CHAPTER THIRTEEN MAJOR STRUCTURE AND PILING ITEMS

Similar documents
CHAPTER TWELVE CONCRETE PAVING ITEMS

CHAPTER NINETEEN MISCELLANEOUS ITEMS

CHAPTER TWENTY- THREE CONSTRUCTION MANAGER AT RISK CONTRACTS

Topic: SAP PPM Close Project. Contents

CITY OF GREATER SUDBURY PROGRESS PAYMENT STATEMENTS, PROGRESS PAYMENT CERTIFICATE AND INVOICING PROCEDURE. ENG-PM-S001 v.1.01

Producer Statements will be accepted only in accordance with this policy.

Goldwater Bank N.A. Mortgage Division Construction-to-Permanent Loan Agreement and Acknowledgement Site Built Homes

Hawaii Division of Financial Institutions 2018 Renewal Checklist

CONSTRUCTION DIVISION

Hawaii Division of Financial Institutions 2019 Renewal Checklist

Payroll Checklists 02/01/2017

REQUEST FOR PROPOSAL (RFP) FOR ENGINEERING DESIGN SERVICES FOR THE Electrical and Stage Lighting Upgrades at B Street Community Center.

NH Mortgage Banker Branch License New Application Checklist (Branch)

POUDRE TRAIL IMPROVEMENTS PROJECT Pre-Bid Meeting Minutes June 21, 10:00 AM

Siding Program Application

What to Do Who How to Do It Purchasing Card Procedures: Purchase to Reconciliation

Denver Public Schools. Financial Services. Full Time Ledger. Financial Services Manual

Vacant Home Program Application

Pre-Qualification Form: RISK ASSESSMENT STUDY Consultants

TaxAid. Your Personal Tax Account Filing Your Tax Return

Vision Service Plan (VSP) New Group Implementation Guide

STRS Advance STRSAD.RPT

Billing Program Billing Information for Agents

ARIZONA FIRE DISTRICT ASSOCIATION FINANCIAL PROCEDURES POLICY

City of Port St Lucie

Renewal of Manager s Certificate

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Mogadishu SO November 7 December 2018

Tracey Sopp Head of Accounting and Processing James Duncan, Deputy Chief Executive / Executive Director of Finance. Contents

Agency Reorganization Process

HOC Works Program Requirements

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Kingston JM JULY 2017

Non-Residential Building Permit Application Review Process

MD Sales Finance License Amendment Checklist (Company)

The Research Foundation for SUNY Facilities & Administrative Cost Space Survey Instructions for Completing the Survey - Laboratory Animal Facilities

Subject Access Requests

DigiCert User Authentication Service Level Agreement

Financial Aid Satisfactory Academic Progress Appeal Request Spring 2019 Deadline: January 3, 2019

REFERENCE NUMBER: PFS.PDS.115. TITLE: Patient Billing and Collections CURRENT EFFECTIVE DATE: 01/01/2018. PAGE 1 of 8 SCOPE:

MD Collection Agency License Amendment Checklist (Company)

TAX CREDIT TO SUPPORT DIGITAL TRANSFORMATION IN PRINT MEDIA COMPANIES INVESTISSEMENT QUÉBEC

1. Accounts Payable > Tasks > Transactions > Recurring Bills

Company specific data

NO LATE ENTRIES WILL BE ACCEPTED.

Alternative Exam Arrangements

Employee Hardship Assistance Policy

County of Riverside OFFICE OF THE AUDITOR-CONTROLLER STANDARD PRACTICE MANUAL

REQUEST FOR PROPOSAL CITY OF DEVILS LAKE October 2018 DOWNTOWN REVITALIZATION PROJECT

CITY OF SAN MATEO, CALIFORNIA

address: Driver license number: Date of birth: Occupation:

Setting up the Creative Pension Trust - Moneysoft User Guide

SCOPE OF WORK AND DELIVERABLES Whitewater State Park Culvert Rehabs

Closing Out Award. The PI will work with ORA in obtaining the applicable resolution. Residuals

WinStabs- NMR 2019 Explained

Fall 2018/Winter 2019 CCoC Project Evaluation Survey

POLICIES AND STANDARDS PERTAINING TO IMPROVEMENT PLANS FOR CONSTRUCTION, INSPECTION, AND FINAL APPROVAL

Legend The legend, as shown below, contains all of the unique symbols that are important to help you interpret your Degree Works audit.

Carrier Optimal Routing, COR & CDRAAP

Request for Proposal

Trustee Fiscal Year End Process (Rev. 05/24/2017)

Any line marked with a # sign is for Official Use Only 1

Expense Reports Users Guide - aqua

HOME IMPROVEMENT CONTRACT

FISCAL OFFICER TRAINING MANUAL

Special School District (SSD) Effective Date: August, Overtime

2019 Curriculum Enhancement Grant (CEG) Request for Proposals

Accounts Payable for Classified Personnel Participants

Temporary Use Permit Review Process

What do you need? Copy of the HIPAA Policy on Amendment of Protected Health Information

There are two ways to submit your banking information for direct deposit into your personal bank account:

NUMBER: BUSF 3.30 Business and Finance. Other Educational and General Program Accounts ("E" Funds) Date: October 18, 2006 I. PURPOSE OF THE POLICY

City of Stevens Point Plan Commission Application Packet

Sewer Blockage Procedure

REQUEST FOR QUALIFICATIONS (RFQ)

IRS 2016 FEDERAL TAX TRANSCRIPT INFORMATION

Design Council CONSULTANT GUIDELINES

Instruction Page. Verification of 2014 Income Information for Individuals with Unusual Circumstances

TOPIC 46 - INTERNAL CONTROLS OVER BANK & CASH

2011 Short Course Presentation. TxDOT Compass from a District Maintenance Perspective

BANK STATEMENT IMPORT (CSV FILE IMPORT)

TRID Rule Purchase For Applications dated on or after 10/3/2015

Overview. Procedure. ERP Replacement Program Non Contract Hourly (NCH) Form July 26, 2018

Key issuing Procedure

UNLV Purchasing Card Manual Revision 6.0 Release Notes. December 1, 2016 III. DEFINITIONS CONTACTS

Grant Application Guidelines

Application Checklist: Supporting documents you need to provide with your application: o Application fee

Resolution Adopting a Financial Management Policy

Breakout Session. Estimates and Repairs

IMPLEMENTATION AND REPORTING LEAD BENEFICIARY SEMINAR 21 MARCH 2018 SUBOTICA, SERBIA

STATE OF NEW YORK MUNICIPAL BOND BANK AGENCY

Joining SportsWareOnLine

Early Payment Offers (EPOs)

City of Tacoma PLANNING AND DEVELOPMENT SERVICES DEPARTMENT. Customer Queuing and Scheduling System Specification No. PL F

Instructions for the Sponsored At Risk Center Review Cape Fear Tutoring, Inc. Agreement # 7506

University of Pittsburgh Office of the Controller General Accounting

Use the included checklist to ensure that the plan(s) include at least the minimum required information.

Terms of Reference - Board of Directors (approved by the Board on 12 April 2018)

Institute For Orthopaedic Surgery (IOS) Subject: Billing and Payments: General Guidelines

Jobsite Charges Overview

APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND

8722 S. HARRISON ST. SANDY, UT P.O. BOX 4439 SANDY, UT FAX

Transcription:

CHAPTER THIRTEEN MAJOR STRUCTURE AND PILING ITEMS 13

MAJOR STRUCTURE AND PILING ITEMS 1 3 OVERVIEW Structure and piling items have different dcumentatin requirements fr each unit f measure (UOM). All structure and piling items must be cunted, measured and/r calculated. Dcumentatin examples fr a few selected structure and piling items are illustrated in this chapter. Sme minr mdificatins may be required t shw the unusual circumstances that may ccur with different items, but the general frmat shuld be fllwed. If there are items which cannt be dcumented accrding t the fllwing examples, cntact the Cnstructin Admin Services Sectin fr assistance. NOTE: Frms change peridically; g t the Cnstructin SharePint Frms, Quality Assurance Area fr the latest versin. Frms can be cmpleted by hand r electrnically. Per Subsectin 200.01.01, (Cnstructin Stakeut) General, f the Standard Specificatins, the Cntractr will be respnsible fr stakeut data n majr structures. The Cntractr s stakeut infrmatin must be given t the Resident Engineer. INSPECTOR S RESPONSIBILITIES MAJOR STRUCTURE AND PILING ITEMS Use the Agreement Estimate Reprt (AEB) as a reference t ensure that items and quantities are paid in the crrect categry. Use the Gemetrics, General Ntes and Quantities Sheet (Figure 13-1), lcated in the Cntract plans, t help identify items, quantities, descriptins and lcatins. Figure 13-1: Example f a Gemetrics, General Ntes and Quantities Sheet State f Nevada Department f Transprtatin Cnstructin Divisin Dcumentatin Manual Nvember 2017 13-1

1 3 MAJOR STRUCTURE AND PILING ITEMS Review the fllwing fr accuracy: Special Prvisins Supplemental Ntices Cntract Mdificatins NOTE: When any changes are made t an item, reference the cntract mdificatin number in the IDR item psting remarks. Email ALL structure item phts t the Office Engineer. Use the naming cnventin: IDR year-mnth-day Inspectrs Initials, (e.g. IDR 2016-13-12 KMM) in the email Subject line. The bdy f the email must cntain a detailed descriptin and lcatin/statin f the pht(s). Turn in ALL structure item calculatin sheets t the Office Engineer. INSPECTOR DAILY REPORT (IDR) MOBILE INSPECTOR 1. Create an IDR in Mbile Inspectr daily t dcument the activity being mnitred. Refer t the Mbile Inspectr User Guide fr details n using this applicatin. Reprt Details daily activities Item Pstings item(s) and quantity(s) Equipment type and hurs Persnnel title and hurs 2. Recrd the fllwing required infrmatin in the Reprt Details windw (Figure 13-2): Date Weather Lw and high temperature Attachments (N/A) Send ALL phts via email. Remarks Verify with the RE n what infrmatin is required. 13-2 State f Nevada Department f Transprtatin Cnstructin Divisin Dcumentatin Manual Nvember 2017

MAJOR STRUCTURE AND PILING ITEMS 1 3 Figure 13-2: IDR Reprt Detail Windw 3. Recrd the fllwing required infrmatin in the Item Pstings windw: Item Prj/Catg Refer t the AEB reprt. Cntractr ALWAYS the Prime Cntractr (Subs are nt allwed). Qty Based n measurements, calculatins and/r cunts. Lcatin Must shw line designatin, LT, RT r CL and ffset if knwn. Statin Frm/T Refer t Cntract plans. Attentin Flag Use t bring attentin t RE and Office Engineer fr verruns and plan errrs. Remarks Must shw calculatins when apprpriate, refer t Calculatin Sheet when apprpriate (Refer t Appendix B, Calculatin Frmulas, in this manual fr a Calculatin Sheet example), ther infrmatin relevant t item psting, and explanatins when Attentin Flag is checked. NOTES fr Majr Structure and Piling item pstings: If there are questins n whether an EACH item can be listed separately r cmbined, cntact the Cnstructin Admin Services Sectin fr assistance. Refer t Figures 13-3 thrugh 13-10 fr examples f structure and piling item pstings with different UOM. If a galln item des nt cme in small size cntainers use the applicatin and surface area t calculate the gallns applied. The fllwing calculatin will be dcumented in the IDR psting: Vl(gas) = W x L x App Rate Pay = # gallns W = # L = # App Rate = 1gal/150 SQFT (Per Subsectin 409.03.13, (Prtland Cement Cncrete Pavement) Cnstructin Curing, f the Standard Specificatins. The Inspectr will visually make sure the cverage f the cure cmpund was satisfactry. State f Nevada Department f Transprtatin Cnstructin Divisin Dcumentatin Manual Nvember 2017 13-3

1 3 MAJOR STRUCTURE AND PILING ITEMS NOTES fr Structure CUYD/CUFT (Figure 13-3): Payment fr CUYD items will be based n plan quantity r field measurements and calculatins if different than plan. Payment fr CUFT items will be based n field measurements and calculatins. Calculatins fr CUYD = L x W x D 27 Calculatins fr CUFT = L x W x D Sig. Fig. =.01 Figure 13-3: IDR Item Psting - Structure CUYD In n case will the payment fr any area exceed the net amunt withut authrized changes and/r final measurement. When paying fr cncrete, payment will be paid accrding t the Bill f Materials (Figure 13-7). If the quantity is different, then calculatins are needed. NOTES fr Structure GAL (Figure 13-4): Figure 13-4: IDR Item Psting - Structure GAL Payment fr Galln items will be based n field measurements and calculatins. Calculatins will cnsist f cunting the drums used r measuring the cntainer and calculating the quantity when a full drum is nt used. If measured by anther device shw the calculatins n hw gallns were derived. A picture f a label must be taken and email t yur Office Engineer fr backup t cnfirm the quantity f the cntainer. Check the Attentin Flag t ntify the Office Engineer there s email that belng with this Item Psting Sig. Fig. = 1 13-4 State f Nevada Department f Transprtatin Cnstructin Divisin Dcumentatin Manual Nvember 2017

MAJOR STRUCTURE AND PILING ITEMS 1 3 NOTES fr Structure LB (Figure 13-5): Payment fr POUND (LB) fr Reinfrcing Steel is based n the Bill f Materials (Figure 13-6). If plan quantity is different, field measurements and calculatins are required. Sig. Fig. = 1 Figure 13-5: IDR Item Psting - Structure LB Figure 13-6: Example f a Bill f Materials Sheet State f Nevada Department f Transprtatin Cnstructin Divisin Dcumentatin Manual Nvember 2017 13-5

1 3 MAJOR STRUCTURE AND PILING ITEMS NOTES fr Structure SQYD/SQFT (Figure 13-7): Payment fr SQYD and SQFT items will be based n field measurements and calculatins. Calculatin fr SQYD = L x W 9 Calculatin fr SQFT = L x W Enter the Line Designatin and left, right r center line in Lcatin. Sig. Fig. =.1 Figure 13-7: IDR Item Psting Structure SQY NOTES fr Piling EACH (Figure 13-8): Prepare the Fundatin Piling Driving Recrd (Frm 040-058). Payment fr EACH item will be based n the Ttal Number Placed value frm the 040-058 frm. Sig. Fig. = 1 If there are any questins cncerning the Fundatin Piling Driving Recrd (Frm N. 040-058), cntact Materials Divisin, Getechnical Sectin fr assistance. Figure 13-8: IDR Item Psting Piling EACH NOTES fr Piling LFT (Figure 13-9): Prepare the Fundatin Piling Driving Recrd (Frm 040-058). Payment fr LFT item will be based n the Ttal Length fr Payment value frm the 040-058 frm. Sig. Fig. = 1 If there are any questins cncerning the Fundatin Piling Driving Recrd (Frm N. 040-058), cntact Materials Divisin, Getechnical Sectin fr assistance. 13-6 Figure 13-9: IDR Item Psting Piling LFT State f Nevada Department f Transprtatin Cnstructin Divisin Dcumentatin Manual Nvember 2017

MAJOR STRUCTURE AND PILING ITEMS 1 3 NOTES fr Drill Shaft LFT (Figure 13-10): Prepare the Drilled Shaft Inspectin Reprt (Frm 040-060) The LFT fr payment is frm the Ttal Length Paid value that is shwn n the 040-060 frm. Sig. Fig. = 1 If there are any questins cncerning the Fundatin Piling Driving Recrd (Frm N. 040-058), cntact Materials Divisin, Getechnical Sectin fr assistance. Figure 13-10: IDR Item Psting Drill Shaft LFT 4. Recrd the fllwing required infrmatin in the Equipment windw (Figures 13-11 and 13-12): Cntractr Actual cntractr perfrming the wrk (include subs). Type Detailed descriptin f the equipment (e.g., diesel, HP, mdel, make). Number Hw many f each type. Hurs Ttal hurs in use. NOTE: An attachment t an equipment s base cnfiguratin must have its wn recrd. Figure 13-11: IDR Equipment Entry Figure 13-12: IDR Equipment List State f Nevada Department f Transprtatin Cnstructin Divisin Dcumentatin Manual Nvember 2017 13-7

1 3 MAJOR STRUCTURE AND PILING ITEMS 5. Recrd the fllwing required infrmatin in the Persnnel windw (Figures 13-13 and 13-14): Cntractr Actual cntractr perfrming the wrk (include subs). Type Details f persnnel type (e.g., freman, labrer, truck driver). Number Hw many f each title. Hurs Ttal hurs wrked. Figure 13-13: IDR Persnnel Entry Figure 13-14: IDR Persnnel List 6. Cmplete a final review f the IDR and lck it. NOTE: When a Mbile Inspectr IDR is cmpleted and lcked the infrmatin is upladed int a FieldManager IDR, where it is reviewed and generated fr prcessing prgress payments. OFFICE ENGINEER S RESPONSIBILITIES MAJOR STRUCTURE AND PILING ITEMS Save all cntractr s survey stakeut data in the EDOC Cntract Files\Cntract Files\Divisin N 12 - Miscellaneus\12.? Stakeut Data directry. Cllect all Material Certificatins. Scan and save them t the EDOC Cntract Files\Material and Testing Files\Divisin N. 4 Materials Divisin Certs and Test Reprts\4.? Send riginal certificatins t the Materials Divisin fr apprval. 13-8 State f Nevada Department f Transprtatin Cnstructin Divisin Dcumentatin Manual Nvember 2017

MAJOR STRUCTURE AND PILING ITEMS 1 3 Save emails cntaining structure item phts in the apprpriate EDOC Cntract Files\Cntract Files\Divisin N. 3 - Multimedia Recrds\3.? Phtgraphs with Descriptins directry. Review structure item calculatin sheets fr accuracy and save electrnically in the apprpriate EDOC Cntract Files\Cntract Files\Divisin N. 7 - Cnstructin Pay Estimate and Related Data\7.? IDR Calculatin Sheets directry using this naming cnventin: IDR year-mnth-day Inspectrs Initials, (e.g. IDR 2016-13-12 KMM). Review the Fundatin Piling Driving Recrds and Drilled Shaft Inspectin Reprts fr accuracy and save electrnically in the apprpriate EDOC Cntract Files\Cntract Files\Divisin N. 7 - Cnstructin Pay Estimate and Related Data\7.? Drill Shaft and Piling Frms directry. Apprve materials in FieldManager when the apprved material certificatins are received frm the Materials Divisin. Refer t Chapter 6, Wrking with Materials, in the FieldManager User Guide, fr details. Distribute executed cpies f cntract mdificatins t Inspectrs. INSPECTOR DAILY REPORT (IDR) FIELDMANAGER When a Mbile Inspectr IDR is lcked by an Inspectr, the infrmatin is upladed int a FieldManager IDR. Refer t Chapter 7, Inspectr Daily Reprt, in the FieldManager User Guide fr details. 1. Verify the fllwing: Infrmatin in Cmments and Remarks Infrmatin in the Cntractr tab (Persnnel and Equipment) Items are paid crrectly accrding t the cntract dcuments (e.g., plans, supplemental ntices, cntract mdificatins). Item quantities Quantities in pstings are dcumented t the crrect Significant Figure. Statins and Line Designatins in the Lcatins Calculatins are crrect. Remarks reference calculatin sheets, if applicable. NOTE: Length des nt always equal the difference between the beginning and ending statin. Smetimes there is a curve r an bstacle that will affect the distance. Always check with the Inspectr befre assuming the calculatins are incrrect. 2. Generate the IDR. State f Nevada Department f Transprtatin Cnstructin Divisin Dcumentatin Manual Nvember 2017 13-9