TOWN OF MEREDITH, NEW HAMPSHIRE CAPITAL IMPROVEMENTS PROGRAM (CIP) RECOMMENDATIONS FOR

Similar documents
Town of Bedford Town Meeting Warrant Articles and Municipal Budget Summary

Town of Bedford Town Meeting Warrant Articles and Municipal Budget Summary

Town of Bedford Town Meeting Warrant Articles and Municipal Budget Summary

Budget of the Village of Emerald Lake Village Form Due Date: 20 Days after the Meeting

TOWN OF PEMBROKE, NEW HAMPSHIRE CAPITAL IMPROVEMENT PROGRAM

Town Square Redevelopment. Phase I Contract Discussion

Budget Committee Public Meeting January 29, 2005

SAMPLE OFFICIAL BALLOT ANNUAL TOWN ELECTION RAYMOND, NEW HAMPSHIRE MARCH 12, 2019

TOWN OF BELGRADE 2018 TOWN MEETING WARRANT. To Jeremy Damren, of the Town of Belgrade, in the said County and State:

DRA F T 11/25/15. Anticipated fiscal year of purchase/completion: To be determined (possible bond vote in 2016)

MINUTES BEECH MOUNTAIN TOWN COUNCIL. Special Meeting April 20, 2017

North Berwick Board of Selectmen s Minutes: March 20, 2007 NORTH BERWICK BOARD OF SELECTMEN MINUTES MARCH 20, 2007

SPECIAL MEETING AGENDA REGULAR AGENDA

Town of Prescott Valley 2014 Development Impact Fee Report. Raftelis Financial Consultants, Inc.

Highlands County Florida

SIX YEAR CAPITAL IMPROVEMENT PROGRAM. Location/Dept. Project Funding Source

Chapter CONCURRENCY

TOWN OF RYE BUDGET COMMITTEE 2016 BUDGET WORK SESSION Thursday, December 8, :30 p.m. Rye Town Hall

Telephone System $6,000 $ - $ - $ - $ - $ - $ 6,000

TOWN OF RYE BOARD OF SELECTMEN 2017 BUDGETS Thursday, October 20, :30 a.m. to 4:30 p.m. Rye Town Hall

PRESENT: Trustee Gifford, Lockwood, Mathes, Rizzo and Mayor Kastberg

Section III.C. Capital Investments Plan

PUBLIC WORKS. FY 17 Recommended Public Works Budget $5,277,276

RESOLUTION NO. R RESOLUTION ADOPTING THE TOWN OF KERNERSVILLE CAPITAL IMPROVEMENT PLAN

Budget Calendar - Action Dates

CAPITAL IMPROVEMENTS ELEMENT:

TOWN OF GREENWICH Annual Department Operational Plan (FY ) Planning and Zoning (171)/Land Use(174)/Zoning Enforcement (161)

FINANCIAL REPORT OF THE TOWN, CITY, OR VILLAGE DISTRICT BUDGET

Seabrook Capital Spending

M-NCPPC, Montgomery Department of Parks Proposed FY13-18 Capital Improvements Program List of Project Description Forms (PDFs)

SECTION 6: CAPITAL IMPROVEMENT DETAIL

A loyal three made stronger in one. Loyalist Township Strategic Plan ( )

Fiscal Impact Analysis

CHAPTER 9 CAPITAL FACILITIES ELEMENT

Town of Bethany Beach. FY 2020 Budget

STRATEGIC PLAN. Value Statement. Goals and Priority Programs. Town Operations. Economic Development

2018 Proposed Property Tax Levy, Budget, & CIP. December 4, 2017

Highlights from the Proposed Budget Fiscal Year

City of Long Branch. Pier Village Phase 3 RAB Financing August 28, 2012

May 29, Board of Trustees --- Proceedings by Authority

FINAL AGENDA STATE BOND COMMISSION MEETING OF JUNE 16, :00 A.M. - SENATE COMMITTEE ROOM A STATE CAPITOL BUILDING

Budget Committee Town of Gilmanton, New Hampshire

01) OPEN MEETING The Municipal Budget Committee Meeting of Thursday November 16, 2017 was called to order at 7:00 p.m. at the Knightly Meeting Room.

TOWN OF BEEKMAN TOWN BOARD MEETING - Agenda January 24, 2018

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: SEPTEMBER 19, 2001 CMR:354:01

TOWN OF BEDFORD, NEW HAMPSHIRE 2018 MUNICIPAL WARRANT

Montrose County. Presentation of the County Manager s Recommended Budget for October 12, 2016

TOWN OPERATING BUDGET FY 2017 FY 2018 FY 2018 GENERAL GOVERNMENT APPROVED REQUEST RECOMMEND

Warner Municipal Budget Committee

WARRANT SPRING ANNUAL TOWN MEETING TOWN OF MILLIS COMMONWEALTH OF MASSACHUSETTS

FORM B CAPITAL PROJECT REQUEST. (Excluding equipment) 1. Project Title 2. Purpose of Project Request Form (Check One)

BUDGET OF THE TOWN OF: Appropriations and Estimates of Revenue for the Ensuing Year January 1, to December 31, or Fiscal Year From to IMPORTANT:

PUBLIC WORKS. FY 17 Recommended Public Works Budget $4,937,107

Utility Board. Agenda topics. For Meeting of July 14, :00 PM to 9:00 PM City Council Chambers, City Hall. Board Members:

Honorable Chairman Pat Prescott and the Pamlico County Board of Commissioners:

Town of Northwood New Hampshire. Voter s Guide

Town of Whitby Recommended Budget Target. January 18 th, 2012

2016 Capital Project Sales Tax Referendum. Public /Press Information Packet

TOWN OF WASCOTT DOUGLAS COUNTY, WISCONSIN FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION

Date:July 30, 2003 Board Members - Parks and Recreation General Manager - Parks and Recreation CHAMPLAIN HEIGHTS COMMUNITY CENTRE ADDITION

Budget Initial Public Forum FY16-17 February 22, Town of Chapel Hill 405 Martin Luther King Jr. Blvd.

Budget Committee Town of Gilmanton, New Hampshire

TOWN OF SWANSBORO BOARD OF COMMISSIONERS SPECIAL MEETING MAY 1, 2018

That staff be authorized to proceed with the implementation of the project as outlined in the Master Plan.

Harleton ISD May 7, 2016 Bond Proposal FAQs

Ten-Year Capital Improvement Program (CIP)

Town Manager FY 09 Budget

First Public Budget Hearing. September 11, 2015

Rockbridge County, Virginia Capital Improvements Program FY

City Council Budget Work Session. City of McKinney August 4, 2017

Dissolution of the Village of Macedon Review of Potential Fiscal and Service Impacts

PARKING GARAGE BUILDING COMMITTEE. 1 JUNKINS AVENUE PORTSMOUTH, NEW HAMPSHIRE School Board Room

Town of Smithfield Rhode Island 2019 Operating Budget

Capital Improvement Plan Table of Contents

CHAPTER 3 PROPOSITION 2½ AGENDA AND OBJECTIVES

Community Development Department

Go Green! Members are encouraged to bring their own mug to the meeting.

Georgetown Planning Department Plan Annual Update: Background

The Other Money: Budgeting and Beyond

DECEMBER 1, 2014 BOARD OF SUPERVISORS MINUTES: 1151

EVANSTON, ILLINOIS Robert Crown Community Center Project Update

Capital Improvements Plan. Goshen, NH

City of PHENIX CITY Alabama

Town of Seabrook Island State Accommodations Tax Advisory Committee Application for Accommodations Tax Funds. Letter of Introduction

SPECIAL MEETING AGENDA CITY OF FREDERICKSBURG CITY COUNCIL. JULY 11, :00 PM Law Enforcement Center, 1601 E. Main St.

REQUEST FOR PROPOSAL SAILING, RECREATION AND EDUCATION PROGRAMS AT THE OYSTER BAY WESTERN WATERFRONT TOWN OF OYSTER BAY DEPARTMENT OF PARKS

Fiscal Impact Analysis of Great Pond Village

3RD DRAFT PARKING GARAGE FEASIBILITY STUDY

Citizen s Guide to the Okeechobee County Fiscal Year Budget

North Berwick Board of Selectmen's Minutes: November 6, 2007 NORTH BERWICK BOARD OF SELECTMEN MINUTES NOVEMBER 6, 2007

FITCHBURG HISTORICAL SOCIETY. Susan Navarre Fitchburghistoricalsociety.org

PLEDGE OF ALLEGIANCE Mayor Cox led the attendees in the Pledge of Allegiance to the United States of America.

VILLAGE OF CHESTNUT RIDGE ADOPTED BUDGET YEAR ENDING MAY 31, 2018 ADOPTED APRIL 20, /20/17 Adopted Adopted 5/31/17 5/31/18 APPROPRIATIONS

Public Schools of the Tarrytowns

County of Gloucester Virginia

Economic Indicators Interest Rates GDP Growth Fuel Costs. Housing & Commercial Growth Building Permits Home Values Top Taxpayer Meetings

HACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT PLAN (UTILITY IMPROVEMENTS)

ISAC New County Officers School

REVENUES, EXPENDITURES, AND DEBT OF MINNESOTA COUNTIES YEAR ENDED DECEMBER 31, 2001

Estimating capital requirements, budgeting priority projects and developing revenue sources for proposed improvements.

Transcription:

TOWN OF MEREDITH, NEW HAMPSHIRE CAPITAL IMPROVEMENTS PROGRAM (CIP) RECOMMENDATIONS FOR 2018-2024 Recommended by: The Capital Improvements Program Advisory Committee: November 1, 2017 Adopted by: The Meredith Planning Board: November 28, 2017 Acknowledgements Capital Improvements Program Advisory Committee Ed Touhey, Chairman, Planning Board Representative Mark Billings, Vice Chairman, Inter-Lakes School Board Representative Richard Gerken, Planning Board Representative Bev Lapham, Select Board Representative Michael Pelczar, Select Board Representative (Alternate) Bob Davis, Trustee of Trust Funds Dave Thorpe Jack Carty Jeanie Forrester Planning Board Bill Bayard, Chairman Ed Touhey, Vice Chairman Richard Gerken, Secretary Jonathan James, Ex Officio, Select Board Ann Butler Peter Brothers Tom Hughes John Kreitler, Alternate Robert Flanders, Alternate

SUMMARY Annually, the Capital Improvement Program (CIP) Advisory Committee reviews, updates and recommends a program of capital improvements for the following budget year. The primary purpose of the CIP is to aid the Select Board in their consideration of their annual budget (RSA 674:5). In addition the CIP identifies future capital needs that may come before the voters in subsequent years. The recommended CIP is a non-binding planning tool. As a preface to the specific recommendations that follow, it is important to note: The recommended 2018 Capital Improvement Program (debt service plus ETF allocations) is $1,634,988. This represents an increase of $ 56,095 or 3.6% compared to 2017 municipal CIP-related appropriations. Existing debt service payments in 2018 will total $609,988. This represents 37% of the recommended municipal Capital Improvement Program for 2018. The Capital Improvement Program incorporates allocations to Expendable Trust Funds (ETF s) in anticipation of future capital needs. For 2018, recommended allocations to six ETF s total $1,025,000. This represents 63% of the recommended municipal Capital Improvement Program for 2018. Existing debt service (final annual payments) to be retired include: 2019 ($168,224), 2022 ($45,783), 2025 ($182,350) and 2028 ($28,695). The Committee understands that as debt is retired, program capacity associated with the retired debt will be available to support future capital needs or offset the effect of future borrowing. There are two major project requests that have been presented to the CIP Advisory Committee both of which have demonstrated need and would involve a significant amount of additional long term indebtedness. (1) $11.3 mil. project for the replacement of the highway garage and DPW offices; and (2) $4.5 mil project for the renovation and expansion of the existing library on Main Street. Projected debt service for both major projects would coincide in 2021. In 2021, proposed debt coupled with existing debt results in a projected debt payment of $1,519,652. This would represent 73% of the recommended municipal Capital Improvement Program for that year.

RECOMMENDATIONS General Government Waterfront Infrastructure: Recommendation: Allocate $275,000 for 2018 to the Waterfront Infrastructure Expendable Trust Fund. Rationale: In 2016 the Town Manager estimated the cost to address the capital needs of waterfront infrastructure at approximately $1.6 mil. This estimate includes improvements at three project areas: the town docks, boardwalk and waterfront parks on Meredith Bay; docks and launch ramp at Shep Brown s; and the town-owned dock and post office on Bear Island. In 2018 the town will initiate a Request for Qualifications process to include an assessment of existing infrastructure conditions, a visionary session and the identification of projects and associated cost estimates for future consideration. The Waterfront Infrastructure Expendable Trust Fund estimated balance as of December 31, 2017 is $295,702. Municipal Parking. Recommendation: Utilize $162,500 of existing funds in the Municipal Parking Expendable Trust Fund towards the purchase of land for municipal parking. Rationale: The Select Board anticipates a warrant article in 2018 seeking authorization to purchase land on High Street adjacent to the Library currently owned by Hayward and Sandra Price (Tax Map U-6, Lot 43). Additional public parking in the village in close proximity to Main Street is a good investment based on its own merits. However should the Library project proceed as proposed, then this public parking lot would also be available to serve the needs of the Library. The acquisition cost is estimated at $325,000. The other half of funds needed to complete the purchase would come from the Town s Undesignated Fund Balance as recommended by the Town Manager. The Municipal Parking Expendable Trust fund has a balance as of December 31, 2017 of $223,360. Fire Department Recommendation: Allocate $100,000 in 2018 and 2019 to the Fire Department Communications Equipment Expendable Trust Fund. Rationale: The Fire Department anticipates spending approximately $200,000 over two years to replace 45 Kenwood Portable Radios and 12 Motorola Mobile Radios acquired in 2006. The estimated balance of the Fire Department Communications Expendable Replacement Fund as of December 31, 2017 is $1,118. Recommendation: Allocate $100,000 to the Fire Department Vehicle Replacement Expendable Trust Fund in 2020. Rationale: The 1994 Pierce Dash (Engine 3) is scheduled for replacement in 2022 ($600.000). The estimated balance of the Fire Department Vehicle Replacement Fund as of December 31, 2017 is $175,352. Department of Public Works Solid Waste Equipment Recommendation: Allocate $100,000 in 2018 through 2020 to the Solid Waste Trailer Expendable Trust Fund.

Rationale: The town owns six trailers that are used to transport solid waste from our transfer station to the disposal site. Trailers are scheduled for replacement in 2018, 2019, and 2020 and cost approximately $90,000 each. The estimated balance of the Solid Waste Trailer Expendable Trust Fund as of December 31, 2017 is $144,468. Also scheduled for replacement is the 1999 Downstroke Baler in 2023 ($110,000). Highway Equipment: DPW Facility: Recommendation: Allocate $275, 000 in 2018 through 2020 to the DPW Equipment Replacement Expendable Trust Fund. Rationale: There is a significant amount of capital equipment scheduled for replacement in the coming years as illustrated below. Year Requested Equipment Being Replaced Estimate 2018 2003 Kenworth dump/sander $210,000 2019 2006 Ford F550 dump/ sander $110,000 2019 1978 International Loader $140,000 2019 2004 Volvo Roller $120,000 2020 Dresser Loader $160,000 2020 2004 Kenworth dump/sander $210,000 2020 2008 Ford F350 Bucket Truck $150,000 2021 2005 Volvo Excavator $250,000 2021 2007 Kenworth dump/ sander $250,000 2021 2013 F-550 Dump/sander $110,000 2023 2004 Volvo Grader $350,000 The estimated balance of the DPW Equipment Replacement Expendable Replacement Trust Fund as of December 31, 2017 is $452,611. Recommendation: Recommend Town Meeting consider an $11.3 mil bond issue in 2018 as presented to the Select Board by the DPW Facility Committee. Rationale: In 2004 the Meredith Space Needs Study Committee recognized the need to replace the existing DPW garage constructed in 1965. In 2014 Town Meeting appropriated $100,000 to conduct a conceptual level, feasibility study for a new DPW facility at the current location on Jenness Hill Road. The DPW Facility Committee and its consultant HKT Architects, Inc. studied the feasibility of redeveloping the existing site. They concluded redeveloping the existing site would require significant site work to accommodate the building program; and would not allow for future expansion; and may be cost prohibitive. In 2016 Town Meeting approved an article funding a feasibility study (using the balance of the 2014 appropriation) to examine sites other than the existing Jenness Hill Road site. Working with HKT, the building program was reduced from 60,724 total sq. ft. (including 33,798 sq. ft. vehicle staging and prep) to the current proposal of 33,039 total sq. ft. (including 12,000 vehicle staging and prep). The new site is located on Jenness Hill Road directly opposite the existing facility. This property would support a new facility consisting of administration, workshops, vehicle maintenance, vehicle storage and a wash bay totaling 33,039 sq. ft. The bond issue figure ($11.3 mil) includes land acquisition, final building design, bidding, soft costs, site costs and construction costs. The CIP Deliberation worksheet dated 11-13-17 illustrates debt service associated with an $11.3 mil bond issue, for a 20-year term at 3.25% interest rate. Full principal and interest annual payments would commence in 2020 ($940,411) and would decline through the remainder of the 20 year term.

Parks and Recreation Department Recommendation: Allocate $75,000 in 2018 through 2020 to the Parks and Recreation Facilities Improvement Expendable Trust Fund. Rationale: In July, 2017 the Parks and Recreation Department completed a comprehensive 15-year master plan. The plan evaluates Parks and Recreation Facilities, programs, operations and resources available to deliver services. Included in the plan are numerous potential projects some of which may be included in future Capital Improvement Programs. The estimated balance of the Parks and Recreation facilities Improvements Expendable Replacement Fund as of December 31, 2017 is $50, 008. Water and Sewer Department Water and Sewer System Improvements: Recommendation: No additional funding is recommended at this time. Rationale: Phil Warren, Town Manager has advised that most projects anticipated by the Water and Sewer Department will be handled through the operating budget or through existing utility reserves. Available reserved funds are noted at the end of the CIP Deliberation Worksheet dated 11-13-17. Public Library Recommendations: (1) Support the utilization of $162,500 of existing funds in the Municipal Parking Expendable Trust Fund towards the purchase of land for additional public parking adjacent to the library; and (2) Establish a Main Street Library Building Project Expendable Trust Fund and allocate $200,000 to this fund in 2018 and 2019 to cover anticipated architectural and engineering fees. Design should commence after design costs are fully funded in 2019; and (3) Endorse a significant fundraising campaign to be conducted by the Library Board of Trustees to reduce the overall amount to be borrowed; and (4) Consider a $2.75 mil bond issue in 2020 for purposes of renovating and expanding the existing library. Rationale: In 2017 Town Meeting created an Expendable Trust Fund for the purpose of evaluating the feasibility of expanding and renovating the existing library located on Main Street together with a $50,000 appropriation. In April the Select Board formed the Joint Library-Select Board Feasibility Advisory Committee. In October 2017 the Joint Committee, working with its consulting architect, Samyn D Elia, presented their findings to the Select Board and the Library Trustees. The renovation/expansion project would total 14, 697 interior square footage. Of that, 10,908 sq. ft. would be available to various library functions and the remaining 3,789 sq. ft. would be devoted to mechanical rooms, stairs, bathrooms and circulation. Estimated total, preliminary project costs are summarized as follows: o Architectural and engineering Fees: $359,149 o Land acquisition : $325,000 o Construction: $4,225,293 o Additional expenses including contingency : $359,500 o Estimated Project Total: $5,268,942 Extending construction funding to 2020 (as noted in recommendation No. 4 above) would: o Provide a degree of separation between the DPW and Library projects thereby improving the town s departmental capacity to manage two major construction projects.

o o Allow additional time for the Library Trustees to develop and execute their fundraising campaign. Slightly lessen the impact of significant additional debt service attributable to both projects. The CIP Deliberation worksheet dated 11-13-17 illustrates debt service impacts associated with a $2.75 mil bond issue, for a 20 year term at 4.00% interest rate. Full principal and interest annual payments would commence in 2021 ($259,472) and would decline through the remainder of the 20 year term. OpenSpace/Conservation Recommendation: No additional funding recommended at this time. Rationale: The 2017 Town Meeting authorized the purchase of approximately 200 acres adjacent to Page Pond and Forest (Article 10). The real estate closing occurred in October, 2017. Total acquisition cost was approximately $1.27 mil. Town funding included approximately $40,000 from the Open Space/Conservation Expendable Trust Fund and $119,000 from the Conservation Commission s Fund. Town funds represent approximately 14 % of the acquisition cost. The balance of the funding (grants a fundraising) was secured through the assistance of the Trust for Public Land. The Open Space/Conservation Expendable Trust Fund estimated balance as of December 31, 2017 is $0. Debt Service Final annual payments related to the following projects will be retired as indicated below: 2019 $168,224 Fire Station 2022 $ 45,783 Plymouth Street/ Route 3 North 2025 $182,350 Community Center 2028 $ 28,695 Bundled Project TOTAL $425,052 Potential debt service associated with the DPW and Library projects are noted above in the respective sections. Individual and combined effects are illustrated in the CIP Deliberation worksheet dated 11-13- 17. Inter-Lakes School District Meredith is one of three communities that comprise the Inter-Lakes School District. Meredith taxpayers are responsible for approximately 75% of the district s costs including capital projects. The District participates in the Meredith CIP process for informational purposes. The Inter-Lakes School District Capital Improvement Plan and Facilities Budget Plan dated May 2017 identifies anticipated capital projects including: SCS boiler replacement/led Lights 2022/23 $130,000 ILES roof 2018/2019 thru 2023/2024 $761,000 Track & field night lighting 2020/2021 $200,000 Synthetic field replacement 2020/2021 $500,000 Track surface respray 2020/2021 $110,000

SUMMARY COMPARISION 2017 MUNICIPAL Capital Appropriations $ 75,000 Fire Department Equipment Replacement ETF (Article 8) $ 50,000 Library Feasibility ETF (Article 9) $ 50,000 Parks & Recreation Facility Improvements ETF (Article 15) $ 75,000 Fire Department Vehicle Replacement ETF (Article 14) $ 105,000 Solid Waste Trailer Replacement ETF (Article 13) $ 200,000 Waterfront Infrastructure ETF (Article 12) $ 325,000 DPW Equipment Replacement ETF (Article 11) $ 698,893 Debt Service-Principle & Interest (Article 7) $1,578,893 Total Municipal CIP Related Appropriations 2018 MUNICIPAL Capital Recommendations $ 275,000 Waterfront Infrastructure ETF $ 100,000 Fire Department Communications ETF $ 75,000 Parks & Recreation Facilities Improvements ETF $ 100,000 Solid Waste Trailer Replacement ETF $ 275,000 DPW Equipment Replacement ETF $ 200,000 Library Building Project ETF (New) $ 609,988 Debt Service- Principle & Interest $1,634,988 Total Municipal CIP Recommendations

2018 Municipal Capital Improvements Recommendations DPW Equipment Replacement ETF, $275,000, 17% Waterfront Infrastructure Improvements ETF, $275,000, 17% Debt Service (Principal & Interest), $609,988, 37% Library Building Project ETF (NEW), $200,000, 12% Solid Waste Trailer Replacement ETF, $100,000, 6% Fire Department Communications Replacement ETF, $100,000, 6% Parks & Recreation Facilities Improvements ETF, $75,000, 5% Attachment: Town of Meredith- CIP Deliberations Worksheet dated November 13, 2017