VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151)

Similar documents
COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program Tranche 3

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province)

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness. General Provisions

Cam My and Thong Nhat Districts DONG NAI PROVINCE Stage 3

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

DECREE No. 108/2006/ND-CP OF SEPTEMBER 22, 2006, DETAILING AND GUIDING THE IMPLEMENTATION OF A NUMBER OF ARTICLES OF THE INVESTMENT LAW THE

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject

Da Nang - Quang Ngai Expressway Development Project

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Tax Environment Landscape and Incentives to New Investment Projects in Nghe An. 08 September 2017 Phan Xuan Qui

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line

NATIONAL POWER TRANMISSION CORPORATION Northern Power Projects Management Board RESETTLEMENT PLAN (RP)

Decree No.15/2015/ND-CP dated 14/02/2015 on Public Private Partnership Investment (PPP) (Effective from 10/4/2015)

Combined Resettlement Plan and Ethnic Minority Development Plan. VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project

SANITATION REVOLVING. Philippines, January, 2013

b) if the sub-project is in the Annex B list of this Operational Manual;

World Bank Environmental. and Social Policy for Investment Project Financing

The World Bank Social Assistance System Strengthening Project (P123960)

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151)

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

(c) Section 3.07 is deleted and the following is substituted therefor:

Financing Agreement OFFICIAL DOCUMENTS ; Public Disclosure Authorized CREDIT NUMBER 5113-VN. Public Disclosure Authorized

Response from the World Bank and ADB (dated 16 December 2016) to Mekong Watch s inquiries

Indigenous Peoples Development Planning Document. PHI : Support for the Sustainable Health Care Project

Socialist Republic of Viet Nam: Water Sector Investment Program Multitranche Financing Facility (MFF) Periodic Financing Request 3

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region

IIC Environmental and Social Guidance Document

PEOCS QUALITY MANAGEMENT SYSTEM ISO C6NG TY Ttl VAN XAY D/NG DION 3 R'P82 VO L t' RESETTLEMENT ACTION PLAN

Practice Area(Lead) Social, Urban, Rural and Resilience Global Practice

Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

SOCIALIST REPUBLIC OF VIETNAM CONSTRUCTION. Independence - Freedom - Happiness

Environmental and Social Directive for Investment Project Financing. Bank Access to Information Policy Designation Public

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing


Integrating Environmental and Social Safeguards in Sub-national REDD+ Planning: Reflections from Vietnam

Monthly Legal Briefing

Socialist Republic of Viet Nam: Ho Chi Minh City Third Ring Road Technical Assistance Project

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2)

Vietnam Legal Briefing

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

RESTRUCTURING PAPER ON A

Asian Development Bank Accountability Mechanism Compliance Review Panel

LOAN AGREEMENT (Ordinary Operations) (Ho Chi Minh City Long Thanh Dau Giay Expressway Construction Project) between SOCIALIST REPUBLIC OF VIET NAM

VIE: Power Transmission Investment Program, Tranche 3

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE

Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized LOAN NUMBER 8457-CN. Public Disclosure Authorized. (Zhengzhou Urban Rail Project)

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness

Section I GENERAL PROVISIONS

COMPARATIVE ANALYSIS OF DMC LEGAL FRAMEWORK AND ADB SAFEGUARD POLICY STATEMENT BANGLADESH

REPORT ON Independent Resettlement Monitoring (Mission I)

Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project

NIIFL E&S Management Policy. NIIF Group. Strategic Fund

REGULATIONS FOR THE DEFENCE OF CUSTOMERS OF MONEYCORP FINANCIAL RISK MANAGEMENT LIMITED, SUCURSAL EN ESPAÑA

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE

Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam. Introduction & Overview

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

India: Karnataka Urban Development and Coastal Environmental Management Project

FACTSHEET ON MINIMUM WAGE LEGISLATION AROUND THE WORLD

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project

VIE: Ben Luc Long Thanh Expressway Project

Public-Private Partnerships (PPP) and Foreign Direct Investment Enterprises ( FDIE ) in Vietnam

THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness. No. 504/QD-TTg Hanoi, 21 April 2010

Local Road Asset Management Program Region. East Asia and Pacific Country. Program-for-Results Program ID. Government of Vietnam Implementing Agency

Fiduciary Systems Assessment (FSA)

CAO Investigation of IFC/MIGA Social and Environmental Performance in relation to:

Viet Nam: Northern Power Transmission Expansion Sector Project

HO CHI MINH CITY LONG THANH DAU GIAY EXPRESSWAY PROJECT

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

MICROFINANCE LOAN PROGRAMME Annual Report 2014

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

LOAN AGREEMENT (Ordinary Operations) (Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program Loan 2) between

THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 31/2015/QD-TTg Hanoi, August 4, 2015 DECISION

INTERNATIONAL AUDITING PRACTICE STATEMENT 1010 THE CONSIDERATION OF ENVIRONMENTAL MATTERS IN THE AUDIT OF FINANCIAL STATEMENTS

Table 1 the Road Network of Mozambique (in kilometers)

International Bank for Reconstruction and Development International Development Association

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:PID Results-Based Operation for Local Road Asset Management Region

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151) Due Diligence Review of Involuntary Resettlement Loc An Binh Son Industrial Zones (Dong Nai Province) 20 March 2014 A. PROJECT OBJECTIVES AND PROJECT COMPONENTS The development objective of the Vietnam Industrial Pollution Management Project (VIPMP) is to improve with industrial wastewater treatment regulations in four of the most industrialized provinces in Vietnam. The project's ultimate beneficiaries will be the general public in the four project provinces and beyond, who will benefit from reduced environmental pollution. The project will deliver direct benefits to: (a) MPI, by improving its capacity to promote sustainable industrial zone development; (b) MONRE, by improving its monitoring and enforcement capacity for industrial pollution management; and (c) the four project provinces, by strengthening their industrial development planning practices and their monitoring and enforcement capacity. IZs in the four provinces will have access to concessional financing to construct Centralized Effluent Treatment Plant (CETP) and technical assistance to improve the design, operation and management of the CETPs. The project consists of three components: (1) Component 1: Environmental Policy, Monitoring and Enforcement; Component 2: Performance-Based (CETP Financing); Component3: Implementation Support. The PDO level results indicators are the extents of compliance with national regulations for effluent discharge from project-financed and non-project-financed industrial zones in the four project provinces. B. PURPOSE AND OBJECTIVE OF THE DUE DILIGENCE REVIEW (DD) Purpose: RP1326 V6 The Bank received a proposal on 19 February 2014 from the Vietnam Environment Protection Fund (VEPF) who requested the Bank to consider financing the installation of a Centralized Effluent Treatment Plant (CETP) for Loc An Binh Son IZ (Dong Nai province) to improve the environmental pollution management for the IZ. Since the CETP required is located inside the IZ, and that the land for IZ was acquired from local owners (in accordance with its Overall Compensation Plan being approved prior to the cut-off-date of May 2010), the Bank conducted a due diligence of the land acquisition for the IZ as per the Project Environmental and Social Management Framework (ESMF) before deciding, along with environmental due diligence, financing the installation of the proposed CETP. Objective The context of this project constitutes how the DD is carried out. 1

First of all, it should be noted that under this project, only Clients (Industrial Zones) that have their Overall Compensation Plan approved by the Provincial Authorities prior to the cut-off date of May 2010 (the date of project identification mission) are eligible for proceeding a due diligence. Secondly, since the compensation payment/support provision/resettlement activities (associated with the IZ area requiring DD) were finished before the proposal was submitted, and given that Overall Compensation Plan approved by the government in 2008 (prior to the date of project identification mission), the objective of the due diligence for this IZ is: a) Evaluate if all involuntary resettlement activities associated with the IZ area (requiring due diligence) were carried out in full compliance with regulations of the Government of Vietnam, b) Confirm if the compensation payment/provision of support/resettlement done by local government (including its resettlement outcome) meets the objectives of Bank s OP 4.12, c) Check if there are any resettlement related issues that remain pending at the time of Bank s due diligence - to propose follow-up action(s). Since the Bank is expected to finance the installation of the CETP only (as per PAD), the DD focused on involuntary resettlement activities that happen within the land areas that are required for a) the installation of the CETP 1 itself, and b) the area (within the IZ) which the proposed CEPT is expected to provide its service. Two key elements that are of particular importance for this DD include a review to (i) confirm if an effective Grievance Redress Mechanism have been existing (to respond to complaints, queries or any aspects related to the on-going resettlement); and (ii) monitor the livelihood restoration process of the peoples affected by the land taking for the purpose of the IZ. If Government regulations applied are not consistent with the World Bank s safeguards policy objectives, a remedial action plan will be prepared for implementation by the IZ subject to the Bank s clearance prior to implementation. This due diligence was conducted by Bank s Consultant - under the guidance of Bank s Social Development Specialists. The DD report was prepared by Bank s consultant, with additional inputs from Bank s Social Development Specialists. C. METHODS This due diligence was conducted in accordance with the project s ESMF. The methods employed include: (i) desk review of secondary information provided by the IZ owner (see details in Appendix 1); (ii) Field visits which was conducted by the Bank s Social Development Specialist and Senior Environmental Engineer during the Bank s Second Implementation Support Mission in September 2013. 1 In this project, the CETP service area is defined as being: i) the land area within the IZ physically occupied by the CETP which will be financed by the project, or the area already occupied by an CETP if the project is upgrading it; and ii) the entire land area within the IZ that will be occupied by industries that are or will be serviced by the CETP. 2

D. FINDINGS This section presents some basic information about the Loc An Binh Son IZ (which the due diligence covers), followed by an evaluative review of various factors with a view to assessing the level of compliance of resettlement activities implemented by the government. Finally, the section presents a list of key safeguards issues, if any, which remain pending by the time the DD report was finalized. a) Basis Information of the Loc An Binh Son IZ The owner of the Loc An Binh Son IZ is Vietnam Rubber Group - Long Thanh Development & Investment Joint Stock Company (The Vietnam Rubber Group has more than 50% of Owners' Equity). Loc An Binh Son IZ was established in May 2010 by the Dong Nai Province People s Committee (Dong Nai Provincial People s Committee s Decision No. 1200/QD-UBND, dated 20/5/2010). The IZ has a planned total of 497.77 ha, which has been developed in three phases; (i) Phase 1: 152.68 ha; (ii) Phase 2: 180.04ha; (iii) Phase 3: 37.36 ha. At present, the owner is developing Phase 1, in which: (i) the area for a CETP to be installed is 1.57ha; (ii) the CETP service area accounts for 152.68 ha of Phase 1 (as mentioned above). As the document (provided by the IZ owner) indicated, the land acquisition for all of the IZ was completed. The owner of the IZ has had a Land User Right Certificate (LURC) for the entire planned IZ area (497.77ha). With regards to land acquisition, two organizations were affected. They are Long Thanh and Binh Son rubber plantations, belonging to Dong Nai Rubber Corporation. No individual household was affected as a result of the IZ development. b) Evaluative Review of Resettlement Implementation In this section, results from evaluative review of resettlement implementation associated with the CETP location and CETP service area will be summarized. The review was conducted on the basis of the information provided by IZ. Schedule for Compensation Payment. The Overall Compensation Plan for the IZ was issued and approved by the Dong Nai province People s Committee by Decision No. 2110/QD-UBND dated 27/7/2009. The compensation payment was completed in November 2010. Compliance with GoV regulations. Review of the records/legal documents provided by the IZ owner indicated that the compensation for the two affected plantations (as mentioned above) was in full compliance with Vietnamese regulations (Land Law 2003 and Decree 197/2004/ND-CP of the Government, dated 03 December 2004, on compensation, assistance and resettlement when the State acquires the land) and Dong Nai Provincial Regulation (Decision No. 2110/QD- UBND dated 27/7/2009 approving the Overall Compensation Plan for the entire IZ area; Decision No. 910A/QD-UBND dated 14/4/2010 on approving the detailed compensation plan for Loc An - Binh Son IZ; Decision No. 2405/QD-UBND dated 16/9/2010 on approving the adjustment to the detailed compensation plan for Loc An Binh Son IZ approved in the Decision No.910A/QD-UBND dated 14/4/2010). 3

Entitlements for affected organizations: The entitlements for affected organizations, which were prepared in full compliance with Government s regulations. The proposed entitlements for affected organizations were accepted by them. Budget for compensation payment for organization. Budget for resettlement compensation were provided by the VRG Investment and Development Joint Stock Company (who owns the Loc An Binh Son IZ) in accordance with the Overall Compensation Plan as approved by Dong Nai Provincial People s Committee. Consultations and Information Disclosure: Two affected organizations were consulted properly in accordance with the Government s regulation. Grievances Redress Mechanism. There have been no claims during the land acquisition process. Livelihood Restoration: Only public land used by 2 organizations is affected. Therefore, there is no livelihood restoration. c) Pending Issue: There are no legacies issues remaining pending by the time of the due diligence. E. CONCLUSIONS By 20 February, 2014 when the due diligence report was updated, compensation payment has been completed for the two affected organizations who have handed their affected land over to the Loc An Binh Son IZ. Based on the information provided, the due diligence indicated that: All involuntary resettlement activities associated with the IZ area (497.77 ha) were carried out in full compliance with regulations of the Government of Vietnam, The compensation payment made by the Vietnam Rubber Group - Long Thanh Development & Investment Joint Stock Company for the two affected rubber plantation (Long Thanh and Binh Son rubber plantations), through the coordination of Long Thanh District People s Committee, were done in accordance with the present government s laws and regulations. The compensation as well as the way the compensation payment was made meet the objectives of Bank s OP 4.12, There are no pending issues at the time the Bank completed the due diligence. As such, no follow-up action is required from the Bank s side. At the moment, the two affected organizations have handed their land over to the Loc An Binh Son IZ. The entire land area for Phase 1 (152.68 ha) within which the CETP will be located) is at the moment vacant, and is ready for the CETP installation. Given that a) all the land acquisition was implemented in full compliance with the government s regulations at central and provincial levels, b) the land acquisition for the Loc An Binh Son IZ 4

meets the objectives of Bank s OP 4.12, and c) there is no pending issues, the request from the Vietnam Environment Protection Fund (VEPF) to finance the installation of the CETP for Loc An Binh Son IZ under the IPMP project could be considered for financing from social safeguards perspective. 5

F. APPENDICES APPENDIX 1: LIST OF THE DOCUMENTS REVIEWED DURING THE DUE DILIGENCE - Dong Nai Province People s Committee s Decision No. 1200/QD-UBND, dated 20/5/2010 on the establishment of the Long An Binh Son IZ. - Dong Nai Province People s Committee s Decision No. 2110/QD-UBND dated 27/7/2009 approving the Overall Compensation Plan for the IZ. - Official letter No. 3843/UBND-KT dated 23/11/2010 issued by Long Thanh district people s committee certifying that the compensation has been completed. - Decision No. 910A/QD-UBND dated 14/4/2010 issued by Dong Nai People s Committee on approving the detailed compensation plan for Loc An - Binh Son IZ. - Decision No. 2405/QD-UBND dated 16/9/2010 issued by Dong Nai People s Committee on approving the adjustment to the detailed compensation plan for Loc An Binh Son IZ approved in the Decision No.910A/QD-UBND dated 14/4/2010. 6