St. Asaph Flood Risk Management Scheme Case Study The Solution

Similar documents
St. Asaph Flood Risk Management Scheme Case Study: The problem and task

Problem Overview. Key Flood extent for present day 1% (or 1 in 100) chance flood event. Dinas Powys. Barry Industrial Area.

Flood Risk Management: Modelling blockage and breach scenarios February 2015

Good Practice Guide. GPG 101 Document Owner: Steve Cook. Page 1 of 7.

Good Practice Guide. Technical guidance: Flood risk activity definitions October GPG 220 Document Owner: Flood Risk Strategy.

Decision by Richard Dent, a reporter appointed by the Scottish Ministers

Abstraction Charges Scheme 2017/18

The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201-

River Lugg Internal Drainage Board. Policy Statement on Flood Protection and Water Level Management

Lowestoft. Summary 2016 FLOOD RISK MANAGEMENT. Mike Page

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management

Barry Island and Docks (2)

UPDATE ON DALLAS FLOODWAY

Appendix 4 Candidate Projects for Local Choices

Croesewir gohebiaeth yn y Gymraeg a r Saesneg / Correspondence welcomed in both Welsh and English.

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option

Frequently Asked Questions

Eddleston, Peebles, Innerleithen, Selkirk, Stow and Galashiels (Potentially Vulnerable Area 13/04) Local Plan District Local authority Main catchment

Requirements for Mapping Levees Complying with Section of the NFIP Regulations

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP)

Flood Risk Management Plan for the BALLYTEIGUE BANNOW River Basin (UoM13)

Flood Risk Assessment Appendix 1 to Strategic Environmental Assessment Screening of Amendment No. 1 to Ferrybank/Belview Local Area Plan

Flood Risk Management Plan for the NORTH WESTERN River Basin (UoM01)

Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catch

Ymweliad â safle a wnaed ar 04/04/16 Site visit made on 04/04/16

Lowestoft Flood Risk Management Project

Army Corps of Engineers Indianapolis North Questions and Answers July QUESTION 1: What is the Indianapolis White River North project?

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management

Peter Brett Associates. Assessing Flood Risk and River Modelling Doulton Brook Development, West Midlands

Business Plan Summary

Flood Risk Sequential Test

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Consider the risks to your own business as well as to your operations

Environment Agency pre-application advice incorporating Local Flood Risk Standing Advice from East Lindsey District Council

Porthcawl to Sker Point (7)

Strategic Environmental Assessment

SUPPLEMENTARY BUDGET MAIN EXPENDITURE GROUP (MEG) Components of the Welsh Government Budget. 000s

HEALTH AND SOCIAL SERVICES

Trinity River Restoration Program

Unique ID: (from PFRA database) Location: Bridgetown, Co. Clare. Stage 1: Desktop Review

Memorandum. Jt~1A. Jordan, P.E. Assistant City Manager CITY OF DALLAS

Implementation Project Development and Review 255

Environmental Permitting Regulations (England and Wales) Regulatory Guidance Series, No RGN 1. Understanding the meaning of operator

Provision of Flood Risk Information for sites on Duchess Street, Grimsby and Doughty Road, Grimsby.

Bisham Parish Council Risk Management Strategy

1 About the permit. 1a Discussions before your application

STRATEGIC FLOOD RISK ASSESSMENT

A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety

HRPP 358. Adapting flood risk management for an uncertain future: Flood management planning on the thames estuary. D. Ramsbottom & T.

achieving results in the public sector Kāpiti Coast District Council Financial Investigation of a Kāpiti Coast Unitary April 2013

Flood Risk Management Planning in Scotland: Arrangements for February 2012

2018 WASHOE COUNTY BALLOT QUESTION WC 1

September 2014 Pagham Neighbourhood Plan

Wales Coastal Flooding Review Project 5 Report Recommendations 25 & 26

YMDDIRIEDOLAETH ARCHAEOLEGOL CLWYD POWYS CLWYD POWYS ARCHAEOLOGICAL TRUST WELSH LANGUAGE SCHEME

Luncarty, Stanley, Bankfoot, Dunkeld and Birnam (Potentially Vulnerable Area 08/08) Local Plan District Local authority Main catchment Tay Perth and K

A guide to how we fund and deliver Flood Risk Management Schemes

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba

Shrewsbury flood defen

Strategic Flood Risk Assessment. SFRA Report

THE CHARTERED INSTITUTE OF LEGAL EXECUTIVES UNIT 11 PLANNING LAW *

Strategic Flood Risk Management

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock

FLOODING INFORMATION SHEET YOUR QUESTIONS ANSWERED

Product 4 (Detailed Flood Risk) for Our Ref: OX_0748_01. Mill Lane, Somerford Keynes

Appendix 5D Water Transfer Analysis Methodology and Results

Aberfeldy and Pitlochry (Potentially Vulnerable Area 08/03) Local Plan District Local authority Main catchment Tay Perth and Kinross Council River Tay

Broad-Scale Assessment of Urban Flood Risk Mark G. E. Adamson 1

AGENDA. 3. To Approve and Sign as a Correct Record the Minutes of the Meeting of the Community Council held on 19 th March 2015.

Between the Western Sydney Parklands Trust (the Trust) (LAND OWNER) and

Flood and Coastal Defence Project Appraisal Guidance Economic Appraisal

SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT

Chapter Flood Consequences

Attachment B. King County Flood Control Zone District Work Program

Decision by Jo-Anne Garrick, a Reporter appointed by the Scottish Ministers

International Real Estate Society Conference 99. Long Term Impact of Flood Affectation on Residential Property Prices

Solway Local Plan District 1 Flood risk management in Scotland 1.1 What is a Flood Risk Management Strategy? Flood Risk Management Strategies have bee

Chapter 5 Floodplain Management

SCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE 5 SEPTEMBER 2016 APPLICATION FOR PLANNING PERMISSION

ENGINEERING REPORT FREEBOARD ANALYSIS. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1. ANSONIA and DERBY, CONNECTICUT

Derwent Catchment Flood Management Plan. Summary Report December managing flood risk

an Inspector appointed by the Secretary of State for Communities and Local Government

PUBLIC INQUIRY DOCUMENT

HAWICK FLOOD PROTECTION SCHEME. 21 December Report by Service Director Assets & Infrastructure SCOTTISH BORDERS COUNCIL

Between the Parramatta Park Trust (the Trust) (LAND OWNER) and

Clyde catchment - Motherwell to Lesmahagow (Potentially Vulnerable Area 11/17/2) Local Plan District Clyde and Loch Lomond Local authority North Lanar

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction

Sequential Flood Risk Test for Mid Sussex Neighbourhood Plans

ROYAL BOROUGH OF WINDSOR & MAIDENHEAD PLANNING COMMITTEE

King County Flood Control District 2015 Work Program

STAGE 2 STRATEGIC FLOOD RISK ASSESSMENT (AS AMENDED)

HAZARD DESCRIPTION... 1 LOCATION... 2 EXTENT... 4 HISTORICAL OCCURRENCES... 6 PROBABILITY OF FUTURE EVENTS... 6 VULNERABILITY AND IMPACT...

PE-CONS 3619/3/01 REV 3

GENERAL PLAN AMENDMENT # FLOOD HAZARDS

Understanding the potential for private sector investment in natural capital lessons from the Spey catchment

Meeting of the Council 25 February 2016 RECOMMENDATIONS FROM CABINET (Minutes 59 and 61)

Flood Risk Management Strategy. Shetland

SCHEDULE B. TABLE OF CONDITIONS FOR A SECTION 10(1)(B) EXEMPTION ORDER Progress Energy Lily Dam

Strategic Flood Risk Assessment

Transcription:

St. Asaph Flood Risk Management Scheme Case Study The Solution Date

Assessing the options for the Flood Risk Management Scheme Each of the flood risk management options were assessed against the following criteria: Technical does the option deliver an acceptable decrease in flood risk? Environmental does the option give rise to any adverse or unacceptable environmental impacts? Economic would the option attract sufficient funding so it could be delivered and maintained. The option that was taken forward was Option 4 existing defences raised and Spring Gardens Bridge replaced. See Appendix 1 for a detailed outline of the chosen option. The option chosen was considered the most technically feasible, most economic and provides additional recreation and environmental benefits for the community. Figure 1 Table showing the different options that were assessed for the St. Asaph Flood Risk Management Scheme Option 1 2 3 4 5 U x xx Description Existing defences abandoned leading to failure Existing defences are maintained to their current condition All in channel and bankside vegetation is removed along the Elwy from St Asaph to its confluence with the River Clwyd to improve the flow of water within the river channel Existing defences raised, new defences built and Spring Gardens Bridge replaced Upstream storage together with improvements to the flood defence through the city where required Option Viability Appraisal Technical Environmental Economic xx xx No x U xx No x xx x No U Yes xx xx No Taken Forward? Technically/ Economically/ Environmentally Feasible Neutral / No impact Not Technically/ Economically/ Environmentally Feasible www.naturalresourceswales.gov.uk Education, Learning and Skills Page 2 of 15

The Flood Risk Management Scheme will provide a 1 in 200 (0.5%) annual event probability standard of protection against flooding with the defences being designed so they can be raised again in the future for climate change to maintain a 1 in 100 (1%) annual event probability standard throughout their design life (100 years). To provide protection against flood detriment, a section of defences on Lower Denbigh Road were built to provide a 1 in 1000 (0.1%) annual event probability standard of protection to minimise the number of new properties at flood risk for the 1 in 1000 (0.1%) flood. Flood defence improvement works were also undertaken at Dol Afon and Rhuddlan to ensure no increase in flood risk downstream of the main scheme works. Spring Gardens Bridge was recognised in the model as a control in the system during higher flows and therefore is to be replaced. The bridge was viewed locally as a primary cause of the flooding problems experienced in the city. The new level for the bridge is at or above the 1 in 100 (1%) annual event probability allowing for a 30% increase in flows in the future due to climate change. Figure 2 work in progress to replace Spring Gardens Bridge The total Present Value (PV) benefits from the scheme were approximately 35 million. Options discounted: Option 1 - existing defences abandoned leading to failure. Discounted as this would lead to danger to life and property and was deemed uneconomic. Option 2 - existing defences are maintained to their current condition. Discounted as this would lead to danger to life and property and was deemed uneconomic. www.naturalresourceswales.gov.uk Education, Learning and Skills Page 3 of 15

Option 3 - all in channel and bankside vegetation is removed along the Elwy from St Asaph to its confluence with the River Clwyd to improve the flow of water within the river channel. This option was discounted as it did not provide a sufficient reduction in flood risk and was also economically and environmentally unacceptable. Option 5 - upstream storage together with improvements to the flood defences through the city where required. This option was discounted as it would be prohibitively expensive and could give rise to unacceptable environmental impacts. Figure 3 Above - work in progress by the Old Bridge at St. Asaph Figure 4 Left, a plaque to remember the 2012 flood and the damage it caused www.naturalresourceswales.gov.uk Education, Learning and Skills Page 4 of 15

An increased Standard or Protection (SoP) for the commercial and residential properties of St. Asaph St. Asaph had a recent history of severe flooding and as a result considerable pressure has been applied by the community and local politicians for works to be undertaken. The preferred option provides protection against the scale of event experienced in 2012 by providing a 1 in 200 (0.5%) standard of protection at present day reducing to a 1 in 100 (1%) Standard of Protection in 2025 due to increased river levels due to climate change. The defences were designed so that they could be raised again in the future to maintain a 1% (1 in 100) annual event probability standard of flood protection to St Asaph. The scheme not only provided protection to 293 residential properties and 136 commercial properties, it also provided peace of mind to St. Asaph s vulnerable community. Figure 5 presents projections for changes in river flows West Wales River Basin District over time and are applicable to the River Elwy at St. Asaph. Total Potential Anticipated Change in River Flow Forecast Time period 1 - Time period 2 - Time period 3-2020s 2050s 2080s Upper end estimate +25% +40% +65% Change factor +15% +20% +30% Lower end estimate +5% +10% +10% Figure 5 Table demonstrating West Wales River Basin District Climate Change Allowances Figure 6 lists the flows and adjusted magnitude for floods in St. Asaph for each climate change time period calculated using the change factor given in Figure 5, above. Present Day Time period 1 2020s (Flows + 15 %) Time Period 2 2040 s (Flows + 20%) Time Period 3 2060 s (Flows + 30%) Flow Magnitude Flow Magnitude Flow Magnitude Flow Magnitude (m 3 /s) of flood (m 3 /s) of flood (m 3 /s) of flood (m 3 /s) 85 1 in 2 97 <1 in 2 102 <1 in 2 110 <1 in 2 113 1 in 5 130 1 in 5 135 1 in 5 147 1 in 2 134 1 in 10 154 1 in 5 161 1 in 5 174 1 in 5 165 1 in 25 190 1 in 15 198 1 in 10 215 1 in 10 192 1 in 50 221 1 in 25 230 1 in 25 249 1 in 15 210 1 in 75 241 1 in 40 251 1 in 35 272 1 in 25 223 1 in 100 256 1 in 55 267 1 in 45 290 1 in 30 243 1 in 150 280 1 in 80 292 1 in 65 316 1 in 45 258 1 in 200 297 1 in 105 310 1 in 85 336 1 in 60 323 1 in 500 371 1 in 300 387 1 in 250 420 1 in 170 385 1 in 1000 443 1 in 600 462 1 in 490 500 1 in 380 Figure 6 Table showing the possible future impacts of climate change on the River Elwy at St. Asaph Climate change is predicted to increase the frequency of extreme flood events. Taking the present day 1 in 200 (0.5%) annual event probability as an example (highlighted in yellow), www.naturalresourceswales.gov.uk Education, Learning and Skills Page 5 of 15

during time period 1 this becomes a 1 in 100 (1%) annual event probability and, by time period 3, is a 1 in 60 (1.66%) annual event probability. This means if a scheme is built for St Asaph providing a present day (2017) 1 in 200 (0.5%) standard of protection, this standard will diminish over the current century, unless there are further interventions, such as raising the defences to track the rate of climate change. Figure 7 shows that future climate change will both significantly reduce the standard of protection provided by the existing defences and increase the number of properties at risk from flooding. Figure 7 Table showing the current and future flood risk in St. Asaph during a 1 in 200 annual chance flood Year Existing Defence Standard of Protection Properties at risk during a 1 in 200 Annual Chance Flood Residential* Present day 1 in 50 293 136 Commercial* 2025 1 in 25 440 (+147) 162 (+26) 2040 1 in 25 454 (+161) 175 (+39) 2070 1 in 25 522 (+229) 185 (+49) *change from present day indicated in teal text If the defences remained at their 2016 height, by 2070 the consequences for St Asaph would be: The city s defences would only provide a 6.7% (1 in 15) annual event probability. Some 520 residential and 180 commercial properties would be at risk in the 0.5% (1 in 200) annual event probability.. www.naturalresourceswales.gov.uk Education, Learning and Skills Page 6 of 15

Good for the environment Scheme detriments The key negative impact resulting from the Scheme has been tree loss along the river corridor to enable the construction of the Scheme. The loss of these trees impacted on local amenity value, landscape, fisheries, birds and bats. Whilst tree losses were minimised as far as possible through the design, some tree loss was inevitable due to the proximity of the existing defences to the tree lined river corridor. Approximately 80-90 trees were removed however more new trees were planted to compensate for the loss. Figure 8 - several trees had to be removed along the river corridor to allow access for machinery to begin work on raising existing defences Scheme benefits New or extended defences where practicable were set back. For example to improve the appearance and setting of the St Asaph Old Bridge, a Grade II Listed Building and Schedule Ancient Monument (SAM), walls were set back immediately adjacent to the bridge and an existing high wall which encroached on the western arch of the bridge was removed, opening up this area. An interpretation board for St. Asaph Old Bridge Scheduled Ancient Monument was installed in collaboration with Cadw. Bird, bat boxes and otter holts were installed to increase the biodiversity in the project study area and coarse woody debris used to provide fish refuges. Landscaping of embankments and sowing of wild flowers seed mix within the recreation ground improved the appearance of the river corridor. www.naturalresourceswales.gov.uk Education, Learning and Skills Page 7 of 15

Access to the river in a less formal manner was encouraged by reducing embankment slope gradient. Dual waste and litter bins were installed to help reduce the amount of litter along the riverbank. Tree and hedgerow planting were undertaken including the planting of native black poplars and the establishment of a community orchard Good for people Existing foot and cycle paths that linked to the existing flood defences were widened, resurfaced and new lengths of footpath established along the embankment crests. New signage, separate lanes for cyclists and improved access ramp gradients were installed. Working in partnership with the Flood Risk Management Scheme contractor, opportunities were sought to work with local schools to raise pupils awareness of the dangers of flooding and their understanding of the 2012 flood event at St. Asaph. Educational resources which could be used by educators based on the Flood Risk Management Scheme were produced and teacher training sessions on how to run them delivered by NRW Education and Skills staff. A contribution was made towards the installation of sculptures along the river embankments to add to the appeal of the riverside walks. Flood Risk Management Scheme Consultees: NRW consulted with the following as part of the Flood Risk Management Scheme: Affected landowners Afon Elwy Environmental group (AEEG) St Asaph City Council Clwyd and Powys Archaeological Trust (CPAT) Cadw Denbighshire County Council Archaeology, Conservation and Footpaths officers Rhyl and St Asaph anglers NRW Fisheries and Geomorphology teams NRW Biodiversity and Protected Sites teams Sustrans Service providers (BT, Dwr Cymru Welsh Water) www.naturalresourceswales.gov.uk Education, Learning and Skills Page 8 of 15

Appendix 1 - Detailed outline of the chosen option for the St. Asaph Flood Risk Management Scheme www.naturalresourceswales.gov.uk Education, Learning and Skills Page 9 of 15

Appendix 2 - Comparison of 1 in 100 annual probability flood outlines

Appendix 3 - Comparison of 1 in 100 annual probability with climate change flood outlines www.naturalresourceswales.gov.uk Education, Learning and Skills Page 11 of 15

Appendix 4 - Comparison of 1 in 1000 annual probability flood outlines www.naturalresourceswales.gov.uk Education, Learning and Skills Page 12 of 15

Explanation of Appendices 2 4 Appendices 2 and 3 compare the flood outlines from the existing situation with the flood defence scheme for the 1 in 100 annual probability flood and climate change scenario (flows increased by 20%) respectively. By containing larger floods in bank than is currently the case however, it is inevitable that more flood water will be conveyed downstream at a faster rate and this could have an impact on thirds parties. Mitigation works were undertaken to ensure no increase in flood risk to properties downstream of St Asaph. Downstream of St Asaph flooding continues to occur, but to a lesser extent than pre-flood Risk Management Scheme. This is because flows overtopped the defences in the city and would continue on the floodplain to affect properties downstream. Raising the defences in the city therefore provided a slight reduction in flood risk to some areas located downstream of the city. Appendix 4 demonstrates the extent of flooding as a consequence of a catastrophic flood, a 1 in 1000 (0.1%) annual probability flood. The flood defences are now overtopped and as a consequence much of St Asaph is shown to be flooded. The flood outline is generally slightly reduced on the left bank side through St Asaph with a significant reduction in the flooding of farmland downstream of the A55. There is an almost slight increase in the flood outline through the industrial estate at the upstream end of the proposed defences on the left bank side and a very slight increase in the flood outline along the right bank side principally along Lower Street, Luke Street and Mill Street. Mitigation work to ensure no flood risk detriment through St Asaph for the 1 in 1000 annual chance flood was not practicable. This would require construction of defences to provide a 1 in 1000 annual chance standard of flood protection throughout the city. A scheme of this type would be too expensive to construct and generate significant local environment, landscape and heritage impacts. Acknowledgements NRW would like to thank the following: Charlotte Lang Carwyn Hughes Tim Owen Marianne Jones www.naturalresourceswales.gov.uk Education, Learning and Skills Page 13 of 15 Rob Green Eirian Gilford Translation department staff Angharad Harris Snowdonia National Park / Geography Association

The accompanying Task and Problem document for this case study can be found on the Education, Learning and Skills pages of NRW s website. You may also wish to refer to the St. Asaph November 2012 Floods Data Report which can also be found on these pages. Published in April 2017 Review due in April 2018 Authored by NRW Education, Learning & Skills If you have any queries or questions regarding this document please contact: education@naturalresourceswales.gov.uk Published by: Natural Resources Wales Cambria House 29 Newport Road Cardiff CF24 0TP 0300 065 3000 (Mon-Fri, 8am - 6pm) enquiries@naturalresourceswales.gov.uk www.naturalresourceswales.gov.uk Natural Resources Wales All rights reserved. This document may be reproduced with prior permission of Natural Resources Wales