Guide for Completing Form AB-83

Similar documents
Organizations shall be accredited by TSSA to perform repairs without the acceptance of a TSSA Inspector pursuant to the provisions set forth below.

Harmonized Requirements for Historical Boilers

13 NCAC is amended with changes as published in 31:09 NCR as follows:

Industrial Legislation

Guide for the Extension of Boiler Internal Inspections

13 NCAC is amended with changes as published in 29:10 NCR 1197 as follows:

IN THE MATTER OF: THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 (the Act ) - and -

The Boiler and Pressure Vessel Regulations, 2017

The Boiler and Pressure Vessel Fees Regulations, 1981

The amendments to these regulations are created pursuant to , and (1)(a) of the Colorado Revised Statutes (CRS).

COLORADO DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY BOILER AND PRESSURE VESSEL REGULATIONS

REVISED REGULATIONS OF SASKATCHEWAN

Statutory Requirements for Pressure Vessels and Systems in Singapore & Introduction of the Workplace Safety and Health Act 2006

The National Board Pressure Equipment Inspector Program

Northeast Process Controls Tel: Fax:

BOILER AND UNFIRED PRESSURE VESSEL LAW Act of Jun. 18, 1998, P.L. 655, No. 85 AN ACT Regulating the construction, equipment, maintenance, operation

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE MICHIGAN BOILER RULES

List Price Sheet

March Process Industry Practices Piping. PIP PNDMV09N Needle Valve Data Sheet and Standard Terms

The amendments to this rule are created pursuant to , and (1)(a) of the Colorado Revised Statutes (CRS).

TECHNICAL SAFETY BC FEE SCHEDULE: BOILERS and PRESSURE VESSELS

List Price Sheet March 28, 2016

APPLICATION FOR MECHANICAL PERMIT Fill in all information completely

PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE

Invitation for Pre-Qualification of Bidders for 1X600 MT Mounded Pressurized Storage Vessel at Lucknow LPG Plant.

REQUEST FOR QUALIFICATIONS (RFQ) FOR DSA INSPECTOR OF RECORD (IOR) SERVICES

HYDROSTATIC TEST PLAN

4101: Existing boilers and pressure vessels.


INFORMATION: Audit Report on "Quality Assurance of Black Cells at the Waste Treatment Plant"

Mt. Hawley Insurance Company Peoria, IL ARTISAN CONTRACTORS SUPPLEMENTAL QUESTIONNAIRE

Price List August 1, 2017

Boilers & Unfired Pressure Vessels

Construction of the Leased Premises

CONTRACTORS SUPPLEMENTAL APPLICATION

SE-330 LUMP SUM BID FORM

CEN/TC 267/WG 8/MHD «Maintenance of EN series» MHD Answers on 2017 Questions

VII. Recommended Guidelines for the Care of Power Boilers. ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE

State of: County of: Subscribed and sworn to before me this day of b. % of Stored Material $ 0.00

TOWN OF BLACKFALDS REQUEST FOR TENDER

City of Forest Park Request for Proposals. Landscape Installation, 803 & 785 Forest Parkway, Forest Park Ga

AIA Document A201 TM 1997

Building Permit Check Sheet

American Petroleum Institute Purchasing Guidelines Purchase API Spec 8C online at Table of Contents

Labor Chapter ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER GENERAL PROVISIONS TABLE OF CONTENTS

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address

ADVERTISEMENT FOR BID

Price List February 17, 2014

Rolling Plains Management Corporation 118 North First Street P.O. Box 490 Crowell, Texas REQUEST FOR PROPOSALS FOR

COACHELLA VALLEY WATER DISTRICT INSTRUCTIONS TO APPLICANT PERMANENT ENCROACHMENT PERMIT

CONTRACTOR REGISTRATION

REQUEST FOR QUALIFICATIONS (RFQ) FOR DSA INSPECTOR OF RECORD (IOR) SERVICES. April 18, 2006

Contractors General Liability Application

City of Forest Park Request for Proposals Concrete Driveway Replacement Fire Station # Jonesboro Rd., Forest Park, Georgia,

TEMPORARY SERVICE APPLICATION (HYDRANT METERS)

In accordance with 61 O.S. 108 and 115, a sworn statement shall accompany any competitive bid submitted for a public construction contract.

BANK OF INDIA, AHMEDABAD ZONE

AIA Document A201 TM 1997

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.

The Hotel Roanoke & Conference Center Invitation for Bid

ADDENDUM NO. 1. ADDENDUM NO. 1 for the above referenced project hereby modifies the RPF documents, as follows:

CONTRACTORS EQUIPMENT RENTAL GENERAL LIABILITY APPLICATION

CSE Safeguard Insurance Company

Divided Record Authority Permit Application

Oil & Gas Supplemental Questionnaire

New Buildings Program 2.0

To request a full data sheet, please send an to:

APPLICATION FOR BUILDING PERMIT CITY OF PORT JERVIS, NEW YORK. Section Block Lot Zone

IC Chapter 6. Regulated Boilers and Pressure Vessels; Boiler and Pressure Vessel Inspectors

SUBCONTRACT. by and between. to perform the Work identified in Article 2 in accordance with the Projects Contract documents.

Recommended Rules for the Care and Operation of Heating Boilers

CITY OF PORT JERVIS 13 STEPS TO HIRING A CONTRACTOR

New Buildings Program 2.0

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

Request for Proposal. Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville. June 15, 2015

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

In accordance with 61 O.S. 108 and 115, a sworn statement shall accompany any competitive bid submitted for a public construction contract.

OM Air Volume Booster Model : VF01. User's Manual

OIL & GAS SERVICE CONTRACTOR SUPPLEMENTAL

PIPELINE INVESTIGATION REPORT P09H0084 CRUDE OIL PIPELINE LEAK

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA PROJECT: BACKFLOW TESTING BID#P

Subcontract Agreement

Business Management Manual Number: POL Version: 2 Effective Date: 3/2/2018

ONTARIO REGULATION to be made under the. TECHNICAL STANDARDS AND SAFETY ACT, 2000 Amending O. Reg. 220/01 (BOILERS AND PRESSURE VESSELS)

Session 3 by Zoltán Záhonyi, FIDIC AIT,

SUBCONTRACTOR TOOLING MANUAL

TERMS AND CONDITIONS RELATING TO CONNECTION OF DOMESTIC PROPERTIES TO THE PHOENIX NATURAL GAS LIMITED NETWORK

Maxville Sports Complex REQUEST FOR TENDER

SEALED BID REQUEST FOR PROPOSAL CLERK-OF-THE-WORKS STRUCTURAL REINFORCEMENTS CENTRAL SERVICES BUILDING, MIDDLESEX, VT

Section Payment Conditions

Repair Authority - Terms of Authority

Prepared July Georgia Law Provisions. Imposition of Tax and Exemptions

1 Authority, Responsibility, and Policy

AIA Document A103 TM 2007

NEVADA IRRIGATION DISTRICT. Appendix B

HRSD Interceptor Force Main Tapping Application

PACKAGE OPTION ADDENDUM

Case Study: Key Performance Indicators implementation in gas transmission pipeline. María José Gutiérrez Argentina

CITY AND BOROUGH OF JUNEAU (CBJ) REQUEST for QUOTES (RFQ) Chain Link Fence Installation at CBJ Wastewater Facilities

PROJECT SPECIFIC INSURANCE MANUAL PROJECT LIABILITY PROGRAM FOR THE PROJECT NAME

Transcription:

AB-83a 2016-07 Guide for Completing Form AB-83 1.0 PURPOSE To provide guidance for completing Form AB-83, Pressure Piping Construction and Test Data Report. 2.0 APPLICATION The Pressure Piping Construction and Test Data Report is used for documenting new construction, repairs and alterations in Alberta for ASME B31.1, B31.3, B31.5, B31.9 and CSA Z662 pressure piping systems that are subject to the Safety Codes Act and Regulations. The form is not to be used for piping systems that are not subject to the Safety Codes Act and Regulations. For pressure piping systems constructed, repaired altered outside Alberta for use in Alberta, Form AB-83F is to be completed. 3.0 GENERAL Form AB-83 is required for documenting new construction, repairs and alterations and for certifying that the work was done in accordance with Alberta requirements. The methods of construction, repairs and alterations may be by welding, brazing, mechanical assembly or by bonding. Any welding and/or rework (such as machining) on the pressure components must be documented on Form AB-83. The latest version is posted on ABSA's website, http://www.absa.ca, under ABSA Form Directory. An alteration is any change in the item described on the original Pressure Piping Construction and Test Data Report which affects the pressure containing capacity of the pressure retaining item. Non-physical changes such as a change in the design pressure or design temperature of a pressure retaining item are alterations. A reduction in minimum design temperature is also an alteration. A repair is the work necessary to restore the pressure equipment to a safe and satisfactory operating condition, provided that there is no deviation from the original design. 4.0 INSTRUCTIONS The following describes the information required for completing each item of Form AB-83. The numbers in these instructions correspond to the numbers on Form AB-83. Revision # 2 Page 1 of 6

AB-83a 2016-07 Front of Form AB-83 (See sample form page 5 of this document) (1) Indicate if the work on the pressure piping system is shop or field construction. (2) Indicate if the report is a final data report or partial data report. When all code requirements have been met and the piping system or sub-assembly has been pressure tested, a final data report must be completed. A project may have multiple final data reports. An owner should clarify the requirement for a final or partial data report at the contract stage. A partial data report is completed when code work such as NDE, PWHT, or pressure testing are not completed. A partial data report is submitted to a company that is authorized by ABSA and takes responsibility for the completion of the incomplete code work and issuance of the final data report. A pressure test is a code requirement; therefore, it must be completed by a company that has a valid Certificate of Authorization Permit for the scope of work. (3)(5) Indicate the primary contractor s or subcontractor s name and address. A primary contractor is the company that was awarded the contract by an owner. A subcontractor is the company that is hired by the primary contractor to do part of the work. (4) Indicate the owner s job number. (6)(7) Indicate the Certificate of Authorization Permit number and permit expiry date for the primary contractor or subcontractor as the case may be. (8)(9) Indicate the primary contractor s name and address, if applicable, otherwise indicate N/A. A subcontractor completing the AB-83 form and part A of the Certificate of Compliance, must provide the name of the primary contractor to whom the partial data report will be provided. (10)(11) Indicate the primary contractor s Certificate of Authorization Permit number and permit expiry date, if applicable, otherwise indicate N/A. (12)(13) Indicate the piping system owner s name, address and location of the installed piping system. (14)(15) Indicate the owner s Certificate of Authorization Permit number and expiry date, if applicable, otherwise indicate N/A. (16) Indicate the piping system design registration number, if applicable, otherwise indicate N/A. The pressure piping PP number must be indicated if the overall internal volume of the pressure piping system exceeds 500 liters. If a subcontractor receives a contract for pressure piping work from a primary contractor or an owner and the internal volume of the contracted piping is less than 500 liters, the PP number is required if the overall volume of the pressure piping project exceeds 500 liters. An owner s existing PP number must be indicated if an addition or repair or alteration is done at a site where the pressure piping system is previously registered by the owner or previous owner. Revision # 2 Page 2 of 6

(17) Mark the box for the company responsible for the design. If the owner subcontracts the work to another company, the owner is responsible for the design. AB-83a 2016-07 (18)(19) Provide the registration number for the welding procedure(s) used and the name of the company that holds the registration. Indicate N/A if no welding procedures were used. A registration number is a number issued by ABSA and starts with the prefix WP. The company s WPS number should not be entered in this field. (20) Provide the registration number for the owner s welding procedures if any are used, otherwise indicate N/A. Welding procedures used by a fabricator must be registered with ABSA in the fabricator s name. A fabricator may use a WPS registered in the owner s name if prior acceptance by ABSA is secured. A subsidiary company of a fabricator may use a WPS registered in the fabricator s name provided the arrangement is described in the fabricator s quality management system manual. (21)(22) Indicate welding procedure specification number(s) for all welding procedures used. If there is insufficient space in (20) and/or (21) indicate the welding procedure specifications under Remarks on the back of Form AB-83. Indicate N/A if no welding procedures were used. (23) Mark the box for the applicable ASME pressure piping code. Per IB10-006 Scope: Steam pipelines include pipelines intended to carry steam, steam and produced fluids, or recovered steam. There may be situations in which produced fluids (emulsion) meet the definition of expansible fluid and required steam pipelines design. The DESIGNER of the system is responsible to make this decision. (24) Mark the service category for ASME B31.3 piping systems. (25) Provide the applicable number(s). (26) Indicate the fluid that the piping system is designed for. (27) Indicate the design pressure of the piping system. (28) Indicate the maximum and minimum design temperatures of the piping system. (29)(30) Provide the test pressure and test medium (e.g. water, glycol, air, etc.), if applicable, otherwise enter N/A. If N/A, the responsibility for completing the pressure test must be indicated in the Remarks section. If the company responsible is not known indicate pressure test to be done by others in Remarks. (31) Provide the material specification and grade for the pipe. If tubing is used, provide the material specification and grade. (32) Indicate the corrosion allowance for the piping system, if applicable, otherwise enter 0. (33) Provide the nominal pipe size and schedule for the pipe. If tubing is used, provide the tube outside diameter and nominal wall thickness. Revision # 2 Page 3 of 6

AB-83a 2016-07 (34) Provide the flange material and rating (e.g. A105N cl 600). If there are no flanges, enter N/A. (35) Indicate the design PWHT and design preheat requirements. (note that for some materials the codes require specific preheats). (36) State the applicable type(s) of NDE. Standard abbreviations such as VT, RT, PT, MT, UT should be used. It is the responsibility of the owner s inspector to confirm all required examinations have been completed. Details of the examinations, such as the % of radiography, shall be included in a manner acceptable to the owner s inspector, or to the ABSA safety codes officer in the case of piping that must be inspected by the ABSA safety codes officer. If there is insufficient space in (36), describe the nondestructive examination(s) in Remarks on the back of Form AB-83. The table from (25) to (36) may be reproduced on a separate sheet and attached to the Form AB-83 if the space provided in the form is not sufficient and/or additional information is included. If a separate sheet is used, specify the piping job no. on the sheet or indicate other information that links the separate sheet to the Form AB-83 for the piping job. Indicate in the table on Form AB-83 or in Remarks to see a separate sheet. Back of Form AB-83 (37) Mark the box and indicate the applicable data from the partial data report(s), if applicable, otherwise indicate N/A. This table is for use by a primary contractor who subcontracts part(s) of the project to other contractor(s). The primary contractor must list and attach all of the partial data reports received from subcontractors. Final Forms AB-83 or AB-83F received from subcontractors need not be listed in this table. (38) Complete according to the instructions shown. Include any additional information that will not fit into the applicable space(s) provided on the Form AB-83. (39) Complete if the form is a partial data report, otherwise leave it blank. (40) Complete if the form is a final data report, otherwise leave it blank. The job no. is to be the same as that indicated for the owner s job no. on the front of Form AB-83. (41) The owner s inspector must sign the Certificate of Inspection for all ASME B31.1, B31.3 and B31.5 pressure piping systems. The owner or owner s representative must sign the Certificate of Inspection for ASME B31.9 pressure piping systems. The job no. is to be the same number as that indicated for the owner s job no. on the front of Form AB-83. For boiler external piping, the form must also be presented for signature to the ABSA safety codes officer who performed the inspection. Revision # 2 Page 4 of 6

AB-83 2016-07 PRESSURE PIPING CONSTRUCTION AND TEST DATA REPORT In accordance with the provisions of the PESR Section 31(1) (1) Shop Construction ; Field Construction ; (2) Final Data Report ; Partial Data Report (from one ABSA- authorized Contractor to another ABSA- authorized Contractor). Complete both sides of this Form 1. Constructed By: (3) Owner s Job No: (4) (Name of ABSA authorized primary contractor or subcontractor) (5) (Address) Certificate of Authorization Permit No. AQP- (6) Expiry (7) 2. Constructed For: (8) (9) (Name of primary contractor if different from above) (Address) Certificate of Authorization Permit No. AQP- (10) Expiry (11) (Required when the primary contractor undertakes some/all of the quality functions, e.g., NDE, PWHT, Tie-in, fabrication, hydro test, final assembly etc.) 3. Owner: (12) (13) (Name and address) (Location of installation) Certificate of Authorization Permit No. AQP- (14) Expiry (15) (Required when the owner undertakes some/all of the quality functions, e.g., NDE, PWHT, Tie-in, fabrication, hydro test, final assembly etc.) 4. Piping Design Alberta Registration No.: PP- (16) (Required if aggregate piping volume is over 0.5m3) 5. (17) Design Responsibility: Owner ; Contractor 6. WP No.: WP- (18) ; Company: (19) Owner s WP No. (If used): WP-(20) (Alberta Registration No.) (Alberta Registration No.) Spec No(s). used: (21) ; Owner s Spec No(s). (If used): (22) 7. Code: (23) ASME B31.1 Non Boiler External Piping ; ASME B31.1 Boiler External Piping ; B31.5 ; B31.9 ; CSA Z662 Steam Pipelines ; Drawing No. Rev. No. Line No. (24) ASME B31.3 - Service Category: Normal, D, M, High Pressure, Severe Cyclic Condition High Purity Fluid (Air/Stm. Etc.) Des. Press. kpa Des. Temp. 0 C (Max. & Min.) Pressure Test kpa Test Medium Pipe Mat'l Spec. & Grade C.A. mm Pipe NPS & Schedule Flange Material & Rating PWHT/ Preheat Temp. 0 C (25) (26) (27) (28) (29) (30) (31) (32) (33) (34) (35) (36) NDE Revision # 2 Page 5 of 6

Partial Data Reports certified by subcontractors are listed below and attached to this Data Report (37) No. Line No. Spool No. Dwg. No. (with Rev. No.) Subcontractor (Name) AQP No. (if from Alberta) AB-83 2016-07 Expiry (if from Alberta) Remarks: For partial data report provide information about the code work that was not completed by the subcontractor (e.g., hydrostatic test, PWHT etc.). For final data report provide information about the code work that was not completed by subcontractors and subsequently completed by the primary contractor (e.g., hydrostatic test of entire assembly, PWHT etc.) (38) A. CERTIFICATE OF COMPLIANCE Signed by the contractor when supplying this certificate as a Partial Data Report (39) We certify that the statements in this Data Report are correct and that materials, construction and workmanship of the piping fabrication conform to the registered quality system and the applicable Piping code(s). Contractor Print Authorized Representative s Name Signature This certificate is not valid unless it forms part of a Final Data Report signed by Primary Contractor Endorse certificate A or B B. CERTIFICATE OF COMPLIANCE Signed by the contractor when supplying this certificate as a Final Data Report (40) We certify that the statements in this Data Report are correct and that piping job no. described in this Data Report was constructed in accordance with the Province of Alberta Safety Codes Act and Regulations, and applicable ASME Piping Code(s). Contractor Print Authorized Representative s Name Signature CERTIFICATE OF INSPECTION (41) I, the undersigned, employed by have verified that all required examination and testing has been completed, and inspected the piping described in this construction data report to the extent necessary to be satisfied that it conforms to all applicable examination requirements of the Code and of the engineering design, and state that, to the best of my knowledge and belief, the contractor has constructed this piping in accordance with the Alberta Safety Codes Act and Regulations. By signing this certificate neither the inspector nor his or her employer makes any warranty, expressed or implied, concerning the piping described in this construction data report. Furthermore, neither the inspector nor his or her employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Owner s Inspector Name (please print) Owner s Inspector Signature ABSA Safety Codes Officer (please print) (BOILER EXTERNAL PIPING ONLY) ABSA Safety Codes Officer s Signature Revision # 2 Page 6 of 6