June 10, Lake Street Parking Structure Evaluation Carl Walker, Inc. Proposal #N Dear Mr. Altenburg,

Similar documents
SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

Civil Design Consultants, Inc.

PROPOSAL January 11, 2019

Standard Form of Agreement Between Contractor and Subcontractor

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

Project Goals: Based on our discussions with you, we understand the current project goals and scope to be as follows:

CONSULTING AGREEMENT STANDARD TERMS AND CONDITIONS

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

Document A Standard Form of Agreement Between Contractor and Subcontractor

CONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services)

Standard Form of Agreement Between Contractor and Subcontractor

CONSTRUCTION CONTRACT AGREEMENT

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

Document A401. Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Owner and Architect without a Predefined

Washington University in St. Louis

ICSC CENTERBUILD CONFERENCE DECEMBER 2-5, 1998 ARIZONA BILTMORE PHOENIX, ARIZONA

Thank you for the opportunity to submit this proposal for the above-referenced project.


WBK ENGINEERING, LLC ENGINEERING SERVICES PROPOSAL

MASTER SUBCONTRACT AGREEMENT

CITY OF ELMHURST WIRELESS RADIO ALARM LEASE

ANNEX A Standard Special Conditions For The Salvation Army

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE

W I T N E S S E T H:

Subcontract Agreement

REQUEST FOR PROPOSAL LOOMIS PARK MASTER PLAN GENERAL INFORMATION LOOMIS PARK MASTER PLAN

SARPY COUNTY AND SARPY CITIES WASTEWATER AGENCY

Terms & Conditions of Sale

RICE UNIVERSITY SHORT FORM CONTRACT

CONTRACT FOR SNOW AND ICE MANAGEMENT SERVICES. Updated November 15, 2018

Canadian Standard Form of Agreement between Client and Architect Abbreviated Version

Amount of Contract work per the plans and specifications for project. Specifications Attached. Plans Attached

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION

Deluxe Corporation Purchase Terms and Conditions

MASTER SUBCONTRACTOR AGREEMENT

SUBCONTRACTOR CONTRACT THIS AGREEMENT, Made as of (Current Date), In the Year of (Current Year),

CUSTOMER S ACCEPTANCE OF

UNITED STATES AND CANADA TERMS AND CONDITIONS OF SALE NOVEMBER 2006

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between

f 11, Scope of Services Task 1 - Hazardous Building Materials Assessment

Document B105 TM. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project

PROPANE. HEATING OIL and KEROSENE. SUPPLY AND EQUIPMENT TERMS AND CONDITIONS Pages 2-4. SUPPLY TERMS AND CONDITIONS Pages 5-6

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

REGISTERED CONTRACTOR AGREEMENT

FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006

thyssenkrupp Elevator Corporation Time and Material Proposal Water Damage Work Order

MASTER SUBCONTRACT AGREEMENT

SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

PROFESSIONAL SERVICES AGREEMENT NO

Kim Gatto Interior Design Hourly Contract

GENERAL: WITNESSETH: That the said Contractor and the said District, for consideration hereinafter named agree as follows: DESCRIPTION OF WORK:

Proudly serving the Inland Northwest for over 36 years

CLAIMS ADMINISTRATION SERVICES AGREEMENT

Workforce Management Consulting Services

INTRODUCTION TERMS AND CONDITIONS

STANDARD TERMS AND CONDITIONS OF SALE. Everight Position Technologies Corporation

Barron County Building Use Policy

Watershed Educational Campaign Project

CONSULTATION AND DESIGN AGREEMENT Between ROMAN FOUNTAINS, a New Mexico Corporation and

Drexel University Independent Contractor Service Provider Agreement. Name: [ ] Limited Liability Company [ ] Professional Corporation

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Force Vector, Inc. Master Contract for Sales of Goods and Services

AIA Document A101 TM 2007

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.

Request for Proposals Installation of Pavilions

2. Attachments a) Design Drawings Drawing(s) Revision Revision Date Specifications (T1.1-T2.8) N/A N/A A /06/17 A1.1 N/A N/A A2.

AGREEMENT FOR ENGINEERING SERVICES. J.R.MacKenzie, P.Eng Goodlad Street Burnaby, BC, V5E 2H9 (herinafter called ENGINEER)

AGREEMENT FOR ENGINEERING SERVICES (AHTD VERSION COST PLUS FEE) JOB NO. FEDERAL AID PROJECT ( FAP ) NO. JOB TITLE PREAMBLE

Florida Forestry Service October 6, 2015 Blackwater Forestry Center Proposal No.: P Munson Hwy Milton, FL 32570

Type: Film TV Commercial Photo Shoot Other. Project title: Brief description: Company name: Address: City, State, Zip: Local Project address:

INDEPENDENT CONTRACTOR AGREEMENT

OFFICE OF THE COUNTY COUNSEL

Subcontractor Contract and Scope of Work MECHANICAL Social Security Administration Auburn, AL Ross Clark Circle Dothan, Alabama 36301

Tel: Fax:

CONTRACT. Owner and Contractor agree as follows: 1. Scope of Work.

ENERGY STAR SMART THERMOSTAT REBATE APPLICATION

SAFETY FIRST GRANT CONTRACT

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

CONSULTING SERVICES AGREEMENT [Lump Sum]

FleetPride, Inc. Standard Terms and Conditions of Purchase

Contracting for Small Projects. DPLE 246 July 5, 2017

AIA Document A107 TM 1997

Request for Qualifications #9709RFQ. Architectural Services for Dawson County Fire Station #9

CITY OF PORT ORCHARD PROFESSIONAL SERVICES AGREEMENT

AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR FOR THE FOLLOWING CONSTRUCTION PROJECT. THE BASIS OF PAYMENT BEING A STIPULATED SUM.

REQUEST FOR PROPOSALS FOR THE MANAGEMENT AND OPERATIONS OF THE RIVERFRONT PARKING GARAGE 35 MONROE AVE. MEMPHIS, TN 38103

City of Sidney Request for Qualifications and Proposal for. Plumbing Maintenance and Repair Services # S

CAMIN CARGO CONTROL - TERMS AND CONDITIONS

TERMS AND CONDITIONS OF SALE

Canadian Standard Form of Contract for Architectural Services

August 2016 Edition 1

Request for Proposal: Copier Fleet Minooka Elementary School

Provide all materials to complete the {Contracts.Description} Scope of Work in strict accordance with this purchase order.

TERMS AND CONDITIONS

Waldman. Scope of Work The scope of work for this proposal is outlined below: Phase I: Site Evaluation and Project Manual. 1.

Telemetry Upgrade Project: Phase-3

a. The initial term of this Agreement shall be for a period of three (3) consecutive full months, beginning on the Effective Date ( Initial Term ).

Transcription:

Mr. Tod Altenburg Chief School Business Official 201 North Scoville Avenue Oak Park, Illinois 60302 Re: Carl Walker, Inc. Proposal #N1-16-115 Dear Mr. Altenburg, Carl Walker is pleased to submit this proposal to provide professional engineering services to complete an engineering evaluation of the Lake Street Parking Structure on the campus of Oak Park and River Forest High School. The scope of the evaluation will be to assess the current condition of the structure, provide a description of recommended repairs and waterproofing protection, and prepare an estimate of probable construction costs for short-term and long-term repairs. PROJECT UNDERSTANDING The Lake Street parking structure is located at the northwest corner of Lake Street and Scoville Avenue in Oak Park, Illinois. It is our understanding that the precast concrete parking structure is owned by the Village of Oak Park, and provides approximately 300 parking spaces for teachers, staff, and visitors. We understand that Oak Park and River Forest High School (OPRF) is seeking a qualified engineering firm to provide professional engineering services to complete a condition a thorough evaluation of the existing parking structure. The scope of work includes, but is not limited to the evaluation of precast concrete elements, construction joints, stair/elevator towers, and other structural components, in order to provide recommend short and long term remediation to ensure safe and efficient operation of the facilities. PROJECT APPROACH EVALUATION During this phase, we have developed our project work plan to provide the necessary assessment of the structure to identify existing deterioration and to present practical cost effective solutions, 1920 S Highland Avenue, Suite 210, Lombard IL 60148 Tel: 630.307.3800 carlwalker.com

addressing both short-term and long-term repair and maintenance costs. Our proposed scope is as follows: 1.1 Coordination A. Establish communication channels for the project. A restoration Project Manager will be assigned as our main point of contact to provide OPRF with one single source of communication. B. Conduct an introductory meeting with appropriate OPRF representatives to: 1.2 Research 1. Review the goals of the project to assure that the necessary aspects of the study are included. 2. Establish investigation guidelines to minimize interference with the current parking operations during our evaluation. If necessary and more expedient for our review, we will perform our field evaluation work during the evenings or on weekends. We do not anticipate any disruptions to the normal operations of the parking facility. A. Review previous reports and any other parking structure documentation, including original design drawings, specifications, previous repair documents, etc. B. Develop an understanding of types of materials used, manufacturers, warranties, age of materials/systems, replacement time frame, and replacement values, etc. C. Meet with and interview the appropriate on-site facilities personnel to help understand the recent history of the parking structures. Maintenance history, including the attention given to known problems and existing damage, will be useful in developing long-term repair and protection programs. 1.3 On-site Evaluation A. Review the structural components general structural condition of each garage, including concrete columns, floor slabs (top and bottom side of structural floors), curbs, beams, walls, and structural connections. B. Review the structure to determine quantities and locations of items of deterioration, such as delaminations, cracking, scaling, and spalling of concrete structural elements. This would include a chain drag mechanical sounding of representative areas of floor surfaces to identify spalled/delaminated concrete. Sounding of other elements including soffits, vertical surfaces, beams, columns etc. would be completed, as necessary, to estimate quantities. C. Review the existing joint sealants, expansion joints, and waterproofing coatings. D. Review parking stall striping and deck markings. E. Perform a limited code review for general conformance, including architectural elements, ADA, and similar. If any issues are identified, a more thorough review may be warranted. 2

F. Review the plumbing and floor drains (drainage system) and related infrastructure to determine general condition. G. Review the electrical systems, lighting systems, and surveillance systems (as applicable) for general condition. A review of system operations is not included. H. Notify OPRF and the Village if any safety concerns are identified. 1.3.1 Material Testing Material testing to determine the chloride ion content in the concrete slabs will be performed to assess the potential for corrosion related deterioration. This test will be performed at 5 locations, as well as a baseline location where exposure to chlorides is not anticipated. The results should provide insight into the level of chloride contamination in the existing precast concrete and cast-in-place washes, and will be useful in projecting the remaining service life of the parking structure. The information obtained from this testing would not be able to be determined by visual examination. If conditions are identified in the field that require additional testing, a request for these services will be provided. 1.4 Parking Structure Report A. A written report, with photographs, will be provided in a bound report format. The report will: 1. Summarize the research and review of each garage. 2. Develop a comprehensive work-item list of recommended repairs requiring immediate attention and long-term repairs scheduled for the next 10 years. 3. Provide a detailed cost estimate of construction costs for the recommended repairs and improvements, including soft costs for engineering and administration. 4. Identify the anticipated remaining service life of the structure based on recommendations. B. A draft report will be provided for review. C. A meeting or conference call will be conducted with OPRF to review the draft reports. D. Report will be finalized, incorporating all review comments. SCHEDULE After we receive authorization to proceed, we will closely coordinate the project schedule with you to minimize interference with parking operations. We anticipate performing the field evaluation within 2 weeks of authorization. If materials testing is required, an additional 2 weeks would be added to the schedule. Following field work and testing, an engineering report will be submitted in 2 to 3 weeks. 3

PROFESSIONAL FEES We propose to provide Engineering services for the condition assessment of the Lake Street Parking Structure on a fixed fee basis, plus reimbursable expense basis. Services will be invoiced monthly in accordance with Carl Walker s Construction Standard Terms and Conditions (attached) commensurate with the work performed in the prior month. Reimbursable expenses for each phase include normal travel, shipping, and reproduction. CARL WALKER, INC. FEES AND EXPENSES Work Task Professional Fee Expenses Engineering Evaluation of the Lake Street Parking Structure $6,500 $300 Materials Testing Chloride Ion Testing (5 samples) $400 $1,700 Evaluation Fee Total: $6,900 $2,000 Trusting that this proposal and letter form of agreement meets with Oak Park and River Forest High School s acceptance, please have it executed where indicated below to serve as our agreement for these services. We are excited about the opportunity to work with OPRF on this project. Please let us know if you have questions, or require additional information. Sincerely, CARL WALKER, INC. Torrey Thompson Managing Principal Attachments: Exhibit A Carl Walker, Inc. Standard Terms and Conditions ACCEPTED BY: Signature Printed Name Title Date 4

CARL WALKER, INC. TERMS AND CONDITIONS 3/1/16 Performance: Carl Walker, Inc. and its employees will strive to exercise the degree of skill and care expected by customarily accepted good engineering practices and procedures. No other warranties, expressed or implied, are made with respect to Carl Walker's performance, unless agreed to in writing. Carl Walker is not a guarantor of the project to which its services are directed, and its responsibility is limited to work performed for the Client. Carl Walker is not responsible for acts or omissions of the Client, nor third parties not under its direct control. Access To Site: Unless otherwise stated, Carl Walker will have access to the project site for activities necessary for the performance of the services. Carl Walker will take precautions to minimize damage due to these activities, but has not included in the fee the cost of restoration of any resulting damage. Fees: Fees are accrued on an hourly basis, unless other arrangements are established. No increase in rate for overtime. No charges for travel time of professional staff outside of normal workday unless time is productive. Technicians may charge up to 2 hours on weekdays for travel outside of normal workday, or up to 4 hours per day for travel on weekends. The total fee, if stated, shall be understood to be an estimate, and shall not be exceeded by more than ten percent without written approval of the Client. Where the fee arrangement is to be on an hourly basis, the rates shall be those that prevail at the time services are rendered. Expenses: Subsistence and out-of-pocket expense incurred for travel, lodging, and meals; reproduction and shipping; etc. Cost + 15% Company or personal cars.62/mi Company trucks or vans.62/mi Telephone expenses shall be billed at ½% of labor fees Equipment Usage: Approximately equal to 1% of the replacement cost per day, subject to adjustment for minimum or extended usage. Outside Consulting, Testing, or Subcontracted Services: Cost plus 10% if Consultant has at least $500,000 Professional/General Liability Insurance, otherwise 20%. Consultants' transportation, subsistence, and out-of-pocket expenses plus 15%. Billings/Payments: Invoices for Carl Walker's services shall be submitted, at Carl Walker's option, either upon completion of such services or on a monthly basis. Invoices shall be due and payable by the last day of the month following the month when the invoice was mailed. If the invoice is not paid when due, Carl Walker may, without waiving any claim or right against the Client, and without liability whatsoever to the Client, terminate the performance of the service. Retainers shall be credited on the final invoice. Late Payments: Accounts unpaid by the last day of the month following the month when the invoice was mailed will be subject to a monthly service charge of 1% on the then unpaid balance (12% true annual rate). In the event any portion or all of an account remains unpaid 90 days after billing, the Client shall pay all costs of collection, including reasonable attorney's fees. Storage: Material samples not consumed in our work may be discarded 30 days after submission of the test report unless the Client requests other disposition. Charges may be made, after notification, for extended storage of materials, records, or equipment. Safety: Field work will be performed only under safe conditions. Charges may be made for safety or security measures required by hazardous job conditions. Insurance: The primary coverages provided by Carl Walker are $1,000,000 for general liability, $500,000 for automobile liability, $500,000 for workers' compensation, and $1,000,000 for professional liability. Umbrella coverage of $1,000,000 applies to general and automobile liability only. Coverage is subject to annual renewal. Indemnification: The Client shall indemnify and hold harmless Carl Walker and all of its personnel from and against any and all claims, damages, losses, and expenses (including reasonable attorney's fees) arising out of or resulting from the performance of the services, to the extent that any such claim, damage, loss, or expense is caused by the negligent act, omission, and/or strict liability of the Client, anyone directly or indirectly employed by the Client (except Carl Walker), or anyone for whose acts any of them may be liable. Hazardous Materials: Carl Walker shall have no responsibility for the discovery, presence, handling, removal or disposal of or exposure of persons to hazardous materials in any form at the project site, including but not limited to asbestos, asbestos products, polychlorinated biphenyl (PCB) or other toxic substances. Risk Allocation: In recognition of the relative risks, rewards, and benefits of the project to both the Client and the Firm, the risks have been allocated such that the Client agrees that, to the fullest extent permitted by law, Carl Walker's total liability to the Client for any and all injuries, claims, losses, expenses, damages, or claim expenses arising out of this agreement from any cause or causes, shall not exceed Carl Walker's fee or $50,000, whichever is greater. Such causes include, but are not limited to, Carl Walker's negligence, errors, omissions, strict liability, or breach of contract or breach of warranty. Termination of Services: This agreement may be terminated by the Client or Carl Walker should the other fail to perform its obligations hereunder. In the event of termination, the Client shall pay Carl Walker for all services rendered to the date of termination, all reimbursable expenses, and reimbursable termination expenses. Ownership of Instruments of Service: All reports, drawings, specifications, CADD files, field data, notes and other documents and instruments prepared by Carl Walker as instruments of service shall remain the property of Carl Walker. The Client understands that changes or modifications to the documents made by anyone other than Carl Walker may result in adverse consequences which Carl Walker can neither predict nor control. Therefore, the Client agrees, to the fullest extent permitted by law, to hold harmless and indemnify Carl Walker from and against all claims, liabilities, losses, damages, and costs, including, but not limited to, attorney fees arising out of or in any way connected with the modification, misinterpretation, misuse, or reuse by the Client or others of the documents provided by Carl Walker under the agreement. Applicable Laws: Unless otherwise specified, this agreement shall be governed by the laws of the state in which the Carl Walker office is located. Mediation: In an effort to resolve any conflicts that arise during the design or construction of the project or following the completion of the project, the Client and Carl Walker agree that all disputes between them arising out of or relating to this agreement shall be submitted to non-binding mediation unless the parties mutually agree otherwise.