Multiple Choice Questions

Similar documents
Standard Cost System Practice Problems

STANDARD COSTS AND VARIANCE ANALYSIS

Standard 4 pounds Quantity $ 7.50/pound Standard Cost $30.00

MGMT-027 Q4 17. The purpose of a flexible budget is to: C. update the static planning budget to reflect the actual level of activity of the period.

Add: manufacturing overhead costs in inventory under absorption costing +27,000 Net operating income under absorption costing $4,727,000

ACC406 Tip Sheet. 1) Planning: It is the process of creating a set of plans that a company intends to achieve a particular goal.

Standard Costs and Variances

ACC406 Tip Sheet. Direct Labour (DL): labour that is directly attributable to the goods and service that are being produced by a firm.

Chapter 10 Standard Costs and Variances

PESIT Bangalore South Campus Hosur road, 1km before Electronic City, Bengaluru -100

Costing Group 1 Important Questions for IPCC November 2017 (Chapters 10 12)

ACCY 121 Chapter 16 Practice Quiz Fundamentals of Variance Analysis (1)

THE HONG KONG POLYTECHNIC UNIVERSITY HONG KONG COMMUNITY COLLEGE

Trainee Accountant Webinar. F2 Management Accounting. Variance Analysis

Module 3 Introduction

Flexible Budgets and Standard Costing QUESTIONS

9706 ACCOUNTING. Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for Teachers.

VARIANCE ANALYSIS: ILLUSTRATION

AFM481 - Advanced Cost Accounting Professor Grant Russell Final Exam Material Chapter 11 & 13. Chapter 11: Standard Costs and Variance Analysis

Flexible Budgets and Overhead Analysis

ACT 2131 (PJJ) TUTORIAL 6

Chapter 11 Flexible Budgets and Overhead Analysis

24 Control through standard costs

Analyzing Financial Performance Reports

Disclaimer: This resource package is for studying purposes only EDUCATIO N

Chapter 11. Standard costs for control: flexible budgets and. manufacturing overhead

Standard Costing and Budgetary Control CA

Both Isitya and Ikopi renders more net profit after further processing and should therefore be processed further.

Introduction and Meaning Concept Advantages & Limitations Objectives of Standard Costing Preliminary Establishment Types of Standard

Page 1. 9 Standard. planning. cost and different. and. activity assumed in. different to $30 for. different particula

HOMEWORK. 1,40,000 20,000 (4,20,000 4,00,000) = 84,000 (F) WN 2: Calculation of effect on profit due to increase in market share

Chapter 23 Flexible Budgets and Standard Cost Systems

MANAGEMENT ACCOUNTING

Standard Cost. Types of Standards

Purushottam Sir. Formulas of Costing

Part 1 Study Unit 10. Cost And Variance Measures. By Ronald Schmidt, CMA, CFM

PAPER 3 : COST ACCOUNTING AND FINANCIAL MANAGEMENT PART I : COST ACCOUNTING Answer all questions.

Chapter 10 Static and Flexible Budgets

b Multiple Choice Questions: 1 The scarce factor of production is known as: d a) Key factor b) Limiting factor c) Critical factor d) All of the above

Illustrative Example Xander Barkley s XYX Company manufactures a single product. The standard cost card for one unit is as follows:

SUGGESTED SOLUTION FINAL MAY 2014 EXAM

BALIUAG UNIVERSITY CPA REVIEW MANAGEMENT ADVISORY SERVICES STANDARD COST AND VARIANCE ANALYSIS THEORY

Free of Cost ISBN : Scanner Appendix. CS Executive Programme Module - I December Paper - 2 : Cost and Management Accounting

ACCOUNTING AND FINANCE ATAR COURSE SPECIFICATIONS BOOKLET 2018

ACCY 121 Chapter 16 Practice Quiz Fundamentals of Variance Analysis

Bob Livingston, PhD Cindy Moriarty Jerry Ramos

MISC QUESTIONS FOR STUDENTS

Chapter 16 Fundamentals of Variance Analysis

You were introduced to Standard Costing in the earlier stages of your studies in which you understood the following;

LINEAR PROGRAMMING C H A P T E R 7

TOPPER S INSTITUTE [COSTING] RTP 16 TOPPER S INSTITUE CA INTER COST MGT. ACCOUNTING - RTP

C9: Accounting and Finance Course

5_MGT402_Spring_2010_Final_Term_Solved_paper


Budget & Budgetary Control

Flexible Budgets, Variances, and Management Control: I

CONCEPTS AND FORMULAE

Chapter 7: FLEXIBLE BUDGETS

Financial Management. 2 June Marking Scheme

Student Learning Outcomes

SUGGESTED SOLUTION INTERMEDIATE N 2018 EXAM

Gleim CPA Review Updates to Business 2011 Edition, 1st Printing March 10, 2011

CMA. Financial Reporting, Planning, Performance, and Control

SAPAN PARIKHCOMMERCE CLASSES

Let s trace the budgets through for a company called the Hayes Company. Sales Budget The first budget prepared, comes from the Sales Forecast

Flexible Budgets and Standard Costing Variance Analysis

Flexible Budgets. and Standard Costing Variance Analysis. Static Budgets and Performance Reports. Flexible Budget Performance Report

PAPER 3: COST ACCOUNTING AND FINANCIAL MANAGEMENT PART-I: COST ACCOUNTING QUESTIONS

SUGGESTED SOLUTION INTERMEDIATE M 19 EXAM

REVIEW FOR EXAM NO. 3, ACCT-2302 (SAC) (Chapters 20-22)

Solution to Problem 1 Material and labor variances

Chapter 1: Principles of Control in a Foodservice Operation

Solved Answer Cost & F.M. CA Pcc & Ipcc May

THE INSTITUTE OF CHARTERED ACCOUNTANTS (GHANA) SOLUTION: COST AND MANAGEMENT ACCOUNTING, NOVEMBER, 2014

Answer to MTP_Intermediate_Syl2016_June2017_Set 2 Paper 10- Cost & Management Accounting and Financial Management

Exam: RR - Budgeting; Standard Cost Accounting

Q. 2 Forecast Statement: Rupees

Particulars VIP Middle Last = = % of 60 = 30

MID TERM EXAMINATION Spring 2010 MGT402- Cost and Management Accounting (Session - 2) Time: 60 min Marks: 47

Management Accounting. Pilot Paper 3 Questions and Suggested Solutions

Model Answers. Subject Accounting for Managerial Decisions. Paper code-as-2366

Ibrahim Sameer (MBA - Specialized in Finance, B.Com Specialized in Accounting & Marketing)

CHAPTER 8: PERFORMANCE EVALUATION Pearson Education. All rights reserved.

F2 PRACTICE EXAM QUESTIONS

MTP_ Inter _Syllabus 2016_ Dec 2017_Set 2 Paper 10 Cost & Management Accounting and Financial Management

When Is It Best Not to Hedge Risk?

SUGGESTED SOLUTION INTERMEDIATE M 19 EXAM

BATCH All Batches. DATE: MAXIMUM MARKS: 100 TIMING: 3 Hours. PAPER 3 : Cost Accounting

Solved Answer COST & F.M. CA IPCC Nov

THE MOMBASA POLYTECHNIC UNIVERSITY COLLEGE

Index COPYRIGHTED MATERIAL.

Answer to MTP_Intermediate_ Syllabus 2012_December 2016_Set2. Paper 10- Cost & Management Accountancy

Dr. M.D. Chase Accounting 610 Examination 1 Chapters 1-8,11 Horngren et.al. 15 th. Spring 2011

PAPER 5 : ADVANCED MANAGEMENT ACCOUNTING

Principles of Management Accounting (MAC2601)

December CS Executive Programme Module - I Paper - 2

Management Accounting Fundamentals Module 8 Fixed overhead analysis and reporting for control

Spring Manufacturing Company Sales Budget 2007

[5 Marks] ` M. [5 Marks] Let the Alternative 2. = ` 4 Lakhs, Debt=` 4. [5 Marks] ` 37,400 ` 34,850. Particulars To Depreciation 40,000

2016 this will help for better notes in future.

Transcription:

Multiple Choice Questions 1. The difference between the actual price and the standard price, multiplied by the actual quantity of materials purchased is the a) direct labor price variance b) direct labor quantity variance c) direct materials price variance d) direct materials quantity variance 2. J Company has a material standard of 1 pound per unit of output. Each pound has a standard price of $25 per pound. During July, J Company paid $127,250 for 4,950 pounds, which they used to produce 4,700 units. What is the direct material price variance? a) $3,500 unfavorable b) $2,600 favorable c) $12,600 unfavorable d) $10,000 unfavorable 3. G Company has a material standard of 1.1 pound per unit of output. Each pound has a standard price of $25 per pound. During July, G Company paid $118,800 for 5,100 pounds, which they used to produce 4,900 units. What is the direct materials quantity variance? a) $7,250 favorable b) $5,000 favorable c) $7,250 unfavorable d) $5,000 unfavorable The next 3 questions refer to the following information. A Company has a standard of 1 direct labor hour per unit at $12 per hour. 3,850 labor hours costing $46,970 were used to produce 4,000 units. 4. Company s labor price variance is a) $770 F b) $770 U c) $1,030 F d) $1,030 U 5. Company s labor quantity variance is a) $1,830 U b) $1,830 F c) $1,800 F d) $1,800 U

6. Company s total labor variance is a) $770 U b) $800 U c) $1,030 F d) $1,930 F The next 2 questions refer to the following information. The actual and standard direct labor rates were $8.50 and $8.00, respectively. 5,500 direct labor-hours were normal capacity. The standard quantity of hours allowed for units produced was 5,000. The standard variable overhead per direct labor-hour is $5.00 and the fixed overhead rate is $6.00. 7. What is the controllable overhead variance if the variable manufacturing overhead costs were $24,750? a) $2,250 U b) $250 F c) $4,750 F d) $1,350 F 8. What is the overhead volume variance if the variable manufacturing overhead costs were $24,750? a) $2,000 U b) $2,500 F c) $3,000 U d) $3,500 F 9. Which of the following is not a benefit of using a balanced scorecard a) It creates linkages from high-level goals to lower level employees b) It provides measurable objectives that are not financial c) It integrates all of the company s goals d) It can easily access individual performance 10. Which of the following is not a benefit of using standard costing a) Useful in setting selling prices b)used as a way to place blame on managers or employees c)simplifies costing of inventory d)contributes to management control

Practice Problem #1 C Company manufactures a number of consumer items for general household use. During the recent month, the company manufactured 5,000 units using 12,000 pounds of material. The 14,000 pounds purchased cost the company $21,000. According to the standard cost card, each unit requires 2.2 pounds, at a cost of $1.40 per pound. Compute the material price variance and material quantity variance. Practice Problem #2 N Company makes premium chocolate in Chicago. One of the company s products is the Bango Mint. Bango Mints are packed 24 per box. During June, 4,000 boxes were produced. The company paid its direct labor workers a total of $14,280 for their work or $11.90 per hour. According to the standard cost card for Bango Mints, each box should require 0.3 direct labor hours at a cost of $12.00 per hour. Compute the labor price variance and a labor quantity variance. Practice Problem #3 ABC Company s overhead rate was based on estimates of $400,000 for overhead costs and 40,000 direct labor hours. ABC standards allow for 2 hours of direct labor per unit produced. Production in January was 1,800 units and actual overhead incurred in January was $39,000. The overhead budgeted for 3,600 standard direct labor hours is $35,200, of which $10,000 was fixed. a) Compute variable overhead controllable spending variance. b) Compute the fixed overhead volume variance.

Solutions 1. C 2. A 3. A 4. B 5. C 6. C 7. B 8. C 9. D 10. B Practice Problem #1 AQ 14,000 AP $1.50 AQ 12,000 SQ 5,000 x 2.2 = $21,000 = $16,800 = $15,400 $1,400 U Price Variance AQ (AP SP) 14,000($1.50-$1.40) AQ 14,000 = $19,600 $1,400 U Quantity Variance SP (AQ - SQ) $1.40(12,000-11,000) Practice Problem #2

AH 1,200 AR $11.90 AH 1,200 SR $12.00 SH 4,000 x.30 SR $12.00 = $14,280 = $14,400 = $14,400 $120 F $0 Rate Variance Efficiency Variance AH (AR SR) SR (AH - SH) 1,200($11.90-$12.00) $12.00(1,200-1,200) Practice Problem #3 ABC Company s overhead rate was based on estimates of $400,000 for overhead costs and 40,000 direct labor hours. ABC standards allow for 2 hours of direct labor per unit produced. Production in January was 1,800 units and actual overhead incurred in January was $39,000. The overhead budgeted for 3,600 standard direct labor hours is $35,200, of which $10,000 was fixed. Overhead Controllable Variance: Actual Overhead - Overhead Budgeted = Total Controllable Variance 3,800 unfavorable 39,000 35,200 Overhead Volume Variance: Budgeted Fixed Overhead (10,000*12)= 120,000 / Standard hours at normal capacity 40,000 = Fixed Overhead Rate $3 Fixed Overhead Rate $3 (Normal Capacity Deliveries- Standard Hours Allowed) = Overhead Volume Variance 800 F (40,000/12)-3,600) Total Overhead Variance= Actual 39,000 Applied (3,600 * 10) = $3,000 Unfavorable