Cost Control. Progress Measurement

Similar documents
Professional Development Seminar Series

Estimate Considerations. Estimate Considerations

ACWP (actual cost of work performed) Cost of actual work performed to date on the project, plus any fixed costs.

Project Time-Cost Trade-Off

Fundamentals of Capital Cost Estimating A TCM approach. Lou Vidotto Managing Director of Vidotto Group

RFP # for Addition to Parks Recreation 190 Facility

BID PROPOSAL FORM FOR SALE AND REMOVAL OF A HOUSE DATE OF BID PROPOSAL:

157. PROFILE ON THE PRODUCTION OF BOLTS AND NUTS

City Of Hammond Purchasing Department. Request for Pricing: RFP For Construction of Metal Building at 190 Maintenance Yard

LCC Methodology. Håkan Sundquist Structural Design and Bridges KTH. ETSI Methodology 1

RENOVATION APPLICATION FORM


2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

SINGLE PROJECT FACT FIND. This application is intended for contracts with a value in excess of 500,000

TECHNICAL ASSIGNMENT TWO

Overbed Table. LM5202B Over bed table Beech finish LM5202T Over bed table Teak finish LM5202W Over bed table White finish

PROJECT MANAGEMENT BODY OF KNOWLEDGE

ETSF01: Software Engineering Process Economy and Quality

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM

Learning Legacy Document

1 of 14 4/27/2009 7:45 AM

Project Planning. Planning is an important step in project execution. Planning means:

construction managmemt

PN 126 (LPA) - 12/31/2012- REVISIONS TO THE 2013 C&MS FOR DESIGN BUILD PROJECTS

Cyclical & Planned Maintenance Procedure. This procedure relates to the establishment of programmes for cyclical and planned maintenance.

[Project Title] Project Scope Statement

(Published Summary in The McPherson Sentinel,, 2016, once)

Working Paper Series Center for Transportation Studies

Body Corporate ten year maintenance plan example for South Africa

SUPPLEMENTAL SPECIFICATION CRITICAL PATH METHOD CONSTRUCTION SCHEDULES

An act to add and repeal Division 36 (commencing with Section 71200) of the Public Resources Code, relating to ballast water.

DOCUMENT SCHEDULING OF WORK PART 1 GENERAL 1.1 RELATED DOCUMENTS AND PROVISIONS

Cost of Construction Labor and Equipment

Release Date: January 3, 2019 Due Date: January 17, 2019

Section 109. MEASUREMENT AND PAYMENT

Project Management Initial Steps

Indicate whether the statement is true or false.

PROJECT MANAGEMENT DIPLOMA COURSE

PRACTICE NOTES FOR QUANTITY SURVEYORS

BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER

Actualtests.CCE-CCC.100 questions

SWEN 256 Software Process & Project Management

Ins. Luay Dwaikat Fall 2013/2014

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

PAYMENT PROVISIONS CONTRACT ADMINISTRATION MANUAL

ROAD COMMISSION FOR IONIA COUNTY

BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

PRACTICE NOTES FOR QUANTITY SURVEYORS

Humphreys &Associates, Inc.

79. PROFILE ON PRODUCTION OF DEXTRIN

REQUEST FOR PROPOSALS (RFP)- SCIENCES BUILDING FOR DSA INSPECTION SERVICES, SADDLEBACK COLLEGE

Architects. Proposal Form

SOLID WASTE FINANCIAL ASSURANCE PROGRAM REPORT

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

The Fair and Equitable Poolwide Utilization Formula

CHAPTER 5 STOCHASTIC SCHEDULING

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI

Annual Implementation Report 2015

DC Program and Project Managers Meeting #2

Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, 2000, (Act No.

Project Management for EPC Contracts Presented by: Dr. Jamal F. AlBahar, PMP, VMA Registered Arbitrator; Member: PMI, CMAA, AACE, AAA, PMA, CSI, SAVE

SCHEDULE CREATION AND ANALYSIS. 1 Powered by POeT Solvers Limited

developers services charges scheme

Thesis Proposal. Bret King Memorial Hospital Miramar Miramar, Fl 12/10/04

Facilities Planning (Revised 2016)

1. What is the ideal burndown rate? 2. Is the project early or late, at the end of week 3? 3. Is the project early or late, at the of week 2?

STORMWATER MANAGEMENT FUND Department of Environmental Services

Investment promotion application form filling guidelines

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES

What Service Measureables Really Mean

Construction Management

Work Breakdown Structure. Managing an Efficient Construction Workflow

BE IT RESOLVED BY THE BOARD OF DIRECTORS OF GALVESTON COUNTY MUNICIPAL UTILITY DISTRICT NO.

2016 Futura Spas Limited Warranty

Charging Arrangements for New Connections Services 2018/2019

CHAPTER 6 PROJECT CASH FLOW

Contract Performance Report

SYLLABUS FOR BAR BENDING & STEEL FIXING TRADE

187. PROFILE ON THE PRODUCTION OF SHOCK ABSORBER (SPRING)

156. PROFILE ON THE PRODUCTION OF BOILER

A Consultation for the Environmental Budgeting Toolkit for USAID Development Food Assistance Programs

Project Management Chapter 13

Purchasing Manual. Resolution Exhibit A. AWWD Purchasing Manual Date: Last Revised 6/29/10

Farm Business Planner

FORM OF AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGEMENT at RISK SERVICES SECTION THE SCHOOL DISTRICT OF PALM BEACH COUNTY, FLORIDA,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

Policy: 3330 PETTY CASH ACCOUNTS

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland

Electric Rate Schedule GS-2 General Service - Demand

HAWAII INSPECTION GROUP

CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918)

OREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor)

CHAPTER 5 SCHEDULING AND TRACKING WORK IN CONSTRUCTION PROJECT MANAGEMENT. UWB10202 Effective Communication by Norazmi Danuri

Benchmarking Capitalization Best Practices

Allegan County Courthouse Square

Stat511 Additional Materials

Performing Contract Audits. Thomas A. Mock, CIA, CCA Director of Internal Audit Lake County Schools

LAO PDR. Schedule of Specific Commitments. (For the First Package of Commitments)

Transcription:

Cost Control Progress Measurement

Introduction Once the execution of the project starts, the project team must periodically report their progress on each task. Since the nature of each task varies, no single reporting method is suitable, and several methods of measuring progress are required. The six most common methods are presented in.

Methods of Measuring Work Progress 1. Units Completed 2. Incremental Milestone 3. Start/Finish 4. Supervisor Opinion 5. Cost Ratio 6. Weighted or Equivalent Units

Method 1: Units Completed Applicable to tasks that involve repeated production of easily measured pieces of work, when each piece requires approximately the same level of effort. Wire pulling is a task where accomplishment is easily measured in terms of linear meters of wire pulled. If the work for pulling a certain type of wire is contained in a single control account, the units completed method can be applied.

Examples 10,000 linear meters are to be pulled, 4000 LM have been pulled, percent complete = 4000/10000 = 40% Placing and finishing reinforced concrete Progress would normally be reported on the basis of cubic meters of concrete placed and finished, or on the number of square meters of finished surface

Method 2: Incremental Milestone method is applicable to any control account that includes subtasks that must be handled in sequence. The task is segmented into subtasks and each is assigned an increment of progress for the entire task. Completing a subtask is the achievement of a milestone. The milestone percentage is normally based. on the number of workhours required

Example: Establishing Rules of Credit for installing a major vessel in an industrial facility Task Incremental Progress Received/ inspected 15% 15% Setting complete 20% 35% Alignment complete 15% 50% Internals installed 25% 75% Testing complete 15% 90% Cumulative Progress Accepted by owner 10% 100%

Method 3: Start/Finish Applicable where no intermediate milestones can be defined or where the effort/time required is very difficult to estimate. Examples include planning activities, flushing and cleaning, testing, and major rigging operations.

Method 3: Start/Finish In the start/ finish approach, a percent complete is arbitrarily assigned to the start of a task, and 100 percent when the task is finished. A starting percentage of 50 percent is reasonable for short duration, lower-value tasks. Tasks with long duration or a high value, 20-30 percent would probably be used. Percentage affects progress payments, and an owner will hesitate to recognize too much completion in advance. For very short tasks, the start/finish percentages are usually 0 percent/ 100 percent.

Method 4: Supervisor Opinion Supervisor simply makes a judgment of percent complete. This is a subjective approach and should be used only for relatively minor tasks and only where developing a more objective status is not feasible. Examples include dewatering, temporary construction, architectural trim, and landscaping are candidates for application of this approach.

Method 5: Cost Ratio Applicable to long duration tasks or that are continuous during the life of a project, and which are estimated and budgeted on bulk allocations of money and workhours rather than on the basis of production. Examples include project management, quality assurance, contract administration, and project controls % complete = actual cost or workhours to date forecast at completion

Method 6-Weighted 6 or Equivalent Units applicable when the task being controlled involves a long period of time and is composed of two or more overlapping subtasks. each with a different unit of work measurement. Structural steel erection provides a good example of where this this method may be applied.

Method 6-Weighted 6 or Equivalent Units Structural steel is normally estimated and controlled by using tons as the unit of measure. However, each of the subtasks have a different unit of measure. Each subtask is weighted by task level of effort (usually workhours) These weights are called "rules of credit. As quantities of work are completed for each subtask, the quantities are converted into equivalent tons The total weight of structural steel in this account is 520 tons.

Allowed Credit Rules of Credit Example for Structural Steel Installation Subtask Total U/M Total Quantity To-date Quantity Earned Tons 0.02 run foundation bolts each 200 200 10.4 0.02 shim % 100 100 10.4 0.05 shakeout % 100 100 26.0 0.06 columns each 87 74 26.5 0.11 beams each 859 45 3.0 0.10 cross braces each 837 0 0.0 0.20 girts and sag rods bay 38 0 0.0 0.09 plumb and align % 100 5 2.3 0.30 connection each 2,977 74 3.9 0.05 punch list % 100 0 0.0 1.00 Steel Totals ton 520-82.5

Example Earned quantity = (allowed credit) * (summary quantity) x (quantity to date) (total quantity) earned tons beams = (0.11) * (520 tons) * (45 each/859 each) = 3.0 tons percent complete = 82.5 tons / 520= 15.9% A variation of this approach uses equivalent units for each subtask. In the example above, each subtask item would be given a unit of measure that in equivalent ton. For example, each beam would have an equivalent ton value determined as follows: beam equivalent ton = (0.11 allowed credit)(520 tons)/(859 beams) = 0.067 tons/beam