Tender Terms and Conditions: 1. This invitation of bid is open to contractors, Class-Small registered with the Construction Development Board.

Similar documents

5.Section 5 - Specimen Forms

BHUTAN TELECOM LTD. REGISTERED OFFICE IN THIMPHU. Construction of Retaining Wall at RBA, Phuentsholing

Section 4. Bidding Forms

Ministry of Physical Infrastructure and Transport BIDDING DOCUMENT. For. Construction of Railway Track Bed

Request for Proposal For Consultant for availing the Duty Credit scrip- under Foreign Trade Policy ( )

Request for Quotation (RFQ) for Services Transportation Service in Colombia

W-5 PROCUREMENT OF CIVIL WORKS UNDER SHOPPING PROCEDURES

Government of Nepal Ministry of Physical Infrastructure and Transport. Department of Railways. Battisputali, Kathmandu BIDDING DOCUMENT.

GOVERNMENT OF PROJECT AGREEMENT NO. NATIONAL COMPETITIVE BIDDING (CIVIL WORKS COSTING US $100,000 AND BELOW) PERIOD OF SALE OF BIDDING DOCUMENT : TO

REPUBLIC OF KENYA MINISTRY OF TRANSPORT, INFRASTRUCTURE, HOUSING AND URBAN DEVELOPMENT

STANDARD TENDER DOCUMENTS FOR PROCUREMENT OF WORKS (MINOR CONTRACTS)

1. Name of the Firm/Dealer/Vendor: Address with telephone No. :.

Procurement of Small Works

W-9 PROCUREMENT OF VERY SMALL WORKS UNDER NATIONAL COMPETITIVE BIDDING PROCEDURES

(e-procurement System)

Tender No. AYCL/ED/SWG/14-16/Security Agency dated 24/10/2014. Appointment of Security Agency at. Electrical Division (Kolkata Operation)

4. A bid Security of US $1, must be submitted along with the bid.

Section 8- Special Conditions of Contract

C A R I B B E A N C O M M U N I T Y C L I M A T E C H A N G E C E N T E R ( C C C C C ) REQUEST FOR PROPOSAL FOR THE

INSTRUCTIONS TO BIDDERS

SUPPLY of LED POWER LIGHTS WITH STAND FOR THE GOVERNMENT FILM UNIT

PIMPRI CHINCHWAD NEW TOWN DEVELOPMENT AUTHORITY (PCNTDA)

STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS

Danida Business Finance. Rules for Procurement

Procurement of Works & User s Guide

REQUEST FOR PROPOSAL FOR THE PROVISION OF EXTERNAL AUDIT SERVICES FOR THE THREE YEARS

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate

Arbitration Agreements DOs and DON Ts

NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT PROJECT ID: CR KE SUPPLY, DELIVERY AND INSTALLATION OF FLEET MANAGEMENT SYSTEM

REPUBLIC OF KENYA MINISTRY OF LAND AND PHYSICAL PLANNING PROPOSED ERECTION AND COMPLETION OF LAND REGISTRY AT BOMET, BOMET COUNTY

STANDARD BIDDING DOCUMENT (SBD)

From Investor AB (publ) 26 September 2007

Section 7. General Conditions of Contract for the Procurement of Works

Standard Bidding Documents. Procurement of Goods. The World Bank

BIDDING DOCUMENT. TENDER No. : ZICTA/ORD/05/17

BID DOCUMENTS For. Printing for PEEF Scholarship Forms

PROPOSED REHABILITATION AND CONSTRUCTION OF RUIRU STADIUM - KIAMBU

Subject: Invitation to bid for the construction of one Payam Police Station in Adong Payam in Baliet County Jonglei State of South Sudan

BIDDING DOCUMENT. For. Procurement of Plant Design, Supply and Installation. Ashuganj 400 MW Combined Cycle Power Plant Project (East)

1. Name of the Firm/Supplier /Vendor: Address with telephone No. :...

THE UNIVERSITY OF THE WEST INDIES, MONA CAMPUS Procurement Policies and Procedures Manual. Appendices APPENDICES

Short Term E-tender Notice for Internet Lease Line

BALMER LAWRIE & CO. LTD. [A Govt. of India Enterprise] Warehousing & Distribution No.1, Sonapur Road Kolkata Phone No.

PROPOSED REHABILITATION AND CONSTRUCTION OF RUIRU STADIUM - KIAMBU

E-TENDER NOTICE COMPUTER STATIONERY ITEMS

Bidding Documents. Procurement of Goods Laboratory Equipment- Industrial & Management Engineering Department

Cost of form BIDDING GRADUATE. S. No. RATES PER DAY ITEMS. Jug. Pedestal

ISSUED BY: SHRI G. C. GAYLONG GENERAL MANAGER & FINANCIAL ADVISOR 2ND FLOOR, SURAKSHA, 170, J. TATA ROAD, CHURCHGATE, MUMBAI

Provision of Janitorial & Related Services

Cost of form Rs. 2000/=(Non refundable) PURCHASE DEPARTMENT UNIVERSITY OF KARACHI TENDER DOCUMENT

UNIVERSITY OF ROCHESTER INSTRUCTIONS TO BIDDERS

UNIVERSITY OF PERADENIYA

REQUEST FOR PROPOSAL

Webel Mediatronics Limited (A Govt. of West Bengal Undertaking) P- 1 Taratala Road, Kolkata Phone: , FAX:

Procurement of Goods

Notice Inviting Tender for Printing of Accounts Manual of APDCL

TENDER NOTIFICATION NO. GMRC/O&M-1/PH-1/2019

KENYA SAFARI LODGES AND HOTELS LIMITED (KSLH) TENDER DOCUMENT FOR REFURBISHMENT WORK AT MOMBASA BEACH HOTEL TENDER NO. MBH/RW/001(A)/

DRILLING & DISTRIBUTION OF KISIMUNI, KWA KASILIA, MWANYANI & KITONGUNI BOREHOLES. TENDER No. GMC/W/T/37/2017/2018 FINAL BID DOCUMENT

DIRECTORATE OF EDUCATION (PRIMARY) MAHARASHTRA CENTRAL BUILDING, PUNE-1 SHORT NOTICE TENDER DOCUMENT FOR

STANDARD BIDDING DOCUMENTS. Procurement of Textbooks and Reading Materials

MINISTRY OF FINANCE Procurement Policy Unit (Established under section 6 of the Public Procurement Act, 2015)

PARTNERS PROJECT IDENTIFICATION PROJECT IDENTIFICATION

SECTION 4 CONTRACT DATA

GOVERNMENT OF NATIONAL COMPETITIVE BIDDING (CIVIL WORKS) (LUMPSUM CONTRACT) TIME AND DATE OF : DATE TIME HOURS PRE-BID CONFERENCE

Gozo Channel Company Limited The Brokerage, Level 2, St. Martha Street, Victoria, Gozo

ANNEX VIII a STANDARD FORMATS AND TEMPLATES

REPUBLIC OF KENYA LAKE VICTORIA SOUTH WATER SERVICES BOARD LAKE VICTORIA WATER SUPPLY AND SANITATION PROGRAM PHASE TWO (LVWATSAN II)

NAIROBI CITY COUNTY PROPOSED CONSTRUCTION OF MULTI PURPOSE HALL AT MADARAKA NAIROBI WEST WARD

TENDER FOR CIVIL WORKS FOR ROAD, DRAIN AND CULVERT AT GORAKHPUR, UTTAR PRADESH [NIT NO. : PNPM/EM250/E/G-202] AMENDMENT-I, DATED:

Nepal Electricity Authority (A Government of Nepal Undertaking) Transmission Directorate

Department of Mechanic, Electronic and Hi-Tech Industry Ministry of Commerce, P.R.C 2008

Procurement of Works & User s Guide

Ref. No. P&S/F.2/OR/198/ Date:

SITC OF SMF BATTERIES AT OUR DATA CENTRE SHIVAJI NAGAR PUNE.

LEGAL NOTICE CITY OF ANSONIA, CONNECTICUT REQUEST FOR PROPOSALS

Standard Request for Proposals Selection of Consultants

Tamil Virtual Academy 4 th Floor, Elnet Software City, Taramani, Chennai , Tamil Nadu.

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD

West Bank and Gaza. Avian Influenza Prevention and Control Project (AIPCP) Construction of Ramallah Central Veterinary Laboratory Ramallah District

Invitation to Bid (ITB) for goods. For the. Purchase of Cement. ITB No: ITB-JAM (JH)

कश म र क न द र य व श वव द य लय CENTRAL UNIVERSITY OF KASHMIR (म न स स धन व क स म त र लय) (MINISTRY OF HUMAN RESOURCE DEVELOPMENT) भ रत सरक र

REPUBLIC OF KENYA TURKANA COUNTY GOVERNMENT PROPOSED CONSTRUCTION OF BOREHOLE DRILLING SERVICES & EQUIPPING AT TURKANA COUNTY HEADQUARTERS.

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD

BALMER LAWRIE & CO. LTD.

GOVERNMENT OF KARNATAKA

Ref. No. e-tender Notice - NITJ/PUR/Furniture/34/18/e-Tender No. 19/2018. Please find enclosed herewith the following:

Information that complements provisions of Section IV must be incorporated.

, UN

C E Y L O N E L E C T R I C I T Y B O A R D

(A State Govt. University) Ph. No.-(0522) , 43, 45 Website: Tender Notice

MASTER PROCUREMENT DOCUMENTS

ICSI HOUSE, C-36, Sector-62, Noida

COUNTY OF COLE JEFFERSON CITY, MISSOURI

Perform Image Capturing of Answer Books Through Scanning/Other Photo Capturing Mechanism and Their Retrieval

KENYATTA NATIONAL HOSPITAL TENDER DOCUMENT

Construction of MLD Water Treatment Plant at Taba LAP

June 2017 BIDDING PROCEDURES No. 90

KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD

Transcription:

Section II: Bidding Data Sheet 1 Tender Terms and Conditions: 1. This invitation of bid is open to contractors, Class-Small registered with the Construction Development Board. 2. The bidder shall be conducted through national competitive bidding procedures specified in the RGoB procurement manual and are open to all bidders from countries as defined in section ITB clause No. 11.1 of the bidding documents. 3. The quoted rate shall include materials cost, labor, all taxes, levy for Thimphu complete 4. Mandatory terms and conditions to be adhered while submitting the tender: Valid trade license and CDB certificate The bidding documents should be sealed with firm s name and should be signed by the proprietor or legally authorized representative. Bidders failing to comply with any of above conditions shall be Rejected during the time of opening of the tender 5. The work shall be carried out to the satisfaction of the Corporation in accordance with the provisions of the contract. 6. Time extension may be allowed for reasons not directly attributable to the contractor like inclusion of additional work, adverse climatic condition or other natural calamities have caused work stoppages, delay or impudent on the part of the Employer etc. 7. The Successful bidder shall be asked to enter into an agreement with the corporation and he shall be bound by the clause of the agreement in respect of the works covered therein. 8. All bids shall be accompanied by a bid security of fixed amount. 9. The standard procurement manual 2009, Ministry of Finance, Royal Government of Bhutan shall be binding on both parties.

Section II: Bidding Data Sheet 2 Notes on Form of Contractor s Bid 1. Contractor s Bid The Bidder shall fill in and submit this Bid form with the Bid. [Date.] Identification No. Title of Contract: The Chairman RICBL, Tender Committee HQ, Thimphu Having examined the all the Bidding Documents (with reference ITB 8), including addenda [insert list], we offer to execute the work...... in accordance with the Conditions of Contract accompanying this Bid for the Contract Price Nu........in figure),........[in words]... currency]. This Bid and your written acceptance of it shall constitute a binding Contract between us. We understand that you are not bound to accept the lowest or any Bid you receive. We hereby confirm that this Bid complies with the Bid validity and Bid Security required by the Bidding Documents and specified in the Bidding Data Sheet. We, including any subcontractors or suppliers for any part of the Contract, have nationalities from eligible countries in accordance with ITB Sub-Clause 3.1; We have no conflict of interest in accordance with ITB Sub-Clause 3.2;

Section II: Bidding Data Sheet 3 Our firm, its affiliates or subsidiaries including any subcontractors or suppliers for any part of the Contract has not been declared ineligible under the laws or official regulations of Bhutan, in accordance with ITB Sub-Clause 3.3. Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution if we are awarded the contract, are listed below: Name and address of agent Amount and Currency Purpose of Commission or gratuity (if none, state none ). In case if I withdraw my bid after opening for whatsoever reasons, I agree to the forfeiture of the EMD/Bid Security and also I shall be bound to pay the cost difference (positive) between my bid with that of the next lowest evaluated bidder and failure on my part to do so within a month, will authorize the client to debar my firm for a period of 2 years. Our duly executed Integrity Pact Statement is attached herewith as Appendix A. Authorized Signature: (Affix Legal Stamp) Name and Title of Signatory: Name of Bidder: Address:

Section II: Bidding Data Sheet 4 2. Bidding Data Sheet A. General ITB 1.1 The Employer is : The Chief Executive Officer, Royal Insurance Corporation of Bhutan Limited, Head Office, Thimphu The name and identification of the contract are (Overall maintenance of RICB building, Head Office, Thimphu) at Head office building, Thimphu. ITB 1.2 ITB 4.3 1 The Intended Completion Date is Three (03) months from the commencement of the work] The information required from Bidders in ITB Sub-Clause 4.3 is modified as follows: NONE ITB 4.3 (j) The ceiling for sub contractor's participation and conditions are : NONE ITB 4.4 ITB 4.5 ITB 4.6 The qualification data required from Bidders in ITB Sub-Clause 4.4 is modified as follows: NONE The qualification criteria in ITB Sub-Clause 4.5 are modified as follows: NONE Subcontractors experience and resources [ shall not ] be taken into account B. Bidding Documents ITB 9.1 The Employer s address for clarification is: The Head, Real Estate 1 Delete if prequalification has been conducted.

Section II: Bidding Data Sheet 5 Division, Head Office, Thimphu. ITB 9.2 Pre-bid Meeting shall be held on.[insert date& time if applicable] At the address given below.not Applicable C. Preparation of Bids ITB 11.1 ITB 12.1 ITB 13.4 ITB 14.2 ITB 14.4 ITB 15.1 ITB 16.1 & 16.2 ITB 17.1 ITB 18.1 The language of the bid is: [English] Any additional materials required to be completed and submitted by the Bidders are: (None) The Contract [ is not ] subject to price adjustment in accordance with GCC Clause 47. The authority for establishing the rates of exchange shall be the Royal Monetary Authority of Bhutan. Bidders [are not ] required to substantiate the rates and prices. The Bid shall be valid for [60 days] from the deadline for submission of Bids stipulated in ITB Clause 20.1 A Bid Security in the amount of Nu. [17,500.00 (Seventeen thousand five hundred)] only will be required in favour of :- Chief Executive Officer Royal Insurance Corporation of Bhutan Head Office, Thimphu, in the form of ; a) Unconditional Bank guarantee b) Cash warrant; or Demand draft Alternative Bids [ shall not be ] considered. In addition to the original Bid, the number of copies is [1(one) copies] D. Submission of Bids

Section II: Bidding Data Sheet 6 ITB 19.1 ITB 19.3 (c) ITB 19.3 (d) ITB 19.3 (e) ITB 20.1 Bidders may submit their Bids electronically: No The Employer s address for the purpose of Bid submission is The Chief Executive Officer, Royal Insurance Corporation of Bhutan Limited, Head Office, Thimphu The name and Identification number of the contract as given in ITB 1.1 above in this sheet. The warning shall read DO NOT OPEN BEFORE [11/09/2018 at 3.00 PM] The deadline for submission of Bids shall be [11/09/2018 before 12.30 PM] E. Bid Opening and Evaluation ITB 23.1 The Bid opening shall take place on: The Chief Executive Officer Chamber, Head Office, Thimphu Date: [11/09/2018] Time:[3.00 PM] The electronic bidding is not permitted ITB 30.1 ITB 30.3 (d) ITB 30.4 Margin of domestic preference of five percent (5%) [ shall not ] apply Other criteria to be used for the purpose of assessing domestic preference eligibility are: [ none ] The procedure used to apply the margin of preference shall be: Not Applicable In the case of procurements in which any Bids are received from foreign (i.e. non-bhutanese) Bidders: (i) if two or more Bids are evaluated as equivalent in accordance with the evaluation methods and factors laid down in the Bidding

Section II: Bidding Data Sheet 7 Documents, and (ii) one or more of the Bids is from a domestic Bidder, as defined in ITB Sub-Clause 30.2, and iii) the total price of the domestic Bid does not exceed by more than five percent (5%) the total price of the lowest priced foreign Bid evaluated as equivalent, then the Contract shall be awarded to the domestic Bid. F. Award of Contract ITB 34.1 The Performance Security shall be provided in any one of the following forms: (a) demand guarantee in the form provided for in Section X, Security Forms, or (b) banker s certified cheque/cash warrant, or (c) Demand draft. ITB 35.1 ITB 36.1 The Advance Payment shall be limited to seven percent (7%) of the Contract Price. The Adjudicator proposed by the Employer is [ shall not ] apply

Section VI: Special Conditions of Contract 8 3. Special Conditions of Contract A. General GCC 1.1 (o) GCC 1.1 (r) GCC 1.1 (v) GCC 1.1 (y) GCC 1.1 (bb) GCC 1.1 (ff) GCC 2.2 GCC 2.3 (9) The Employer is [The Chief Executive Officer, RICBL, Head Office, Thimphu The Intended Completion Date for the whole of the Works shall be [03(Three) Months] The Project Manager is: The Head, Real Estate Division, Head Office, Thimphu The Site is located at [Head Office, Thimphu] The Start Date shall be [10 days after issuance of work order]. The Works consist of Overall maintenance of RICB building at Head Office, Thimphu. Sectional Completions are: [None] The following documents also form part of the Contract: [list documents; e.g. (delete or add to as appropriate)] Schedule of Other Contractors (GCC 9) Schedule of Key Personnel (GCC 10) Site Investigation Reports (GCC 11) Schedule of Operating and Maintenance Manuals (GCC 57) GCC 3.1 The language of the contract is (English) The law that applies to the Contract is the law of the Kingdom of Bhutan.

Section VI: Special Conditions of Contract 9 GCC 9.1 GCC 10.1 GCC 14.1 Schedule of other contractors: [None] Key Personnel: (None) The minimum insurance amounts and deductibles shall be: (a) loss of or damage to the Works, Plant and Materials to be built into the works: [within the jurisdiction of the contractor] GCC 15.1 GCC 21.1 GCC 25.2 GCC 25.3 Queries. [Not Applicable] The Site Possession Date(s) shall be: [10 days after the Issuance of work order] Fees and types of reimbursable expenses to be paid to the Adjudicator: [Not Applicable]. [For smaller contracts, the institution is usually from Bhutan. For contracts that are awarded to international contractors it is recommended that the arbitration procedure of an international institution be used] Institution whose arbitration procedures shall be used: For Contracts with Bhutanese Contractors Construction Development Board (CDB) or other Independent Agency: GCC Sub-Clause 24.3 All disputes arising in connection with the present Contract shall be for finally resolved by arbitration in accordance with the rules and procedures of the CDB or any other independent agency that has been appropriately mandated at the time of submission of the dispute through its National Arbitration Committee. The arbitration award shall be final on the parties who shall be deemed to have accepted to carry out the resulting award without delay and to have waived their right to any form of appeal

Section VI: Special Conditions of Contract 10 insofar as such waiver can validly be made. For Contracts with International Contractors [one institution from among those listed below; insert the corresponding wording] United Nations Commission on International Trade Law (UNCITRAL) Arbitration Rules: GCC Sub-Clause 25.3 Any dispute, controversy or claim arising out of or relating to this Contract, or breach, termination or invalidity thereof, shall be settled by arbitration in accordance with the UNCITRAL Arbitration Rules as at present in force. or Rules of Conciliation and Arbitration of the International Chamber of Commerce (ICC): GCC Sub-Clause 25.3 All disputes arising in connection with the present Contract shall be finally settled under the Rules of Conciliation and Arbitration of the International Chamber of Commerce by one or more arbitrators appointed in accordance with the said Rules. or Rules of the Arbitration Institute of the Stockholm Chamber of Commerce: GCC Sub-Clause 25.3 Any dispute, controversy or claim arising out of or in connection with this Contract, or the breach, termination or invalidity thereof, shall be settled by arbitration in accordance with the Rules of the Arbitration Institute of the Stockholm Chamber of Commerce. or

Section VI: Special Conditions of Contract 11 Rules of the London Court of International Arbitration: GCC Sub-Clause 25.3 Any dispute arising out of or in connection with this Contract, including any question regarding its existence, validity or termination shall be referred to and finally resolved by arbitration under the Rules of the London Court of International Arbitration, which rules are deemed to be incorporated by reference to this clause. The place of arbitration shall be: [Insert city and country] GCC 26.1 Appointing Authority for the Adjudicator: [insert name of Authority]. B. Time Control GCC 27.1 The Contractor shall submit for approval a Program for the Works within [number] days from the date of the Letter of Acceptance. The Program shall include, but not be limited to, the following elements under the conditions stipulated: (a) Quality Assurance Plan (QAP) The Quality Assurance Plan shall specify the work methodology, quality control tests and intervals for such tests in accordance with the work specifications for each item of the Works. If in the opinion of the Project Manager the QAP submitted by the Contractor does not fully represent the spirit of the General Conditions of Contract or the Specifications he may seek further clarification from the Contractor before his approval. The Contractor shall strictly follow the QAP in the execution of the Works. If the Contractor does not comply with the QAP, he shall not be allowed to proceed further with the Works. Details of all procedures and compliance documents shall be submitted to the Project Manager for information before each execution stage is commenced. Compliance

Section VI: Special Conditions of Contract 12 GCC 27.3 with the quality assurance system shall not relieve the Contractor of any of his duties, obligations or responsibilities under the contract. The period between Program updates is [30] days. The amount to be withheld for late submission of an updated Program is (not applicable) C. Quality Control GCC 35.1 The Defects Liability Period is: [12Months] The Defects Liability Period is usually being 12 to 24 months. D. Cost Control GCC 44.1 (l) Other Compensation Events are: None GCC 45.1 GCC 47.1 In case of certain Tax exemptions, such as in foreign assistance projects, this specific exemption(s) should be clearly specified in this clause. The Contract [insert is or is not ] subject to price adjustment in accordance with GCC Clause 47. [Price Adjustment is applicable only for Contracts of duration more than 18 months} GCC 48.1 The proportion of payments retained is: [10%] GCC 49.1 GCC 50.1 The liquidated damages for the whole of the Works are [insert percentage of the final Contract Price] per day. The maximum amount of liquidated damages for the whole of the Works is [10%] of the final Contract Price. The Mobilization Advance Payment shall be seven percent (7%) of the Contract Price and shall be paid to the Contractor no later than 30 days after receipt by the Employer of an acceptable Advance

Section VI: Special Conditions of Contract 13 Payment Guarantee. GCC 50.2 GCC 51.1 The secured advance is 75% of the cost of materials delivered at site supported by original invoices/bills from the suppliers. The Performance Security amount is [insert amount(s), shall be ten percent (10%) of the Contract Price, denominated in the types and proportions of the currencies in which the Contract Price is payable, or in a freely convertible currency acceptable to the Employer]. E. Finishing the Contract GCC 57.1 The date by which operating and maintenance manuals are required is [Not Applicable]. The date by which as built drawings are required is [Not Applicable]. GCC 57.2 The amount to be withheld for failing to produce as built drawings and/or operating and maintenance manuals by the date required in GCC Sub-Clause 57.1, or failing to obtain the Project Manager s approval of them by the said date, is [Not Applicable]. GCC 58.2 (i) The maximum number of days is: [360 days (12 months) consistent with SCC Sub-Clause 49.1 on liquidated damages]. GCC 60.1 The percentage to apply to the value of the work not completed, representing the Employer s additional cost for completing the Works, is [20 %]