Agenda Item 5: Financial Instruments (Updates to IPSAS 28-30)

Similar documents
Financial Instruments (Updates to IPSAS 28-30)

Agenda Item 7: Financial Instruments

Agenda Item 5: Social Benefits

SUMMARY OF IASB WORK PLAN AS AT 14 NOVEMBER 2017

SUMMARY OF IASB WORK PLAN AS AT 18 MAY 2017

Agenda Item 13.2: IPSAS IFRS Alignment Dashboard

Agenda Item 1.7: IPSAS-IFRS Alignment Dashboard

Financial Instruments (Updates to IPSAS 28-30)

Improvements to IPSASs. 1. To review and approve proposed changes to certain IPSASs following the review and evaluation of:

Item 9: Revenue Update of IPSAS 23

SUMMARY OF IASB WORK PLAN AS AT 15 FEBRUARY 2018

Agenda Item 12: Public Sector Measurement

Agenda item 6: Public Sector Combinations

Social Benefits. Paul Mason, Principal. IPSASB Meeting March 7 10, 2016 Washington, D.C., USA. Page 1 Proprietary and Copyrighted Information

PROJECT HISTORY. The IPSASB considered an Issues Paper and a draft of sections of a Consultation Paper (CP).

Public Sector Measurement

Table 1 IPSAS and Equivalent IFRS Summary*

Agenda Item 11: Grants and Other Transfers Time Requirements

Table 1 IPSAS and Equivalent IFRS Summary 1

Table 1 IPSAS and Equivalent IFRS Summary 2

NON-EXCHANGE EXPENSES

Table 1 IPSAS and Equivalent IFRS Summary 2

PROJECT HISTORY. Contact: Stephenie Fox December 2014

Public Sector Combinations

Exposure Draft 66 August 2018 Comments due: October 22, Proposed International Public Sector Accounting Standard

NON-EXCHANGE EXPENSES

SUMMARY OF IASB WORK PLAN AS AT 23 AUGUST 2018

REVENUE. Meeting objectives Topic Agenda Item. Project management Decisions up to SEPTEMBER 2018 Meeting

Social Benefits. Social Benefits. Paul Mason, Principal. IPSASB Meeting September 19-22, 2017 Toronto, Canada

IPSAS 41 Summary Financial Instruments

REVENUE APPROACH TO IFRS 15

Comments on the Exposure Draft 62 Financial Instruments

Proposed International Public Sector Accounting Standard XX (ED 53) on

Public Sector Combinations

IPSAS Update. Task Force on Accounting Standards Meeting. Financial instruments ED 62. Bekzod Rakhimov 2-3 October 2017, Rome

SUMMARY OF IASB WORK PLAN AS AT 5 NOVEMBER 2013

SUMMARY OF IASB WORK PLAN AS AT 31 JULY 2015

ED 57, Impairment of Revalued Assets

IFAC IPSASB Meeting Agenda Paper 5.0 February 2009 Paris, France Page 1 of 43

Agenda Item 6: Leases

Agenda Item 11: Grants and Other Transfers Time Requirements

Exposure Draft: Financial Instruments

Consultation Paper August 2017 Comments due: January 15, Accounting for Revenue and Non-Exchange Expenses

SUMMARY OF IASB WORK PLAN AS AT 7 NOVEMBER 2018

Consultation Paper XXX 2017 Comments due: XXX XX, Accounting for Revenue and Non-Exchange Expenses

Public Sector Measurement Education Session

IFAC IPSASB Meeting Agenda Paper 4.0 March 2012 Düsseldorf, Germany Page 1 of 6. Financial Statement Discussion and Analysis Approve ED

P O Box Lynnwood Ridge 0040 Tel Fax

FIRST TIME ADOPTION OF ACCRUAL BASIS IPSASS

Agenda item 12: Revenue Education Session

MARCH 31, 2018 IPSASB EXPOSURE DRAFT 63: SOCIAL BENEFITS RESPONSE MANJ KALAR

The Applicability of IPSASs

Public Sector Specific Financial Instruments

Public Sector Specific Financial Instruments

IPSASB. October IPSAS 32 Service Concession Arrangements: Grantor THE INTERNATIONAL PUBLIC SECTOR ACCOUNTING STANDARDS BOARD

Improvements to IPSAS, 2018

New Zealand Accounting Standards Board

22 April Submitted to: Dear Stephenie

IPSAS 40, Public Sector Combinations

Exposure Draft 63 October 2017 Comments due: March 31, Proposed International Public Sector Accounting Standard.

Agenda Item 9: Emissions Trading Schemes

Joint Arrangements. Exposure Draft 51. IFAC Board. October 2013 Comments due: February 28, 2014

IPSASB Update Ian Carruthers

International Public Sector Accounting Standard 32 Service Concession Arrangements: Grantor IPSASB Basis for Conclusions

Paris, January 19, 2018

LEASES. Meeting objectives Topic Agenda Item. Project management Decisions up to September 2018 meeting

IMPAIRMENT OF REVALUED ASSETS (AMENDMENTS TO PBE IPSASs 21 AND 26)

Agenda Item 7: Grants & Other Transfers (Revenue & Non-Exchange Expenses)

PUBLIC BENEFIT ENTITY INTERNATIONAL FINANCIAL REPORTING STANDARD 5 NON-CURRENT ASSETS HELD FOR SALE AND DISCONTINUED OPERATIONS (PBE IFRS 5)

Emissions Trading Schemes

Agenda Item 5: Heritage

INTERNATIONAL PUBLIC SECTOR ACCOUNTING STANDARDS BOARD PROJECT BRIEF AND OUTLINE

International Public Sector Accounting Standard 35 Consolidated Financial Statements IPSASB Basis for Conclusions

Process for Considering GFS Reporting Guidelines during Development of IPSASs

The Applicability of IPSASs to Government Business Enterprises and Other Public Sector Entities

IPSAS 8 INTERESTS IN JOINT VENTURES

Comments on Exposure Draft 63 Social Benefits

On the Horizon for IFRS

International Federation of Accountants

International Public Sector Accounting Standard 23 Revenue from Non-Exchange Transactions (Taxes and Transfers) IPSASB Basis for Conclusions

SUBMISSION: Conceptual Framework Exposure Draft 2: Elements and Recognition in Financial Statements

Applying IFRS. Joint Transition Resource Group discusses additional revenue implementation issues. July 2015

CONSULTATION PAPER (CP) ACCOUNTING FOR REVENUE AND NON-EXCHANGE EXPENSES

Financial Instruments: Recognition and Measurement

Proposed Amendments to IAS 8 - Draft Comment Letter

Conceptual Framework: Responses to Exposure Draft, Elements and Recognition in Financial Statements

Accounting Standards Advisory Forum The Conceptual Framework September 2016 The Linkage between Financial Performance and Measurement

EXPLANATORY GUIDE A2: OVERVIEW OF THE ACCOUNTING STANDARD SETTING PROCESS (EG A2)

Latest developments in IPSASs and GFS harmonisation

Service Concession Arrangements: Grantor

IPSAS 42, Social Benefits

Recognition of Deferred Tax Assets for Unrealised losses (Amendments to NZ IAS 12)

IPSASB: Current guidelines in IPSASs for recording PPPs

PUBLIC SECTOR ACCOUNTING STANDARDS (PSAS) UPDATE 2017

CONCEPTUAL FRAMEWORK: ELEMENTS AND RECOGNITION IN FINANCIAL STATEMENTS

Financial Instruments

Entity Combinations from Exchange Transactions

ICAEW REPRESENTATION 92/16

P O Box 7001 Halfway House 1685 Tel Fax

Public Sector Accounting International Harmonisation: Benefits and IPSASB s Role

Transcription:

Agenda Item 5: Financial Instruments (Updates to IPSAS 28-30) Dave Warren, Manager, Standards Development and Technical Projects Ross Smith, Deputy Director IPSASB Meeting Toronto, Canada June 19 22, 2018 Page 1 Proprietary and Copyrighted Information

Session Outline Project Management and Project Development Review of Task Force Recommendations (Agenda Items 5.2.1-5.2.7) Basis for Conclusions (Agenda Item 5.2.8) Approval of IPSAS 41 (Agenda Item 5.2.9) Page 2 Proprietary and Copyrighted Information

Summary of Project Progression (Agenda Item 5.1.3) September 2016 March 2017: Approval of authoritative guidance & amendments to other IPSASs April 2017 TBG Meeting: Review of the non-authoritative material at the in-person TBG Meeting June 2017: Final approval of draft ED March 2018 Initial Review of Response and delegation of Specific Issues to the Task Force June 2018 Approval of IPSAS 41 Page 3 Proprietary and Copyrighted Information

Task Force Process (Agenda Item 5.3.1) Teleconference One (March 26, 2018) Reviewed Staff Recommendations Teleconference Three (May 23, 2018) Reviewed Basis for Conclusion Agreed on Task Force Recommendations Teleconference Two (April 19, 2018) Reviewed Issues delegated by the IPSASB Page 4 Proprietary and Copyrighted Information

Concessionary Originated Credit Impaired Loans (Agenda Item 5.2.1) (1/2) Issue 1 - classifying a loan as concessionary or originated credit impaired Issue 2 - accounting for concessionary loans which are credit impaired Concessionary Loan Originated Credit Impaired Loan Concessionary Originated Credit Impaired Loan (CU100) FV of Loan Component Task Force Recommendation Distinction between concessionary and originated credit impaired loan is based on intent of loan; Clarification made in AG121, AG122 and G.5. Value of the concession? Task Force Recommendation Require the entire difference between the transaction price and fair value to be allocated to the concessionary element; Clarification made in AG127 and G.6.ssssssss Value of the impairment? Page 5 Proprietary and Copyrighted Information

Concessionary Originated Credit Impaired Loans (Agenda Item 5.2.1) (2/2) Matter for Consideration Does the IPSASB agree with the Task Force Recommendation? Page 6 Proprietary and Copyrighted Information

Commitment to Issue a Concessionary Loan (Agenda Item 5.2.2) (1/2) Issue expense recognition when the commitment liability does not equal the value of the concession Task Force Recommendation Existing guidance is sufficient to account for transactions where a commitment to issue a concessionary loan is granted; An illustrative example was developed to illustrate the application of the principles with case facts (see IE 162). Page 7 Proprietary and Copyrighted Information

Commitment to Issue a Concessionary Loan (Agenda Item 5.2.2) (2/2) Matter for Consideration Does the IPSASB agree with the Task Force Recommendation? Page 8 Proprietary and Copyrighted Information

Ignoring the Effects of Discounting Short Term Receivables (Agenda Item 5.2.3) (1/2) Issue the IFRS 15 practical expedient does not exist in IPSAS IFRS 15.63 Practical Expedient No adjustment to contractual amount for financing if payment is expected within 12 months VS IPSAS 41 General Measurement Requirements Measure a financial asset at its fair value Task Force Recommendation Add prominence to existing guidance that requires short-term receivables to be measured at the original invoice amount (paragraphs 57 and 60). Page 9 Proprietary and Copyrighted Information

Ignoring the Effects of Discounting Short Term Receivables (Agenda Item 5.2.3) (2/2) Matter for Consideration Does the IPSASB agree with the Task Force Recommendation? Page 10 Proprietary and Copyrighted Information

Measuring Fair Value of Non-Cash Generating Equity Instruments (Agenda Item 5.2.4) (1/2) Issue 1 difficult for public sector entities to obtain valuations for unquoted equity investments Issue 2 using a cash flow valuation technique to measure unquoted equity instruments may result in impairments Task Force Recommendation This is not a public sector difference; Log the issue for consideration as part of the public sector measurement project. Task Force Recommendation IPSAS 41 allows for various measurement techniques; Incorporate BC39 to BC42 which provides an overview of IPSAS 41 s fair value guidance. Page 11 Proprietary and Copyrighted Information

Measuring Fair Value of Non-Cash Generating Equity Instruments (Agenda Item 5.2.4) (2/2) Matter for Consideration Does the IPSASB agree with the Task Force Recommendation? Page 12 Proprietary and Copyrighted Information

Clarifying an In Substance Equity Instrument (Agenda Item 5.2.5) (1/2) Issue evaluating the substance, rather than the contractual terms, of whether an instrument is equity is challenging in the public sector Task Force Recommendation Continue to require professional judgement to be applied in determining whether an instrument is an equity instrument; Incorporate additional Implementation Guidance, G.4, that includes the indictors from paragraph 38 of IPSAS 23 to help constituents apply professional judgement. Page 13 Proprietary and Copyrighted Information

Clarifying an In Substance Equity Instrument (Agenda Item 5.2.5) (2/2) Matter for Consideration Does the IPSASB agree with the Task Force Recommendation? Page 14 Proprietary and Copyrighted Information

Interaction of Day One Fair Value Guidance with Other Valuation Guidance (Agenda Item 5.2.6) (1/2) Issue guidance in paragraph AG117 is duplicated in paragraphs AG147 and AG148 of ED 62 Task Force Recommendation Amend AG117 and AG151 (previously AG147 and AG148) to eliminate duplication of fair value guidance; Incorporate BC46 to BC48 to explain the amendment. Page 15 Proprietary and Copyrighted Information

Interaction of Day One Fair Value Guidance with Other Valuation Guidance (Agenda Item 5.2.6) (2/2) Matter for Consideration Does the IPSASB agree with the Task Force Recommendation? Page 16 Proprietary and Copyrighted Information

Other Issues Delegated to the Task Force (Agenda Item 5.2.7) (1/5) Other Issues: Issue 1 the term grant requires additional explanation Task Force Recommendation apply more generic wording in the Application Guidance by using the term non-exchange transaction (AG124) Page 17 Proprietary and Copyrighted Information

Other Issues Delegated to the Task Force (Agenda Item 5.2.7) (2/5) Other Issues: Issue 2 clarify the sequencing of SPPI evaluation for concessionary loans Task Force Recommendation clarify assessment is performed after initial measurement, not initial recognition (AG126) Page 18 Proprietary and Copyrighted Information

Other Issues Delegated to the Task Force (Agenda Item 5.2.7) (3/5) Other Issues: Issue 3 and 5 the IFRS 9 practical expedient for short term receivables is not available in IPSAS 41 Task Force Recommendation amend initial measurement guidance to indicate short term receivables and payables are measured at the invoice amount (paragraph 60) Page 19 Proprietary and Copyrighted Information

Other Issues Delegated to the Task Force (Agenda Item 5.2.7) (4/5) Other Issues: Issue 4 applying the originated credit impaired requirements to short term receivables is complex in the public sector Task Force Recommendation introduce a practical expedient exempting short term receivables from originated credit impaired guidance (paragraph 89) Page 20 Proprietary and Copyrighted Information

Other Issues Delegated to the Task Force (Agenda Item 5.2.7) (5/5) Matter for Consideration Does the IPSASB agree with the Task Force Recommendation? Page 21 Proprietary and Copyrighted Information

Basis for Conclusion (Agenda Item 5.2.8) (1/2) BCs Identified Task Force Members agreed which BCs were necessary Review of BCs IPSASB Technical Director performed first review Task Force delegated detailed review to one member (Jeanine Poggiolini) Task Force reviewed and agreed to recommend BCs to the IPSASB BCs Drafted Staff drafted BCs for Task Force Review Page 22 Proprietary and Copyrighted Information

Basis for Conclusion (Agenda Item 5.2.8) (2/2) Matter for Consideration Does the IPSASB agree with the Basis for Conclusion recommended by the Task Force? Page 23 Proprietary and Copyrighted Information

Approval of IPSAS 41 (Agenda Item 5.2.9) Due process requires: The IPSASB Technical Director advise that due process has been followed effectively; The IPSASB to confirm it is satisfied there are no additional issues to be discussed; The IPSASB to confirm it is satisfied that due process has been followed effectively; The IPSASB to approve IPSAS 41, Financial Instruments; The IPSASB to confirm there has been no substantial change to ED 62; and Set an effective date of January 1, 2022 for IPSAS 41, Financial Instruments. Page 24 Proprietary and Copyrighted Information

www.ipsasb.org