COMPLIANCE & ENFORCEMENT DIVISION

Similar documents
This is a courtesy copy of this rule. All of the department s rules are compiled in title 7 of the new jersey administrative code.

PETITION FOR A HEARING BEFORE THE HEARING BOARD OF THE SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

WHITE PLAINS MECHANICAL CODE PART 1. GENERAL REQUIREMENTS

RULE BANKING OF EMISSION REDUCTION CREDITS (ERCs) GENERAL REQUIREMENTS (Adopted & Effective 10/22/97; Adopted & Effective (date of adoption))

13 NCAC is amended with changes as published in 31:09 NCR as follows:

This rule applies only to the Imation Corp. facility and operation located at South Lewis Road, Camarillo, California (the operator).

MEDIUM Motor Vehicle Refueling Facilities

IC Chapter 6. Regulated Boilers and Pressure Vessels; Boiler and Pressure Vessel Inspectors

BOILER LAW Health and Safety Code, Chapter 755 Administered by the Texas Department of Licensing and Regulation (Effective September 1, 2009)

SUBCHAPTER 5. REGISTRATION, EMISSION INVENTORY AND ANNUAL OPERATING FEES

CONSTRUCTION PERMIT THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 100. AIR POLLUTION CONTROL

GROUNDWATER AIR STRIPPERS and SOIL VAPOR EXTRACTION SYSTEMS

ENVIRONMENTAL STANDARD OPERATING PROCEDURE 16 BOILER OPERATION

Guide for the Extension of Boiler Internal Inspections

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

Monterey Bay Unified Air Pollution Control District Silver Cloud Court, Monterey, CA 93940

MASTER GRANT AGREEMENT Exhibit A, Program Element 12 Low Income Home Energy Assistance Program

MONTEREY BAY UNIFIED AIR POLLUTION CONTROL DISTRICT. <Protocol >

Title 2 ADMINISTRATION [1]

VEHICLE STORAGE FACILITIES

The amendments to this rule are created pursuant to , and (1)(a) of the Colorado Revised Statutes (CRS).

ENVIRONMENTAL APPEAL BOARD Province of British Columbia

Hughes Natural Gas, Inc. Customer Information and Rules of Service Updated September 2017

SF Access Services SF Access Reservations and Where s My Ride

UTILITIES INTERNAL POLICIES AND PROCEDURES MANUAL

CHAPTER FIRE PREVENTION, BUILDING, PLUMBING AND MECHANICAL INSPECTOR CERTIFICATION STANDARDS AND QUALIFICATIONS TABLE OF CONTENTS

Tri-County Trust Company Online Banking Disclosure and Agreement 05/13/2016

Off-Road Equipment Replacement PROGRAM ELIGIBILITY

ARTICLE I OFFICERS AND TERMS OF OFFICE

Online Banking Agreement and Disclosure

INSURANCE POLICIES AND RATES RATE FILINGS BY INSURERS AND RATE SERVICE ORGANIZATIONS

2018 New Construction Rebate Application

MONTEREY BAY UNIFIED AIR POLLUTION CONTROL DISTRICT. < Protocol >

Rule 301 PERMIT FEES. Rule 302 PERMIT FEE SCHEDULES. Rule 303 MISCELLANEOUS FEES

PROCEDURE TO ESTABLISH OPERATING CERTIFICATION FOR STEAM BOILER OPERATORS

CITY OF KELOWNA BYLAW NO. 9316

NEW JERSEY PROVIDER AGREEMENT

ELECTRONIC FUND TRANSFERS YOUR RIGHTS AND RESPONSIBILITIES

APPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT

EPSON PreferredSM. Toll-Free Phone Number. Priority Technical Support. Security and Peace of Mind. Exchange/On-Site Repair

MAINE COMMUNITY COLLEGE SYSTEM

Electronic Funds Transfer Your Rights and Responsibilities From Security First Bank 5505 Red Rock Lane Lincoln, NE 68516

Guidelines on Occupational Safety and Health Management at the TEPCO Fukushima Daiichi Nuclear Power Plant

Collision Reporting, Investigation, and Analysis

HEARING BOARD Ventura County Air Pollution Control District PETITION FOR HEARING. No. INSTRUCTIONS

IGB ACCIDENT/INCIDENT REPORTING AND INVESTIGATION PLAN

STACK TESTING GUIDELINES As of March 3, For the purposes of this guidance, stack testing is more narrowly defined as:

GOPHER STATE ONE CALL

Article 6. Application, Eligibility, and Enrollment Process for the SHOP

Bradley M. Campbell, Commissioner, N.J.S.A. 13:1D-1 et seq.; 13:1B-3; 13:1D-125 to 133 et

RULE 2301 EMISSION REDUCTION CREDIT BANKING (Adopted September 19, 1991; Amended March 11, 1992; Amended December 17, 1992; Amended January 19, 2012)

CINCINNATI BELL ANY DISTANCE INC. Nonresidence Service Agreement Local Telephone Services. Section 2 Regulations

RULE MOBILE SOURCE EMISSION REDUCTION CREDITS/BANKING (Adopted ) INDEX

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 1165

Personal Online User Agreement

LOUISIANA CCAP PROVIDER TIME AND ATTENDANCE EQUIPMENT AGREEMENT

SECTION 5. SMALL CASE PROCEDURE FOR REQUESTING COMPETENT AUTHORITY ASSISTANCE.01 General.02 Small Case Standards.03 Small Case Filing Procedure

Christina Agustin, MD Board Certified in Adult Psychiatry 1 Lake Bellevue Drive, Suite 101 Bellevue, WA Phone Fax:

SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES.

GENERAL RULES OF THE ALABAMA PUBLIC SERVICE COMMISSION

STATE OF NEVADA DEPARTMENT OF EMPLOYMENT, TRAINING AND REHABILITATION REHABILITATION DIVISION BUREAU OF DISABILITY ADJUDICATION AUDIT REPORT

COLORADO DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY BOILER AND PRESSURE VESSEL REGULATIONS

SECTION 7 - CHARGES, FEES AND DEPOSITS

WORKERS COMPENSATION. Your safety is everyone s responsibility, especially yours PROCEDURE MANUAL

A Safety, Environmental and Labour rights Guide for Suppliers to British Airways

Hart County Water and Sewer Authority

ALABAMA TAS PROVIDER EQUIPMENT AGREEMENT

CITY OF LOS BANOS PUBLIC WORKS DEPARTMENT INVITATION FOR SEALED BIDS PROPOSAL FOR THE PURCHASE OF ONE NEW 2018/2019 MODEL BRUSH CHIPPER

Claims and Appeals Procedures

APPENDIX - A TECHNICAL SPECIFICATIONS. JEA Fleet Services Heavy Duty Maintenance and Repair

The amendments to these regulations are created pursuant to , and (1)(a) of the Colorado Revised Statutes (CRS).

REQUEST FOR PROPOSAL FOR: FIRE ALARM PANEL & LIFE SAFETY EQUIPMENT SERVICE

Dixie Chopper Limited Warranty

CHAPTER 6 GOPHER STATE ONE CALL

Draft Air Individual Permit Part 70 Reissuance Permit characteristics: Federal; Part 70/ Limits to avoid NSR; Limits to avoid NSR

Short-Term Disability. Summary Plan Description

WECC Standard BAL-STD Operating Reserves

November 14, 2005 ADVICE 1929-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Off-Road Equipment Replacement

ALAMEDA County Transportation Commission. Alameda County Transportation Commission GUARANTEED RIDE HOME PROGRAM GUIDELINES

dc water guide to customer services district of columbia water and sewer authority

CALIFORNIA CODE OF REGULATIONS TITLE 9. REHABILITATIVE AND DEVELOPMENTAL SERVICES DIVISION 4

ADDENDUM NUMBER 01 TO THE BID DOCUMENTS. BID NUMBER: G Math and Science Building Exterior Stair Lighting #32107 Evergreen Valley College

FARMERS INSURANCE FEDERAL CREDIT UNION

Service Manual. Service Policy UNCONTROLLED IF PRINTED 1 PURPOSE

The Cecilian Bank Bill Pay Terms and Conditions. Welcome to The Cecilian Bank Online Bill Pay Service.

California Workplace Safety Compliance Outlook 2017: New Cal/OSHA Developments and Legal Snares to Avoid

Section 6: Incident Reporting & Investigation

Sick Leave & Disability

For full regulatory text and compliance requirements, please refer to 40 CFR part 60 subpart LLLL & MMMM.

FORM ADV (Paper Version) UNIFORM APPLICATION FOR INVESTMENT ADVISER REGISTRATION AND REPORT FORM BY EXEMPT REPORTING ADVISERS

REQUEST FOR PROPOSALS. Western Municipal Water District. Water Meter Reading Services (Annual Contract)

PREQUALIFICATION PACKAGE FOR

Q: Do I have to pay a deposit to get service from the Lebanon Utilities?

Alcatel-Lucent Short Term Disability Plan Summary Plan Description. January 2015

ebanking Agreement and Disclosure

Load Response Program Agreement Real-Time Demand Response Program 30 Minute Notice

REPUBLIC PARKING SYSTEM, INC REQUEST FOR PROPOSAL RFP # SECURITY SERVICES FOR CHURCH STREET GARAGE LOCATED AT 200 CHURCH STREET, HARTFORD

APPENDIX A TECHNICAL SPECIFICATIONS RFQ PLUMBING SERVICES

Transcription:

COMPLIANCE & ENFORCEMENT DIVISION Policies & Procedures BREAKDOWN GUIDELINES Table of Contents Section 1. Breakdown Criteria 1 Page A. Applicability 1 B. Breakdown Notification (Episode Reporting Requirements) 2 C. Written Report Requirements 3 Section 2. Investigation 4 A. Inspection Responsibilities 4 B. Technical Services and Enforcement Responsibilities 5 Section 3. Emergency Variance 5 Section 4. Notice of Violation Criteria 6 A. Breakdown Denial 6 B. Public Nuisance 6 C. Discretionary Enforcement 7 Section 5. Administrative Requirements 7 Section 6. Report of Investigation 7 Section 7. Report Forms 8 Exhibit I: Episode Report Form Exhibit II: Breakdown Episode Investigation Form

BAY AREA AIR QUALITY MANAGEMENT DISTRICT ENFORCEMENT DIVISION Policies & Procedures SUBJECT: BREAKDOWN GUIDELINES The Air Pollution Control Officer (APCO) may refrain from enforcing the provisions of District regulations for excesses of emissions resulting from the breakdown of air pollution abatement equipment or operating equipment provided such emissions do not interfere with the attainment or maintenance of any national or California ambient air quality standard and further provided that the persons responsible for such emissions comply with the administrative requirements of Section 1-431 and 432. (Regulation 1, Section 112) A breakdown is any unforeseeable failure or malfunction of any air pollution control equipment or operating equipment which causes a violation of any emission standard or limitation prescribed by District, California or federal rules, regulations or laws. (Regulation 1, Section 208) 1. BREAKDOWN CRITERIA A. Applicability All source and control equipment is eligible. Process "upsets" are not eligible for breakdown relief. In some cases emissions may not be quantifiable, but a violation may still exist. All resources shall be utilized to document excessive emissions. Flares: Breakdown relief will not be granted for excessive smoke from a flare due to a process unit malfunction; however, relief may be granted provided there is a malfunction in the flare itself, causing the excessive smoke. Landfills: If a landfill experiences an unanticipated shutdown, such as an extinguished pilot light, the operator may request breakdown relief, utilize inspection and maintenance downtime hours, or apply for a variance, depending on how long the system is down. (Refer to Regulation 8-34 Breakdown Guidelines 9/15/98 1

Policies and Procedures for additional information.) B. Breakdown Notification (Episode Reporting Requirements) A person seeking relief pursuant to Section 1-112 shall notify the APCO of the breakdown condition immediately, with due regard for public safety, including the hazard of fire and explosion. Such notification shall include the time, specific location, equipment involved and to the extent possible the cause of the breakdown. (Regulation 1, Section 431) Breakdown requests are considered episodes for purposes of District reporting procedures and they shall contain the following information: Company name and District-assigned plant number. Equipment description and District-assigned source number. Type of Emission: violation of District standard; e.g., visible emissions, VOC, etc. Problem: what caused the emission/violation. Name of reporting person: the representative that reported the breakdown. Start date, clear date: the date and time the excess started, the date and time the excess ceased. The following options are available to industry for reporting breakdown episodes: Submission via facsimile (fax), at all hours, a completed "Episode Report Form" (Exhibit I) at (415) 928-0338. Reporting via telephone Monday through Friday from 8:30 a.m. to 5:00 p.m.: at telephone (415) 749-4979. Reporting via telephone message machine, breakdown episodes ONLY, after business hours or on weekends at (415) 749-4666. District staff receiving a breakdown episode report will generate a breakdown episode ID# and will dispatch the information to the area Inspector as soon as possible. When a breakdown episode is reported during other than normal working hours, an ID# is assigned the following working day. If the company does not receive confirmation of the breakdown report by having an ID# assigned to it, it is the company's responsibility to contact the District. Breakdown Guidelines 9/15/98 2

The District will not accept a breakdown request unless there are excessive emissions. If emission data is not available, the office staff will take the request as a message. In the case of visible emissions, where no monitor is present, an indication that the plume appears excessive will be acceptable. A breakdown request will not be taken if more than 24 hours have elapsed since the onset of excess emissions. Subsequent attempts by a facility to cancel or withdraw a breakdown request will be denied unless it has inadvertently been reported as a duplicate of an existing request. If a company needs to report both a breakdown and emission excess (es) for the same incident, they must obtain separate episode ID#s. While the same Episode Report Form may be used, all pertinent information must be checked, e.g., both B and E information areas clearly filled. A breakdown episode number cannot also be used as a monitor excess number. See the CEM, GLM and Mobile Monitor Guidelines of this Policies and Procedures Manual. C. Written Report Requirements Within 30 days of the occurrence of a breakdown, the person responsible shall submit a written report to the APCO. The following information shall be included: 1. Sufficient information to enable the APCO to determine whether or not a breakdown occurred and the cause of the breakdown. a. Total excess emissions for the entire breakdown period, including calculations and assumptions. b. All operating parameters used to establish excess emissions (e.g., unit throughput, raw material usage, temperature, pressure, exhaust flow rate, etc.). 2. A summary of the corrective action taken following the breakdown, including a description of steps taken to minimize excess emissions and its effectiveness in reducing emissions. 3. Present status of the breakdown. 4. A summary of actions taken to insure that such breakdowns will not occur in the future. (Regulation 1, Section 432). Breakdown Guidelines 9/15/98 3

2. INVESTIGATION A. Inspection Responsibilities Pursuant to Regulation 1-431 the APCO shall promptly investigate to determine whether the occurrence reported constitutes a breakdown. The determination may be made based upon information developed by the investigation, or upon the basis of such information in addition to information reported in the written report made pursuant to Section 1-432. If the APCO determines that the occurrence does not constitute a breakdown, appropriate enforcement action may be taken. The investigation should include the following: Breakdown Guidelines 9/15/98 4 (Regulation 1, Section 433) Document any ongoing violations by taking a plume evaluation reading, TLV or OVA meter reading, verifying a source of odor, obtaining charts or other observations. Determine through interview the following information: 1. When and how did the operator become aware of emissions? 2. Prior to breakdown was the air pollution control or operating equipment properly maintained? 3. Were repairs made in an expeditious manner? Was overtime or off-shift labor utilized? 4. Were emissions minimized as to amount and/or duration, and how? 5. Were emissions part of a recurring pattern indicative of inadequate design, operation or maintenance? 6. If the equipment is an abatement device, what sources are controlled by it, and what sources were in operation at the time of the breakdown. When it is not possible to determine excessive emissions, collect sufficient data for Technical evaluation. Answer ongoing citizen complaints as soon as possible. For large events with significant impact on the community, contact a Supervisor to divide tasks if necessary. In those cases where emissions have ceased or could not be confirmed,

contact with plant staff will still be required and an inspection report must be written. B. Technical Support Services and Enforcement Responsibilities For breakdowns resulting in major emissions and/or impact on the community, Technical Support Services and Incident Response staff will supplement the investigation, as follows: 1. Coordinate efforts with the assigned Inspector to document and quantify excess emissions from the breakdown. 2. If possible, accompany Inspector on initial investigation of the breakdown. 3. Confer with Inspector(s) and supervising Inspector regarding the breakdown request. For other, non-major breakdowns, Technical Support Services shall provide technical support only as requested. If this technical support is necessary in order to evaluate or determine the breakdown recommendation, the Inspector will consult with appropriate staff and provide all information or copies that are necessary prior to reaching a conclusion regarding relief. If any related monitor episode excess is reported, pursuant to the CEM, GLM and Mobile Monitor Guidelines document of this Manual, the excess will be submitted to Technical Services Division evaluation, via the Air Quality Technician processing episodes. Any excesses which are confirmed as violations will be cited only if relief is denied pursuant to these guidelines. 3. EMERGENCY VARIANCE If excessive emissions are anticipated to continue beyond 24 hours or a production run, the plant has the option to apply for an Emergency Variance (EV) or a variance. If a variance is already existing, but the excess emissions violate a condition of the variance, follow the procedures in this document unless an additional EV for the particular circumstances is sought. Refer to the Hearing Board Activities Guidelines of this Policies and Procedures Manual for more information. Breakdown Guidelines 9/15/98 5

4. NOTICE OF VIOLATION CRITERIA Notices of Violation (NOVs) associated with breakdowns will be prepared by Inspectors and issued in the field. A. Breakdown Denial The APCO will deny relief if any of the following conditions exist: 1. The breakdown is the result of intent, negligence or disregard of air pollution control regulations. 2. The breakdown is the result of improper maintenance. 3. The breakdown creates a public nuisance (see Section B. Public Nuisance for a related emission violation). 4. The breakdown is caused by an excessively recurrent breakdown of the same equipment. 5. The breakdown occurs and the emissions interfere with attainment or maintenance of any National or California air quality standard. If the breakdown is recommended for denial, an NOV will be issued citing the regulation or permit condition violated. The basis for denial of relief will be clearly discussed when issuing the NOV and will be identified in the report documenting the NOV, including the Supervisor s recommendation on Page 2 of the Episode Investigation Form (Page 2 of Exhibit II). B. Public Nuisance When a public nuisance and emission violation occur at the same time, the following will apply: Breakdown relief may be granted for the emission standard violated provided all the requirements in Regulation 1 are met; however, breakdown relief will not be granted for any violation of Regulation 1, Section 301, or Health & Safety Code 41700, Public Nuisance (Section 41700 is cited only for sources otherwise excluded from District rules and regulations). Breakdown Guidelines 9/15/98 6

C. Discretionary Enforcement Even if none of the conditions in (A) apply, an NOV may still be issued if the company does not: 1. Demonstrate appropriate corrective action, or 2. Shut down equipment before the next production run or 24 hours, whichever comes first. 5. ADMINISTRATIVE REQUIREMENTS The following reporting requirement failures will result in violation of the emission standard or limitation, where an excess is confirmed: a. Breakdowns not reported in accordance with Section 1-431. b. Written report not provided as required by Section 1-432. 6. REPORT OF INVESTIGATION The Inspector's breakdown report will follow the same format as the NOV report (refer to Notice of Violation Guidelines). If the documentation includes any records, clearly identify what the records are and how they relate to the excess. All breakdown reports recommending relief will be submitted to the Supervisor within 15 days after receipt of a breakdown request. The report will be forwarded to the Compliance and Enforcement Division Source file via the Air Quality Technician processing episodes. All breakdown reports recommending denial require concurrence of the area Supervising Inspector (see (7) Report Forms, below) before an NOV is prepared and issued by the Inspector. The report will be the basis for the NOV documentation and should be submitted in the normal manner for NOVs as soon as practical after completing the investigation. A report will be submitted even when no excessive emissions have been recorded. A recommendation for granting or denying the breakdown should follow the guidelines on Investigation, (Section 2A) Breakdown Denial, (Section 4A) and Public Nuisance (Section 4B) of this document. Reports on breakdowns associated with a District approved monitor excess episode should follow the CEM, GLM and Mobile Monitor Guidelines. Breakdown Guidelines 9/15/98 7

The Inspector should indicate in the report whether Technical Support Services was involved. 7. REPORT FORMS The report of the breakdown investigation will be written on the "Breakdown Episode Investigation Form. The information required on the form will be obtained from the plant representative at the time of the episode report receipt, and dispatched to the Inspector. When contact is made with the plant representative, verify the information. Any differences in information reported should be noted in the body of the report. A complete report consists of the following: Breakdown Episode Investigation Form (see Exhibit II) Violation documentation Any Associated monitor episode excesses (reported pursuant to the CEM, GLM and Mobile Monitor Guidelines document of this Manual) Company written report (normally received via District office) If no company written report has been received within 30 days following the request, the Inspector should recommend denial, where a violation has been documented. However, the Inspector may optionally contact the company, as a reminder prior to expiration of the 30-day period, if the report has not been received. If a report is received in the field, it must be attached as part of the complete report. Even though Inspectors will issue NOVs in the field, if breakdown denial is recommended, the Supervisor must still approve all recommendations prior to any action. The Episode Investigation form provides uniformity in guiding both Inspectors and Supervisors to select one, only, of the following four choices for a breakdown recommendation: Relief (and all administrative provisions met) - This choice requires that in addition to the Inspector s investigation and conclusions, the required written report has been received and reviewed. This category can include monitor excess episodes even before the Technical Division evaluation is completed. If, however, the written report is not received within the required 30 days, then denial must be recommended, unless significant circumstances justify otherwise. Breakdown Guidelines 9/15/98 8

Variance Relief Applies - This would apply to either an already-existing variance or a newly-approved EV. No Further Action Applies (non-monitor only) - Inspector is unable to verify that a violation has occurred (only where no emission monitor evaluation is involved). Denial - Two subcategories are listed: Pending monitor evaluation requires that the basis for an NOV is dependent upon a Technical Division evaluation of a monitor chart. Complete NOV Data requires the Inspector to provide the information to be cited (e.g., regulation, rule, specific permit condition), and attach the documentation necessary to support the citation. Upon approval by the Supervisor, this will be the basis for the NOV prepared by the Inspector. Supervisors should review the Inspector s recommendation and if they concur, sign at the bottom of the form. If the recommendation is for denial, Supervisors must also check the applicable denial code(s), located immediately above the Comments portion of the Breakdown box. The basis for denial must be selected from one or more of the following categories: Nuisance (See Section 5B) Recurrent (See Section 2A5) Intent or Negligence Maintenance (See Section 2A1,2) Administrative (See Section 1B,C) Definition (See Regulation 1, Section 208) For denial recommendations which are approved by the area Supervisor, the report will be returned to the Inspector for preparation and issuance of an NOV in the field. Inspectors will call in the Episode ID# at the same time the NOV# is called into to dispatch and RTOs will enter the NOV# into the episode data program. For relief recommendations, the report will be forwarded to the Air Quality Technician for ID# update in the episode data program and subsequent forwarding to the Division Source file. Breakdown Guidelines 9/15/98 9

Bay Area Air Quality Management District ID# for District use only EPISODE REPORT FORM (see instructions on reverse) The District is available to receive your episode report M-F 8:30 am - 5:00 pm telephone (415) 749-4979. After hours for breakdowns only telephone (415) 749-4666 FAX (415) 928-0338 TYPE (check one box; report only one type on a form; use a separate form for each Episode) Breakdown Excess Inoperative Monitor PRV SITE COMPANY PLANT# or GDF# LOCATION CITY EQUIPMENT SOURCE DESCRIPTION S# ABATEMENT DEVICE A# EMISSION POINT (STACK) P# OCCURRENCE START DATE TIME : REPORTED DATE TIME : for District use only CLEAR DATE TIME : REPORTED BY RECEIVED BY for District use only PHONE ( ) EXT PROBLEM BREAKDOWN (if box B is checked) RELATED EXCESS EMISSIONS 1? MONITOR EXCESS OTHER EXCESS EMISSION DESCRIPTION EXCESS EMISSION OR INOPERATIVE MONITOR (if box E, or I box is checked) MONITOR DESCRIPTION TYPE: CEM 2 GLM 3 FUEL GAS 4 PARAMETRIC 5 PARAMETER: NO x SO CO H 2 2S TRS NH O 3 2 CO 2 H 2O OPACITY/LTA LEAD GAUGE PRESSURE HYDROCARBON BREAKTHROUGH (VOC ) TEMP ph WIND SPEED WIND DIRECTION FLOW STEAM EXCESS (if box E is checked) INDICATED EXCESS ppm vol ppb vol min/hr > 20% inches H 2 0 psig mmhg %VOC ALLOWABLE LIMIT units should be the same as the District Regulation Standard or Permit Condition AVERAGING TIME 6 MINUTES RELATED BREAKDOWN ID# for District use only 1.If there are no excess emissions, a Breakdown Report will NOT be accepted 2 For 'CEM' any single PARAMETER, except H2S and LEAD, applies 3 For 'GLM' only the SO2, H2S, or LEAD PARAMETER applies 4 For 'FUEL GAS' only the H2S PARAMETER applies 5 Applies to gauge pressure, hydrocarbon breakthrough (VOC), Temperature, ph and flow 6 Averaging time applies to the allowable limit Exhibit I

1 TYPE INSTRUCTIONS FOR COMPLETING THE EPISODE REPORT FORM M-F 8:30 am - 5:00 pm telephone (415) 749-4979; after hours for breakdowns only telephone (415) 749-4666 Fax # (415) 928-0338 Check one box; report only one type on a form; use a separate form for each Breakdown, Excess, Inoperative Monitor or PRV (Pressure Relief Valve) venting. 2 SITE Enter company name, address and District Plant number or GDF number. For companies with multiple plants, be certain that the Plant number is correct for the location. 3 EQUIPMENT. Enter: Source Description and source number (S#) Abatement Device Description and abatement device number (A#). Emission Point number (P#), if available. 4 OCCURRENCE. Enter: Start Date, Clear Date, the date and time the Episode started, the date and time the Episode ceased. the problem which caused the Breakdown, Excess, Inoperative monitor or PRV venting. Reporter's Name, Phone Number and Extension.. Do Not Enter - Reported Date and Time. District will enter based on time received. 5 BREAKDOWN Check the appropriate box indicating either a Monitor Excess (emission or parametric) or Other Excess not associated with any monitor (e.g. Visible emission evaluation). Describe the excessive emission. 6 EXCESS EMISSION OR INOPERATIVE MONITOR Describe the monitor where the excess occurred or the monitor that malfunctioned. Enter:. the Type of monitor that malfunctioned or recorded the excess.. the Parameter which the monitor measures. For Excesses (also) enter:. the Indicated Excess in ppm vol, ppb vol or min/hr > 20%. Opacity. Temperature is expressed as degrees Fahrenheit. Gauge pressure is expressed as mmhg, psig or inches H 2 0. Hydrocarbon Breakthrough is expressed as %VOC. ph is expressed as a number. For flow use the units specified in the District Regulation Standard or Permit Condition. the Allowable Limit (e.g., Regulation Standard, Permit Condition, National or State Air Quality Standard).. the Averaging Time.. the Breakdown ID number associated with the Excess, only if previously assigned by the District. Upon receiving the episode report form, the District will record the information and assign an ID number and acknowledge the Episode report by letter. NOTE: Breakdowns reported during other than normal working hours will be assigned an ID number the following working day. If the company does not receive an ID number it is the company's responsibility to contact the District to obtain the ID number. The company must submit a written report to the District within 30 days of the occurrence. It is essential that the report include detailed emission calculations for breakdowns and specific information as required in Regulation 1, Section 432. Send breakdown letters to: BAAQMD, 939 Ellis Street, San Francisco, CA 94109, Attn: Breakdown, Enforcement Division. Exhibit I H:pubdata/forms/brkdwn3

BAY AREA AIR QUALITY MANAGEMENT DISTRICT 939 ELLIS STREET, SAN FRANCISCO, CA, (415) 771-6000 BREAKDOWN ID# EPISODE ID# BREAKDOWN EPISODE INVESTIGATION FORM SUPV ENF Initials Date TECH SUPV COMPLETE THIS BOX FOR ALL EPISODES COMPANY: SITE # REPORTED BY: TITLE: START date: Time: hr REPORTED date: Time: hr CLEAR date: Time: hr REPORTED date: Time: hr ABATEMENT DEVICE: BREAKDOWN SOURCE DESCRIPTION: S# PROBLEM: COMPANY WRITTEN REPORT due: RECEIVED WITHIN 30 DAYS: YES NO INSPECTOR REVIEWED REPORT ON: RELIEF VARIANCE IN EFFECT DOCKET # NOT APPLICABLE No violation documented (non-monitor only) DENIAL Inspector will either ATTACH MONITOR EXCESS PENDING TECHNICAL EVALUATION COMPLETE THE FOLLOWING NOV DATA REGULATION: RULE: SECTION: REGULATION: RULE: SECTION: FOR PERMIT CONDITION VIOLATIONS: CONDITION NO. Subsection No. NUMBER OF DAYS: Inspector: I# Date of Report: H:\pub_data/FORMS-Inspection/Admin/Breakdown (revised 3/02) Exhibit II

BAY AREA AIR QUALITY MANAGEMENT DISTRICT 939 ELLIS STREET, SAN FRANCISCO, CA, (415) 771-6000 Breakdown Episode Investigation Report page 2 SITE # EPISODE BREAKDOWN ID# EPISODE ID# Inspector: Date of Report: I# RELIEF Supervisor must verify the inspector has reviewed the company s written report. If no report is received, relief must be denied where excess emissions are confirmed NOT APPLICABLE No violation documented NOT APPLICABLE - After Source Test evaluation No violation was documented DENIAL If recommended for a reason other than lack of company written report, it must be verified that the inspector has reviewed the company s written report (see above). Also, the applicable DENIAL CODE(S) must be checked: N NUISANCE I INTENT OR NEGLIGENCE R RECURRENT M MAINTENANCE D DEFINITION: A ADMINISTRATIVE: Not unexpected Not Equipment Failure SUPERVISOR RECOMMENDATION Late reporting of event None or Late written company report COMMENTS: SUPERVISING INSPECTOR: DATE: Exhibit II

I. INTRODUCTION II. OBSERVATIONS III. STATEMENTS IV. CONCLUSION V. RECOMMENDATION Exhibit II