New Zealand Energy Corp.

Similar documents
Management s Discussion and Analysis Nine Months Ended 30 September 2017

Management s Discussion and Analysis Six Months Ended 30 June 2017

Management s Discussion and Analysis Nine Months Ended 30 September 2018

Management s Discussion and Analysis Year Ended 31 December 2017

Strategic Taranaki Acquisition

Third Quarter 2015 Unaudited Condensed Consolidated Interim Financial Statements 30 September, 2015

First Quarter 2018 Condensed Consolidated Interim Financial Statements. 31 March 2018

Consolidated Financial Statements Year Ended 31 December 2016

PAINTED PONY ANNOUNCES A 52% INCREASE IN PROVED PLUS PROBABLE RESERVES TO 1.7 TCFE WITH A NET PRESENT VALUE DISCOUNTED AT 10% OF $1.

CANADIAN NATURAL RESOURCES LIMITED ANNOUNCES 2019 BUDGET CALGARY, ALBERTA DECEMBER 5, 2018 FOR IMMEDIATE RELEASE

Light Oil International Tim McKay, Chief Operating Officer

Advantage Announces 2011 Year End Financial Results and Provides Interim Guidance

News release February 10, 2015

Stream Announces 2011 Reserve Report. Net Present Value of Reserves Increased by 35% (Proved) & 29% (Proved plus Probable)

Bengal Energy Announces Fourth Quarter and Fiscal 2018 Year End and Reserve Results

TSX V: HME. Achieved a two year average F&D cost of $9.22/boe (including changes in FDC) for a recycle ratio of 1.8.

PETERS & CO. LIMITED ENERGY CONFERENCE

CANADIAN NATURAL RESOURCES LIMITED ANNOUNCES 2016 YEAR END RESERVES CALGARY, ALBERTA FEBRUARY 14, 2017 FOR IMMEDIATE RELEASE

HEMISPHERE ENERGY ANNOUNCES Q FINANCIAL AND OPERATING RESULTS

The Turning Point corporate Summary

TSXV: TUS September 8, 2015

CRESCENT POINT ANNOUNCES STRATEGIC CONSOLIDATION ACQUISITION OF CORAL HILL ENERGY LTD. AND UPWARDLY REVISED 2015 GUIDANCE

Consolidated Financial Statements Year Ended 31 December (Expressed in Canadian Dollars)

Canadian Natural Resources Limited MANAGEMENT S DISCUSSION AND ANALYSIS

Q First Quarter Report

Gran Tierra Energy Announces 2011 Year-End Reserves

Company's Brazil and Peru business units of $44 million; impairment losses decreased by $414 million, net of income tax recovery, compared to 2016

Company Greenfields MD&A Third Quarter and Year-to-Date 2018 Highlights Sales Volumes Bahar Project

Cub Energy Inc. Announces Strategic Ukraine Acquisition

BNK PETROLEUM INC. ANNOUNCES THIRD QUARTER 2018 RESULTS WITH POSITIVE NET INCOME

The Game Plan corporate Summary

Executive Overview. Rich Kruger, Chairman, President & CEO

2011 Annual Report. Non-Consolidated Financial and Operating Highlights (1) Year ended December 31, Three months ended December 31, 2010

CEQUENCE ENERGY ANNOUNCES 2015 INDEPENDENT RESERVES EVALUATION

SHAMARAN ANNOUNCES FINANCIAL AND OPERATING RESULTS FOR THE NINE MONTHS ENDED SEPTEMBER 30, 2018

US$11 million Private Placement. Intention to apply for admission to trading on the AIM Market

Athabasca Oil Corporation Announces 2018 Year end Results

TSX-V: NZ OTCQX: NZERF

SPARTAN ENERGY CORP. ANNOUNCES STRATEGIC SOUTHEAST SASKATCHEWAN LIGHT OIL ACQUISITION

Corporate Presentation

Bengal Energy Announces Fiscal 2017 Second Quarter Results

News Release January 9, Parex Announces Drilling Success on Aguas Blancas and Cabrestero Blocks and Continued Production Growth on LLA-34

NEWS RELEASE April 30, , 707 7th Avenue S.W. Calgary, Alberta T2P 3H6 Telephone: (403) Facsimile (403)

FINANCIAL AND OPERATING HIGHLIGHTS (THREE MONTHS ENDED MARCH 31, 2018)

INPLAY OIL CORP. ANNOUNCES 2016 YEAR END RESERVES AND AN OPERATIONS UPDATE

PETRUS RESOURCES ANNOUNCES FOURTH QUARTER AND YEAR END 2017 FINANCIAL & OPERATING RESULTS AND YEAR END RESERVE INFORMATION

News Release March 7, Parex Resources Announces 2016 Fourth Quarter and Full Year Results

For Immediate Release Granite Oil Corp. Announces 2017 Record Year End Reserve Metrics and Operational Update

Border Petroleum Corp.

We have the building blocks to be a successful heavy oil company

InPlay Oil Corp. Announces First Quarter 2018 Financial and Operating Results Highlighted by a 24 % Increase in Light Oil Production

SHAMARAN ANNOUNCES INCREASE IN ATRUSH YEAR END RESERVES ESTIMATE

Annual and Special Shareholder Meeting May 17, 2018

POSITIONED FOR SUCCESS

Independent Auditor s Report

JOINT NEWS RELEASE PENGROWTH ENERGY CORPORATION AND NAL ENERGY CORPORATION ANNOUNCE STRATEGIC BUSINESS COMBINATION

Heavy Oil. Gems. November TSX:PXX; OMX:PXXS

BELLATRIX ANNOUNCES 2018 YEAR END RESERVES HIGHLIGHTED BY 13% RESERVE GROWTH AND LOW COST RESERVE ADDITIONS

DELPHI ENERGY RELEASES YEAR END 2015 RESERVES

CEQUENCE ENERGY ANNOUNCES 35% GROWTH IN RESERVES AND 2012 FINANCIAL AND OPERATING RESULTS

InPlay Oil Corp. Announces Second Quarter 2018 Financial and Operating Results and Increases Production Guidance

ACQUISITION OF SPARTAN ENERGY CORP. APRIL 2018

MANAGEMENT S DISCUSSION AND ANALYSIS

SHAMARAN ANNOUNCES 25% INCREASE IN ATRUSH RESERVES ESTIMATES

MART RESOURCES: A Nigeria Marginal Field Case Study Mr. Wade Cherwayko (Chairman & CEO) Asia O&G Assembly, Hong Kong, 25 April 2013

CONTINUING OPERATIONS

take a closer look Encana Corporation Key Resource Play Statistics As at June 30, 2011

A SPRINGBOARD FOR GROWTH

Hunter Oil Corp. (formerly known as Enhanced Oil Resources Inc.) Management s Discussion & Analysis

CRESCENT POINT ANNOUNCES SASKATCHEWAN VIKING CONSOLIDATION ACQUISITION AND UPWARDLY REVISED GUIDANCE FOR 2014

Light Oil North America Jeff Wilson, Senior Vice-President, Exploration

Third Quarter Highlights

CNOOC Limited Enters Into Definitive Agreement to Acquire Nexen Inc.

MANAGEMENT S DISCUSSION AND ANALYSIS

Lessons Learned After Opening a Top Slide Valve on a Live Coke Drum

NOT FOR DISTRIBUTION TO U.S. NEWS SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

PACIFIC EXPLORATION & PRODUCTION CORP.

Year-end 2017 Reserves

Canacol Energy Ltd. Reports Record Production Levels

DELPHI ENERGY CORP. REPORTS 2018 YEAR END RESERVES

Hunter Oil Corp. Management s Discussion & Analysis

AUSTRALIA FOCUSED EXPLORATION & PRODUCTION COMPANY

Q Financial Results Conference Call

CEQUENCE ENERGY ANNOUNCES SECOND QUARTER 2018 FINANCIAL RESULTS

Q Conference Call

SUSTAINABLE DIVIDEND & GROWTH May 2018

TRAVERSE ENERGY LTD. MANAGEMENT'S DISCUSSION AND ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2015

MANAGEMENT S DISCUSSION & ANALYSIS. Year Ended July 31, 2017

SURVIVE TO THRIVE 2016 CAPP SCOTIABANK INVESTMENT SYMPOSIUM

MATERIAL CHANGE REPORT

Encana reports fourth quarter and full-year 2018 financial and operating results

THIRD QUARTER REPORT SEPTEMBER 30, 2012

TSX : TAO OTCQX : TAOIF! A proven leader in New Zealand s! oil & gas industry!! Focused on production growth from proven assets!! Fall 2018!

NIKO REPORTS RESULTS FOR THE QUARTER ENDED DECEMBER 31, 2017

Tuscany has built a large inventory of horizontal oil locations

NATIONAL INSTRUMENT STANDARDS OF DISCLOSURE FOR OIL AND GAS ACTIVITIES TABLE OF CONTENTS

Delayed Coker Engineering Experience Horizon Oil Sands Project. September 9, 2008

AFRICA ENERGY CORP. Report to Shareholders

NEWS RELEASE MARCH 1, 2018 VERMILION ENERGY INC. ANNOUNCES 2017 YEAR-END SUMMARY RESERVES AND RESOURCE INFORMATION

Yangarra Announces 2017 Year End Corporate Reserves Information

Transcription:

New Zealand Energy Corp. Investor Business Update November / December 2015

Cautionary Notes FORWARD-LOOKING INFORMATION This document contains certain forward-looking information and forward-looking statements within the meaning of applicable securities legislation (collectively forward-looking statements ). The use of any of the words will, objective, plan, seek, expect, potential, pursue, subject to, can, could, hopeful, contingent, anticipate, look forward, and similar expressions are intended to identify forward-looking statements. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements. Such forward-looking statements should not be unduly relied upon. The Company believes the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct. This document contains forward-looking statements and assumptions pertaining to the following: business strategy, strength and focus; the granting of regulatory approvals; the timing for receipt of regulatory approvals; geological and engineering estimates relating to the resource potential of the properties; the estimated quantity and quality of the Company s oil and natural gas resources; supply and demand for oil and natural gas and the Company s ability to market crude oil and natural gas; expectations regarding the Company s ability to continually add to reserves and resources through acquisitions and development; the Company s ability to obtain qualified staff and equipment in a timely and cost-efficient manner; the Company s ability to raise capital on appropriate terms, or at all; the ability of the Company s subsidiaries to obtain mining permits and access rights in respect of land and resource and environmental consents; the recoverability of the Company s crude oil, natural gas reserves and resources; and future capital expenditures to be made by the Company. Actual results could differ materially from those anticipated in these forward-looking statements as a result of the risk factors set forth below and elsewhere in the document, such as the speculative nature of exploration, appraisal and development of oil and natural gas properties; uncertainties associated with estimating oil and natural gas resources; changes in the cost of operations, including costs of extracting and delivering oil and natural gas to market, that affect potential profitability of oil and natural gas exploration; operating hazards and risks inherent in oil and natural gas operations; volatility in market prices for oil and natural gas; market conditions that prevent the Company from raising the funds necessary for exploration and development on acceptable terms or at all; global financial market events that cause significant volatility in commodity prices; unexpected costs or liabilities for environmental matters; competition for, among other things, capital, acquisitions of resources, skilled personnel, and access to equipment and services required for exploration, development and production; changes in exchange rates, laws of New Zealand or laws of Canada affecting foreign trade, taxation and investment; failure to realize the anticipated benefits of acquisitions; and other factors. Readers are cautioned that the foregoing list of factors is not exhaustive. Statements relating to reserves and resources are deemed to be forward-looking statements, as they involve the implied assessment, based on certain estimates and assumptions that the resources described can be profitably produced in the future. This document includes references to management s forecasts of future development, probability of success, production and cash flows from such operations, which represent management s best estimates at the time. The forward-looking statements contained in the document are expressly qualified by this cautionary statement. These statements speak only as of the date of this document and the Company does not undertake to update any forward-looking statements that are contained in this document, except in accordance with applicable securities laws. More information is available in the audited consolidated financial statements and the associated MD&A of the Company for the year ended December 31, 2014, and the unaudited condensed consolidated interim financial statements and MD&A for the period ended September 30, 2015 as publicly filed on SEDAR at www.sedar.com. CAUTIONARY NOTE REGARDING RESERVE & RESOURCE ESTIMATES The oil and gas reserves calculations and income projections were estimated in accordance with the Canadian Oil and Gas Evaluation Handbook ( COGEH ) and National Instrument 51-101 ( NI 51-101 ). The term barrels of oil equivalent ( boe ) may be misleading, particularly if used in isolation. A boe conversion ratio of six Mcf: one bbl was used by NZEC. This conversion ratio is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead. Reserves are estimated remaining quantities of oil and natural gas and related substances anticipated to be recoverable from known accumulations, as of a given date, based on: the analysis of drilling, geological, geophysical, and engineering data; the use of established technology; and specified economic conditions, which are generally accepted as being reasonable. Reserves are classified according to the degree of certainty associated with the estimates. Proved Reserves are those reserves that can be estimated with a high degree of certainty to be recoverable. It is likely that the actual remaining quantities recovered will exceed the estimated proved reserves. Probable Reserves are those additional reserves that are less certain to be recovered than proved reserves. It is equally likely that the actual remaining quantities recovered will be greater or less than the sum of the estimated proved plus probable reserves. Revenue projections presented are based in part on forecasts of market prices, current exchange rates, inflation, market demand and government policy which are subject to uncertainties and may in future differ materially from the forecasts above. Present values of future net revenues do not necessarily represent the fair market value of the reserves evaluated. The report also contains forward-looking statements including expectations of future production and capital expenditures. Information concerning reserves may also be deemed to be forward looking as estimates imply that the reserves described can be profitably produced in the future. These statements are based on current expectations that involve a number of risks and uncertainties, which could cause the actual results to differ from those anticipated. Contingent resources are those quantities of oil and gas estimated on a given date to be potentially recoverable from known accumulations using established technology or technology under development, but which are not currently considered to be commercially recoverable due to one or more contingencies. Contingencies may include factors such as economic, legal, environmental, political and regulatory matters, or a lack of markets. Prospective resources are those quantities of oil and gas estimated on a given date to be potentially recoverable from undiscovered accumulations. The resources reported are estimates only and there is no certainty that any portion of the reported resources will be discovered and that, if discovered, it will be economically viable or technically feasible to produce. More information is available in the Company s Form F1-101F1 Statement of Reserves Data and Other Oil and Gas Information dated April 30, 2015, which is filed on SEDAR at www.sedar.com. 2

Agenda 1. Introductions 2. Current Status 3. Plans and Growth 4. Activities 5. HSE 6. Summary Page 3

Current Status 1. New CEO - with extensive relevant NZ experience 2. New Board with three members, all new 3. Disciplined approach to all expenditure. Challenging conventional approaches encouraged. 4. Focus on development and optimisation projects maximising value of existing wells and connected infrastructure 5. Shift from frontier exploration to focus on Taranaki basin 6. Pursue external growth opportunities in Taranaki against strict investment criteria 7. HSE remains essential to our business, and is adapting systems to meet the new regulations (2016). Page 4

CEO and Board of Directors Chief Executive Officer - Michael Adams 30 years of commercial, management, operational and reservoir engineering experience in New Zealand, Australia, the Middle East and the North Sea. An expert in reservoir appraisal, development and production optimisation with substantial experience in New Zealand, Australia, and Europe. Has managed multi-disciplinary teams in projects of worth more than $500 million. Mr Adams qualified with M.Sc. (Physics) and B.Sc (Physics, Geology). Chairman - James Willis Has an extensive background in the oil and gas E & P industry with a particular focus on commercial and contractual issues affecting industry participants. After 25 years as a partner at New Zealand law firm Bell Gully specializing in oil and gas matters, became managing director of an Australian oil and gas exploration group with a large portfolio of offshore permits. Since returning to New Zealand in 2011 Mr Willis has held governance positions with and consulted to various participants in the oil and gas exploration sector. Director - Mark Dunphy Chairman and CEO of privately-held operating company, Greymouth Petroleum which he formed in 2000. Greymouth is the second largest of the New Zealand owned and operated upstream oil & gas companies. Prior to that Mr Dunphy was Chairman of ASX listed Cultus Petroleum NL (1988 to 1999) and Chairman of privately-held Australian company Interstate Energy Limited (1996 to 2002). Director - David Llewellyn Dr Llewellyn has held senior management positions with Shell International (Netherlands; Singapore; New Zealand; Thailand) and Mobil International spanning a 35 year career. Dr Llewellyn holds an MA (Hons) in Geology and a doctorate in Geophysics. In the latter part of his career Mr Llewellyn has been extensively involved in regional and global M&A activities. Page 5

Current Status How are we performing? Financials from Quarterly MD&A (all in C$) 9 months ended 30 September 2015 2014 Prod. Rate NZEC Share (bbl/day) 122 210 Field Net Back ($/bbl ) 34.9 66.1 Oil Price ($/bbl ) 63.9 115.5 Production Costs ($ million) 0.8 2.1 Processing Costs ($ million) 0.7 0.7 G & A Expenses ($ million) 3.4 5.0 Capital Projects ($ million) 0.2 3.1 Key messages; Cost structure dramatically reduced. NZEC now has a fit for-purpose operating structure. Key improvements will come from increasing production from existing wells and restoring wells to production. Page 6

Current Status How are we performing? Oil Production 1. Reduction at Copper-Moki-Waitapu due to CM2 pump performance falling off in April/May and Waitapu-2 Pump failing in March. CM Water-flood and CM2 pump repair to address this. 2. WN production increases due to switching to continuous gas-lift and minor remedial works (wax-cuts & de-bottlenecking). Dip in November due to N1 gas-lift failure (now replaced) Page 7

NZEC Assets Reserves 2P Reserves NZEC Share as at 31 December 2014 Entity 2P Net Oil (Mbbls) 2P Net Sales Gas (MMscf) 2P Net BOE (BOE) Copper Moki 345 770.8 473.5 Waihapa 634 1177.3 830.4 Total 979 1948 1304 Copper Moki TWN Eltham Alton Notes: 1. Reserves and resources estimated by Deloitte LLP report effective date 31 Dec 2014. Page 11

Current Status and Opportunities #1 Current Status Low production cost ~$25 per barrel through right sizing business for today Production opportunities in existing acreage positions World class reservoir optimisation and development expertise Low cost subsurface team Extensive acreage position, i.e. exploration blocks (Alton & Eltham) and in TWN and Copper-Moki. Opportunities Marginally negative cash-flow can be turned into positive cash flow by increasing production (projects underway) Waihapa Voidage project, with potential to unlock additional reserves Waterflood in Copper Moki pool underway Restoration of CM3 to production Tariki gas field and other Tariki area wells Evaluation and value gap analyses of fields New Zealand based subsurface expertise available to contract as required Retain blocks through appropriate work programs so that exploration drilling can restart when economically viable. No borrowing Future flexibility for debt facilities Page 9

Current Status and Opportunities #2 Current Status Spare capacity in existing processing facilities NZEC WPS is the only facility that offers 3 rd party processing in NZ Significant pipeline infrastructure Opportunities Negotiations underway with 3 rd party to supply process water. Nov 2015, Gas throughput agreement signed to process gas for Contact Energy Agreed new terms LPG storage for 3 rd party. Efficient operations & in-field project management Strong focus on operating the plant safely Utilising expertise of experienced production technicians to train a number of young production technicians. Strong relationship with Contact Energy, delivers significant cash to the business Build a long term relationship with Contact Energy for AGS operatorship and provision of other services Strong relationships with key partners LME, & Greymouth Credibility in the market place, resource sharing and peer review Page

Capabilities-Driven Strategy Capability area Description People Dedicated, hands-on focussed team Wealth of technical, operational and commercial experience Staff retention E&P Value Chain Low cost operation Enhanced oil recovery Flexible midstream 3 rd party services Core Region Focus on operating in the Taranaki (only producing region in New Zealand) Extensive knowledge of all working play types Partnerships LME, Contact Energy and Greymouth Key Contractors Community stakeholders and regulators Innovation Staged implementation of low cost water flood Jet pumping Waihapa 1 (pump operated from nearby Waihapa-2 site) Waihapa voidage project (pressure depletion) Operational Integration of new technologies into an existing asset Fit for purpose and flexible maintenance and operating strategy Commercial Diversified income stream Gas sales contract pricing Page 11

Portfolio & Project Maturation Funnel Possible External Growth Opportunities Productio n CM1 Pool with Waterflood WN Tik CM2 Pool Waihapa Voidage Project CM3 Pool New Pump Tariki Gas Straddle Plant (stripping 3 rd party LPG) WN Crest WN Void. LPG Prod. Tariki- 4A updip s/track Eltham Block Miocene prospects and new seismic from STOS Kapuni survey Tariki sand prospects in the Tariki block Alton Block Horoi Well and other prospects Tariki-1A/4A Gas CM wellsite conversion to jet pump Waihapa Deep Gas Tikorangi Prospects in the TWN and Eltham blocks Page 12 Resource Category Developed Undeveloped Contingent Exploration Notes: 1. Bubble sizes are qualitative only & should not be considered accurate.

Activities - TWN Fields Gas-Lift: Continuous gas-lift at Waihapa 6 and Ngaere 1 from April 2015, supported by works. Result has been WN production rates climbing instead of declining. Waihapa 1: Static gradient shows oil in tubing Injectivity testing in October confirms reservoir communication is good Moving ahead to put artificial lift (Jet pump)on this well for the first time since 1995. Planned for 1st quarter 2016 and will be a low cost activity (~$40k NZEC share), utilising an existing jet pump at Waihapa 2 Tariki Gas well: Late November flow tests has shown Tariki-4A can supply gas at pressures of ~90 bar at rates of 0.5 to 1 TJ per day. Further testing is required and is underway using production infrastructure. Page 13

Activities - Copper Moki Permit Copper Moki Waterflood: Substantial revision to initial project scope has resulted in implementation of the project in two stages. Stage 1 water-flood commenced mid November 2015. Stage 2 (increase in water injection) expected to commence 2nd quarter 2016 Incremental oil volumes estimated at ~ 90,000 stb oil (P50) over 5 years. Copper Moki 2: Page 14 CM2 well performance fell off in April 2015. Pump removed in October 2015 New pump will be run in mid December 2015. Oil rates expected to increase by >25 bopd from the new pump.

HSE - Our People Over 110,000 work hours without a serious harm incident - Last serious harm was in March 2014. This was an LTI when a contractor fell through loose grating into a well cellar - 1 Medical Treatment Case since then in June 2015. This was stitches in finger on cut shattered glass from gas detector. External Health, Safety and Environmental Audit conducted in Q2 2015. Findings reinforce NZEC is managing Risks to a high standard. Hazard observations - Positive and safe work practices have increased due to improving worker participation system Hazard Observation Reports Jan Nov 2015 Positive Safe Act 21 56 Safe Condition 33 32 Hazard Unsafe condition/act Page 15

1. NZEC is surviving the challenging low oil price environment through: Substantial restructuring & cost shedding Development projects screened by evidence, experience & science Expanding the operations services business 2. NZEC has the management, staff, board, strategies and processes in place for the business to grow in the current low oil price environment 3. NZEC has a portfolio of robust operational projects to assist growth next year and quality exploration permits with identified prospects 4. Internal growth may be supplemented by external opportunities, including acquisitions and may require shareholder support for these 5. NZEC has the Operational, Technical and Commercial capabilities to succeed 6. HSE is an integral part of our business. Summary Page 16 16