MFF - Bihar Urban Development Investment Program (Facility Concept)

Similar documents
PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS

PROJECT PREPARATORY TECHNICAL ASSISTANCE

India: Preparing for the Ara Canal Water Productivity Improvement Project

PROJECT PREPARATION TECHNICAL ASSISTANCE

India: Karnataka Urban Development and Coastal Environmental Management Project

Additional Cofinancing

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

INITIAL POVERTY AND SOCIAL ANALYSIS. Country: India Project Title: Loan to PNB Housing Finance Limited. FI Department/Division: PSOD/PSFI

Policy Paper. March Establishing the Project Design Facility

Section 3.07 is deleted and the following is substituted therefor:

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)

Multitranche Financing Facility Annual Report 2017

India: Kolkata Environmental Improvement Project

Republic of the Maldives: Preparing Business Strategy for Port Development

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK

Georgia: Strengthening Domestic Resource Mobilization

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2)

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

ASIAN DEVELOPMENT BANK

OPERATIONS MANUAL BANK POLICIES (BP)

Section 3.06 is deleted and the following is substituted therefor:

Technical Assistance Report

Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors. Proposed Loan Kingdom of Bhutan: Secondary Towns Urban Development Project

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

Report and Recommendation of the President to the Board of Directors

ASIAN DEVELOPMENT BANK

Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4

FINANCIAL MANAGEMENT ASSESSMENT

ANNEXURE-2 URBAN INSTITUTIONAL, FINANCIAL, REGULATORY, AND OPERATIONAL REFORM AGENDA

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Cambodia: Rural Credit and Savings Project

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Nauru Country Operations Business Plan. August 2015

Report and Recommendation of the President to the Board of Directors

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program

Cook Islands: Preparing the Infrastructure Development Project (Cofinanced by the Japan Special Fund and Government of New Zealand)

Republic of the Philippines: Preparing the Road Sector Improvement Project

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

Nepal: Road Connectivity Sector I Project

Report and Recommendation of the President to the Board of Directors

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Viet Nam: Microfinance Development Program (Subprograms 1 and 2)

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011

Report and Recommendation of the President to the Board of Directors

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

People s Republic of Bangladesh: Updating the Road Master Plan

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

Country Operations Business Plan. Papua New Guinea August 2016

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Technical Assistance Report

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

RISK ASSESSMENT AND RISK MANAGEMENT PLAN

Statement of the Asian Development Bank s Operations in 2017

Country Operations Business Plan. Timor-Leste March 2017

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Georgia: Preparing the Second Domestic Resource Mobilization Program

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)

Concept Paper. Project Number: January Nauru: Public Financial Management Reform Program

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Country Operations Business Plan. Fiji October 2016

Project Administration Instructions

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

Republic of Uzbekistan: Solid Waste Management Improvement Project

Armenia: Infrastructure Sustainability Support Program

Indonesia: Metropolitan Medan Urban Development Project

Policy Paper. June Mainstreaming the Multitranche Financing Facility

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Country Operations Business Plan. Armenia October 2015

Report and Recommendation of the President to the Board of Directors

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011

Report and Recommendation of the President to the Board of Directors

Nepal: Preparing the North South Fast Track Road Project

Project Administration Instructions

MATRIX OF STRATEGIC VISION AND ACTIONS TO SUPPORT SUSTAINABLE CITIES

Republic of the Philippines: Islamic Finance for the Philippines

ASIAN DEVELOPMENT BANK

India: Assam Governance and Public Resource Management Sector Development Program

(c) Section 3.07 is deleted and the following is substituted therefor:

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

India: Bihar State Highways Project

Transcription:

India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount MFF - Bihar Urban Development Investment Program (Facility Concept) India Active Loan MFF Facility Concept 0067-IND: MFF - Bihar Urban Infrastructure Development Sector Program (Facility Concept) Ordinary capital resources US$ 200.00 million Strategic Agendas Drivers of Change Sector / Subsector Gender Equity and Mainstreaming Description Environmentally sustainable growth Inclusive economic growth Governance and capacity development Water and other urban infrastructure and services - Water supply and sanitation Effective gender mainstreaming Bhagalpur, Darbhanga, Gaya, and Muzaffarpur are the four largest towns with the highest economic growth potential in Bihar, after the state capital, Patna. Despite being the economic centers of Bihar, the four towns have been unable to achieve the national urban service goals or match many of the national averages for urban service delivery performance in India. Their inability to sustain water supply and sewerage services is the result of inadequate size and condition of infrastructure, mainly attributed to inadequate new investment and operation and maintenance (O&M). The investment program will improve and expand the water and sewerage infrastructure in the four towns, and help urban local bodies (ULBs) of the four towns the infrastructure owners to ensure discipline and structures for operations that result in sustainable O&M.

Project Rationale and Linkage to Country/Regional Strategy In FY2010, Bihar's gross state domestic product (GSDP) ranked 14th among all states in India; its per capita GSDP of Rs17,959 at current prices was the lowest. Bihar's GSDP largely depends on economic activities in urban areas; thus the importance of urban services for economic growth has been increasing. In FY2011, tertiary sectors contributed 61% of the GSDP, secondary sectors 18%, and primary sectors 21%. Therefore, an increase in productivity in urban areas is key to stimulating Bihar's GSDP. Improving the urban environment and quality of life will lead to better health for the urban population and, hence, to an increase in labor productivity. Urban service in the four towns is poor. The deterioration of key urban services (water supply, sewerage, and solid waste management [SWM]) may jeopardize the potential of the towns to continuously play their role as engines of economic growth in Bihar. Poor urban services negatively impact labor productivity an increase in cases of water- and vector-borne diseases will prevent affected members of the working age population from engaging in income-generating activities. The consequences of poor urban services greatly constrain women from engaging in much-needed additional and alternative sources of income as they are responsible for household water collection, waste disposal, family hygiene, and care of the sick. The core problem for the ability of towns to sustain key urban services is the inadequate size and condition of infrastructure. This is mainly attributed to inadequate new investment and O&M, stemming from four main problems: (i) User charges. With no user charges, ULBs cannot recover O&M cost. Inability to capture (a) accrued revenues and expenditures; and (b) apportioned common expenses makes the calculation of appropriate user charges difficult, even if ULBs are willing to levy user charges. (ii) Accounting practice. In the absence of a dedicated account specific for each urban service, ULBs cannot accumulate internal reserves for major investments. As a result, they rely on grants from various national and state schemes. Uncertainty of the availability of financial resources makes planning for the future difficult. (iii) Public administration. The absence of a municipal civil service system means that ULBs have difficulty accumulating skills. Most staff are contracted with multiple assignments, often not having the qualifications and rarely devoted to specialized tasks. (iv) Human resources. Too few staff are recruited to sustain the water supply, sewerage, and SWM services at the national target. Along with difficulty attracting qualified personnel, ULBs have difficulty preparing a longterm plan and project proposals to attract financiers. Urban service delivery. India's Eleventh Five-Year Plan (April 2007-March 2012) sets out 27 national targets, covering economic and social goals, including (i) ensure clean drinking water is available to all by 2009, with no slippages by the end of the plan; and (ii) treat all urban wastewater by 2011/2012 to result in clean river water. The plan recognizes infrastructure bottlenecks and lack of long-term funds for infrastructure investment as binding constraints for achieving the goals. The plan calls for public sector investment to meet infrastructure requirements where private participation is less likely. Road map for achieving service targets. To achieve the national and state targets for water supply, sewerage, and SWM services in the four towns, the Bihar state government, with assistance from the Asian Development Bank (ADB) through the project preparatory technical assistance (TA), formulated a plan that matches shortand long-term goals with specific solutions to help meet the targets a road map for 2010 2021. The key findings are as follows: (i) The physical investment for water supply, sewerage, and SWM will cost about Rs35 billion by 2021, and will incur annual O&M cost of about Rs414 million upon full completion. (ii) To create a sustainable environment for physical investment, the ULBs, in collaboration with the state government, need to (a) formulate and adopt user charge and subsidy policies; (b) establish an administrative body for recommending user charges; (c) migrate to an accrual-based, double-entry accounting system; (d) establish accounts dedicated to each urban service operation; (e) install automated billing systems for the user charge; (f) increase O&M staff numbers; and (g) train O&M staff in the ULBs. (iii) The nonphysical investment for construction management, systemic improvements in operations, and capacity building will require Rs2,270 million. Government and state government efforts. Various ongoing and planned investment projects of the national and state governments, valued at about Rs3,500 million, cannot meet the physical investment requirements of the road map. Ongoing external assistance in Bihar. Since 2010, the state government has been undertaking various urban municipal governance reforms with assistance from the Support Program for Urban Reforms (SPUR), financed by the Department for International Development of the United Kingdom. SPUR is a 61 million ($95 million equivalent) program to support urban governance and planning, municipal financial management, municipal infrastructure management, local economic development, and poverty reduction in 28 ULBs, which include the four towns. SPUR focuses on capacity building covering most of the reform requirements of the road map. ADB strategy and focus. The country partnership strategy and ADB assistance program for 2009-2012 were designed to support the Government of India's efforts to address the binding constraints in the plan through four strategic pillars. One of the pillars emphasizes the continuation of ADB assistance to infrastructure development in various sectors, including the urban sector. The country operations business plan for India, 2012-2014 places more focus on less-developed states, and allocates an MFF of up to $200 million for the investment program. Through the investment program, ADB will support a part of the funding shortfall for water supply and sewerage infrastructure improvement proposed in the road map. The aim is to develop a complete system in a town by complementing the ongoing investment of the national and state governments. The investment program will also increase the efficiency and cost-effectiveness of O&M by outsourcing operations through design-build-operate (DBO) contractual arrangements, and support ongoing efforts to address user charges, subsidies, and accounting specific to water supply and sewerage operations. A series of project loans through an MFF is the most suitable lending modality, as it will enhance continuity and predictability. Long-term engagement of consultants and DBO contractors will be financed through multiple loans. Greater predictability of financing availability under the MFF will enable the four towns to prepare the MFF tranches and investment in accordance with the road map beyond ADB's country programing period. It will provide a clear financial envelope in advance, and allow them to graduate from a traditional mode of planning preparing a project after budget is sanctioned. Greater continuity and predictability will enable the state government to plan and execute investment in a holistic manner.

Impact Urban population in relatively poor and weak capacity state (Bihar) has improved access to water supply and sanitation facilities. Project Outcome Description of Outcome Progress Toward Outcome People, especially vulnerable household, will have access to better quality and sustainable urban water supply and sewerage services in Bhagalpur, Darbhanga, Gaya and Muzaffarpur. Implementation of Tranche 1 project covering Bhagalpur water supply subproject is progressing well. Advance action for Tranche 2 is ongoing. Implementation Progress Description of Project Outputs Status of Implementation Progress (Outputs, Activities, and Issues) Water supply infrastructure in 3 towns improved. Sewerage infrastructure in 1 town improved. O&M of the asset created by the subprojects improved. Urban service delivery management improved. Project management and implementation skills and transparency in improved. Both the project management consultants (PMC) and design and supervision consultants (DSC) have already been mobilized and are helping the Project Management Unit in project implementation. Under the approved Tranche 1, design-build-operate contract was already awarded and is currently in the design phase. Construction is expected to start in late 2015. For Tranche 2, advance actions covering Gaya water supply subproject are ongoing. Approval of Tranche 2 is expected in 2015. Geographical Location Safeguard Categories Environment Involuntary Resettlement Indigenous Peoples B B C Summary of Environmental and Social Aspects Environmental Aspects Involuntary Resettlement Indigenous Peoples The categorization of individual Projects/Tranches will be determined in accordance with the Environmental Assessment and Review Framework. The categorization of individual Projects/Tranches will be determined in accordance with the Resettlement Framework. There are no IPs or EM groups in all subproject towns. These are supported by census data and confirmed by FGDs and transect walks. The categorization of individual Projects/Tranches will be reconfirmed in accordance with the Indigeneous Peoples Planning Framework was prepared. Stakeholder Communication, Participation, and Consultation During Project Design There were two initial workshops to introduce the PPTA in May 2010, inviting state government officials, senior officers and engineers of Bhagalpur, Darbhanga, Gaya and Muzaffarpur municipal corporations and nongovernment organizations. As soon as the scope of the ensuing investment became clear, the community development specialist of the PPTA team conducted stakeholder analysis, and consultations including workshops and focus group discussions, and discussions with key stakeholders. Between August and October 2010, 21 consultations with focus groups of 241 (126 men and 115 women) across the various socio-economic groups have been undertaken. Participants were asked about the usage of water supply, status of sanitation and willingness pay to water and sewerage services. After preparing the draft investment program, one workshop was organized to share information about the investment program with ADB, state government of Bihar, SPUR, local elected representatives, ULB officers, nongovernment organizations and community-based organizations. In December 2010 and February 2011, the PPTA team held discussion with the general residents of the area regarding sites for proposed water treatment plant and other water supply assets at 7 locations in Bhagalpur.

During Project Implementation The draft consultation and participation plan envisages: 1. Six one-day project orientation workshops organized by PMU for: (iii) Shared responsibility (iv) Shared decision-making 2. Six half-day project orientation seminars in each of the four towns organized by PIU in collaboration with NGO, ULB and WDC for: (iii) Shared decision-making 3. Two half-day focus group discussion workshops on water supply and sewerage services organized by PMU, PIU, ULB in collaboration with NGO for: 4. A one-day knowledge sharing workshop organized by PMU, PIU and ULB in collaboration with NGO for: (iii) Shared decision-making 5. A half-day semiannual participatory monitoring meetings for community watchdogs organized by PIU and ULB in collaboration with NGO and WDC for: 6. Four half-day focus group discussions, and eight half-day small group meetings on resettlement and entitlement organized by PMU, PIU and ULB in collaboration with NGO for: 7. A half-day consultation workshopa with temporarily affected persons organized by PMU, PIU and ULB in collaboration with NGO for: 8. A half-day consultation workshop with fishing communities in Bhagalpur organized by PIU and ULB in collaboration with NGO for:. Business Opportunities Consulting Services Procurement All consultants will be recruited according to ADB's Guidelines on the Use of Consultants (2010, as amended from time to time). The indicative consults recruitment activities are: quality- and cost-based selections, 64 personmonths international and 1,236 person-months national consultants, $ 17.6 million in two contracts. Each will be carried out by the same team throughout the investment program from 2012 to 2020 to ensure continuity and consistency. These will cover the entire implementation period of the investment program from 2012 to 2020. The initial loan will cover the consulting service contracts for the first 5 years while the subsequent loans will cover the remaining period of the contracts. All procurement of goods and works will be undertaken in accordance with ADB's Procurement Guidelines (2010, as amended from time to time). The indicative procurement activities are: (i) international competitive bidding, 3 contracts, $185 million; (ii) national competitive bidding, 4 contracts, $58 million, (iii) shopping, 8 contracts, $ 0.7 million. Large international competitive bidding contracts, which cover construction of an entire water supply system or a sewage treatment plant on DBO basis, will be proposed for each subproject so as to achieve clear accountability for functioning of the system or the plant. The contractor will design, build and operate the asset in about 9 years (up to 1 year for design, up to 3 years for construction and 5 years for operations). One loan may cover the whole design and construction periods of a DBO contract, and another loan(s) may continue to finance a part of the operations period of the same contract up to the initial 3 years. In the ninth year, the implementing agency, the employer of the contractor, will have options to have the operational responsibility transferred to the ULB, to continue engaging the same operator or engage other operator through the state procedure. Responsible Staff Responsible ADB Officer Responsible ADB Department Responsible ADB Division Executing Agencies Fan, Mingyuan South Asia Department Urban Development and Water Division, SARD Urban Development and Housing Department Govt. of Sikkim, NH 31A Gangtok-797101, India Timetable Concept Clearance 11 Apr 2011

Fact Finding 07 Apr 2011 to 15 Apr 2011 MRM 15 Jul 2011 Approval 29 Mar 2012 Last Review Mission - Last PDS Update 13 Mar 2015 MFF Facility Concept 0067-IND Financing Plan Loan Utilization Total (Amount in US$ million) Date ADB Others Net Percentage Project Cost 285.71 Cumulative Contract Awards ADB 200.00-0.00 0.00 % Counterpart 85.71 Cumulative Disbursements Cofinancing 0.00-0.00 0.00 % Project Page Request for Information https://www.adb.org/projects/41603-013/main http://www.adb.org/forms/request-information-form?subject=41603-013 Date Generated 12 April 2017 ADB provides the information contained in this project data sheet (PDS) solely as a resource for its users without any form of assurance. Whilst ADB tries to provide high quality content, the information are provided "as is" without warranty of any kind, either express or implied, including without limitation warranties of merchantability, fitness for a particular purpose, and non-infringement. ADB specifically does not make any warranties or representations as to the accuracy or completeness of any such information.