Re-booting the Premium Grade Kami Iron Ore Project. Corporate Presentation September, 2018 IRON: TSX

Similar documents
Premium Grade Kami Iron Ore Project. Corporate Presentation December, 2018 IRON: TSX

K A M I A PREMIUM-GRADE IRON ORE PROJECT READY FOR DEVELOPMENT IN THE LABRADOR TROUGH

Investor Presentation April 2018 IRON: TSX

NPV at 8% discount rate $ 1,698 M IRR 24.6% Projected Years to Payback Total Estimated Capital Cost (excluding sustaining capital and closure

Final Report. An Analysis of the Economic Impacts Associated With the Kami Iron Ore Project: A 8 Mtpa, 26 Year Project

newest iron ore LABRADOR IRON MINES Canada s producer Q3 Conference Call (for the quarter ended December 31, 2012)

(A Development-Stage Company)

Spanish Mountain Gold Announces Results of New PEA for the First Zone

MASON GRAPHITE PRESENTS ITS UPDATED FEASIBILITY STUDY ECONOMIC RESULTS FOR THE LAC GUÉRET GRAPHITE PROJECT

Managing Director s Review of Operations

LABRADOR IRON MINES REPORTS THIRD QUARTER RESULTS. Requirement for Refinancing and Restructuring Voluntary Delisting from the TSX

NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES

PREMIUM PRODUCT, HIGH QUALITY INFRASTRUCTURE, TIER 1 JURISDICTION. Bloom Lake In Production

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012

Developing an Advanced Lithium Project in Quebec, Canada

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

Skouries Update March 2018

Altius Minerals Corporation

CORPORATE PRESENTATION JULY 2018

Côté Gold Project Feasibility Study Conference Call

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

Detour Gold Updates Life of Mine Plan for Detour Lake

Mining High Grade Gold in Burkina Faso

CANADA S INTERMEDIATE GOLD PRODUCER

Kişladağ Update March 2018

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

Authier Lithium Project Advances to the Definitive Feasibility Stage

Global Iron Ore and Steel Forecast Unlocking value across our portfolio. Edgar Basto, Asset President Western Australia Iron Ore 21 March 2018

A Copper-Gold Producer in the Making

THIRD QUARTER THIRD QUARTER REPORT REPORT

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

80 YEARS IN LABRADOR WEST 14NOV

All amounts are in US dollars, unless otherwise indicated.

Detour Gold Announces 2016 Operating Results and 2017 Guidance

Annual General Meeting

CANADA S INTERMEDIATE GOLD PRODUCER

JEFFERIES 2017 INDUSTRIAL CONFERENCE

Orezone Announces Positive Preliminary Economic Assessment

TSX.V: TEN US: TCEGF

CANADA S INTERMEDIATE GOLD PRODUCER

MBAC ANNOUNCES POSITIVE DEFINITIVE FEASIBILITY STUDY FOR ITAFÓS PHOSPHATE PROJECT, BRAZIL

CENTURY IRON MINES CORPORATION

AVINO SILVER & GOLD MINES LTD.

SISSON PROJECT: TUNGSTEN MOLYBDENUM. New Brunswick, Canada

US$1.98 Billion NPV & US$3 Million Capex (Phase 1)

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project

For personal use only

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

Velocity Announces C$9M Strategic Investment by Atlantic Gold

CANADA S INTERMEDIATE GOLD PRODUCER

TAMPIA GOLD PROJECT FEASIBILITY STUDY

Operational Outlook & Update Conference Call November 29, 2018

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

10 May BoAML Global Metals, Mining & Steel Conference Chris Lynch. Chief financial officer

Lamaque Update March 2018

Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland

Eldorado Gold Reports Results of Technical Studies

Rambler Updates Reserves at its Producing Canadian Copper & Gold Mine Demonstrating a Profitable 20 Year Mine Life

ANACONDA MINING EXPANDS ITS GREAT NORTHERN PROJECT WITH THE ACQUISITION OF THE RATTLING BROOK DEPOSIT

Cumberland Completes Cannu Gold Resource Estimate, Plans for New Reserves and Continued Exploration in 2007 at Meadowbank Gold Project

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

Milestone Potash Project. November 2018

For personal use only

For personal use only

TSX.V: TEN US: TCEGF

September 15, 2016 News Release SILVER STANDARD PROVIDES MARIGOLD FIVE-YEAR OUTLOOK

REPORT TO HOLDERS OF COMMON SHARES

StockPotentials December 15, 2011

NEWS RELEASE JANUARY 29, 2015

2018 Interim Financial Results 24 July 2018

Goldcorp and Teck Combine El Morro and Relincho Projects in Chile

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

First Quarter 2018 Results April 26, 2018

New Polaris Gold Mine

CENTURY IRON MINES CORPORATION

Investor Day 2014: Strategic progress Mining exploiting our potential

LETTER FROM THE CEO: BUNKER HILL GEARS UP FOR SIGNIFICANT DEVELOPMENT

COLONIAL COAL INTERNATIONAL CORP. Suite Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604)

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

CAUCHARI-OLAROZ SITE VISIT

KINROSS GOLD CORPORATION

TSX: ECS OTCQX: ECSIF FRA: ECO. April

PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016

Q Results. Conference Call. October 26, Kışladağ, Turkey

Detour Gold Reports Second Quarter 2017 Results

Exploration COPPER COBALT ZINC In Newfoundland

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

JAMBREIRO IRON ORE PROJECT SET TO DELIVER STRONG CASH FLOWS AND RETURNS: PRE-FEASIBILITY STUDY

SILVERCORP REPORTS SIGNIFICANT GAIN IN MEASURED AND INDICATED MINERAL RESOURCES AT THE YING SILVER-LEAD-ZINC MINING DISTRICT, HENAN PROVINCE, CHINA

ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD.

CENTURY IRON MINES CORPORATION

CANADA S INTERMEDIATE GOLD PRODUCER

VALUE THROUGH GOLD ANNUAL ROTH CONFERENCE

VALUE THROUGH GOLD DENVER GOLD FORUM 2016

Achmmach Tin Project. Definitive Feasibility Study ASX : KAS. Kasbah Resources Limited

WESDOME GOLD MINES ANNOUNCES THIRD QUARTER FINANCIAL RESULTS

LUNDIN GOLD RECONFIRMS PROJECT SCHEDULE AND LOWERS ALL-IN SUSTAINING COST ESTIMATE TO US$583 PER OUNCE FOR ITS FRUTA DEL NORTE GOLD PROJECT

VALUE THROUGH GOLD RAMPING UP BRUCEJACK

CANADA S INTERMEDIATE GOLD PRODUCER

Transcription:

Re-booting the Premium Grade Kami Iron Ore Project Corporate Presentation September, 2018 IRON: TSX

Disclaimer Special Note Regarding Forward-Looking Information This presentation contains "forward-looking information" within the meaning of the U.S. Private Securities Litigation Reform Act and Canadian securities laws concerning anticipated developments and events that may occur in the future. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of mineral resources and mineral reserves; (ii) the market, demand for, and future price of iron ore and related products; (iii) estimates of future steel production; (iv) estimation of railway capacity; (v) the negotiation, conclusion and potential terms of infrastructure contracts; (vi) potential economic benefits of the Kami Project; (vii) future freight costs, (viii) the potential advantages of iron ore concentrate produced from the Kami Project and (ix) the results of the Updated Feasibility Study ( FS ) including statements about future production, future operating and capital costs, the projected IRR, NPV, payback period, construction timelines and production timelines for the Kami Project. In certain cases, forward-looking information can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Forward-looking information contained in this presentation is based on certain factors and assumptions regarding, among other things, the estimation of mineral reserves and resources, the realization of resource and reserve estimates, iron ore and other metal prices, the timing and amount of future exploration and development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs, the availability of necessary financing and materials to continue to explore and develop the Kami Project in the short and long-term, the progress of exploration and development activities, the receipt of necessary regulatory approvals, the estimation of insurance coverage, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining operations may not commence at the Kami Property, risks relating to variations in mineral resources, grade or recovery rates resulting from current exploration and development activities, risks relating to the ability to access rail transportation, sources of power and port facilities, risks relating to changes in iron ore prices and the worldwide demand for and supply of iron ore and related products, risks related to increased competition in the market for iron ore and related products and in the mining industry generally, risks related to current global financial conditions, uncertainties inherent in the estimation of mineral resources, access and supply risks, reliance on key personnel, operational risks inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that might be encountered during the development process, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, including the risk that the financing necessary to fund the exploration and development activities at the Kami Project may not be available on satisfactory terms, or at all, risks related to disputes concerning property titles and interest, environmental risks, and the additional risks identified in the Risk Factors section of the Company s Annual Information Form for the most recently completed financial year or other reports and filings applicable with Canadian securities regulators. Accordingly, readers should not place undue reliance on forward-looking information. The forward-looking information is made as of the date of this presentation. Except as required by applicable securities laws, the Company does not undertake any obligation to publicly update or revise any forward-looking information. Additional Information For further information on the Kami Project please refer to (i) the press release of the Company dated September 26, 2018 (the Press Release ) and (ii) the Technical Report entitled Update to the Re-Scoped Preliminary Economic Assessment of the Kamistiatusset (Kami) Iron Ore Property, Labrador dated effective November 7, 2017, that are available on SEDAR at www.sedar.com. NI 43-101 Qualified Person The technical information presented in this presentation is from the Press Release. The Press Release was prepared under the supervision of Mr. Angelo Grandillo, P.Eng, of BBA, a Qualified Person as defined by NI 43-101, with contributions from Mr. Jeffrey Cassoff, P.Eng, of BBA, Mr. James Powell of Gemtec, Mr. Peter Merry of Golder and Mr. Michael Kociumbas. Mr. Grandillo is a Qualified Person as defined by NI 43-101 and Mr. Grandillo is independent of Alderon. Mr. Grandillo has reviewed and approved the technical information contained in the Press Release, with the exception of the mineral resource estimate. Mr. Michael Kociumbas, P.Geo., is a Qualified Persons as defined by NI 43-101 and is responsible for reviewing and approving the mineral resource estimate and the QA/QC associated with the mineral resource estimate. Mr. Kociumbas is independent of Alderon. 2

Investment highlights Iron-ore market has improved with Chinese demand for higher-grade product expected to remain strong Market dynamics favour premium product with high-iron content of 65.2% and ultra-low deleterious elements Ideal location in Canada s premier iron-ore district with secured access to low-cost utilities and transport Shovel-ready project with robust economics (USD, Pre-Tax) $1.7 billion NPV 8 24.6% IRR C1 cost = $30.72 (FOB) Capex = $982.41 million Projected premium product quality represents an exceptional value-in-use proposition for the steelmakers 3

What sets us apart Product Location Infrastructure Partners Premium Iron Ore Labrador Trough Ideally Located Strategic Partnerships High-iron content at 65.2% Fe Ultra-low phosphorus & alumina Magnetite content Safe and stable jurisdiction Long history as a mining region Hydro-electric power at competitive rates 14.5km to common-carrier railway with +80 Mtpa capacity 15.5km to high voltage grid power agreement signed 100% of production committed Access to skilled labor Agreement in place to ship year-round via deep-water port Underpinned by 1.1 billion tonnes at 29.6% iron of Measured & Indicated Resources Measured and Indicated Resources of the Rose Deposit 1093.2 Tonnes (Million) 29.6% TFe Total Inferred 522.6 Tonnes (Million) 29.5% TFe 4

Kamistiatusset High-Grade Iron Ore Property (the "Property" or "Kami") Rio Tinto IOC 21 Mtpa QIO Railway Quebec Iron Ore 7.4 Mtpa ArcelorMittal 24 Mtpa Labrador City Town of Wabush Alderon Iron Ore Corp. Proven & Probable Mineral Reserves 517.2 Mt @ 28.8%* Labrador Québec Sep 2018 *Note: The Mineral Reserve estimate is effective as of August 12, 2018. The Proven and Probable Mineral Reserves are derived from the December 17, 2012 Mineral Resource estimate. Total Measured & Indicated Resources exclude Mineral Resources within the Mills Lake Deposit, and the Inferred Mineral Resources within the Rose Deposit. 5

Kami Project offers a differentiated product to supply an evolving market Iron %* (Fe) Phosphorus %* (P) Aluminium oxide%* (Al 2 O 3 ) Bifurcation of the market setting in Source: Bloomberg Source: Platts & Company Disclosures China s drive for emissions reduction is leading to supply side reforms 6 and shift to higher-quality raw materials 6

Flight to quality has become a well-established theme in the iron ore market Over the past several years China has moved to slash steel production capacity in a bid to modernise outdated industrial sectors and limit environmental damage. Financial Times, August 2018 When investment in iron ore offers a prospective 30% rate of return on pretty much any plausible price outlook, then why would you look at anything else? Mining Journal, August 2018 Closures of sintering plants will likely spur demand for iron ore pellets, adding further upwards pressure on prices, which have risen a third this year, said Zhao Yu, steel analyst at Huatai Futures. Reuters, September 2018 The outperformance of higher grade iron ore does confirm that China s steel mills have been using better quality ore to maximise output and lower emissions. Reuters, August 2018 Short-term spikes to this level are entirely possible in response to Chinese production and policy announcements, said Paul Gray, vice president for iron ore markets referring to the $100 mark for top-grade prices. Bloomberg, July 2018 7

Premium product and strong market form the foundation of Kami Project s launch Kami offers a premium product relative to benchmark 62%-Fe grade with higher iron content and ultra-low impurities Chinese steel production remains robust; India positioned to drive next wave of steel intensity growth Iron-ore consumption expected to peak by mid to late next decade (CAGR=0.4%) Price spread will be sustained in the long term Source: Wood Mackenzie Source: Accenture Strategy 8 8

Our approach continues to unlock Kami s potential Strategic Partnerships Established 100% of Product Sold Year-round Access to Global Market High-Grade Kami Iron Ore Project Alderon Iron Ore Corp. Port + Power Agreements Concluded Local Skilled Workforce High-Grade Product, Low Impurities Guaranteed Access to Railway 23-Year Life-of-Mine (LOM) Location in Labrador Trough provides low-cost access to utilities, transportation, and skilled labour 9 9

Strategic partnerships in place HBIS Group (formerly Hebei Iron & Steel) is China s second largest steelmaker and has invested a total of C$182.2 million to date & will purchase 60% of annual production C$119.9 million in project equity for 25% interest in the Kami Project C$62.3 million in corporate equity for 19.9% of Alderon common shares Altius Minerals holds 39% of the outstanding shares of Alderon An exploration and project-generation company with a focus on Newfoundland and Labrador Hold multiple successful investments in the Labrador Trough Chinese iron and steel manufacturing conglomerate. Newfoundland and Labrador, Canadabased diversified mining royalty company. Glencore will purchase 40% of annual production One of the world s largest global diversified natural resource companies Anglo Swiss multinational commodity trading and mining company. Partners will purchase 100% of annual production 10 10

Access to infrastructure secured Concluded long-term agreement with Port of Sept-Îles in return for a C$20.46 million investment Multi-user berth in deep water up to 23 meters, suitable for large, cape-size vessels Loading capacity of 50 to 60Mt per year Power availability confirmed by Crown Utility Power Purchase Agreement concluded with Initial 76 megawatts required increasing to 86 megawatts over LOM at very competitive rates Nearby common-carrier railway with over 80Mt per year capacity guaranteed access The Port of Sept-Îles One of North America's largest ore-handling ports. Source: Alderon Iron Ore 11 11

Updated Feasibility Study (FS) reconfirms economic potential US$1.7 billion NPV 8% 24.6% IRR FS updated in September 2018 Initial capital costs estimated at US$982.41 million Operating costs streamlined for current mine plan with lower strip ratio Higher average LOM annual production due to improved mine plan Tailings management facility redesigned to current standards Photo: Labrador City 12

Robust economics* Updated FS Results: September 2018 Annual Production (65.2% Fe con) Initial CAPEX Cash operating cost (FOB) ($/t of concentrate) Capital Intensity Payback Period Proven and Probable Mineral Reserves 1 Mine Life 7.84 Mtpa $982.41 million $30.72/t ~$125/t 4.0 years 517.2 Mt @ 28.8% TFe 23 years *Pre-tax, USD Note 1: The Mineral Reserve estimate is effective as of August 12, 2018. The Proven and Probable Mineral Reserves presented in the table above are derived from the December 17, 2012 Mineral Resource estimate. Total Measured & Indicated Resources exclude Mineral Resources within the Mills Lake Deposit, and the Inferred Mineral Resources within the Rose Deposit. 13

Summary of CAPEX & OPEX Estimated Initial Capital Costs (Million US$) Mine $72.20 Mineral Processing Area $302.81 Estimated Average LOM Operating Costs (US$/t Dry Concentrate) Mining (including mining equipment leasing costs) $11.25 TMF Area (Initial Dykes) $23.66 Site Infrastructure and Utilities $309.90 Mineral Processing $5.72 General Site $0.50 Other EPC Costs (Indirects, Guaranties, Insurance) $192.17 General Administration $2.26 TOTAL EPC COSTS $900.74 Pre-Operational Capitalized Costs $26.90 Environmental & Tailings Management $0.37 Owner s Costs $30.98 Mine (Waste Rock Pre-Stripping by Kami) $23.79 TOTAL $982.41 Rail Transportation and Port Services (including railcar leasing costs) $10.62 TOTAL $30.72 14

Conventional flowsheet High-quality product Drill and Blast Load and Haul Gyratory Crusher Primary Grinding %Fe 29.5% Fe Rec % 100% Wt % 100% Gravity Separation Magnetic Separation Spiral Tails Regrind Final tails Spiral Concentrate %Fe 65.2% Fe Rec tot % 63.7% Wt % of feed 28.1% % of total concentrate 82.5% Mag Concentrate %Fe 65.2% Fe Rec tot % 13.7% Wt % of feed 6.0% % of total concentrate 17.5% Final Concentrate %Fe 65.2% % SiO 2 4.3% Fe Rec % 77.4% Wt % 34.1% %Mn 0.81% P80 267 um Rail 15

Kami will create jobs and tax revenue* $7.6 billion Incomes to workers and businesses across Canada $5.1 billion Federal and provincial government revenues $21.3 billion National GDP contributions over 26-year period Photo: The Port of Sept-Îles >100,000 Direct, indirect and induced Jobs $5.5 billion in total incomes to workers and businesses in Newfoundland & Labrador and Québec * Economic Impact Assessment completed by Dr. Wade Locke of Memorial University, November 2017. 16

Economic Impacts* *Direct, indirect, and induced economic impacts 17

Sustainable development Fully released from Federal and Provincial Environmental Assessment; permitted for construction start Concluded stakeholder agreements Provincial benefits agreement with Newfoundland and Labrador Municipal agreements with Labrador City and Wabush Impact/benefit agreement with two Indigenous organizations Project Consultation Plan involves engaging community residents and groups, local businesses, and government regulators Indigenous Relations Policy involves information sharing, engagement, and traditional land and resource use studies Photo: QNS&L main rail line 18

I/P Achieved Kami has been largely de-risked and remains a shovel-ready project Project Development Detailed engineering advanced to 50% Key processing equipment purchased Extensive flowsheet and product testing completed Infrastructure Agreements Environmental Assessment Port access agreement concluded Power purchase agreement concluded Rail access guaranteed under common-carrier obligations Released from Federal & Provincial Environmental Assessments Mining and surface leases secured Off-Take Stakeholder Agreements Financing Long-term agreement with HBIS in place for 60% of production Long-term agreement in place with Glencore for 40% of production Provincial benefits agreement and diversity plan concluded Municipal agreements concluded Indigenous agreements in place (2 out of 5) Updated bankable feasibility study concluded in Q3-2018 Financing plan under review; to be launched in Q4-2018 19

Preliminary project schedule Feasibility Study Update Marketing Strategic Investor Project Finance Relaunch Debt Equity Chinese ECA Funding Project Restart Construction Start 2018 2019 2020 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 20

Company profile Ticker IRON: TSX Shares Outstanding as of August 31, 2018 138,282,880 Options as of August 31, 2018 7,285,000 Warrants as of August 31, 2018 5,241,436 Fully Diluted as of August 31, 2018 151,709,316 Cash & Cash Equivalents (as of June 30, 2018) CDN $5.7M 52-week Share Price Range $0.21 - $0.38 Current Share Price as of September 4, 2018 $0.30 Board of Directors Mark Morabito Chairman Tayfun Eldem Adrian Loader John Baker David Porter Zhou Wei (Wayne) Dr. Andrew Furey Rolland G. Morier Management Tayfun Eldem CEO Kate-Lynn Genzel CFO Gary Norris Executive VP Government & Community Affairs Xinneng (David) Li VP Asia Pacific Affairs Olen Aasen Corporate Secretary Shareholder Distribution Major Shareholders in Alderon Iron Ore Corp*. Altius Minerals 39% HBIS Group 19.6% Other Insiders ~2% Strategic Partners & Other Insiders, 61% Retail, 39% *Source: SEDI 21

Guided by a strong Board of Directors with deep knowledge of the industry and the region Mark J. Morabito B.A., J.D. Non-Executive Chairman Tayfun Eldem P.Eng CEO, President & Director Adrian Loader M.A. Director John Baker Q.C Director David Porter MBA Director Zhou (Wayne) Wei Director Dr. Andrew Furey MD, MSc, BSc, FRCSC Director Rolland G. Morier MBA Director 20 years of experience in public markets with strong focus on capital-raising and corporate development for junior mining companies. Led the team that struck an off-take agreement with Hebei Iron & Steel, China s largest steel producer, worth over $400 million. Holds a BA from Simon Fraser University and completed his J.D. at the University of Western Ontario. Seasoned mining executive with nearly 30-years of operating and technical experience in iron ore. Held several executive roles at Rio Tinto s Iron Ore Company of Canada, including COO and VP, Expansion Projects & Engineering. Formerly Managing Director of Iron Ore & Coal at Hatch. Professional Engineer and a graduate of Dalhousie University. 20 years working for Shell, including most recently as President and CEO of Shell Canada. Previously served as Director of Strategy and Business Development and Director of Strategic Planning, External Affairs, HSE and Sustainable Development for the Royal Dutch Shell Group. Graduated with an MA from the University of Cambridge. Co-founded Altius in 1997, has been the Chairman of Altius since 2006 and was appointed its Executive Chairman in June 2014. Senior partner in a leading St. John's law firm until June 2014, where he conducted mining corporate and commercial practice. Named St. John s Corporate Lawyer of the Year by the respected peer review publication Best Lawyers. Formerly Vice President, Human Resources & Organizational Effectiveness for the Iron Ore Company of Canada. 33 years experience in operations, HSE, sustainable development, and community relations across the mining and steel sectors. Negotiated landmark agreements with international unions, governments, and communities. Manages the Export Department of HBIS group. Holds an Industry Management Engineering degree from Hebei University of Science and Technology. Associate Professor of Surgery at Memorial University, the President of the Newfoundland and Labrador Surgical Society. Recently named one of Atlantic Business Magazine s Top 50 CEOs and was the recipient of the 2015 CBC Innovator of the Year award. Holds a B.Sc. Biology, M.D., and M.Sc., Medicine: Clinical Epidemiology, from Memorial University in Newfoundland. Served as President of Northern Strategies Inc. since 2015. 20 years at the Rio Tinto Group in senior executive roles including CFO roles at the Iron Ore Company of Canada and Quebec Iron & Titanium. Holds Master of Business Administration and Bachelor of Commerce degrees from Concordia University and McGill University respectively. 22

For more information, please contact: Mishka Gounden Phone: 604-681-8030 ext. 289 Email: info@alderonironore.com Corporate Head Office Montreal St. John s Labrador City 1240 1140 West Pender St. Vancouver, BC V6E 4G1 4th Floor 6500 Trans Canada Highway Pointe-Claire, QC H9R 0A5 102-1 Church Hill, Suite 201 St. John s, NL A1C 3Z7 PO Box 214 Labrador City, NL A2V 2K5 Follow us on www.alderonironore.com IRON: TSX