Risk Video #1. Video 1 Recap

Similar documents
Haeryip Sihombing 1. Risk. Risk Management

Project Management. Managing Risk. Clifford F. Gray Eric W. Larson Third Edition. Chapter 7

Project Risk Management

PROJECT MANAGEMENT: PERT AMAT 167

Managing Project Risk DHY

Chapter-8 Risk Management

SCHEDULE CREATION AND ANALYSIS. 1 Powered by POeT Solvers Limited

Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management

Project Risk Management. Prof. Dr. Daning Hu Department of Informatics University of Zurich

Unit 9: Risk Management (PMBOK Guide, Chapter 11)

Fundamentals of Project Risk Management

MS Project 2007 Page 1 of 18

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

WHY ARE PROJECTS ALWAYS LATE?

RISK MANAGEMENT. Budgeting, d) Timing, e) Risk Categories,(RBS) f) 4. EEF. Definitions of risk probability and impact, g) 5. OPA

Project Management. Session 5 Budgets and Estimation Andre Samuel

ADVANCED QUANTITATIVE SCHEDULE RISK ANALYSIS

Appendix A Decision Support Analysis

Quantitative Risk Analysis with Microsoft Project

Information Technology Project Management, Sixth Edition

Poor Man s Approach to Monte Carlo

CHAPTER 5 STOCHASTIC SCHEDULING

Monte Carlo Introduction

Making sense of Schedule Risk Analysis

Project Theft Management,

Real Options and Risk Analysis in Capital Budgeting

Five-Day Schedule and Course Content

COPYRIGHTED MATERIAL. Index

Optimization Prof. A. Goswami Department of Mathematics Indian Institute of Technology, Kharagpur. Lecture - 18 PERT

Project Management Chapter 13

Project Management Professional (PMP) Exam Prep Course 11 - Project Risk Management

Mohammed Rafiuddin CEO and General Manager, BIOSI Biohazards Solutions Innovators

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ

A METHOD FOR STOCHASTIC ESTIMATION OF COST AND COMPLETION TIME OF A MINING PROJECT

Achieve PMP Exam Success Five-Day Course Syllabus

PROJECT SCENARIOS, BUDGETING & CONTINGENCY PLANNING

EARNED VALUE MANAGEMENT AND RISK MANAGEMENT : A PRACTICAL SYNERGY INTRODUCTION

1 of 14 4/27/2009 7:45 AM

Unit 5 Slide Lectures of 04/05/06 April 2017

Textbook: pp Chapter 11: Project Management

Integrated Cost Schedule Risk Analysis Using the Risk Driver Approach

Use of the Risk Driver Method in Monte Carlo Simulation of a Project Schedule

STOCHASTIC COST ESTIMATION AND RISK ANALYSIS IN MANAGING SOFTWARE PROJECTS

u w 1.5 < 0 These two results imply that the utility function is concave.

UNIT-II Project Organization and Scheduling Project Element

SENSITIVITY ANALYSIS IN CAPITAL BUDGETING USING CRYSTAL BALL. Petter Gokstad 1

CISC 322 Software Architecture

Introduction. Introduction. Six Steps of PERT/CPM. Six Steps of PERT/CPM LEARNING OBJECTIVES

STOCHASTIC COST ESTIMATION AND RISK ANALYSIS IN MANAGING SOFTWARE PROJECTS

3/15/2018 CHAPTER 5. PROJECT MANAGEMENT. Prepared by: Dr. Maria Elisa Linda T. Cruz

Project Risk Management

Project planning and creating a WBS

Cost Risk Assessment Building Success and Avoiding Surprises Ken L. Smith, PE, CVS

INTRODUCTION PROJECT MANAGEMENT

(RISK.03) Integrated Cost and Schedule Risk Analysis: A Draft AACE Recommended Practice. Dr. David T. Hulett

Risk Management Process-02. Lecture 06 By: Kanchan Damithendra

Every project is risky, meaning there is a chance things won t turn out exactly as planned.

Programmatic Risk Management in Space Projects

How to Avoid the Common Problems When Using Risk Management

Pass PMP in 21 Days - ITTO Toolbox PROCESS MAP

Managing Project Risks. Dr. Eldon R. Larsen, Marshall University Mr. Ryland W. Musick, West Virginia Division of Highways

L U N D S U N I V E R S I T E T. Projektledning och Projektmetodik

COST MANAGEMENT IN CONSTRUCTION PROJECTS WITH THE APPROACH OF COST-TIME BALANCING

LCS International, Inc. PMP Review. Chapter 6 Risk Planning. Presented by David J. Lanners, MBA, PMP

Crowe, Dana, et al "EvaluatingProduct Risks" Design For Reliability Edited by Crowe, Dana et al Boca Raton: CRC Press LLC,2001

Introduction to Monte Carlo

Full Monte. Looking at your project through rose-colored glasses? Let s get real.

SAMPLE. Answer all 60 multiple choice questions sample paper contains 30 questions only Use the proforma answer sheet provided.

Integrated Cost Schedule Risk Analysis Using the Risk Driver Approach

February 2010 Office of the Deputy Assistant Secretary of the Army for Cost & Economics (ODASA-CE)

Running Head: RISK MANAGEMENT PLAN 1

M_o_R (2011) Foundation EN exam prep questions

Project Management. Estimating Project Times and Costs. Clifford F. Gray Eric W. Larson Third Edition. Chapter 5

Better decision making under uncertain conditions using Monte Carlo Simulation

Software Economics. Introduction to Business Case Analysis. Session 2

Integrated Cost-Schedule Risk Analysis Improves Cost Contingency Calculation ICEAA 2017 Workshop Portland OR June 6 9, 2017

Scheduling Resources and Costs

RISKS. Diane Van Hoy and Jacob Kloos

Objectives. What is Risk? But a Plan is not Reality. Positive Risks? What do we mean by Uncertainty?

Formulas to Know for EXAM

Presented to: Eastern Idaho Chapter Project Management Institute. Presented by: Carl Lovell, PMP Contract and Technical Integration.

EVM s Potential for Enabling Effective Integrated Cost-Risk Management

Year 0 $ (12.00) Year 1 $ (3.40) Year 5 $ Year 3 $ Year 4 $ Year 6 $ Year 7 $ 8.43 Year 8 $ 3.44 Year 9 $ (4.

MINI GUIDE. Project risk analysis and management

A Study on Risk Analysis in Construction Project

Learning Le cy Document

UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING MSc CONSTRUCTION PROJECT MANAGEMENT SEMESTER ONE EXAMINATION 2017/2018

Likelihood-based Optimization of Threat Operation Timeline Estimation

Welcome! A Critical Tool of the Project Manager. What People Are Doing 9/15/2016. Risk Management A Critical Tool

Real-World Project Management. Chapter 15

Acritical aspect of any capital budgeting decision. Using Excel to Perform Monte Carlo Simulations TECHNOLOGY

PROJECT COST MANAGEMENT

RISK MANAGEMENT ON USACE CIVIL WORKS PROJECTS

Computational Finance Least Squares Monte Carlo

CHAPTER 9: PROJECT MANAGEMENT

Uncertainty in Economic Analysis

Network Analysis Basic Components. The Other View. Some Applications. Continued. Goal of Network Analysis. RK Jana

CHAPTER 6 CRASHING STOCHASTIC PERT NETWORKS WITH RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM

Exam Questions PMI-SP

INSE 6230 Total Quality Project Management Winter 2018 Quiz I. Max : 70 points. This is a closed book exam. Answer all the questions in the booklet.

Transcription:

Risk Video #1 Video 1 Recap 1

Risk Video #2 Video 2 Recap 2

Risk Video #3 Risk Risk Management Process Uncertain or chance events that planning can not overcome or control. Risk Management A proactive attempt to recognize and manage internal events and external threats that affect the likelihood of a project s success. What can go wrong (risk event). How to minimize the risk event s impact (consequences). What can be done before an event occurs (anticipation). What to do when an event occurs (contingency plans). 3

The Risk Event Graph FIGURE 7.1 The Risk Management Process FIGURE 7.2 4

Managing Risk Step 1: Risk Identification Generate a list of possible risks through brainstorming, problem identification and risk profiling. Macro risks first, then specific events Step 2: Risk Assessment Scenario analysis for event probability and impact Risk assessment matrix Failure Mode and Effects Analysis (FMEA) Probability analysis Decision trees, NPV, and PERT Semiquantitative scenario analysis The Risk Breakdown Structure (RBS) FIGURE 7.3 5

Partial Risk Profile for Product Development Project FIGURE 7.4 Defined Conditions for Impact Scales of a Risk on Major Project Objectives (Examples for negative impacts only) FIGURE 7.5 6

Risk Assessment Form Failure Mode and Effects Analysis (FMEA) Impact Probability Detection = Risk Value FIGURE 7.6 Risk Severity Matrix Failure Mode and Effects Analysis (FMEA) Impact Probability Detection = Risk Value FIGURE 7.7 7

Managing Risk (cont d) Step 3: Risk Response Development Mitigating Risk Reducing the likelihood an adverse event will occur. Reducing impact of adverse event. Avoiding Risk Changing the project plan to eliminate the risk or condition. Transferring Risk Paying a premium to pass the risk to another party. Requiring Build-Own-Operate-Transfer (BOOT) provisions. Retaining Risk Making a conscious decision to accept the risk. Contingency Plan Contingency Planning An alternative plan that will be used if a possible foreseen risk event actually occurs. A plan of actions that will reduce or mitigate the negative impact (consequences) of a risk event. Risks of Not Having a Contingency Plan Having no plan may slow managerial response. Decisions made under pressure can be potentially dangerous and costly. 8

Risk and Contingency Planning Technical Risks Backup strategies if chosen technology fails. Assessing whether technical uncertainties can be resolved. Schedule Risks Use of slack increases the risk of a late project finish. Imposed duration dates (absolute project finish date) Compression of project schedules due to a shortened project duration date. Risk Response Matrix FIGURE 7.8 9

Risk and Contingency Planning (cont d) Costs Risks Time/cost dependency links: costs increase when problems take longer to solve than expected. Deciding to use the schedule to solve cash flow problems should be avoided. Price protection risks (a rise in input costs) increase if the duration of a project is increased. Funding Risks Changes in the supply of funds for the project can dramatically affect the likelihood of implementation or successful completion of a project. Contingency Funding and Time Buffers Contingency Funds Funds to cover project risks identified and unknown. Size of funds reflects overall risk of a project Budget reserves Are linked to the identified risks of specific work packages. Management reserves Are large funds to be used to cover major unforeseen risks (e.g., change in project scope) of the total project. Time Buffers Amounts of time used to compensate for unplanned delays in the project schedule. Severe risk, merge, noncritical, and scarce resource activities 10

Contingency Fund Estimate ($000s) TABLE 7.1 Exploit Opportunity Management Tactics Seeking to eliminate the uncertainty associated with an opportunity to ensure that it definitely happens. Share Allocating some or all of the ownership of an opportunity to another party who is best able to capture the opportunity for the benefit of the project. Enhance Taking action to increase the probability and/or the positive impact of an opportunity. Accept Being willing to take advantage of an opportunity if it occurs, but not taking action to pursue it. 11

Managing Risk (cont d) Step 4: Risk Response Control Risk control Execution of the risk response strategy Monitoring of triggering events Initiating contingency plans Watching for new risks Establishing a Change Management System Monitoring, tracking, and reporting risk Fostering an open organization environment Repeating risk identification/assessment exercises Assigning and documenting responsibility for managing risk Change Management Control Sources of Change Project scope changes Implementation of contingency plans Improvement changes 12

Change Control System Process 1. Identify proposed changes. 2. List expected effects of proposed changes on schedule and budget. 3. Review, evaluate, and approve or disapprove of changes formally. 4. Negotiate and resolve conflicts of change, condition, and cost. 5. Communicate changes to parties affected. 6. Assign responsibility for implementing change. 7. Adjust master schedule and budget. 8. Track all changes that are to be implemented The Change Control Process FIGURE 7.9 13

Benefits of a Change Control System 1. Inconsequential changes are discouraged by the formal process. 2. Costs of changes are maintained in a log. 3. Integrity of the WBS and performance measures is maintained. 4. Allocation and use of budget and management reserve funds are tracked. 5. Responsibility for implementation is clarified. 6. Effect of changes is visible to all parties involved. 7. Implementation of change is monitored. 8. Scope changes will be quickly reflected in baseline and performance measures. Sample Change Request Form FIGURE 7.10 14

Change Request Log FIGURE 7.11 PERT and PERT Simulation 15

PERT Program Evaluation Review Technique Assumes each activity duration has a range that statistically follows a beta distribution. Uses three time estimates for each activity: optimistic, pessimistic, and a most likely time to represent activity durations. Knowing the weighted average and variances for each activity allows the project planner to compute the probability of meeting different project durations. Activity and Project Frequency Distributions FIGURE A7.1 16

Activity Time Calculations The weighted average activity time is computed by the following formula: (7.1) Activity Time Calculations (cont d) The variability in the activity time estimates is approximated by the following equations: The standard deviation for the activity: (7.2) The standard deviation for the project: Note the standard deviation of the activity is squared in this equation; this is also called variance. This sum includes only activities on the critical path(s) or path being reviewed. (7.3) 17

Probability of Completing the Project The equation below is used to compute the Z value found in statistical tables (Z = number of standard deviations from the mean), which, in turn, tells the probability of completing the project in the time specified. (7.4) Activity Times and Variances A B C D E F TABLE A7.1 18

Hypothetical Network (cont d) FIGURE A7.2 (cont d) Possible Project Duration Probability project is completed before scheduled time (T S ) of 67 units Probability project is completed by the 60 th unit time period (T S ) FIGURE A7.3 19

Z Values and Probabilities TABLE A7.2 Mitigating Schedule Risks Monte Carlo Technique Monte Carlo project simulation is a powerful tool that can be used to assess project risk of schedules, budgets, resources, and cash flow. Simulation provides information to manage risks, make contingency plans, and create more realistic schedules. 20

Mitigating Schedule Risks Monte Carlo Technique Schedule simulation recognizes uncertainty and instability in activity time estimates and the resultant impact and consequences on project duration. Criticality indexes provide valuable information in planning people, money, materials and equipment. Mitigating Schedule Risks Monte Carlo Technique Advance information from Monte Carlo simulation gives project planners an opportunity to identify and mitigate risk before the project begins 21

Given the project network sequence and dependencies, the simulation technique only requires that you provide three durations for each activity: (a) optimistic, (m) most likely, and (b) pessimistic. These times are assumed to be under normal conditions and there is only one chance in 100 that the activity will be completed earlier or later than the optimistic or pessimistic times. The average activity time for the triangular distribution (t e ) is computed with the formula: a + m + b t e = 3 22

The average time for each activity in the project is computed similarly. Using a software random number generator and the Monte Carlo approach of simulated sampling of the cumulative distribution for each activity, a duration for each activity in the project is generated. With the durations for all the activities in the project computed, the critical path is computed, recorded, and stored. This process is repeated, say 2,000 times. For example, in the activity above the first simulation duration might be 27, the second simulation 13, third 18, etc. Three key pieces of information are derived from repeating this process for the network for 2,000 simulations: The percentage (probability) of times a path shows up critical The percentage (probability) of times an activity shows up critical Average simulated project duration. The two percentages are called criticality indexes. 23

Advantages of using Monte Carlo Simulation To Assess Project Schedule Risk A few major advantages are listed here: Deals with uncertainty of activity times Identifies interaction among project activities Highlights potential delay and bottleneck areas before the project begins Tests the project schedule for activities that are sensitive to time delay risks Identifies activities that will never or rarely become critical Allows choice of probability distribution combinations to increase accuracy and flexibility. 24

Concluding Remarks 25