Wed, May 6,2009 FILE #:

Similar documents
DAT MEETING NOTES # 1

Progress Update Identified Needs & Capital Plan

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Capital Projects Completed since 1988

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

CMP Strategy Project Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects)

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717

Ballot Measures-T Section

REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

San Pedro Elementary School Community Town Hall Meeting #1 March 22, 2017 MINUTES

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

Why did we undertake a comprehensive Educational Facility Master Plan?

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

City School District of Albany Five Year Facilities Plan 3/14/2019

APPENDIX A FULL TEXT OF BOND MEASURE

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

NOTICE TO TAXPAYERS. The Notice to Taxpayers is available online at or by calling (888)

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Public Presentation Capital Bond November 27, 2017

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

Stone Mountain Middle

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Pleasantdale Elementary

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

William Bradley Bryant Center

CH-UH Board of Education Meeting. June 27, 2017

Robert Shaw Theme Elementary

Report to Committee of the Whole May 14, 2012

Sagamore Hills Elementary

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

S M A L L S T E P S B I G C H A N G E S

2019 Capital Projects Plan

West Bend School District Community Survey Results. Spring 2018

Bob Mathis Elementary

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

Harnett Central High

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL

2017 Bond Program Summary

CAPITAL PROJECT PROCESS

Building and Site Sinking Fund Millage. Election Date: November 7th 2017

School District of Horicon Community Survey Results. Fall 2017

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016

Capital Projects Fund. Board Work Session August 9, 2007

Ballot Measures-LL Section

Local ballot measure: B. Redding School District Bond Measure

GRF Mutual Project Log (10/31/17)

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

Barnesville Public Schools Proposed Building Program

Guaranteed Energy Savings

Muskego Norway Schools Community Survey Results. Fall 2015

DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016

Springfield High School

Central Michigan University Capital Budget

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013

Integrating Green Building Measures into Capital Planning for HUD Assisted and Public Housing Programs

Reserve Analysis Report

DeKalb Elementary School of the Arts at Terry Mills

Capital Improvement Budgeting

FY17 FMD Capital Budget

Investing in Our Schools:

Annual Report on Parish Facilities. Patrick Jendraszak

GREENVILLE ISD Bond Steering Committee. Recommendations to the Board of Trustees for a May 2014 Bond Election

Anderson Creek Primary

Educational & Performing Arts Center: Downriver Campus

BERKELEY UNIFIED SCHOOL DISTRICT

Lake Mills Area School District Community Survey Results. Spring 2018

Central Davie Academy

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING

Abilene Independent School District Bond Oversight Committee. Meeting Agenda

October 4, 2007 Page 1 of 8

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget?

Barnesville Public Schools Proposed Building Program

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

Burlington Area School District Community Survey Results. Winter 2016

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL DRAFT

PROPOSED TEN-YEAR CAPITAL IMPROVEMENT PLAN

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013

Backlog Reduction Plan

Use of State and District Construction Funds

Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160

Ronald E. McNair Discovery Learning Academy

Freedom Area School District Community Survey Results. Fall 2018

Budget Committee Meeting. February 8, 2018

Martin Luther King Jr. High

Mountain Heritage High

Social Housing Administration Directive No

Davie County Early College High

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867

Transcription:

ARCHITECTURE URBAN DESIGN INTERIOR DESIGN MEETING MINUTES PROJECT NAME: BVSD Birch Elementary School DATE: 22 April 2009 NOTES BY: Wells Squier PROJECT #: 509023.00 Wed, May 6,2009 MEETING #: 002 NEXT MEETING: 3:15 PM ATTENDEES: Tracy Stegall - BES Tammie Hill - BES Tom Schiola - BES Kim Hohensee - BES Lisa Boston - BES Kort Hedges - BES Beth Murphy - BES Ellie McKinley - Comm. Member Gabriella Ruelez - Parent Denise Sorensen - Parent David Jorschumb - BVSD Charles Zachemsky - A+P Kelly Yamasaki - OZ Architecture Kate Fields - OZ Architecture Wells Squier - OZ Architecture Carol Henry - Design Concepts FILE #: DISTRIBUTION: 09.04.08-BVSD-Birch-DAT 002 mtg Attendees Consultants Will Valkner - A&P Lisa Abeyta - Parent file. The aforementioned minutes constitute our understanding of the items discussed. If this is not an accurate written description of the intent and results of this meeting, please contact this office with comments. The minutes will stand as a record of the meeting unless corrections are received within seven (7) days after receipt. ITEM # DESCRIPTION RESPONSIBILITY DEADLINE 1. Meeting Start Review of previous meeting minutes. Request from DAT for future Meeting minutes to be issued sooner. 2. MUOF OZ got clarification from BVSD that the budget proposed for this scope was reduced when the total bond package was reduced, in addition it is not being funded from a different source and is part of our Construction budget. Our committed budget that needs to spent on safety and accessibility at the playgrounds is $74,246 we can add to this from our building scope if the DAT feels this is a better use of funds. Carol Henry with Design Concepts joined the meeting to discuss the outdoor playing fields/playgrounds existing conditions, use and popularity and get feedback on the groups vision for the future. The current budget barely allows us to replace all existing pea gravel with wood chips and appropriate curbing for accessibility. The group agreed that the pea gravel to the South of the gym was larger than needed and that moving the play equipment closer to the building would help reduce the scope of replacement and get kids away from a muddy area and the neighbors fence the group suggested relocating pea gravel removed in this area to infill some of the low spots in the pea gravel areas to remain. Info 4.28.2009 Page 1 of 3 DENVER BOULDER COLORADO SPRINGS LAS VEGAS LAKE TAHOE DENVER PHONE: 303.861.5704 3012 HURON STREET FAX: 303.861.9230 DENVER, COLORADO 80202 WWW.OZARCH.COM

ITEM # DESCRIPTION RESPONSIBILITY DEADLINE The west play area is used only because of the few pieces of equipment located in it if these were removed/relocated this play area could be removed or significantly reduced in size. The swings are really popular. There is no grade separation at play areas except for the preschool courtyard. The Preschool/ Kindergarten area could benefit from some work should funds be available The group would like a workable whole playground design and will look at funding equipment through the PTA in the future. Noise from the playground is not a concern due to the limited window in the building interior noise is more disruptive. 3. Scope Definition OZ reviewed the CBOC list which now includes the value of work based on the requirement list relative to the Schematic design scope. This list will continue to be a work in progress for our budget and a design scope reference. OZ presented the primary scheme as a merger of schemes presented at the second DAT, with some refinement per A&P s pricing/cost analysis. Because of concerns over budget, the design team wanted to work with the DAT to prioritize aspects of the preferred scheme. To accomplish this, OZ presented colored pieces of each component (addition and remodel), with estimated values associated with the scope of work. We started with a blank plan and, in order of priority, built up the scheme working toward our estimated budget for PCA items of +/- 2.1 million dollars (note, this figure is the conceptual estimate for PCA items only, and is continuing to be evaluated based on withholdings for FCA and MUOF items). The following summarizes the desired PCA improvements (addition(s) and/or remodeling work) in order of understood priority: a. Provide accessible route between all levels by installing 3 ramps. b. Locate Admin, a new main entry and the Cafeteria/Kitchen on the main level in an addition. c. Relocate Kindergarten to the remodeled cafeteria/kitchen space with a shared new restroom facility between the classrooms. d. Provide a corridor addition as an exit, classroom entry and coat zone for Kindergarten. This includes a small storage room south of the corridor. e. Remodel Admin area as Special Ed and ICAN classrooms. ICAN to have an ADA restroom with access from the corridor and classroom. f. Remodel current 3 rd Grade as the IMC this includes an office/workroom, resource room and AV closet. g. Third grade addition over outdoor play area to allow for relocation of 3 rd grade to the current Kindergarten wing. h. Remodel Kindergarten with a direct corridor connection to the exterior, 3 classrooms and a small group room. i. Remodel 3 rd grade Special Ed room to storage/conference/offices. j. Remodel IMC to computer room/ ESL/ Workroom/ Literacy 4.28.2009 Page 2 of 3

ITEM # DESCRIPTION RESPONSIBILITY DEADLINE and Small group rooms. k. Remodel existing Special Ed to Music remove booth, risers, storage, ext stairs, lower door or replace with window. The scope above was about $1million over budget. On the positive side the current scheme addresses all the CBOC, Requirement list and a majority of the wish list items identified by the DAT. We will endeavor to pursue this scheme in as affordable manner as possible. 4. Additional funds have been allocated by Don Orr at the District to accommodate required life safety/accessibility items that were unfunded by the Bond. This funding will be limited to between $500,000 and $600,000 assigned exclusively to Asbestos abatement, Accessibility (3x ramp costs) and the Fire Sprinkler installation costs. 5. DAT Recommendations: A critical analysis of the plan presented the following adjustments in the spirit of savings: Minimize scope at Music leave risers in place but demo booth. Minimize scope at Storage/conf off Cafeteria possibly locate Custodial here. Reduce size of computer room to match sqft of existing and allow for extra small group/office space in the central core Reduce gang restrooms in admin to 3 single use restrooms (2 unisex, 1 faculty) Delete IMC workroom and AV storage space and create a common workroom for Admin. IMC and Staff. Reduce Admin addition size due to efficiencies at rest room and workroom above. Leaving the IMC as open space for informal layout of small group and Computers was deemed unfeasible. 6. FCA List Analysis B. HVAC Upgrades S4,319 and $16,148 are included in PCA pricing (Special Ed remodel at old Admin) C. Electrical OZ & A&P to evaluate funds before next meeting. D. Interior Finishes Discussed redoing all carpet at 4 th and 5 th grade since abatement is needed to do this work and is funded by District. Carpet at 1 st and second grade can be done under Cap Reserve or future maintenance dollars as this space has no asbestos. Add walls and doors to corridors at 4 th &5 th Grade. ($25,000 savings out of $100,193) aa. Intercom and paging system replacement is not needed ($44,991). cc Fire Sprinkler funded separately by District ($175,000) dd Accessibility at restrooms provided in Admin no remodel ($81,713) Provisional FCA savings = $172,171 Including Fire Sprinkler scope = $347,171 7. DAT Meeting Schedule DAT#4 Wed, May 6, 3:15pm DAT#5 Wed, May 20, 3:15pm DAT#6 Mid July - During Summer Holiday ONLY if necessary DAT#7 Wed, August 26, 3:15pm DAT#8 Wed, October 14, 3:15pm Bid Review ONLY if Necessary Info 4.28.2009 Page 3 of 3

Birch Elementary Project Scope Wednesday, April 22nd, 2009 Current Scope CBOC/Web Summary List DAT Input Requirement List Value Schematic Design Budget Cost Facility Condition Assessment (FCA) Priority Budget Cost Proposed Cost A Fire Alarm Replacement No $0 $0 HVAC Upgrades - Air Distribution Systems- B Replace Nonfunctioning UV In Room 113 High 1 $4,319 $4,319 HVAC Upgrades at Office High 3 $16,148 $16,148 Electrical - Emergency Light and Power- Missing Exit Signs 1 $7,365 $7,365 C Electrical - Add Surge Protection 2 $5,010 $5,010 Electrical Distribution - Branch Wiring 2 $164,560 $164,560 Electrical Service - Undersized High 2 $179,311 $179,311 Interior Finish Improvements (Paint, Carpet, D Flooring, Ceiling, Tile, Etc) Paint Done Need Carpet 3 $100,193 $100,193 E Irrigation System Replacement Minor $0 $20,000 F Select Exterior Window Replacement Primary & 3rd grade 3 $51,353 $51,353 G Roof Replacement High 2 $50,069 $50,069 H Replace Boiler High 2 $46,581 $46,581 I Interior Signage Program High 3 $4,980 $4,980 Unassigned Requirement List Items aa Intercom & Paging System Replacement High 1 $44,991 $44,991 bb Communications-Clock System High 2 $41,782 $41,782 cc Fire Sprinkler High 4 $109,881 $175,000 dd Accessibility at Restrooms (ADA) High 5 $81,713 $81,713 FCA Subtotal $908,256 $993,375 Program Compatibility Assessment (PCA) Priority Budget Cost Proposed Cost Music Improvements Music High 1 $226,800 A Art Room Improvements - Kiln Rm 230 needs rated enclosure Storage 1 $29,652 B Enlarge Library High 2 $195,989 C Expand Administration Office & Health High 2 $341,880 D Provide Small Group Teaching Spaces High 1 See F below E Provide Kindergarten Remodel High 1 $123,900 F Provide Additional Classrooms High 1 $412,440 G Improve Open Space Classroom Acoustics High 2 $84,000 Unassigned Requirement List Items Café Rm 102, Kitchen Rm 103, Lounge aa Rm106 Too Small - Addition/Remodel High 2 $386,400 Gym Storage Rm 401 & 408 Too Small - bb Addition/Remodel High 2 $75,600 cc Restrooms (Too Small) - Remodel - ADA High 2 $90,720 PCA Subtotal $1,967,381 $0 Multi-Use Outdoor Facilities (MUOF) Priority Budget Cost Proposed Cost Upgrade Playground Surfacing, Equipment A and Fencing High PNA1 $218,148 $74,246 B Provide adequate curbing and drainage High see A see A Preplace aged and/or unsafe playground C equipment High PNA2 $151,704 see A D Make playgrounds ADA accessible High see C see A MUOF Subtotal $369,852 $74,246 Base Expenditure $3,245,488 $1,067,620 Construction Budget - Schedule "A" Balance to spend on unbudgeted items $3,231,309 -$14,179 $2,163,689 Unbudgeted "Wish List" Scope Items Unbudgeted Work Priority Budget Cost Proposed Cost 1 Haz Mat - Abatement of Asbestos (Piping) High unknown 2 Accessibility at Restrooms (ADA) High see FCA Item dd and PCA Item dd above 3 Dedicated Kindergarten Play Area High 4 HVAC Replace all Unit Ventilators High 5 HVAC at Computer lab High 6 Storage for all grades High 7 Coathooks & Backpack system for all kids High 8 Accessibility and Circulation High 9 Remove all Lifts - if possible High 10 Delivery control High 11 Exterior and Parking Lot Lighting - Safety High 12 Site Circulation & vehicle flow High 13 Increase Parking lot capacity - 70 spots High Unbudgeted Subtotal $0 $0 Total "Base Expenditure + Unbudgeted" $3,245,488 $1,067,620 Balance available -$14,179 $2,163,689