Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Similar documents
BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TABULATION BID REQUEST NO

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

TOTAL QUANTITY UNIT COST UNIT

Rock Chalk Park - Infrastructure Report. July 2013

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

REPLACEMENT OF MERCER COUNTY BRIDGE

OKLAHOMA TURNPIKE AUTHORITY

LETTING : CALL : 056 COUNTIES : MILLE LACS

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

OKLAHOMA TURNPIKE AUTHORITY

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

ADDENDUM No. 1 January 29, Paving Program Village of Milford

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Department of Public Works Engineering

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

PART A ROADWAY - BASE BID

SUBDIVISION IMPROVEMENTS AGREEMENT

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

OKLAHOMA TURNPIKE AUTHORITY

Engineer's Preliminary Estimate - 100% Submittal

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

Reviax Constracting Corp. DeSantis Construction

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

RFB Addendum 3

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

A DESIGN-BUILD PROJECT

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

Addendum 1 13 TH Street Streetscape. September 1, 2017

CITY OF TAMPA ADDENDUM 2. April 18, 2018

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL


Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST

Opinion of Probable Cost

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

BID TABULATION PAGE 1 OF 8

BID TABULATION. Engineer's Estmated Opinion of Costs

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

Exhibit 4 Page 1 of 8

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS

CONTRACT TIME DETERMINATION

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

Active Construction RV Associates Scarsella JR Hayes

DENVER INTERNATIONAL AIRPORT BID FORMS. CONTRACT NAME: Rehabilitate East Employee Parking Lot Contract No.: BID LETTER

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

Market Street Gateway Improvements Phase 1

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS

BID TABULATION JAMES STREET TRUNK SEWER IMPROVEMENTS CORALVILLE, IOWA

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

Addendum 1 Downtown North CRA Sidewalks

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM

BID TABULATION PAGE 1 OF 6

The bid due date has been changed to 2:50 p.m. May 25, 2018.

Transcription:

Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Date: February 5, 2018 This Addendum forms a part of the contract documents for the above identified project and modifies the original Bid Documents dated January 2018 and all previous addenda, if any. All remaining portions of the Bid Documents not specifically mentioned or otherwise revised by this Addendum remain in full force and effect. This Addendum is issued by CT Consultants, Inc. on behalf of Cuyahoga Community College. Modifications to the Bid Documents, revisions to the Construction Plans dated February 5, 2018 noted as Revision No. 1, and answers to any Bidders questions are as follows: CONSTRUCTION PLANS NOTE: The total number of sheets at the bottom right corner of each sheet was revised from 24 to 25. This required all sheets to be reissued. Below is a more specific list of revisions to certain sheets. Sheet C100 Title Sheet 1) Updated information in the Drawing Index to reflect Revision No. 1. 2) Added Sheet C-143. Sheet C110 Existing Condition 1) Removed reference to STM. HW #16 in Existing Utility Keynotes. Sheet C111 Existing Condition 1) CP #2 near Match Line B-B was revised to be CP #1. Sheet C140 Utility Plan 1) Revised Lighting Keynotes to add detailed technical information or clarify Keynotes #1, #4, #5, #8, #13 and #15.

Addendum No. 1 Page Two Sheet C141 Utility Plan 2) Added missing Keynote #14. Sheet C143 Robert Bishop Dr. Lighting Electrical Plan & Details 1) Added this sheet. Sheet C150 Grading Plan 1) Added additional spot grades and slopes. Sheet C151 Grading Plan 1) Added additional spot grades and slopes. Sheet C152 Grading Plan 1) Added additional spot grades and slopes. Sheet C160 Storm Water Pollution Prevention Plan 1) Added missing Keynote for FSA (e.g. Fuel Storage & Vehicle Fueling Area) to Erosion Control Keynote. BID PROPOSAL 1) There was a duplicate Reference No. 32 in the Unit Price Sheet for Base Bid. All Unit Price Sheets (e.g. Base Bid, Alternate 1, Alternate 2 and Alternate 3) have been revised to reflect the corrected numbering. 2) The guardrail type for Reference No. 45 (original misnumbered No. 44) was changed from Type 5 to Type 4 to match the Construction Plans. 3) Reference Nos. 71 and 72 (original misnumbered Nos. 70 and 71) were missing the units of measurement. This has been corrected. 4) A new item (Reference No. 69) was added for #8 AWG Distribution Cable, (3) Copper Conductors. 5) Quantities and descriptions were revised for various Lighting items (Reference Nos. 62 through 77).

Addendum No. 1 Page Three BIDDER S QUESTIONS 1) QUESTION: No questions received. ANSWER: N/A This Addendum must be acknowledged by completing the attached Addendum Receipt Form. The form shall be sent by fax to 330.665.0620 or scanned and sent by email to GArters@CTconsultants.com. The Addendum must also be acknowledged on the bid forms. Failure to do so may subject the bidder to disqualification. Should there be any questions or additional information required, please do not hesitate to contact our office by email at GArters@CTconsultants.com.

Addendum No. 1 Page Four ADDENDUM RECEIPT This is to hereby acknowledge receipt of Addendum No. 1 for the referenced project that includes the following pages. Addendum Letter = 3 pages Addendum Receipt = 1 page Bid Proposal = 11 pages Construction Plans = 25 pages TOTAL PAGES = 40 pages Please complete and return this Addendum Receipt to Gene E. Arters, P.E. via facsimile at 330-665-0620 or email to GArters@CTconsultants.com upon receipt. The Addendum must also be acknowledged on the bid forms. PROJECT NAME: Project #C20166009 CCE Parking Lot Replacement Phase 2 Robert Bishop Drive PROJECT LOCATION: Corporate College East 4380 Richmond Road, Highland Hills, Ohio 44122 (CT Project No. 160567-03) BIDDER INFORMATION: Contractor Name: Telephone No: Email: Signed By: Print Name: Title: H:\2016\160567\SPEC\160567-03 JANUARY 2018\Addenda\Addendum 1\150567-03 Addendum 01.Docx

BID PROPOSAL CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE BASE BID TOTAL DEMOLITION: 1 201 Tree Removed, 18" Size 2 EA $ $ $ $ 2 201 Stump Removed, 18" Size 2 EA $ $ $ $ 3 202 Pipe Removed (24" and Under), Storm 209 FT $ $ $ $ 4 202 Pipe Cleanout 300 FT $ $ $ $ 5 202 Catch Basin Cleanout 6 EA $ $ $ $ 6 202 Catch Basin or Inlet Removed 1 EA $ $ $ $ 7 SPCL Plug Existing Manhole, Storm 4 EA $ $ $ $ 8 202 Pavement Removed, Asphalt 2,058 SY $ $ $ $ 9 202 Pavement Removed, Concrete 64 SY $ $ $ $ 10 202 Pavement Removed, Concrete with Asphalt Overlay 13 SY $ $ $ $ 11 202 Walk Removed 43 SY $ $ $ $ 12 202 Curb Removed, Concrete 1,717 FT $ $ $ $ 13 202 Guardrail Removed 186 FT $ $ $ $ 14 202 Guardrail Post Removed 63 EA $ $ $ $ 15 255 Full Depth Pavement Sawing, Pavement 192 FT $ $ $ $ 16 255 Full Depth Pavement Sawing, Walk 12 FT $ $ $ $ 17 630 Removal of Sign and Disposal 5 EA $ $ $ $ 18 630 Removal of Sign Post and Disposal 7 EA $ $ $ $ 1 of 11

CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE BASE BID TOTAL EARTHWORK AND EROSION PROTECTION: 19 651 Topsoil Stockpiled 1,100 CY $ $ $ $ 20 203 Excavation Including Embankment 230 CY $ $ $ $ 21 204 Proof Rolling 5 HR $ $ $ $ 22 204 Subgrade Compaction 2,465 SY $ $ $ $ 23 204 Excavation of Subgrade (20%), (12") 164 CY $ $ $ $ 24 204 Granular Material Type B, (12") 164 CY $ $ $ $ 25 652 Placing Stockpiled Topsoil 367 CY $ $ $ $ 26 659 Seeding and Mulching, Class 1, Lawn 1,300 SY $ $ $ $ 27 654 Commercial Fertilizer 1 TON $ $ $ $ 28 659 Water 100 MGAL $ $ $ $ 29 SPCL Concrete Washout Pit 1 EA $ $ $ $ 30 SPCL Construction Exit 1 EA $ $ $ $ 31 SPCL Silt Fence 875 FT $ $ $ $ 32 SPCL Storm Drain Inlet Protection 15 EA $ $ $ $ ROADWAY: 33 448 Asphalt Concrete Surface Course, Type 1, PG64-22 (1-1/4") 86 CY $ $ $ $ 34 407 Tack Coat for Intermediate Course (0.10 Gal/SY) 247 GAL $ $ $ $ 35 448 Asphalt Concrete Intermediate Course, Type 2, PG64-22 (1-3/4") 120 CY $ $ $ $ 2 of 11

CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE BASE BID TOTAL 36 407 Tack Coat (0.10 Gal/SY) 247 GAL $ $ $ $ 37 301 Asphalt Concrete Base, PG64-22 (4") 274 CY $ $ $ $ 38 304 Aggregate Base, 'Modified 304', (10"), Under Asphalt Pavement 685 CY $ $ $ $ 39 451 8" Reinforced Concrete Pavement, Class QC1 812 SY $ $ $ $ 40 304 Aggregate Base, 'Modified 304', (6"), Under Drive Apron 34 CY $ $ $ $ 41 608 4" Concrete Walk 154 SF $ $ $ $ 42 608 Curb Ramp 108 SF $ $ $ $ 43 304 Aggregate Base, 'Modified 304', (4") Under Walk 4 CY $ $ $ $ 44 608 Detectable Warning 24 SF $ $ $ $ 45 609 Curb, Type 6 1,787 FT $ $ $ $ 46 606 Guardrail, Type 4 606 FT $ $ $ $ 47 630 Ground Mounted Support, No. 2 Post, U-Channel 70 FT $ $ $ $ 48 630 Sign, Stop and Misc 10 EA $ $ $ $ 49 642 Center Line, Type 1 860 FT $ $ $ $ 50 642 Stop Line, Type 1 38 FT $ $ $ $ 51 642 Channelizing Line, 8", Type 1 76 FT $ $ $ $ 52 642 Lane Line, 4", Type 1 132 FT $ $ $ $ 53 642 Island Marking, Type 1 2,080 SF $ $ $ $ 54 642 Lane Arrow, Type 1 4 EA $ $ $ $ 55 642 Crosswalk Line, Type 1 103 FT $ $ $ $ 3 of 11

CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE BASE BID TOTAL STORM: 56 611 4" Conduit, Type B, 707.45, for Underdrain (PVC SDR 35) 833 FT $ $ $ $ 57 611 12" Conduit, Type B, 707.33 (HDPE) 482 FT $ $ $ $ 58 611 Catch Inlet, Nyloplast 10 EA $ $ $ $ 59 611 Catch Basin Adjusted to Grade 2 EA $ $ $ $ 60 SPCL Core Drill Existing Catch Basin 4 EA $ $ $ $ 61 SPCL Connect to Existing Manhole 4 EA $ $ $ $ LIGHTING: 62 625 30' Wood Pole 12 EA $ $ $ $ 63 625 4' Aluminum Road Arm with Bracket and LED Fixture 12 EA $ $ $ $ 64 625 Grounding 15 EA $ $ $ $ 65 625 Pull Box, Polymer Concrete, 13"W X 24"L X 18"D 3 EA $ $ $ $ 66 625 Trench and Backfill in Lawn Area 950 FT $ $ $ $ 67 625 Conduit, PVC Schedule 40, 2" 984 FT $ $ $ $ 68 625 Plastic Caution Tape 984 FT $ $ $ $ 69 625 #8 AWG Distribution Cable, (3) Copper Conductors 490 FT $ $ $ $ 70 625 #4 AWG Distribution Cable, (3) Copper Conductors 494 FT $ $ $ $ 71 625 #4 AWG Aluminum Triplex Aerial Cable 1,635 FT $ $ $ $ 72 625 Concrete Light Pole Foundation, 24" x 90" Deep 3 EA $ $ $ $ 4 of 11

CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE BASE BID TOTAL 73 625 Light Pole Type "M" with Single LED Luminaire Fixture 3 EA $ $ $ $ 74 SPCL Light Pole, Connection Only 15 EA $ $ $ $ 75 SPCL Stub-Up, Secondary Riser Pole, PVC Schedule 80, 2" 1 EA $ $ $ $ 76 SPCL Electrical Service Modification (at EHCT Building) 1 LS $ $ $ $ 77 SPCL Electrical Service Modification (at Existing Light Pole) 1 LS $ $ $ $ MISCELLANEOUS: 78 614 Maintaining Traffic 1 LS $ $ $ $ 79 623 Construction Layout Stakes and Surveying 1 LS $ $ $ $ 80 624 Mobilization 1 LS $ $ $ $ 81 SPCL Utility Coordination, First Energy 1 LS $ $ $ $ 82 SPCL Marking of Private Utilities 1 LS $ $ $ $ 83 SPCL Contractor's Fee 1 LS $ $ $ $ Informal Total Base Bid $ 5 of 11

BID PROPOSAL CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE ALTERNATE 1: REMOVE WOOD POLES, WIRE & LIGHT FIXTURES IN LEU OF FIRST ENERGY TOTAL DEMOLITION: 84 630 Removal of Wood Pole and Disposal 8 EA $ $ $ $ 85 630 Removal of Light Fixture 8 EA $ $ $ $ 86 630 Removal of Electric Lighting Wire 907 LF $ $ $ $ 87 SPCL Utility Coordination, First Energy 1 LS $ $ $ $ 88 SPCL Contractor's Fee 1 LS $ $ $ $ Informal Total Alternate #1 $ 6 of 11

BID PROPOSAL CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE ALTERNATE 2: REMOVE Y INTERSECTION & INSTALL T INTERSECTION TOTAL DEMOLITION: 89 202 Pipe Removed (24" and Under), Water 145 FT $ $ $ $ 90 202 Pavement Removed, Asphalt 1,175 SY $ $ $ $ 91 202 Curb Removed, Concrete 485 FT $ $ $ $ 92 255 Full Depth Pavement Sawing, Pavement 57 FT $ $ $ $ 93 638 Fire Hydrant Removed and Disposed 1 EA $ $ $ $ 94 SPCL Plugging Existing Service Connection, Water 1 EA $ $ $ $ EARTHWORK AND EROSION PROTECTION: 95 651 Topsoil Stockpiled 25 CY $ $ $ $ 96 203 Excavation Including Embankment 1,000 CY $ $ $ $ 97 204 Proof Rolling 2 HR $ $ $ $ 98 204 Subgrade Compaction 967 SY $ $ $ $ 99 204 Excavation of Subgrade (20%), (12") 64 CY $ $ $ $ 100 204 Granular Material Type B, (12") 64 CY $ $ $ $ 101 652 Placing Stockpiled Topsoil 25 CY $ $ $ $ 102 653 Topsoil Furnished and Placed 330 CY $ $ $ $ 103 659 Seeding and Mulching, Class 1, Lawn 3,200 SY $ $ $ $ 104 654 Commercial Fertilizer 1 TON $ $ $ $ 7 of 11

CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE ALTERNATE 2: REMOVE Y INTERSECTION & INSTALL T INTERSECTION TOTAL 105 659 Water 100 MGAL $ $ $ $ 106 SPCL Silt Fence 690 FT $ $ $ $ 107 SPCL Storm Drain Inlet Protection 2 EA $ $ $ $ ROADWAY: 108 448 Asphalt Concrete Surface Course, Type 1, PG64-22 (1-1/4") 34 CY $ $ $ $ 109 407 Tack Coat for Intermediate Course (0.10 Gal/SY) 97 GAL $ $ $ $ 110 448 Asphalt Concrete Intermediate Course, Type 2, PG64-22 (1-3/4") 47 CY $ $ $ $ 111 407 Tack Coat (0.10 Gal/SY) 97 GAL $ $ $ $ 112 301 Asphalt Concrete Base, PG64-22 (4") 108 CY $ $ $ $ 113 304 Aggregate Base, 'Modified 304', (10"), Under Asphalt Pavement 269 CY $ $ $ $ 114 609 Curb, Type 6 681 FT $ $ $ $ 115 630 Ground Mounted Support, No. 2 Post, U-Channel 30 FT $ $ $ $ 116 630 Sign, Stop and Misc 3 EA $ $ $ $ 117 642 Center Line, Type 1 402 FT $ $ $ $ 118 642 Stop Line, Type 1 37 FT $ $ $ $ 119 642 Lane Line, 4", Type 1 115 FT $ $ $ $ 8 of 11

CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE ALTERNATE 2: REMOVE Y INTERSECTION & INSTALL T INTERSECTION TOTAL STORM: 120 611 4" Conduit, Type B, 707.45, for Underdrain (PVC SDR 35) 328 FT $ $ $ $ 121 611 12" Conduit, Type B, 707.33 (HDPE) 219 FT $ $ $ $ 122 611 Catch Inlet, Nyloplast 2 EA $ $ $ $ 123 611 Catch Basin Recontructed to Grade 1 EA $ $ $ $ MISCELLANEOUS: 124 623 Construction Layout Stakes and Surveying 1 LS $ $ $ $ 125 SPCL Contractor's Fee 1 LS $ $ $ $ Informal Total Alternate #2 $ 9 of 11

BID PROPOSAL CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE ALTERNATE 3: REMOVE AND REPLACE ROADWAY TOTAL DEMOLITION: 126 202 Pavement Removed, Asphalt 271 SY $ $ $ $ 127 202 Pavement Removed, Concrete with Asphalt Overlay 1,046 SY $ $ $ $ 128 202 Pipe Removed (24" and Under), Water 78 FT $ $ $ $ 129 638 Fire Hydrant Removed and Disposed 1 EA $ $ $ $ 130 SPCL Plugging Existing Service Connection, Water 3 EA $ $ $ $ 131 202 Curb Removed, Concrete 248 FT $ $ $ $ 132 202 Wearing Course Removed 65 SY $ $ $ $ 133 255 Full Depth Pavement Sawing, Pavement 119 FT $ $ $ $ EARTHWORK AND EROSION PROTECTION: 134 651 Topsoil Stockpiled 20 CY $ $ $ $ 135 203 Excavation Including Embankment 400 CY $ $ $ $ 136 204 Proof Rolling 2 HR $ $ $ $ 137 204 Subgrade Compaction 1,173 SY $ $ $ $ 138 204 Excavation of Subgrade (20%), (12") 78 CY $ $ $ $ 139 204 Granular Material Type B, (12") 78 CY $ $ $ $ 140 652 Placing Stockpiled Topsoil 20 CY $ $ $ $ 141 659 Seeding and Mulching, Class 1, Lawn 1,200 SY $ $ $ $ 10 of 11

CCE PARKING LOT REPLACEMENT PHASE 2 ROBERT BISHOP DRIVE ALTERNATE 3: REMOVE AND REPLACE ROADWAY TOTAL ROADWAY: 142 448 Asphalt Concrete Surface Course, Type 1, PG64-22 (1-1/4") 43 CY $ $ $ $ 143 407 Tack Coat for Intermediate Course (0.10 Gal/SY) 124 GAL $ $ $ $ 144 448 Asphalt Concrete Intermediate Course, Type 2, PG64-22 (1-3/4") 57 CY $ $ $ $ 145 407 Tack Coat (0.10 Gal/SY) 117 GAL $ $ $ $ 146 301 Asphalt Concrete Base, PG64-22 (4") 131 CY $ $ $ $ 147 304 Aggregate Base, 'Modified 304', (10"), Under Asphalt Pavement 326 CY $ $ $ $ 148 609 Curb, Type 6 779 FT $ $ $ $ 149 642 Center Line, Type 1 508 FT $ $ $ $ STORM: 150 611 4" Conduit, Type B, 707.45, for Underdrain (PVC SDR 35) 251 FT $ $ $ $ MISCELLANEOUS: 151 623 Construction Layout Stakes and Surveying 1 LS $ $ $ $ 152 SPCL Contractor's Fee 1 LS $ $ $ $ Informal Total Alternate #3 $ 11 of 11