level 2 application without visual signals. The model enables the dynamic behaviour of an ETCS application to be evaluated for

Computers in Railways XI 195 Table 1: Basis. Data EEIG ERTMS USERS GROUP: 97E881 Version 6L Description of the brake curve calculation [R1] ERTM/CAM/D0128 Issue 2.1 System Description (National Values) [R2] IEP-TECH-REQ-35 Issue 01 Train Technical Specification [R3] ATO Data [R4] Electrostar train data [R4] ETCS SRS Class 1 version 2.3.2 [R5] different scenarios and configurations of the ETCS application including with an ATO overlay. The data used in the model is summarised in Table 1. 4 Railway model The CPetcs model development is based on the following principles: The number of trains per hour that can be scheduled to run over a particular railway section depends on the minimum headway, between two consecutive trains that can be achieved at the worst bottleneck within the section; The model therefore simulates the running of a number of trains separated by, user defined target headways over a, user defined sample railway section; The speed profiles of these trains is dependent on train performance characteristics, Permanent Speed Restrictions (PSR), gradients, station stopping points and dwell times, all of which are user inputs to the model; Constraints imposed by ERTMS / ETCS signalling are then imposed by the model in accordance with interoperability specifications (TSI) [R1,R2,R5]; The extent of the signalling constrains depends on the following factors (all of which are included in the model): Operations of trainborne ETCS equipment with, user defined, performance characteristics based on TSI values [R2,R5]. Operations of trackside ETCS equipment with, user defined, performance characteristics. Values of these characteristics are based on Parsons experience of typical supplier capabilities. Delays in message interchange between the two due to the GSM-R network. These are based on TSI values [R5] of message lengths and GSM-R performance requirements. Braking curve calculations as specified by EEIG [R1]. The margins between target and achievable headways are computed by the model in order to indicate the feasibility of achieving the target capacity, and the level of margin available for schedule recovery with and without ATO. 4.1 Headway scenarios analysed The following scenarios have been analysed: a. A plain line section with gradient change from uphill to downhill; b. The same plain line section with the inclusion of an Radio Block Centre (RBC) boundary;

196 Computers in Railways XI c. A section including a station stop; d. A section including a converging junction; e. A section including a diverging junction; f. A composite section including all the above features together with PSR changes. 4.1.1 Scenario parameter values All scenarios use the following parameter values: Electrostar Class 375 train; Manual driving 90% of full braking, 98% of ceiling speed, 99% of acceleration; Axle Counters are used for train detection. For scenarios (a) and (b) the following parameter values have been used: Scheduled headway 75 seconds; 10 km plain line track; Line speed 120 kph; Initial gradient 1% uphill changing to 1% downhill after 5 km; 8 car train Other key parameters were varied according to Table 2 Headway Key Parameters. GSM-R Circuit Switched Mode (CSM) high error represents a 10 fold increase in random errors and call drop outs and GSM-R cell size reduction from 4 km to 2 km (i.e. double frequency of hand-over gaps). Table 2: Headway key parameters. Variable Better Nominal Worse Block size (m) 400 500 600 Balise space (m) 100 400 1200 Train length (Class 375) 4 car 8 car 12 car ATP / ATO ATO ATP ATP MA event/cycle event event cycle GSM-R GPRS mean CSM 99% CSM 99% high error 4.2 ETCS level 2 capacity analysis results The results give an indication of the impact of different railway features on the capacity of a line section. They also indicate which signalling related parameters have greatest impact on capacity. In broad terms they indicate a capacity limit of about 24 tph for ETCS Level 2 with manual driving. However a particular railway layout can contain features that interact to further constrain its capacity. This implies the need to analyse real line sections before drawing final conclusions on their capacity. 4.2.1 Results for plain line scenarios (a) & (b) The results, in terms of maximum trains per hour, are shown on fig. 1. Each axis in the radar diagram shows capacity sensitivity to a specific parameter value. The following observations can be made on these results (taking the parameters in a clockwise sequence): ETCS Block size has a very significant impact. The values illustrated (400 m, 500 m and 600 m) were chosen to be relatively close to avoid

Computers in Railways XI 197 distorting the overall chart. Larger block sizes show a marked reduction in railway capacity but there is a law of diminishing returns as block sizes decrease. Balise spacing has a relatively small impact. The length of the train is a significant factor. The significance increases at low train speeds. ATO offers a very significant improvement. The TSI specifications allow two principal options for delivering Movement Authority updates to trains. Results show that the RBC should send updates as soon as available (event option) rather than waiting for cyclic repeat requests from the train (cycle). The nominal values are all based on GSM-R operating in Circuit Switched Mode and performing in accordance within specified limit. Higher values of error rates, call dropout rates and cell handover gaps can have a significant adverse effect on capacity. GPRS offers a modest improvement. There is a relatively small deterioration in headways as trains cross RBC boundaries due to the time for inter-rbc communication. 4.2.2 Results for station stops (c) The impact of station stops depends largely on the dwell time as illustrated in fig. 2. 4.2.3 Results for converging junctions (d) The impact of a converging junction as a function of the turn-in speed limit compared to the 120 kph points-normal line speed is shown in fig. 3. The impact is modest. The irregularity is caused by interaction with the block spacing. Better Nominal Worse RBC boundary GSM-R TPH Sensitivity Trains per Hour 33 32 31 30 29 28 27 Block size Balise space MA event/cycle Train length ATP / ATO Figure 1: Results of plain line analysis.

198 Computers in Railways XI Station Stop Capacity (trains per hour) 27 26 25 24 23 22 21 25 30 35 40 45 50 55 60 65 Dwell (seconds) Figure 2: Capacity reduction from station stop. Capacity reduction from plain line Capacity Reduction (%) 3.5% 3.0% 2.5% 2.0% 1.5% 1.0% 0.5% 0.0% 0 20 40 60 80 100 120 Turn-in speed limit (kph) Figure 3: Capacity reduction from turn-in speed. Capacity reduction from plain line 30.0% 25.0% Capacity Reduction (%) 20.0% 15.0% 10.0% 5.0% 0.0% 0 20 40 60 80 100 120 Turnout speed limit (kph) Figure 4: Capacity reduction from turnout speed.

Computers in Railways XI 199 4.2.4 Results for diverging junctions (e) The diverging junction scenario (e), however, shows a much more significant capacity impact as illustrated in fig 4 compared with a points-normal speed limit of 120 kph. 4.2.5 Results for the sample section (f) A headway plot for a hypothetical railway sample section is shown below. Time Headways 160 140 Station Stop Station Stop 120 100 Diverging junction Time (sec) 80 60 Converging junction 40 20 Reducing block sizes 0 1474 1759 2044 2329 2614 2899 3184 3469 3754 4039 4324 4609 4894 5179 5464 5749 6034 6319 6604 6889 7174 7459 7744 8029 Track location (distance from start) 8314 8599 8884 9169 9454 9739 Figure 5: Sample section results. The shape of the headway plot can be explained as follows: The trace starts at a point about 3300 m from the start of the specimen section. This is the location of the leading train when the following train starts its journey. Headways increase as the following train accelerates because the braking time increases. The sharp drops in headway coincide with the lead train passing an overlap and hence freeing up the preceding block. There is an increase in headway at the converging junction (marked). The headway drop after the converging junction is due to the following train braking to a PSR reduction. The converging junction precedes a station stop and short block spacing has been provided in these areas. This explains the small headway fluctuations followed by a sharp increase when the lead train stops at the station. The headway then drops as the lead train leaves the station. It then rises again as the lead train slows down for a diverging junction.

200 Computers in Railways XI Following the diverging junction we see the effect of varying block sizes. The final rise is for a second station stop. This rise is more pronounced as the following train is at full line speed in this case 5 ATO integration analysis To assess whether ERTMS could be integrated successfully with an ATO overlay the interactions between the on-board elements of the ETCS system and the ATO are considered by analysing the data flows, represented by arrows, identified in the ATO functional model presented in fig. 6 below. For the purposes of the analysis the model defined in IEEE P1474.3 has been adapted for an ERTMS application. The model summarises the interfaces between ATO sub-functions (solid boxes) to non ATO sub-functions (dashed boxes). Within each box the system performing the function is indicated by: [A] performed by ATS equipment, [W] by ETCS wayside equipment, by ETCS/ATO train-borne equipment, [E] indicates by external equipment to ETCS/ATO, [W/T] by either wayside equipment or train-borne equipment, depending on the specific ETCS system design, [T/E] by either train-borne or external equipment, depending on the specific ETCS system design. The station stopping functionality of ATO is modelled by analysing the affects of the odometry accuracy on the performance of ATO to regulate its train operations profile. Door Interlocks [E] Train length determination [W/T] Door Control Station Stop Functions [A] Determine train stopping point Train regulation [A] Determine ATO Profile ERTMS Train Location determination ERTMS Train speed determination Departure Interlocks [T/E] ATP Profile Regulate Train Speed On-board ATO Users interface Figure 6: ATO functional model. 5.1 Results 5.1.1 ATO fixed data The ATO requires fixed data to perform its functions such as calculate ATO profile, Door Control and station stopping. In an ERTMS application the

Computers in Railways XI 201 movement authority sent to the train includes some of the information required by the ATO to perform these functions. The data may therefore be transmitted by the on-board EVC to the ATO or held within the ATO system as part of the fixed data. Whether the fixed data elements are sent to the ATO at the same time that the EVC receives an MA update or the data is held within the ATO makes no significant difference to the performance of the ATO overlay and does not present an integration issue. 5.1.2 ERTMS train location determination This function provides the train location information to the ATO to enable the ATO to control the train speed and stop the train accurately at the platform. The accuracy of the platform stop will be governed largely by the accuracy of the odometry system. The odometry system uses the balises to provide a positional reference. The ATO system uses this information to update and correct its location information used to regulate the train speed, which may result in the ATO modifying its propulsion or brake commands. During a platform stop the effects of two cases of odometry error are considered: In the first case there is an odometry error, which causes the ATO to believe that the train has not travelled as far as the actual train position. The ATO upon receipt of a location update after reading the balise will release the service brake in an attempt to follow the correct stopping curve. Once the ATO is following the correct stopping curve it will re-apply the service brake. The effects of the brake-build-up time will cause an overshoot of the stopping point. If no correction is made the train will stop short or undershoot the stopping location. In the second case an odometry error causes the ATO to believe that it has travelled further than it actually has. In this case as the ATO is already demanding full service brake the train will continue to overshoot the platform stopping position. 6 Conclusions The conclusions from the study suggest that there are no fundamental constraints preventing an ETCS/ERTMS level 2 implementation supporting a technical headway of 120 seconds or better, enabling an operational headway of 24 Trains Per Hour with 30 seconds recovery margin. The implementation of ATO for a high density application offers a significant improvement to headway performance and will enable a higher train capacity throughput to be sustained. The implementation of an ATO overlay to ETCS /ERTMS will require a level of development and enhancement to the ERTMS functionality and architecture to correctly implement some ATO functionality that maybe desirable in certain applications. These developments are largely to implement ATO station stopping functionality. It can be further concluded that it should be possible to overlay an ATO system to an ETCS application. The accuracy of the odometry system would need to be sufficient to support the correct function of the ATO. The solution and performance is likely to be supplier specific. A further potential constraint is the capacity of the GSM-R radio communication network for communication between ETCS Level 2 trainborne

202 Computers in Railways XI and trackside signalling equipment. The present versions of TSIs require an individual radio channel for each ETCS controlled train. The available GSM-R bandwidth could become a limitation. This limitation can be removed by the, envisaged, migration of the ETCS standards to include packet mode (GPRS) data transmission. Although not embodied within the TSI s, the TSI s themselves do not prevent implementation of an ATO overlay as analysed in this study, for example the TSI s do not prevent implementation of a more accurate odometry system. The authors are also aware that there are number of change requests proposed that could if implemented enable some ATO functionality such as door control and standard automatic driving interface. The TSI s will however, need to be modified to implement GPRS. This would also require development of the necessary ETCS functionality. References [1] Network Rail National ERTMS Programme Team, EEIG ERTMS USERS GROUP: 97E881 Version 6L Description of the brake curve calculation [2] Network Rail National ERTMS Programme Team, ERTM/CAM/D0128 Issue 2.1 System Description (National Values) [3] DfT IEP-TECH-REQ-35 Issue 01 Train Technical Specification [4] Parsons, ATO data and Electrostar data [5] ERA website, ETCS SRS Class 1 version 2.3.2