City of Shawano Park and Rec Dept. 220 E Division St., Shawano, (715) Fax: (715)

Similar documents
REQUEST FOR PROPOSALS FOR BID TOWN OF MIDDLESEX, VERMONT TROPICAL STROM IRENE FEDERAL BUYOUT DEMOLITIONS

REQUEST FOR PROPOSALS. Demolition

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM

Demolition, Landscaping and Insurance Requirements for the Razing of Buildings and other Structures Located in the City of Appleton

SUBCONTRACTOR CONTRACT THIS AGREEMENT, Made as of (Current Date), In the Year of (Current Year),

CITY OF HUTCHINSON SEALED BID FORM PAGE 1 of 4

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. direction on the parameters for negotiating the purchase of 301 Potter Street.

RFP NO: REQUEST FOR PROPOSAL BUILDING DEMOLITION SERVICES CITY OF SOUTH BAY 335 SW 2ND AVENUE, SOUTH BAY, FLORIDA 33493

TOWN OF ERWIN REQUEST FOR PROPOSALS FOR GRASS MOWING SERVICES - ADDENDUM

ROSS COUNTY LAND REUTILIZATION CORPORATION Mailing Address: 35 S. Paint St., Chillicothe, OH 45601

Request for Bids/Proposals for City-Wide Stump Grinding Project

Santa Cruz Port District REQUEST FOR PROPOSALS FOR GARBAGE HAULING SERVICES

Owner Phone. Contractor. Address. Type Existing Type Proposed. Type Existing Type Proposed. Length Width Area S.F.

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID

UNITED VETERANS MUTUAL HOUSING COMPANY, INC. Bell Park Manor-Terrace

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT

REQUEST FOR BID PROPOSALS FOR DEMOLITION OF FARM STRUCTURES. Issued: March 26, 2018

ADVERTISEMENT FOR BIDS City of Northport, Alabama. Bid File Number LAWN MAINTENANCE SERVICE

ROAD COMMISSION FOR IONIA COUNTY

DEMOLITION SERVICES AGREEMENT

DEMOLITION OF PORTABLE BUILDINGS #2 AMD #3

HOUSING CONSTRUCTION CONTRACT (Projects up to $10,000)

DECORATING AGREEMENT (Effective 10/7/14)

INVITATION TO BID. Demolition of Commercial Building 706 Washburn Switch Road, Shelby, NC N W

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

City of Anderson Community Development Department 601 South Main Street, SC Phone (864) Fax (864)

PURCHASING DEPARTMENT 101 EAST 11 th STREET, STE. G-13 CHATTANOOGA, TENNESSEE CITY HALL. Request for Proposals for the City of Chattanooga, TN

LANCASTER COUNTY SOLID WASTE MANAGEMENT AUTHORITY REQUEST FOR PROPOSAL. for. Construction & Demolition Waste Characterization Study

Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI Phone: (231) Fax: (231)

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS

CASTAIC LAKE WATER AGENCY STANDARD CONTRACT RISK TRANSFER PROVISIONS, GENERAL CONDITIONS and REQUIRED INSURANCE for

Project Name, Improvement District No. Improvement District Number

RIGHT-OF-WAY PERMIT APPLICATION

DEVELOPER S AGREEMENT PUBLIC/SITE IMPROVEMENTS THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF SOUTH FAYETTE ALLEGHENY COUNTY, PENNSYLVANIA

SEWER LATERAL REPAIR APPLICATION

OREGON STATE UNIVERSITY

City of Mt. Pleasant, Michigan CONTRACT DOCUMENTS. For. HSP Station Building Roof Replacement. NANCY RIDLEY City Manager

City of Corpus Christi Housing and Community Development

TOWN OF TYNGSBOROUGH

Please give a detailed description of services offered: (This must be filled out completely)

GP-4-1 of 9 GP-4 SCOPE OF WORK

TOWN OF FARMINGTON DEPARTMENT OF PUBLIC WORKS & DEVELOPMENT SERVICES ENGINEERING DIVISION

CITY OF MORRISTOWN, TENNESSEE INVITATION TO BID DEMOLITION OF PROPERTY INVITATION TO BID

REQUEST FOR PROPOSALS DEMOLITION SERVICES Date Issued: September 19, 2018 Walk Through: September 26, :00 AM Due: September 28, 2018 at 2:00 PM

CONTRACT SPECIFICATIONS/AGREEMENT FOR TRANSPORTATION AND DISPOSAL OF TIRES FOR TOWN OF PHIPPSBURG, MAINE SOLID WASTE TRANSFER STATION

2019 GROUNDS MAI NTENANCE M OWI WATE R TREATMENT PLANT AND VAR I OUS LO CATI ONS NEAR THE AUSTI NVI LLE WATE R TREATMENT PLANT SPECIFICATIONS

NEVADA IRRIGATION DISTRICT. Appendix B

CITY OF MANCHESTER REQUEST FOR PROPOSALS BUILDING DEMOLITION SERVICES

REQUEST FOR PROPOSAL (RFP) FOR: RFP # LEACHATE HAULING MAR-OCO LANDFILL POSTING DATE: OCTOBER 17, 2018

Right-of-Way Utilization Permit Please complete a separate application for each road

APPENDIX A. Main Extension Agreement (MEA)

ROAD COMMISSION FOR IONIA COUNTY

City of Coralville Invitation to Quote Snow/Ice Removal and Parking Space Sweeping 5 th Street On Street Angle Parking

REQUEST FOR PROPOSALS Little Trout Lake Septic System

Right to Refuse The City of Coralville reserves the right to reject any and all bids and to waive any technicalities in the bidding process.

Amendment Issue date

ARTICLE RIGHT-OF-WAY RULES AND REGULATIONS

ROAD COMMISSION FOR IONIA COUNTY

City of St. Clair. Request for Proposals. (Lawn Maintenance Services)

NOTE: OUR ADDRESS HAS CHANGED TO 69 STATE STREET, 8 th Fl, ALBANY, NY 12207

INSPECTION SERVICES DIVISION FEE SCHEDULE

City of Spartanburg. Procurement and Property Division Post Office Drawer 1749, Spartanburg SC Phone (864) Fax (864)

RFP # City Of Hammond Purchasing Department. CONCRETE SLAB FOR BASKETBALL COURT FOR JACKSON PARK Recreation Department.

NOTICE TO BIDDERS CONCRETE CONSTRUCTION

VILLAGE OF SPENCER, WISCONSIN DEMOLITION OF 108 NORTH LASALLE STREET, SPENCER, WISCONSIN (COMMERCIAL BUILDING SUBJECT TO RAZE ORDER) INVITATION TO BID

Request for Proposals 2018 Erosion Control Project. Madison, Wisconsin

ROAD COMMISSION FOR IONIA COUNTY

Lease Agreement Between ANNE ARUNDEL COUNTY, MARYLAND and. Dated TABLE OF CONTENTS. Paragraph

Encroachment Permit. Permit Fee: Receipt #: Bond Fee: Receipt #: Expiration Date: Phone# Mailing Address:

RANCHO PARK OIL AND GAS LEASE EXTENSION

REQUEST FOR PROPOSAL (RFP) on

INVITATION FOR BIDS. Agency Name: Culpeper SWCD. 351 Lakeside Drive. Culpeper, Virginia (540) Project Name & Location:

STREET CLOSURE APPLICATION STAFF APPROVAL (LESS THAN 400 FEET)

PROPOSAL FOR STREET SWEEPING SERVICES

Right of Entry Permit

CITY OF UNIVERSITY HEIGHTS TREE PRUNING & REMOVAL CONTRACTOR SPECIFICATIONS

Berrysburg Borough Contract Specifications for Lawn Mowing and Maintenance of the Borough Square

REQUEST TO SUBMIT PROPOSALS FOR ASBESTOS SURVEYOR FOR THE CITY OF PONTIAC

APPENDIX G WATER DISTRICT MAIN EXTENSION AGREEMENT

APPLICATION FOR ALTERATIONS OR ADDITIONS

CHARTER TOWNSHIP OF WEST BLOOMFIELD INVITATION TO BID WEST BLOOMFIELD, FACILITY OPERATIONS

ROAD COMMISSION FOR IONIA COUNTY

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70.

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1022 FOR SALE OF SURPLUS GRAVEL

REQUEST FOR PROPOSAL SNOW / ICE REMOVAL HARTLAND CONSOLIDATED SCHOOLS HOWELL, MICHIGAN 48843

OPERATIONS AND MAINTENANCE AGREEMENT

Ponderosa Townhome Association

A NEW online entry system for applications and submittal of documents will be available in summer of 2018.

The City of Roanoke is currently soliciting bid proposals for fire lane striping for all City owned facilities with fire lanes.

THREE RIVERS AREA YOUTH SPORTS COMPLEX. Request for PROPOSALS. 333 West Michigan Ave. Three Rivers, Michigan,

Contractor and Service Provider. 2018/2019 Registration Packet

SUBCONTRACT CONSTRUCTION AGREEMENT

DEMOLITION 535 Fraser Street

AGENDA ITEM 2 B Action Item

ROAD OPENING PERMIT APPLICATION. Instructions

Mt. Hawley Insurance Company CONTRACTORS SUPPLEMENTAL APPLICATION

Request for Proposal. For. Grounds Maintenance Services

The Firemen s Association of the State of New York

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Transcription:

September 11, 2018 To Whom it May Concern: The City of Shawano is requesting proposals from qualified contractors for demolition and removal of various structures and items at 909 S. Lincoln, Shawano, WI 54166. The contractor will be responsible for the demolition, removal and proper disposal of the structures and debris at the site. The Contractor will also be responsible for top soiling and seeding the site. The buildings to be demolished are two. Building one is a block structure with concrete floor and footings. This building is approximately 49 x 25 in size with interior block walls. Building two is a metal pole shed with a dirt floor and is approximately 44 x 24 in size. Both buildings are adjacent to each other with a concrete and black top apron around them. Concrete and black top is to be removed as well. Pre-Proposal Inspection It is encouraged that all contractors complete an inspection of the buildings to be demolished. This can be done by contacting Director Hendricks at mhendricks@cityofshawano.com to schedule a time. We will review all items for demolition and removal, review any requirements for area restoration, and answer any questions contractors may have. Utilities The disconnection of all utilities has already occurred. (Electric, Cable, Gas, Sewer, Telephone, and Water). Permits & Licenses There are no permits necessary for this project. Demolition Work Demolition shall include, but not be limited to, identified structures and related appurtenances such as porches, steps, retaining walls, underground plumbing and other utilities. Demolition result in the complete removal of foundation/basement walls and footings and the proper abandonment and capping of the water service at the curb stop and sanitary sewer lateral at the property line. The demolition area becomes the contractor s responsibility from the date of

notice of award, until final acceptance by the City. The site will require effective stormwater BMP consideration and adequate barriers to provide for public safety. Restoration It is the contractor s responsibility to restore all rights-of-way and property which has been disturbed, damaged, or otherwise affected by demolition to a condition equal to, or better than existed prior to the commencement of demolition. All large excavations must be backfilled with a high quality sand base material with a cover of good quality top-soil, free of foreign material and conducive to vegetation growth to a depth of not less than 12 inches. All disturbed areas shall be graded to drain and not contain any tripping and/or falling hazards, consistent with the ability to mow the area. All areas will be seeded with climate appropriate grass seed. Salvage It is the contractor s prerogative to salvage any items from the demolition area, unless specifically identified as remaining. Disposal of Debris All debris and trash found at the demolition site, or which results from demolition activities, must be hauled in accordance with applicable regulations and disposed of at an appropriate landfill licensed by the State of Wisconsin. Inspection and Acceptance It is the contractor s responsibility to arrange for an inspection by the City upon completion of the demolition, removal, and prior to backfill and restoration work at the site. A final inspection will be required after restoration is completed. City infrastructure will be inspected before the award date and after final inspection. The contractor is responsible for repairing any damage to said infrastructure resulting from their demolition activities. Completion Time It is the contractor s responsibility to coordinate activities with the Parks and Recreation Director, Matt Hendricks (mhendricks@cityofshawano.com Cell 715-853-2276). We anticipate receiving City Council approval at their October 10 th meeting. Demolition can begin no sooner than Monday October 15 th and must be completed prior to Friday December 7 th. The contractor shall identify the estimated start date and days of work necessary to complete the project and be prepared for final inspection.

Asbestos/Environmental Danger It is the contractor s responsibility to identify any and all hazardous materials which may be present at the site, such as asbestos, and to provide for the proper removal and disposal of such materials in accordance with all applicable regulations. Contract Period; Payment Terms The contract completed as a part of the proposal must include: 1) Modification and Termination a. Breach by Contractor: If for any reason the Contractor fails to fulfill, in a timely and proper manner, its obligations under this contract, or if the Contractor violates any of the covenants, agreements or stipulations of the contract, Shawano shall thereupon have the right to terminate the contract by giving 5 days written notice. b. Termination for the convenience of Shawano: Shawano reserves the right to terminate the contract for convenience at any time during the contract period by giving 5 days written notice. In the event of termination for convenience, the Contractor shall be entitled to receive just and equitable compensation for any satisfactory work completed prior to the termination of this contract. 2) Payments. Payment will be made within a reasonable time following completion of the work at each site. 3) Relationship of Parties: Contractor shall be at all times acting as an independent contractor and not as an officer, agent, or employee of Shawano. As an independent contractor, Contractor and any employees of the Contractor shall not be covered by City s worker s compensation insurance, nor shall Contractor, or employees of Contractor, be entitled to any current or future benefits provided to employees of Shawano. Further, City shall not be responsible for withholding of social security, federal, and/or state income tax, or unemployment compensation from payments made by City to Contractor. 4) Insurance: Contractor is required to provide proof of insurance prior to award. Specified levels of coverage are provided in Appendix A. 5) Indemnification: Contractor shall hold and save Shawano and its officers, agents, servants/employees harmless from liability of any nature of any kind connected with the work to be performed arising out of any negligent or willful act or omission of any employee or agent of Contractor to the degree such indemnification is allowed by law in the performance of the contract. 6) Shawano is exempt from sales tax; Contractor s prices shall be computed accordingly. 7) Contractor will comply with all applicable local, state and federal laws. 8) The Request for Proposals shall be and is hereby incorporated by reference into the contract between the parties.

Proposal Proposals shall include a lump sum fee for all work provided herein. Questions regarding this request for proposals may be directed to Matt Hendricks, Director of Parks and Recreation, email: mhendricks@cityofshawano.com or telephone at (715) 853-2276. Sealed proposals shall be sent to: City of Shawano Attn: Matt Hendricks 127 S. Sawyer ST Shawano, WI 54166 Proposals must be received no later than Tuesday, October 2 nd at Noon. Sincerely, Matt Hendricks Parks and Recreation Director Shawano Parks and Recreation

Return Sheet Lump sum fee for all work to be completed at 909 S. Lincoln St, Shawano, WI 54166: $ Estimated project start date: Estimated days needed to complete work: Proof of Insurance meeting Appendix A requirements included: Yes No Additional Comments about the Project By: Company: Title: Date: Contact Informaiton:

Appendix A INSURANCE COVERAGES Worker s Compensation and Employer s Liability: 1. The Liability limits shall not be less than: Worker s Compensation Statuary 2. The Liability limits shall not be less than: Employer s Liability $1,000,000 per occurrence. Comprehensive Motor Vehicle Liability: 1. The liability limits shall not be less than: Bodily Injury and Property Damage combined $1,000,000 per occurrence. Comprehensive General Liability: 1. The Liability limits shall not be less than: Bodily Injury and Property Damage combines $1,000,000 per occurrence, $1,000,000 total sum. 2. The Liability limits shall not be less than: Personal Injury Liability $1,000,000 total sum. The CONTRACTOR shall furnish coverage for bodily injury and property damage for Comprehensive Motor Vehicle Liability and Comprehensive General Liability through the use of a combined limit as indicated above or through separate single split limits acceptable to OWNER. Owner s Protective Liability: 1. The Liability limits shall be the same as those of the Comprehensive General Liability policy. Umbrella Excess Liability: 1. The Liability limits may be provided through split limits, acceptable to OWNER, or through a combination of Underlying and Umbrella Liability. All insurance policies shall name the OWNER as additional insured, except for Workman s Compensation coverage. The CONTRACTOR s Liability Insurance shall be the minimum limits of liability and coverage s required by law. The Comprehensive General Liability insurance shall include completed operations insurance. All of the policies of insurance so required to be purchased and maintained. THE CONTRACTOR WILL BE REQUIRED TO SIGN AND DATE THE INSURANCE NOTIFICATION AGREEMENT FORM (EXAMPLE PROVIDED) PRIOR TO AWARD. THE AGREEMENT REQUIRES THE CONTRACTOR TO NOTIFY THE CITY AND ALL OTHER ADDITIONAL INSURED IMMEDIATELY SHOULD ANY OF THE INSURANCE COVERAGE BE CANCELLED, MATERIALLY CHANGED OR RENEWAL REFUSED BEFORE THE EXPIRATION DATE THEREOF. The insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting, removing, or replacing defective work. THE OWNER REQUIRES THE CONTRACTOR TO SUBMIT A DECLARATIONS PAGE, AND OR A COMPLETE POLICY TO THE CITY CLERK S OFFICE.

THE OWNER ALSO REQUIRES THAT THE CONTRACTOR S INSURANCE COMPANY NAME THE CITY OF SHAWANO AS ADDITIONAL INSURED. INSURANCE NOTIFICATION AGREEMENT FORM Name of Project (Name of Company) hereby agrees to immediately notify the City of Shawano Clerk s Office, located at 127 South Sawyer Street, Shawano, Wisconsin 54166, telephone (715) 526-6138, fax (715) 526-5751, and all other additional insured by written notice, in the event any of the above-entitled project change; renewal is refused or coverage s changed in any way, either due to a request by the contractor or as a result of action taken by the insurance company. Dated this day of, 20 (NAME OF CONTRACTOR) (Signature of Contractor/Agent) Dated this day of, 20 (CITY OF SHAWANO) (Signature of Contractor/Agent)