Project Agreement. (Private Sector Development Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Similar documents
Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized. Public Disclosure Authorized CREDIT NUMBER 5127-UG

Southern African Power Market Program Project Agreement. (Mozambique Component Mozambique-Malawi Transmission Interconnection Project) between

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB

Project Agreement. (Zanzibar Basic Education Improvement Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

OFFICIAL DOCUMENTS. Project Agreement. Public Disclosure Authorized. GRANT NUMBER D336-GN CREDIT NUMBER 6261-GN Public Disclosure Authorized

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.

Project Agreement. (West Beka a Emergency Water Supply Project) between

Project Agreement. (WEST AFRICA REGIONAL FISHERIES PROGRAM REPUBLIC OF LIBERIA (Phase I)) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8655-YF. (Additional Financing for Corridor X Highway Project) between

Tamil Nadu Project Agreement

Project Agreement CONFORMED COPY CREDIT NUMBER 4191-TA. (Financial Sector Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

Financing Agreement. (Additional Financing for Village Communities Support Program (Phase I)) between REPUBLIC OF GUINEA. and

INTERNATIONAL DEVELOPMENT ASSOCIATION

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

Nile Basin Trust Fund Grant Agreement

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement OFFICIAL DOCUMENTS GRANT NUMBER D004-FM FEDERATED STATES OF MICRONESIA INTERNATIONAL DEVELOPMENT ASSOCIATION

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and

OFFICIAL MDTF-HRI GRANT NUMBER TF between REPUBLIC OF CAMEROON. and

MULTI-DONOR TRUST FUND GRANT AGREEMENT

Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized LOAN NUMBER 8457-CN. Public Disclosure Authorized. (Zhengzhou Urban Rail Project)

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6343-RW. Public Disclosure Authorized. (Housing Finance Project)

Multi Donor Trust Fund for the Zimbabwe Reconstruction Fund Project Agreement

Financing Agreement. (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between NEPAL. and

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement. (Indonesia Infrastructure Finance Facility Project) among INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement OFFICIAL DOCUMENTS LOAN NUMBER 8391-UA. Second Urban Infrastructure Project (Urban Infrastructure Project - 2) between

Financing Agreement OFFICIM. DOCUMENTS1 CREDIT NUMBER 5283-IN. (Low Income Housing Finance Project) between INDIA. and

Development Credit Agreement

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA

Financing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC.

Financing Agreement. (Environmental and Social Capacity Building for the Energy Sector Project) between THE REPUBLIC OF CAMEROON.

Republic of Senegal: Advance Agreement for the Preparation of the Proposed Casamance Development Pole Project Project Preparation Advance No.

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

Global Environment Facility Grant Agreement

Haiti Education for All Multi-donor Trust Fund Grant Agreement

Restated and Amended Project Agreement

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement. (Additional Financing for Health Sector Development Project) between REPUBLIC OF DJIBOUTI. and

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and

Global Environment Facility Trust Fund Grant Agreement

Loan Agreement. (Indonesia Infrastructure Finance Facility Project) between REPUBLIC OF INDONESIA. and

Financing Agreement CONFORMED COPY CREDIT NUMBER IQ. (Dokan and Derbandikhan Emergency Hydropower Project) between REPUBLIC OF IRAQ.

Development Credit Agreement

Project Agreement REPUBLIKA SRPSKA CREDIT NUMBER 4912-BA. (Additional Financing for Health Sector Enhancement Project) between

Financing Agreement,.

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1674 PA. Public Disclosure Authorized

, Honorable Tendai Biti Minister of Finance Ministry of Finance

1. Paragraph (D) of the Preamble to the GEF Grant Agreement is deleted and the succeeding paragraph re-numbered accordingly.

Development Financing Agreement

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and

PEOPLE S REPUBLIC OF CHINA

Financing Agreement. (Energy Community of South East Europe APL 3 Montenegro Project) between THE REPUBLIC OF MONTENEGRO. and

(Third Integrated Financial Management Technical Assistance Project) between REPUBLIC OF GUATEMALA. and

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

OFFICIAL DOCUMENTS. Loan Agreement. Public Disclosure Authorized LOAN NUMBER 8746-IN. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Liaoning Project Agreement

OFFMCAL. olrakdocuments,

ECG Project Agreement

Project Agreement. (Energy Efficiency Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement LOAN NUMBER CN. (Second Liuzhou Environment Management Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Real Property Registration and Cadastre Project) between REPUBLIC OF CROATIA. and

Loan Agreement OFFICIAL 90CUMENTS1. Public Disclosure Authorized LOAN NUMBER 8263-GE. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Loans, Credits, and Grants Assumption and Amendment Agreement

Project Agreement CREDIT NUMBER 3991 MOZ. (Beira Railway Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER PK. Public Disclosure Authorized

CONFORMED COPY LOAN NUMBER 4100 IND LOAN NUNMBER 4100 IND

Regional Project Agreement

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

CIA. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Loan Agreement. (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and ELECTROSTOPANSTVO NA MAKEDONIJA

Global Environment Facility Trust Fund Grant Agreement

Project Agreement. between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and COMPANHIA BRASILEIRA DE TRENS URBANOS. Dated April 3, 1996

Development Credit Agreement. (Basic Health Project) between BOSNIA AND HERZEGOVINA. and INTERNATIONAL DEVELOPMENT ASSOCIATION

OFFICIAL DOCUMENTS. H. E. Jean Gustave Sanon Minister of Economy and Finance Ministry of Economy and Finance Ouagadougou Burkina Faso.

OFFICIAL DOCUMENTS ZW4

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3771 BUL. Public Disclosure Authorized. (Agricultural Development Project)

Project Agreement. Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 7792-IN. Public Disclosure Authorized

Development Credit Agreement. (Provincial Health Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Financing Agreement OFFICIAL DOCUMENTS 1. (Amending and Restating the Development Credit Agreement) Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Project Agreement. OffICIAL OCUMENTS I LOAN NUMBER 8121-ID. Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) between

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 8599-GE. Public Disclosure Authorized. (Secondary Road Asset Management Project)

Clean Technology Fund Loan Agreement

ARAB REPUBLIC OF EGYPT

Project Agreement. (Orissa Socio-Economic Development Program) among INTERNATIONAL DEVELOPMENT ASSOCIATION. and

CONFORMED COPY LOAN NUMBER 3717 PE LOAN NUMBER 3717 PE

Loan Assumption Agreement

Transcription:

Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H275-AF Public Disclosure Authorized Project Agreement (Private Sector Development Support Project) Public Disclosure Authorized between INTERNATIONAL DEVELOPMENT ASSOCIATION and AFGHANISTAN INVESTMENT SUPPORT AGENCY Public Disclosure Authorized Dated March 8, 2007

GRANT NUMBER H275-AF PROJECT AGREEMENT AGREEMENT dated March 8, 2007, entered into between INTERNATIONAL DEVELOPMENT ASSOCIATION (the Association ) and AFGHANISTAN INVESTMENT SUPPORT AGENCY (the Project Implementing Entity ) (the Project Agreement ) in connection with the Financing Agreement of same date between Islamic Republic of Afghanistan (the Recipient) and the Association (the Financing Agreement ). The Association and the Project Implementing Entity hereby agree as follows: ARTICLE I - GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to the Financing Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in the Project Agreement have the meanings ascribed to them in the Financing Agreement or the General Conditions. ARTICLE II - PROJECT 2.01. The Project Implementing Entity declares its commitment to the objectives of the Project. To this end, the Project Implementing Entity shall carry out Part 1 and Part 2(a) of the Project in accordance with the provisions of Article IV of the General Conditions, and shall provide promptly as needed, the funds, facilities, services and other resources required for its Respective Parts of the Project. 2.02. Without limitation upon the provisions of Section 2.01 of this Agreement, and except as the Association and the Project Implementing Entity shall otherwise agree, the Project Implementing Entity shall carry out its Respective Parts of the Project in accordance with the provisions of the Schedule to this Agreement. ARTICLE III - TERMINATION 3.01. For purposes of Section 8.05(c) of the General Conditions, the date on which the provisions of this Agreement shall terminate is twenty years after the date of this Agreement. ARTICLE IV - REPRESENTATIVE; ADDRESSES 4.01. The Project Implementing Entity s Representative is the President and Chief Executive Officer of AISA.

-2-4.02. The Association s Address is: International Development Association 1818 H Street, NW Washington, DC 20433 United States of America Cable: Telex: Facsimile: INTBAFRAD 248423(MCI) or 1-202-477-6391 Washington, D.C. 64145(MCI) 4.03. The Project Implementing Entity s Address is: Afghanistan Investment Support Agency (AISA) Opposite Ministry of Foreign Affairs Kabul Afghanistan Tel.: 93 (0) 20-210 3404 e-mail: info@aisa.org.af AGREED at Kabul, Islamic Republic of Afghanistan, as of the day and year first above written. INTERNATIONAL DEVELOPMENT ASSOCIATION By /s/ Mariam J. Sherman Authorized Representative AFGHANISTAN INVESTMENT SUPPORT AGENCY By /s/ Omar Zakhilwal Authorized Representative

-3- SCHEDULE Execution of the Project Implementing Entity s Respective Parts of the Project Section I. Institutional and Other Arrangements A. General 1. The Project Implementing Entity shall be responsible for implementing Parts 1 and 2(a) of the Project under the oversight of its President and Chief Executive Officer. 2. (a) With respect to Part 1 of the Project, the Project Implementing Entity shall vest responsibility for implementation and monitoring in the Industrial Parks Development Department. To that end, the Project Implementing Entity shall ensure that the Industrial Parks Development Department is maintained, with functions, staffing and resources satisfactory to the Association. Specifically, the Industrial Parks Development Department shall be responsible for: (i) managing and overseeing the environmental and social assessments and design work; (ii) preparing bid documents for the industrial park, inviting and evaluating bids, and awarding contracts; (iii) hiring implementation supervision consultants to supervise the construction contractors so as to ensure quality; (iv) monitoring the work of the implementation supervision consultants by supervising the progress in terms of specification, quality and actual progress of the work; (v) implementing the Environment Management Plan and the Social Management Plan; (vi) overseeing the procurement of consultants, equipment and other services for implementing Part 1(b) of the Project; (vii) supervising the consultants work, and designing and implementing the training program and study tours; (viii) preparing withdrawal applications for payments to consultants, vendors and other purchases; and (ix) managing the financial records for all industrial parks activities and preparing accounts for standard financial reporting and management. (b) (c) Within the first two years of the operation of the industrial park, the Project Implementing Entity shall ensure that tenants of the industrial park form an investors association with terms of reference, duties and responsibilities clearly spelt out in a memorandum of understanding ( MOU ) to be entered into between the investors association and the Project Implementing Entity. After the first three years of the operation of the industrial park, the Project Implementing Entity shall use its best efforts to transfer the maintenance functions of the industrial park to private management by entering into a management contract, satisfactory to the Association, with such private management with respect to the industrial park. The

-4- management contract shall spell out the functions, rights and responsibilities of the private management vis-à-vis the Project Implementing Entity and the investors association, including general maintenance and cleaning, environmental and social management, property inspection, reporting on the state of the property, and security. The private management shall collect utility service charges from tenants but not the lease rents or sales installments, which shall remain responsibilities of the Project Implementing Entity. The Project Implementing Entity shall retain the authority/responsibility to market industrial plots, award leases or sale industrial plots, draw up, negotiate and re-negotiate sales/lease agreements, cancel leases, collect installment payments on sales and rentals, and prepare operational and capital budgets. The private management may sub-contract certain activities, subject to approval of the Project Implementing Entity. The private management shall employ and supervise the maintenance, cleaning and security staff employed at the park. The private management shall be paid a management fee for its services. B. Environment and Social Safeguards 1. The Project Implementing Entity shall no later than September 30, 2007 adopt a Social Management Plan acceptable to the Association in accordance with the Environment and Social Impact Assessment. 2. The Project Implementing Entity shall ensure that the Project is carried out in accordance with the Environment Management Plan and the Social Management Plan, and that the implementation of the Environment Management Plan and the Social Management Plan are adequately monitored and supervised throughout Project Implementation. 3. Except as the Association shall otherwise agree, the Project Implementing Entity shall not amend or waive any provision of the Environmental Management Plan or the Social Management Plan if, in the opinion of the Association, such amendment or waiver may materially and adversely affect the carrying out of the Project or the achievement of the objectives thereof. 4. In implementing and monitoring the Environment Management Plan and the Social Management Plan, the Project Implementing Entity shall coordinate and work closely with NEPA, which shall also assist in developing the environmental management and monitoring capacity of the Project Implementing Entity. 5. The Project Implementing Entity shall ensure that no land acquisition is carried out under the Project without prior consultation with the Association, and that any resettlement of people, property or businesses is carried out in accordance with a plan approved by the Association prior to the commencement of such resettlement or the payment of any compensation related thereto.

-5- Section II. Project Monitoring, Reporting, Evaluation A. Project Reports 1. The Project Implementing Entity shall monitor and evaluate the progress of its Respective Parts of the Project and prepare Project Reports for its Respective Parts of the Project in accordance with the provisions of Section 4.08(b) of the General Conditions and on the basis of indicators agreed with the Association. Each such Project Report shall cover the period of one calendar quarter, and shall be furnished to the Recipient not later one month after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report. 2. The Project Implementing Entity shall provide to the Recipient not later than four (4) months after the Closing Date, for incorporation in the report referred to in Section 4.08(c) of the General Conditions all such information as the Recipient or the Association shall reasonably request for the purposes of such Section. B. Financial Management, Financial Reports, Audits 1. The Project Implementing Entity shall maintain a financial management system and prepare financial statements in accordance with consistently applied accounting standards acceptable to the Association, both in a manner adequate to reflect the operations and financial condition of the Project Implementing Entity, including the operations, resources and expenditures related to its Respective Parts of the Project. 2. The Project Implementing Entity shall have its financial statements referred to above audited by independent auditors acceptable to the Association, in accordance with consistently applied auditing standards acceptable to the Association. Each audit of these financial statements shall cover the period of one fiscal year of the Recipient. The audited financial statements for each period shall be furnished to the Association not later than six (6) months after the end of the period. Section III. Procurement All goods, works and services required for the Project (including for the Project Implementing Entity s Respective Parts of the Project) and to be financed out of the proceeds of the Grant shall be procured in accordance with the provisions of Schedule 2 to the Financing Agreement. Section IV. Other Undertakings 1. The Project Implementing Entity shall, no later than June 30, 2007, hire an implementation supervision consultant with terms of reference, qualifications and experience satisfactory to the Association, who shall work under the Industrial

-6- Parks Development Department to ensure timely and quality implementation of Part 1 of the Project. 2. The Project Implementing Entity shall, no later than March 1, 2007, hire an environment specialist and a social development specialist, with terms of reference, qualifications and experience satisfactory to the Association. 3. The Project Implementing Entity shall no later than September 30, 2007 carry out base line surveys of: (i) private sector views on the Recipient s private sector policies; and (ii) time taken and costs incurred to start a business.