Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

Job No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

Pflugerville, TX St. Hedwig, TX 78152

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

RFB Addendum 3

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

ADDENDUM 1. Bid# , Bosque Bonito Units 1 and 2 Sewer System Improvement Project

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

The bid due date has been changed to 2:50 p.m. May 25, 2018.

OKLAHOMA TURNPIKE AUTHORITY

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Rock Chalk Park - Infrastructure Report. July 2013

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

TOTAL QUANTITY UNIT COST UNIT

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

REPLACEMENT OF MERCER COUNTY BRIDGE

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

SAN ANTONIO WATER SYSTEM CIBOLO CREEK SEWERSHED FLOW DIVERSION PROJECT SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM NO.

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

BID TABULATION BID REQUEST NO

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

BID FORM. PROJECT: 2017 Water line replacement

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF TAMPA ADDENDUM 2. April 18, 2018

BID PROPOSAL. PROPOSAL OF, a corporation. a partnership consisting of. an individual doing business as

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Opinion of Probable Cost

PART A ROADWAY - BASE BID

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

ADDENDUM No. 1 January 29, Paving Program Village of Milford

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

Utility Committee Meeting AGENDA. October 3, 2017

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Addendum 1 Downtown North CRA Sidewalks

BID PROPOSAL Mobilization for Non-Emergency Work Orders; 200 EA $ $ Mobilization for Emergency Work Orders; 2 EA $ $

Engineer's Preliminary Estimate - 100% Submittal

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT

ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Reviax Constracting Corp. DeSantis Construction

SUBDIVISION IMPROVEMENTS AGREEMENT

APPLICATION & PERMIT FOR CONSTRUCTION IN PUBLIC RIGHT OF WAY. Name of Owner: Name of Applicant: Address of Applicant: City: State: Zip:

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

OKLAHOMA TURNPIKE AUTHORITY

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

INVITATION FOR BIDS. Agency Name: Culpeper SWCD. 351 Lakeside Drive. Culpeper, Virginia (540) Project Name & Location:

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 123 COUNTY: 11/03/2016 ESTIMATE PAID: AWARD DATE: 11/17/2016 ESTIMATE PERIOD:

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

DENVER INTERNATIONAL AIRPORT BID FORMS. CONTRACT NAME: Rehabilitate East Employee Parking Lot Contract No.: BID LETTER

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

On-Call Civil Construction Services Project No. MT-GN

Gail Hamrick-Pigg, PE Director Pipelines. M. Antonio Leyva, PE Manager Pipelines. Angelica Mata Manager Contract Administration

OKLAHOMA TURNPIKE AUTHORITY

BRICK UTILITIES PARTIAL WATER MAIN REPLACEMENT CEDAR VILLAGE VARIOUS STREETS & PARTIAL FORCE MAIN REPLACEMENT BAY HARBOR BOULEVARD

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT FRANCISCO YELLOWSTONE SEWERLINE REHABILITATION. ADDENDUM NO. 3 April 3, 2019

ADDENDUM NO. 1 TO CONTRACT DOCUMENTS

PROPOSAL FOR IMPROVEMENTS TO OGDEN - HINCKLEY AIRPORT OGDEN, UTAH AIP PROJECT NO

TOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

SAN ANTONIO WATER SYSTEM E-20 BYPASS BORE CONSTRUCTION SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM NO. 1.

VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA PHONE: (352) * FAX:

CITY OF SAN MARCOS ENGINEERING DIVISION

CONTRACT DOCUMENTS TABLE OF CONTENTS BIDDING AND CONTRACT REQUIREMENTS

San Antonio Water System

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Addendum 1 13 TH Street Streetscape. September 1, 2017

CITY OF DEERFIELD BEACH Request for City Commission Agenda

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

OLMSTED STONE ARCH BRIDGE REPAIR PROJECT

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Transcription:

Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes to furnish all labor and materials as specified and perform the work required for the execution of the San Antonio River Improvement Historic Mission Reach, Phase IV Project for the San Antonio Water System, Sewer Job 09-5575, in accordance with the Plans and Specifications for the following prices to wit: SEWER WORKS BASE BID UNIT PRICES FOR: C.Y. 50 $ $ GAL. 696 $ $ P-1

Description 205 HOT MIX ASPHALTIC CONCRETE PAVEMENT (1.5" COMPACTED DEPTH) 208.1 SALVAGING, HAULING & STOCKPILING RECLAIMABLE ASPHALTIC PAVEMENT 509.1 REMOVE AND REINSTALL BOLLARDS AT ASHLEY ROAD 511.3 CUTTING AND REPLACING PAVEMENTS (TRENCH REPAIR) 515 TOP SOIL 520 HYDROMULCHING (RESIDENTIAL OR COMMERCIAL) S.Y. 7,090 $ $ S.Y. 6,956 $ $ S.Y. 134 $ $ C.Y. 1,934 $ $ S.Y. 12,257 $ $ P-2

Description 530 BARRICADES, SIGNS & TRAFFIC HANDLING 540.1 ROCK FILTER DAMS (INSTALL/REMOVE) (TYPE 1) 540.6 CONSTRUCTION EXITS (INSTALL/REMOVE) 540.8 SANDBAGS FOR EROSION CONTROL FENCE (6") 540.9 TEMPORARY SEDIMENT CONTROL FENCE 550.1 TRENCH EXCAVATION SAFETY PROTECTION L.F. 100 $ $ S.Y. 205 $ $ L.F. 200 $ $ L.F. 3,900 $ $ L.F. 670 $ $ P-3

Description 551.1 TEMPORARY SPECIAL SHORING 848 20" AIR BYPASS PIPE (20" DIPS DR 26 HDPE BY OPEN CUT) 848 30" DIA. SIPHON PIPE (30" DIPS DR 21 HDPE BY OPEN CUT) 848 36" DIA. SEWER MAIN (36" DIPS DR 26 HDPE BY OPEN CUT) 848 42" DIA. SEWER MAIN (42" DIPS DR 26 HDPE BY OPEN CUT) 850 SANITARY SEWER MANHOLE STRUCTURE NO. A L.F. 408 $ $ L.F. 774 $ $ L.F. 219 $ $ L.F. 40 $ $ EA. 1 $ $ P-4

Description 850 SANITARY SEWER MANHOLE STRUCTURE NO. C 850 SANITARY SEWER SIPHON STRUCTURE NO.B1 850 SANITARY SEWER SIPHON STRUCTURE NO.B2 856.1 JACKING, BORING OR TUNNELING 78" DIA. 856.2 20" AIR BYPASS CARRIER PIPE(22" DIPS DR 26 HDPE BY JACK & BORE) 856.2 30" DIA. SIPHON CARRIER PIPE (30" DIPS DR 21 HDPE BY JACK & BORE) EA. 1 $ $ EA. 1 $ $ EA. 1 $ $ L.F. 143 $ $ L.F. 143 $ $ L.F. 286 $ $ P-5

Description 856.2 20" AIR BYPASS CARRIER PIPE(22" DIPS DR 26 HDPE BY OPEN CUT) 856.2 30" DIA. SIPHON CARRIER PIPE (30" DIPS DR 21 HDPE BY OPEN CUT) 856.3 CASING OR LINER 78" DIA. (BY JACKING & BORING) 856.3 CASING OR LINER 78" DIA. (BY OPEN CUT) 862 ABANDONMENT OF SANITARY SEWER MAIN & MANHOLES 864.1 BYPASS PUMPING (SET UP AND REMOVE) L.F. 40 $ $ L.F. 80 $ $ L.F. 143 $ $ L.F. 40 $ $ L.F. 1,002 $ $ P-6

Description 864.2 BYPASS PUMPING (OPERATION) 866 PRE-CONSTRUCTION SEWER MAIN TELEVISION INSPECTION (30" - 36") 866 POST CONSTRUCTION SEWER MAIN TELEVISION INSPECTION (30"-42") 910.2 MANHOLE REHABILITATE - NON STRUCTURAL/HIGH SULFATE COATING 1001 TEMPORARY TREE PROTECTION 2003.1 ODOR CONTROL SET-UP AND REMOVAL MON. 3 $ $ L.F. 486 $ $ L.F. 1,914 $ $ VF 77 $ $ P-7

Description 2003.2 ODOR CONTROL EQUIPMENT RENTAL 2003.3 ODOR CONTROL BIOCHEMICAL SOLUTION A. BASE BID SUBTOTAL FOR SEWER WORKS $ P-8

100 MOBILIZATION Description 101 PREPARING RIGHT-OF-WAY B. TOTAL BID AMOUNT (Base Bid, Mobilization & Preparing Right of Way) $ Mobilization lump sum bid shall be limited to a maximum ten percent (10%) of the subtotal base bid amount. Preparing Right-of-Way lump sum bid shall be limited to a maximum of five percent (5%) of the subtotal base bid amount. The combined total bids for 100, Mobilization and 101, Preparing Right-of-Way shall not exceed fifteen percent (15%) of the subtotal base bid amount. The subtotal base bid is the amount in line item A. and is defined as all bid items excluding 100, Mobilization and 101, Preparing Right-of-Way. P-9

BIDDER'S SIGNATURE AND TITLE FIRM'S NAME (TYPE OR PRINT) FIRM'S ADDRESS FIRM'S PHONE NO./FAX NO. The Contractor herein acknowledges Addendum Nos. OWNER RESERVES THE RIGHT TO ACCEPT THE OVERALL MOST RESPONSIBLE BID. 1. Bidder must return Pages P-1 through P-10, P-2b, Good Faith Effort Plan, Conflict of Interest Questionnaire Note, Conflict of Interest Questionnaire, and Statement of Bidder s Experience. Any and all Addenda which are issued by the San Antonio Water System with appropriate signatures which acknowledge receipt shall be attached to and made part of this bid. 2. The bidder offers to construct the Project in accordance with the Contract Documents for the contract price and to complete the Project within 120 calendar days after the start date, as set forth in the Authorization to Proceed. The bidder understands and accepts the provisions of the Contract Documents relating to liquidated damages of the project if not completed on time. Complete the additional requirements of the Proposal which are included on the following pages. P-10