Indonesia: Earthquake and Tsunami Emergency Support Project

Similar documents
Mongolia: Social Security Sector Development Program

Georgia: Emergency Assistance for Post-Conflict Recovery

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

Cambodia: Rural Credit and Savings Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Validation Report. Indonesia: Second Decentralized Health Services Project. Independent Evaluation Department

Indonesia: Participatory Irrigation Sector Project

Indonesia: Metropolitan Medan Urban Development Project

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda

Validation Report Rural Finance Project (Mongolia) (Loan 1848-MON)

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

Viet Nam: Microfinance Development Program (Subprograms 1 and 2)

Pakistan: Decentralization Support Program

Maldives: Tsunami Emergency Assistance Project

Bangladesh: Chittagong Hill Tracts Rural Development Project

Indonesia: Capacity Building in Urban Infrastructure Management Project

Validation Report Banking Sector Reform Program (Lao People s Democratic Republic) (Loan 1946-LAO)

Afghanistan: Regional Airports Rehabilitation Project (Phase 1)

India: Karnataka Urban Development and Coastal Environmental Management Project

Philippines: Philippine Energy Efficiency Project

Validation Report. Indonesia: Coral Reef Rehabilitation and Management Project Phase II. Independent Evaluation Department

Philippines: Small and Medium Enterprise Development Support Project

Indonesia: Rural Income Generation Project

Indonesia: Sustainable Aquaculture Development for Food Security and Poverty Reduction Project

Indonesia: Infrastructure Financing Facility Company Project

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Pakistan: Agribusiness Development Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Infrastructure Reconstruction Financing Facility Region

Evaluation Study. Midterm Review Process. Operations Evaluation Department

India: Assam Governance and Public Resource Management Sector Development Program

Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2)

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

Establishment of the High-Level Technology Fund

Kazakhstan: Countercyclical Support

Philippines: Mindanao Basic Urban Services Sector Project

ASIAN DEVELOPMENT BANK

Validation Report. Tonga: Economic Support Program. Independent Evaluation Department

Section 3.07 is deleted and the following is substituted therefor:

ASIAN DEVELOPMENT BANK

Pakistan: Road Sector Development Program

ASIAN DEVELOPMENT BANK

Viet Nam: Health Care in the Central Highlands Project

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Mongolia: Regional Road Development Project

Nepal: Road Connectivity Sector I Project

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

Project Administration Instructions

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department

Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia. Janelle Plummer, WSP-EAP Bill Paterson, EASTR

Policy Paper. March Establishing the Project Design Facility

Partnership Brief. Cofinancing with Spain

EAP DRM KnowledgeNotes Disaster Risk Management in East Asia and the Pacific

MFF - Bihar Urban Development Investment Program (Facility Concept)

Completion Report. Project Number: Loan Number: 1978 September Indonesia: Small and Medium Enterprise Export Development Project

Providing Social Protection and Livelihood Support During Post Earthquake Recovery 1

Preliminary Damage and Loss Assessment

Indonesia: Financial Market Development and Integration Program

OPERATIONS MANUAL BANK POLICIES (BP)

ASIAN DEVELOPMENT BANK

Republic of the Maldives: Preparing Business Strategy for Port Development

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Completion Report. Project Number: Loan Number: 1583 November Indonesia: Rural Income Generation Project

Maldives: Information Technology Development Project

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-57657, TF-98082) ON A MULTI DONOR TRUST FUND FOR ACEH AND NIAS (MDF) GRANTS

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

Cambodia: Small and Medium Enterprise Development Program

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

October Review of the Asian Development Bank s Service Charges for the Administration of Grant Cofinancing from External Sources

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

Statement of the Asian Development Bank s Operations in 2017

Featured Session on the Launch of Post Disaster Needs Assessment and Disaster Recovery Framework: Indonesia s Perspective

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Tajikistan: Power Rehabilitation Project

Tonga: Integrated Urban Development Sector Project

Palu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( )

Monitoring fund flows

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

LESSONS LEARNED FROM ACEH NIAS RECONSTRUCTION : Relevant Lessons for FutureCity Initiative

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

THE AUDITING OF TSUNAMI DISASTER RELIEF FUNDS IN ACEH AND NIAS BETWEEN

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

Establishment of a Self- Sustaining Environmental Investment Service in the East Asian Seas Region

Validation Report. India: Rural Roads Sector I Project. Independent Evaluation Department

GDLN Seminar on Disaster Risk Management in East Asia and the Pacific series - Summary of April 1, 2010 Video Conference

Republic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

Solomon Islands: Second Road Improvement (Sector) Project

Ex-Post Project Evaluation 2011: Package IV -2. (Indonesia, Thailand, Mongol)

Piloting Results-Based Lending for Programs: Proposed Increase in Resource Allocation Ceiling

Proposed grant to Solomon Islands for the. Solomon Islands Rural Development Programme

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund)

Cambodia: Second Power Transmission and Distribution Project

Technical Assistance Report

Republic of Indonesia: Sustainable Infrastructure Assistance Program

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Transcription:

Validation Report Reference Number: PVR 237 Project Number: 39127 Grant Number: 0002-SF December 2012 Indonesia: Earthquake and Tsunami Emergency Support Project Independent Evaluation Department

ABBREVIATIONS ADB Asian Development Bank BAPPENAS Badan Perencanaan Pembangunan Nasional (National Development Planning Agency) BRR Badan Rehabilitasi dan Rekonstruksi (Agency for Rehabilitation and Reconstruction) EMS Extended Mission to Sumatra IED Independent Evaluation Department MOF Ministry of Finance NGO nongovernment organization PCR project completion report PMO project management office SPEM spatial planning and environmental management NOTE In this report, $ refers to US dollars. Key Words adb, asian development bank, bappenas, earthquake, emergency project, indonesia, project implementation, tsunami The guidelines formally adopted by the Independent Evaluation Department (IED) on avoiding conflict of interest in its independent evaluations were observed in the preparation of this report. To the knowledge of IED management, there were no conflicts of interest of the persons preparing, reviewing, or approving this report. In preparing any evaluation report, or by making any designation of or reference to a particular territory or geographic area in this document, IED does not intend to make any judgments as to the legal or other status of any territory or area.

PROJECT BASIC DATA Project Number: 39127 PCR Circulation Date: 18 April 2011 Grant Number: 0002 (SF) PCR Validation Date: Dec 2012 Project Name: Earthquake and Tsunami Emergency Support Project Country: Indonesia Approved ($ million) Actual ($ million) Sector: Multisector Total Project Costs: 321.50 327.21 ADB Financing: ATF: 291.00 Grant: 290.00 290.84 ($ million) OCR: 0.00 Borrower: 28.00 32.88 Cofinancier: Government of the Total Cofinancing: 3.50 3.49 Netherlands Approval Date: 7 Apr 2005 Effectiveness Date: 27 Jul 2005 21 Jun 2005 Signing Date: 29 Apr 2005 Closing Date: 30 Dec 2008 30 Dec 2010 Project Officers: Location: P. Smidt R. Budiman Extended Mission to Sumatra Indonesia Resident Mission Validators: M. Napud, Consultant J. Dimayuga, Senior Evaluation Officer, IED2 Peer Reviewer: T. Ueda, Principal Evaluation Specialist, IED1 Quality Reviewer: R. Sabirova, Evaluation Specialist, IED1 Director: W. Kolkma, IED1 ADB = Asian Development Bank, ATF = Asian Tsunami Fund, IED1/2 = Independent Evaluation Department (Division 1/2), OCR = ordinary capital resources, PCR = project completion report, SF = special funds. A. Rationale I. PROJECT DESCRIPTION 1. In December 2004, earthquakes and tsunami severely hit Indonesia and left 225,000 lives lost, over 400,000 internally displaced, 20% of the population of Aceh Province rendered homeless, and 20% of the land area of Nias Island damaged. The disaster wiped out most infrastructures along the coast, causing the collapse of public services and major losses of private property and livelihood. On Nias, the earthquake devastated buildings and infrastructure. Restoring normality was essential for pulling people out of their trauma. Damaged public infrastructure had to be rehabilitated or rebuilt. The human and social dimensions of the disaster required concerted efforts to revive livelihoods and restore entire communities. The cost of rehabilitation and reconstruction was estimated at $7 billion. Asian Development Bank (ADB) support of $290.8 million from the Asian Tsunami Fund made ADB one of the largest contributors and helped meet a portion of the reconstruction fund requirements. The project constituted an integral and essential part of the Government of Indonesia s reconstruction efforts. B. Expected Impact 2. The Earthquake and Tsunami Emergency Support Project 1 was expected to revive the economies of Aceh and North Sumatra by restoring agriculture and fisheries production by mid- 1 ADB. 2005. Report and Recommendation of the President to the Board of Directors: Proposed Grants to the Republic of Indonesia for the Earthquake and Tsunami Emergency Support Project and Contribution to the Multidonor Trust Fund. Manila.

2 2008; resuming private sector activities as the main component of economic activity; and increasing average household incomes at half of pre-disaster levels by mid-2008. C. Objectives or Expected Outcomes 3. The overall goal of the project was to help rebuild the affected regions and support their economic revival toward meeting the Millennium Development Goals. Its objective was to (i) provide job opportunities for every household by the end of 2006; (ii) attain full enrollment of schoolchildren by the end of 2007; (iii) reduce water-borne diseases by mid-2008; and (iv) have viable transport enterprises operating by the end of 2006. D. Components and Outputs 4. To meet critical needs in a flexible manner, the project was designed as a multisector project facility following the sector loan approach. It consisted of 12 components of the following principal sector groups: (i) (ii) (iii) (iv) (v) Livelihood Restoration. Rehabilitated agriculture and fisheries sectors, the mainstay of a majority of the Acehnese; and revived micro and small enterprises Social Service Provision. Rehabilitated and reconstructed health and education facilities, and supported skills development of the affected population through vocational training Community Infrastructure. Provided water and sanitation facilities, rebuilt irrigation infrastructure, and rehabilitated the damaged and/or reconstructed housing within an integrated community development framework Physical Infrastructure. Rebuilt damaged roads and bridges, restored power supply, supported sound spatial planning, and strengthened environmental management systems Fiduciary Governance. Ensured sound oversight of donor fund utilization, and facilitated effective delivery of the project E. Provision of Inputs 5. Total cost of the project was $327.2 million. Table 1 gives a breakdown of project costs. Table 1: Breakdown of Project Cost Item Cost ($ million) A. Livelihood Support 76.0 1. Agriculture 32.4 2. Fisheries 29.8 3. Micro and Small Enterprise Support 13.8 B. Social Services 28.3 4. Health 11.4 5. Education and Skills Development 16.9

3 Item Cost ($ million) C. Community Infrastructure 111.4 6. Rural Water Supply and Sanitation 6.2 7. Housing 75.2 8. Irrigation 30.0 D. Physical Infrastructure 65.4 9. Spatial Planning and Environmental Management 17.0 10. Roads and Bridges 38.9 11. Power 9.5 E. Fiduciary Oversight 20.1 F. Other Investment Costs 26.0 Total 327.2 Source: ADB. 2005. Report and Recommendation of the President to the Board of Directors: Proposed Grants to the Republic of Indonesia for the Earthquake and Tsunami Emergency Support Project and Contribution to the Multidonor Trust Fund. Manila. F. Implementation Arrangements 6. In January 2005, within 1 month after the tsunami, the government adopted a long-term framework for rehabilitating and reconstructing the affected regions and communities. The National Coordination Board for Disaster Management, headed by the Indonesian vice president s office, coordinated emergency rescue and relief efforts until the Agency for Rehabilitation and Reconstruction (BRR) was established in April 2005 for coordination and management. As BRR staff were seconded from various departments and agencies with limited management skills or familiarity with ADB policies and procedures, the BRR project management office (PMO) faced major difficulties in supervising and managing the project. In early November 2006, the BRR reorganized its PMO to make it more operation-oriented. In May 2007, the PMO was strengthened by engaging project management advisors to coordinate and monitor the implementation of project components through respective sector directorates. The engagement of this team greatly facilitated implementation, monitoring, and progress reporting, besides streamlining coordination among many project implementation units across a wide area of the region and sectors. In addition, support in the form of several other advisors to BRR management was provided for overall reconstruction coordination, disaster management, housing coordination, and transition strategy formulation. After the closure of the BRR in April 2009, the PMO was placed under the administrative control of the National Development Planning Agency (BAPPENAS) until the closure of the project. 7. ADB introduced innovation in the administration of the grant by delegating authority to the field mission. Southeast Asia sector divisions from ADB headquarters in Manila initially monitored project administration. The Extended Mission to Sumatra (EMS) was established in May 2005. It became operational in July 2005 with offices in Medan and Banda Aceh. The extended mission offices were closed in May 2008, and the offices in Medan and Banda Aceh followed in June 2009. The EMS was headed by ADB professional staff who oversaw the work effectively with support from a team of international and national advisors. Placing the EMS in the affected region was appropriate because of the urgency of rehabilitation and reconstruction and the multitude of demands needing prompt attention. The Indonesia Resident Mission supervised project implementation from July 2009.

4 II. EVALUATION OF PERFORMANCE AND RATINGS A. Relevance of Design and Formulation 8. The project completion report (PCR) 2 rated the project highly relevant. Based on the PCR, the project was highly relevant at the time of design. It was designed to meet the requirements of tsunami recovery as determined jointly by the damage, loss, and needs assessment and as requested by the government. ADB assistance was designed in line with the government s master plan for rehabilitation and reconstruction that was prepared in 2005 and revised in 2008. The sector modality allowed flexibility to modify, eliminate, enhance design aspects, or expand the scope or area of coverage, based on emerging needs. With strong support for economic, service, and infrastructure development during the latter stages, it remained relevant at completion. Adjustments were necessary to respond to evolving circumstances and the realities of planning and design in an emergency. Component design was generally satisfactory. Conversely, the health component did not adequately involve local government authorities. Some spatial planning and environmental management (SPEM) subcomponent designs were overoptimistic and did not reflect realities. Only two components, agriculture and fisheries, had design and monitoring frameworks. Considering these factors, this validation rates the project relevant. B. Effectiveness in Achieving Project Outcomes 9. The PCR rated the project highly effective in achieving its objective of rebuilding earthquake and tsunami-affected regions and restoring economic activity and livelihoods to meet the public s demands for recovery. The project channeled over $40 million in six components directly into communities, and over 3,900 contracts executed through communities. The project s emergency nature meant that the sector approach targeted works to achieve the outcome that was substantially different from those envisaged at appraisal. The power component was effectively integrated into the overall reconstruction program, fully involving the electricity authority. The decision to implement half the housing program off budget through nongovernment organizations (NGOs) and other partners turned out to be very positive in restoring housing and community infrastructure. For the reasons explained below for different components, this validation does not agree with the PCR rating and downgrades it to effective, which is in line with the PCR s own assessment of the effectiveness of the project s components (PCR, Table 1). Generally, shortfalls in attaining outcomes and output are attributed to factors such as lack in capacity of implementing entities and cancellation of some activities. 10. For instance, ADB contracted an NGO, Bina Sawadya, for community facilitation mainly through self-help groups for the agriculture component. Given the large number of funding agencies, sectors, and projects, and the limited number and capacity of local NGOs, the government s support for the livelihoods sector was limited. Meanwhile, project implementation units appointed supervisors for aquaculture, boat construction, and fishery infrastructure subprojects. However, the untimely deployment of suitably qualified supervisory staff was an ongoing problem throughout implementation. In many cases, supervisors were not competent to identify problems when construction failed to follow design specifications. 11. The social services sector included components on health and education. Most activities in the health planning and management subcomponent were canceled, including health disaster 2 ADB. 2011. Completion Report: Earthquake and Tsunami Emergency Support Project. Manila.

5 analysis, the development and implementation of a strategic plan, and the development of health information systems. Initially, the component had an allocation of $21 million, but there was limited progress in 2005. Given the response of other aid agencies, the BRR requested a review of the component s design. The component was completed in February 2009 at a cost of $11.36 million. The education component achieved its revised design targets as follows: (i) replenished teaching and learning materials, upgraded school libraries, and trained librarians in 395 schools in all 23 districts of Aceh and Nias, covering 75% of senior secondary schools in Aceh and 100% in Nias; (ii) constructed a senior secondary school at Sabang; (iii) upgraded practical science and information communication technology at 41 senior secondary schools. The allocation for the education component was originally $21 million, but was reduced to $16.36 million with component redesign. The component was completed within budget in November 2009. 12. The rural water supply and sanitation component provided sustained access to safe drinking water and better sanitation, improving the hygiene behavior of low-income communities in rural and peri-urban areas of Aceh and Nias. It also helped improve district government capacity to facilitate and regulate basic water and sanitation services; empower communities to take responsibility for developing and implementing such services using a demand-driven, community-based approach; and raise awareness about healthy and hygienic behavior. On the other hand, in view of the rapid increase in construction costs during 2005 2006 for the housing component, it was agreed to reduce the targeted number of new housing units from 14,000 to 8,000 and those to be repaired or rehabilitated from 10,000 to 2,000. In the end, 6,000 new housing units were completed and 1,100 houses were repaired by December 2009. 13. The goal of the SPEM component under the government s reconstruction master plan was to help rebuild the affected regions and support their economic revival to meet the Millennium Development Goals. All SPEM activities under subcomponents 1 (village planning) and 2 (planning and preparation of subdistrict plans) originally started under the supervision of the deputy for spatial planning in the BRR. Subcomponents 3 (district infrastructure planning) and 4 (forestry and natural resources management) were implemented after the BRR s reorganization, when the spatial planning deputy position was abolished and a directorate for spatial planning was created under the BRR housing deputy. Coordination with provincial and local government was implicit from the beginning but was further formalized in the planning process as new activities were added. 14. Despite delays, the road works facilitated the steady flow of goods from the principal supply areas to Aceh. Completing all works, including new alignments added late in the project period, within 4.5 years is considered justified, under the circumstances. Other outcomes include significant safety improvement on the east coast road and reduction in transit times. Aspects requiring further work in some sections were reported to include signage; road surface improvement, particularly between Lhokseumawe and Medan, outside the area covered by the component; road widening; and the completion of lane marking, reflectors, and other safety measures. 15. Prior to the tsunami, electricity was supplied to Aceh mainly through the Northern Sumatra network. The scope of services was limited, with only the eastern coastal area and cities receiving service. The overall goal was to contribute to reestablishing and promoting Aceh s economic development. Initially, the component focused on constructing medium- and low-voltage lines. Perusahaan Listerik Negara, the state electricity company, subsequently requested the inclusion of consumer lines and metering equipment, a service building and the

6 installation of a supervisory control and data acquisition system for service optimization, and the provision of safety tools. C. Efficiency of Resource Use in Achieving Outputs and Outcomes 16. The PCR rated the project efficient. The project was executed in close coordination with the development partners specifically through the multi-donor fund. All components were efficient, apart from rural water supply and sanitation and the roads and bridges components, which were less efficient, and agriculture, which was highly efficient, having been comprehensive and completed on time and within budget. Much of the fishery component was completed within budget; with most of the community contracts issued covering a wide range of restoration and rehabilitation activities. The micro and small enterprises component enabled the creation of a revolving fund and provided financial resources to participating institutions even beyond the project period, with assets growing over time. 17. The health component is rated efficient as all construction was completed to contract specifications. The health component s objective of a sustainable, quality health system may have been more efficiently achieved by focusing on isolated project locations. In education, government-prescribed block grant funding ensured that resources were disbursed effectively and expeditiously and significantly promoted community participation in component activities. 18. The irrigation component is rated efficient. Process efficiency was moderate, as planning, design, tendering, and contracting were protracted. However, this component was completed with little delay and within budget, and was significantly better than most other ADBfunded irrigation projects in Indonesia. The housing component was efficient compared with other housing reconstruction support programs of the government and other agencies. The power component is also rated efficient, its implementation being close to the schedule and within budget, and all subprojects being completed in accordance with design specifications. 19. The implementation of the fiduciary governance component was efficient for its most essential aspect of timely authorization and release of payments for various treasury activities and overall management of project implementation. However, several SPEM subcomponents were less efficient as they lacked clear focus and suffered major delays and cost overruns. The project was a new experience for ADB, entailing direct involvement in a major governmentcoordinated emergency reconstruction operation. This validation agrees with the PCR rating of the project. D. Preliminary Assessment of Sustainability 20. The PCR rated the project likely to be sustainable. Provincial and local governments have confirmed their readiness to provide continued budget allocation for operation and maintenance of completed subprojects. Most subprojects were carried out largely using implementation processes familiar to provincial and local government institutions, which were also involved in detailed project design and implementation. Much effort was made to use these mechanisms to develop relationships with stakeholders and communities. 21. Capacity in support services and local government institutions was strengthened significantly by rebuilding and reequipping offices. Housing and related infrastructure is likely sustainable, as beneficiaries own the land and housing. The participatory approach in the creation of these assets shows that beneficiaries can maintain and improve their homes. The

7 small and medium-sized enterprise and fiduciary governance components will be sustained by the continued operation of the Microfinance Innovation Fund and local government financing institutions. This validation agrees with the PCR s rating of the project. E. Impact 22. The PCR rated the impact of the project as substantial. The project contributed to sustainable economic growth by minimizing the long-term impact of the earthquake and tsunami. Subprojects were selected based on technical feasibility, cost-effectiveness, and contribution to economic revival, and they brought significant direct benefits to affected people. Livelihood components provided immediate opportunities in agriculture and fisheries. Support for restoring housing assets had economic and social benefits. By providing essential public services and rebuilding social and physical infrastructure, the project had major direct and indirect impacts on economic revival. The project largely achieved its objective by contributing to economic revival and livelihood restoration and involving affected communities in planning and implementing recovery and community-rebuilding programs. This validation agrees with the PCR that the project impact was substantial. III. OTHER PERFORMANCE ASSESSMENTS A. Performance of the Borrower and Executing Agency 23. Overall, the performance of government agencies the Ministry of Finance (MOF) as the recipient, the BRR and BAPPENAS as executing agencies, and line ministries as implementing agencies was generally satisfactory considering the institutional constraints and limitations within which they had to operate. The success of the project owed much to the government s sustained commitment to the effective delivery of reconstruction programs and other initiatives for improving livelihoods and social infrastructure. Problems were encountered in 2005 with implementation through national line ministries that were envisaged in the grant agreement to be implementing agencies. Delays arose from government staff shortages and unclear understanding of ADB s role in the Aceh and Nias reconstruction program. The BRR took considerable time organizing itself as executing agency. The government was overwhelmed by the extent of the damage and the many international and national agencies that responded. In the initial stages of the project, MOF arranged to establish the imprest account and special treasury office in Banda Aceh. The performance of the treasury office in disbursing and tracking all reconstruction funds, not just project-related ones, was commendable, and earned MOF a national award. The MOF s performance in processing withdrawal and disbursement documents was reasonable and satisfactory. MOF also prefinanced a substantial portion of project disbursements to ensure their timely completion. This validation agrees with the PCR rating. B. Performance of the Asian Development Bank 24. This validation agrees with the PCR rating of ADB performance as highly satisfactory. The project was prepared and approved in less than 4 months following the tsunami. ADB s Disaster and Emergency Assistance Policy was effective in getting financial assistance approved quickly and shortened the time frame of ADB s processing and approval of consultants and contractors. As envisaged at appraisal, the EMS was responsible for managing, administering, and implementing the project, working closely with the BRR, its PMO, and other government agencies to structure and implement the subprojects.

8 25. As the emergency assistance moved into detailed planning, design, and implementation, the nature of infrastructure restoration and the magnitude of ADB assistance required an approach different to the upgrading and expanding of infrastructure under normal projects. Besides adopting a sector lending modality, ADB decentralized decision making by establishing the EMS within 3 months of grant approval, simplified subproject preparation, and approval while maintaining environmental and social safeguards, and delegated review and approval authority to the EMS. 26. The EMS became operational by June 2005 with the country director of the Indonesia Resident Mission providing oversight. EMS was staffed by ADB professionals and supported by a team of international and national advisors with expertise in project management and safeguards issues. Component oversight was devolved to the EMS gradually, beginning in late 2005. By the end of 2006, 8 of 12 components were delegated, and by 2007, the number increased to 11, with 1 component administered by the resident mission. C. Others 27. The PCR did not mention any safeguard, gender, or governance issues affecting the project. IV. OVERALL ASSESSMENT, LESSONS, AND RECOMMENDATIONS A. Overall Assessment and Ratings 28. Overall, the PCR rated the project successful. It was highly relevant, highly effective, efficient, likely sustainable, with substantial impact. This validation concurs with these assessments except for relevance and effectiveness as explained below in the Table 2. Borrower and/or executing agency performance was satisfactory, and ADB performance was highly satisfactory. The Independent Evaluation Department (IED) agrees with the overall successful rating of the project. Table 2: Overall Ratings Criteria PCR IED Review Reason for Disagreement and/or Comments Relevance Highly relevant Relevant Shortcomings in project design, i.e., overoptimistic in presenting realities; lacking ownership of local government; and absence of monitoring framework for some components (para. 8). Effectiveness in achieving outcome Highly effective Effective Efficiency in achieving Efficient Efficient outcome and outputs Preliminary assessment Likely Likely of sustainability Overall assessment Successful Successful Although substantial outcomes were achieved under the various components, gaps remained, brought by lack of capacity and cancellation of activities (para. 9).

9 Criteria PCR IED Review Reason for Disagreement and/or Comments Borrower and executing agency Satisfactory Satisfactory Performance of ADB Highly satisfactory Highly satisfactory Impact Substantial Substantial Quality of PCR Satisfactory Para. 32. ADB = Asian Development Bank, EMS = Extended Mission to Sumatra, IED = Independent Evaluation Department, MOF = Ministry of Finance, PCR = project completion report. Source: ADB Independent Evaluation Department. B. Lessons 29. This validation agrees with all the PCR lessons identified and would like to emphasize the following: (i) (ii) (iii) (iv) (v) Reconstruction support should be selective and adopt a realistic time frame, with ADB focusing on areas that are unlikely to receive support from other donors. Phasing of reconstruction assistance may be considered, clearly distinguishing the needs of initial emergency response from those of subsequent reconstruction. Proper institutional arrangements and central coordination by one agency are essential. The effectiveness of post-disaster reconstruction depends on the willingness and collaboration of relevant government agencies. Off-budget funded activities may expedite implementation as on-budget funded activities are constrained by the government budget cycle. Flexibility in implementation is essential, as it facilitates the design of need-based reconstruction projects through simplified documentation. C. Recommendations for Follow-Up 30. This validation agrees with all PCR recommendations but would like to emphasize the following: (i) (ii) Sector operation appears to be the preferred approach to quickly deliver ADB assistance if the country has the institutional capability to effectively use flexible approach to project implementation. ADB should evaluate the government s staff resources realistically and provide consulting support as required. Government requests for additional support should be thoroughly scrutinized to ensure that project objectives can be attained. An ADB extension office located near the project site that is properly staffed, adequately funded, and has the requisite flexibility and decision-making authority, should be considered from the start. ADB should review its time frame for completing emergency assistance following major disasters. Project experience

10 suggests that a 3-year period for such substantive support is too short, considering uncertainties in project design and staffing. Rapid emergency rehabilitation and reconstruction must be balanced with ensuring that projects are well designed and major works properly constructed. V. OTHER CONSIDERATIONS AND FOLLOW-UP A. Monitoring and Evaluation Design, Implementation, and Utilization 31. There is no mention of the project performance and management system in the PCR and the consultants progress reports. B. Comments on Project Completion Report Quality 32. This validation rates the PCR as satisfactory. It was consistent with the PCR guidelines (Project Administration Instructions No. 6.07) and relevant IED guidelines and presented complete evidence to substantiate the ratings. The lessons and recommendations presented are useful for future endeavors of the same magnitude. C. Data Sources for Validation 33. This PCR validation referred to the following reports and documents: (i) PCR, RRP, loan agreement; (ii) Minutes of management review meeting; (iii) Project monthly summary reports and project review reports; and (iv) Other IED evaluation reports, including PCR reviews. D. Recommendation for Independent Evaluation Department Follow-Up 34. None.