IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Similar documents
IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

WHITBY HYDRO ELECTRIC CORPORATION

PARTIAL DECISION AND RATE ORDER

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

NEWMARKET - TAY POWER DISTRIBUTION LTD.

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC.

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC.

DECISION AND RATE ORDER

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC.

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB VERIDIAN CONNECTIONS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ORANGEVILLE HYDRO LIMITED

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB KENORA HYDRO ELECTRIC CORPORATION LTD.

GUELPH HYDRO ELECTRIC SYSTEMS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB COLLUS POWERSTREAM CORP.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB NIAGARA PENINSULA ENERGY INC.

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective January 1, 2017 Board File No.: EB

Ontario Energy Board Commission de l énergie de l Ontario

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB HYDRO ONE NETWORKS INC.

The Filing includes the Application; the Manager s Summary; and live versions of the following models:

Ontario Energy Board Commission de l énergie de l Ontario RATE ORDER EB HYDRO ONE NETWORKS INC.

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

North Bay Hydro Distribution Ltd. Application for 2018 Electricity Distribution Rates EB

October 22, Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700, P.O. Box 2319 Toronto, ON M4P 1E4

CHAPLEAU PUBLIC UTILITIES CORPORATION ED IRM APPLICATION EB

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B) (the Act );

BY COURIER. August 16, Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700 P.O. Box 2319 Toronto, ON M4P 1E4

PowerStream Inc. (Licence Name PowerStream Inc. ED ) 2010 Electricity Distribution Rate Adjustment Application EB

Halton Hills -- HYDRO--

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

Collus PowerStream Corp. ED Incentive Regulation Mechanism Electricity Distribution Rate Application

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

2.11 EXHIBIT 8: RATE DESIGN... 2 Overview... 2

Essex Powerlines Corporation 2730 Highway #3, Oldcastle, ON, N0R 1L0 Telephone: (519) Fax: (519)

Oakville Hydro Electricity Distribution Inc Distribution Rate Adjustment Application (EB ) Effective January 1, 2018

AIRD BERLIS. October 16, 2017 VIA COURIER, AND RESS

Veridian Connections Inc., 2019 Electricity Distribution IRM Rate Application Board File No.: EB

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Ontario Power Generation Inc. Application for payment amounts for the period from January 1, 2017 to December 31, 2021

IN THE MATTER OF the Ontario Energy Board Act, 1998, S. O. 1998, c.15, Schedule B;

EB Ontario Energy Board Commission de l énergie de l Ontario DECISION AND INTERIM ORDER UNION GAS LIMITED

August 23, via RESS signed original to follow by courier

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

EB Hydro One Networks Inc. s 2019 Transmission Revenue Requirement Application and Evidence Filing

Balsam Lake Coalition Interrogatory # 8

REGULATORY ACCOUNTS. The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts.

An Application. Canadian Niagara Power Inc. To Adjust. Electricity Distribution Rates. Effective January 1, 2019 EB

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective May 1, 2012 Board File No. EB Evidence Update

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

IN THE MATTER OF subsections 78(2.1), (3.0.1), (3.0.2) and (3.0.3) of the Ontario Energy Board Act, 1998;

RESIDENTIAL SERVICE CLASSIFICATION

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1.

EB Hydro One Remote Communities Inc. 4GIRM 2019 Distribution Rate Application Application and Evidence

Orangeville Hydro Limited 2019 IRM APPLICATION EB Submitted on: September 24, 2018

Ontario Energy Board

Canadian Manufacturers & Exporters (CME) INTERROGATORY #1 List 1

EB Hydro One Remote Communities Inc. 4GIRM 2014 Distribution Rate Application Application and Evidence Filing

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB UNION GAS LIMITED

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

OSHAWA PUC NETWORKS CUSTOM INCENTIVE REGULATION RATE PLAN MID-TERM UPDATE INTRODUCTION & OVERVIEW

EXHIBIT 9 DEFERRAL AND VARIANCE ACCOUNTS

List of Appendices Application Manager s Summary Proposed Adjustments... 12

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

DEFERRAL AND VARIANCE ACCOUNTS

Oakville Hydro Electricity Distribution Inc Distribution Rate Adjustment Application (EB ) Effective January 1, 2017

ENERSOURCE HYDRO MISSISSAUGA INC. HORIZON UTILITIES CORPORATION & POWERSTREAM INC.

TABLE OF CONTENTS. C. Business Planning and Budgeting Process and Economic Assumptions

ATTACHMENT 8 SUMMARY OF FIXED/VARIABLE SPLITS HORIZON UTILITIES RZ

2019 PRICE CAP INCENTIVE REGULATION ELECTRICITY DISTRIBUTION RATE APPLICATION

DEFERRAL AND VARIANCE ACCOUNTS

Ontario Energy Board

REGULATORY ASSETS, VARIANCE AND DEFERRAL ACCOUNTS

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15;

Energy Probe (EP) INTERROGATORY #50 List 1

IN THE MATTER OF the Ontario Energy Board Act;

RATE RIDERS. Filed: EB Exhibit G1 Tab 5 Schedule 1 Page 1 of REGULATORY ASSET RATE RIDER

Ontario Energy Board (Board Staff) INTERROGATORY #16 List 1

CALCULATION OF INCREMENTAL CAPITAL MODULE REVENUE REQUIREMENT

DECISION AND ORDER. Ontario Energy Board Commission de l énergie de l Ontario EB HYDRO ONE NETWORKS INC.

Doug Curtiss, CEO, GPI Shafee Bacchus, Chair, NWTC Encls. *Mark Rodger Professional Corporation TOR01: : v1

EXECUTIVE SUMMARY OF APPLICATION

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, Schedule B;

SUMMARY OF APPLICATION

DECISION AND ORDER ON PHASE 1

BILL IMPACTS LEGACY CUSTOMERS

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND ORDER EB UNION GAS LIMITED. BEFORE: Susan Frank Presiding Member

Horizon Holdings Inc.

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B)

Re: EB /EB /EB SEC Submissions

BY COURIER. October 11, Ms. Kirsten Walli Board Secretary Ontario Energy Board Suite Yonge Street Toronto, ON M4P 1E4. Dear Ms.

Transcription:

Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Hydro One Networks Inc. for an order approving just and reasonable rates and other charges for electricity distribution to be effective January 1, 2014. BEFORE: Ken Quesnelle Presiding Member Marika Hare Member Allison Duff Member FINAL DECISION and ORDER ( Hydro One ) filed an application with the Ontario Energy Board (the Board ) on April 26, 2013 under section 78 of the Act, seeking approval for changes to the rates that Hydro One charges for electricity distribution, effective January 1, 2014 (the Application ). The Board assigned file number to the Application and issued a Notice of Application on May 24, 2013. The Application met the Board s requirements as detailed in the Report of the Board: Renewed Regulatory Framework for Electricity Distributors: A Performance-Based Approach (the RRFE Report ) dated October 18, 2012 and the Filing Requirements for Transmission and Distribution Applications (the Filing Requirements ) dated July 17, 2013.

The Vulnerable Energy Consumers Coalition ( VECC ), School Energy Coalition ( SEC ), Federation of Ontario Cottagers Association ( FOCA ), Energy Probe, Balsam Lake Coalition ( BLC ), Power Workers Union ( PWU ), Ontario Sustainable Energy Association ( OSEA ), Canadian Manufacturers and Exporters ( CME ), Union Gas Limited ( Union ), the Ontario Federation of Agriculture ( OFA ), and the Consumers Council of Canada ( CCC ) and Mr. Howard I. Blatt applied for and were granted intervenor status. All but BLC, Union and PWU were granted cost eligibility. Five Letters of Comment were received. A settlement conference was held on September 4, 2013 on the issues related to a Smart Grid rate rider. The parties agreed to a settlement and Hydro One filed a Settlement Proposal on September 17, 2013. On September 26, 2013 the Board issued a Partial Decision and Procedural Order No. 3, in which it accepted the Settlement Proposal and approved a rate rider to recover the costs of Hydro One s Smart Grid program. The Partial Decision did not deal with the other aspects of the Application including the Incentive Rate Mechanism (IRM) adjustment, the Retail Transmission Service Rates and the Income Tax Sharing rate rider. Accordingly, the Board made provision for submissions on the other aspects of the Application. Submissions were received from the Power Workers Union (PWU) and Board staff. The PWU supported the other aspects of Hydro One s Application noting that the 2014 IRM calculation would be updated by the Board. Board staff submitted that it had no concerns regarding Hydro One s 2014 IRM rate calculations (subject to updates), the updated Retail Transmission Service Rates (RTSR) or the calculation of the Shared Tax Savings. While the Board has considered the entire record in this proceeding, it has made reference only to such evidence as is necessary to provide context to its findings. As the Smart Grid rate rider has already been approved, the following remaining issues are addressed in this Final Decision and Order: Price Cap Index Adjustment; Shared Tax Savings Adjustments; and Retail Transmission Service Rates. Final Decision and Rate Order 2

Price Cap Index Adjustment The Board issued its Report on Rate Setting Parameters and Benchmarking under the Renewed Regulatory Framework for Ontario s Electricity Distributors (the Price Cap IR Report ) on November 21, 2013 which provides the 2014 rate adjustment parameters for distribution companies selecting either the Price Cap IR or Annual IR Index option. Distribution rates under the Price Cap IR option are adjusted by an inflation factor, less a productivity factor and a stretch factor. The inflation factor for 2014 rates is 1.7%. Based on the total cost benchmarking model developed by Pacific Economics Group Research, LLC, the Board determined that the appropriate value for the productivity factor is zero percent. The Board also determined that the stretch factor can range from 0.0% to 0.6% for distributors selecting the Price Cap IR option, assigned based on a distributor s cost evaluation ranking. In the Price Cap IR Report, the Board assigned Hydro One a stretch factor of 0.6%. As a result, the net price cap index adjustment for Hydro One is 1.1% (i.e. 1.7% - (0% + 0.6%). The price cap index adjustment applies to distribution rates (fixed and variable charges) uniformly across all customer classes. The price cap index adjustment does not apply to the components of delivery rates set out in the list below. Rate Riders; Rate Adders; Low Voltage Service Charges; Retail Transmission Service Rates; Wholesale Market Service Rate; Rural or Remote Rate Protection Charge; Standard Supply Service Administrative Charge; Transformation and Primary Metering Allowances; Loss Factors; Specific Service Charges; MicroFit Charge; and, Retail Service Charges. Rural or Remote Electricity Rate Protection Charge As of the date of this Decision and Rate Order, the Board has not issued a decision on the Rural or Remote Electricity Rate Protection ( RRRP ) charge for 2014. In the event Final Decision and Rate Order 3

that a new charge is established for 2014, the RRRP rate order will supersede this Decision and Rate Order with respect to the RRRP charge. Shared Tax Savings Adjustments In its Supplemental Report of the Board on 3 rd Generation Incentive Regulation for Ontario s Electricity Distributors, issued September 17, 2008, the Board determined that a 50/50 sharing of the impact of legislated tax changes between shareholders and ratepayers is appropriate. The tax reduction will be allocated to customer rate classes on the basis of the last Board approved cost of service distribution revenue. The Application identified a total tax savings of $2,183,500 resulting in a shared amount of $1,091,750 to be refunded to rate payers. The rider will also be designed to include 13% for an HST rebate shortfall on the 2013 Shared Tax Savings Rate Rider that is currently in effect. When the 2013 Shared Tax Savings Rate Rider was implemented it was deemed to be HST exempt although it should not have been. As a result, an amount of $141,928 will be refunded to customers. Therefore, the rider for 2014 will include the 2014 Shared Tax Savings of $1,091,750 and the HST rebate shortfall of $141,928 for a total of $1,233,678 to be refunded to customers. The Board approves the disposition of the shared tax savings of $1,233,678 based on a volumetric rate rider using annualized consumption for all customer classes over a oneyear period (i.e. January 1, 2014 to December 31, 2014). Retail Transmission Service Rates Electricity distributors are charged for transmission costs at the wholesale level and then pass these charges on to their distribution customers through the Retail Transmission Service Rates ( RTSRs ). Variance accounts are used to capture differences in the rate that a distributor pays for wholesale transmission service compared to the retail rate that the distributor is authorized to charge when billing its customers (i.e. Accounts 1584 and 1586). On June 22, 2012 the Board issued revision 3.0 of the Guideline G-2008-0001 - Electricity Distribution Retail Transmission Service Rates (the RTSR Guideline ) which outlines the information that the Board requires electricity distributors to file to adjust their RTSRs for 2014. The RTSR Guideline requires electricity distributors to adjust Final Decision and Rate Order 4

their RTSRs based on a comparison of historical transmission costs adjusted for the new Uniform Transmission Rates ( UTR ) levels and the revenues generated under existing RTSRs. Similarly, embedded distributors must adjust their RTSRs to reflect any changes to the applicable Sub-Transmission RTSRs of their host distributor(s), e.g. The objective of resetting the rates is to minimize the prospective balances in Accounts 1584 and 1586. Hydro One applied to adjust its Retail Transmission Service Rates ( RTSR ) to reflect the UTRs effective January 1, 2013, resulting from the Board s EB-2012-0031 Rate Order issued December 20, 2012. These are shown in the following table: 2013 Uniform Transmission Rates Network Service Rate Connection Service Rates Line Connection Service Rate Transformation Connection Service Rate $3.63 per kw $0.75 per kw $1.85 per kw The Board finds that these 2013 UTRs are to be incorporated into the filing module to generate the 2014 RTSRs for Hydro One. As of the date of this Decision and Rate Order, the Board has not issued its rate order for Hydro One Network Inc. Transmission which will adjust the UTRs effective January 1, 2014. The Board will therefore approve the RTSRs as partially adjusted in this Application. The differences arising from the new UTRs will be captured in Accounts 1584 and 1586 for future disposition. IMPLEMENTATION The Board made findings in its Partial Decision and this Final Decision and Order which will change the 2014 distribution rates from those proposed by Hydro One. The Board expects Hydro One to file a draft Rate Order, including a proposed Tariff of Rates and Charges and all relevant calculations showing the impact of this Decision and Rate Order on Hydro One s determination of the final rates. Supporting documentation shall include, but not be limited to, filing a completed version of the 2014 IRM Rate Generator model, and related documents showing how the RTSR, the Shared Tax Savings rate rider and the Smart Grid rate rider were established. Final Decision and Rate Order 5

A Rate Order will be issued after the steps set out below are completed. THE BOARD ORDERS THAT: 1. Hydro One shall file with the Board, and shall also forward to intervenors, a draft Rate Order that includes revised models in Microsoft Excel format and a proposed Tariff of Rates and Charges reflecting the Board s findings no later than 7 days from date of issuance of this Final Decision and Order. 2. Board staff and intervenors shall file any comments on the draft Rate Order including the revised models and proposed rates with the Board and forward to Hydro One within 7 days of the date of filing of the draft Rate Order. 3. Hydro One shall file with the Board and forward to intervenors responses to any comments on its draft Rate Order including the revised models and proposed rates within 4 days of the date of receipt of Board staff and/or intervenor comments. All filings to the Board must quote file number, be made through the Board s web portal at, https://www.pes.ontarioenergyboard.ca/eservice// and consist of two paper copies and one electronic copy in searchable / unrestricted PDF format. Filings must clearly state the sender s name, postal address and telephone number, fax number and e-mail address. Parties must use the document naming conventions and document submission standards outlined in the RESS Document Guideline found at www.ontarioenergyboard.ca. If the web portal is not available parties may email their document to BoardSec@ontarioenergyboard.ca. Those who do not have internet access are required to submit all filings on a CD in PDF format, along with two paper copies. Those who do not have computer access are required to file 2 paper copies. DATED at Toronto, ONTARIO ENERGY BOARD Original signed by Kirsten Walli Board Secretary Final Decision and Rate Order 6