RESERVOIR LEGISLATION IN WALES

Similar documents
Explanatory Memorandum to The Reservoirs Act 1975 (Exemptions, Appeals and Inspections) (Wales) Regulations 2015

Coupar Angus (Potentially Vulnerable Area 08/07) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Coupar Burn (River T

Kelso (Potentially Vulnerable Area 13/09) Local Plan District Local authority Main catchment Tweed Scottish Borders Council River Tweed Background Thi

Ness, Isle of Lewis (Potentially Vulnerable Area 02/01) Local Plan District Outer Hebrides Local authority Comhairle nan Eilean Siar Main catchment Le

Consultation on proposed enforcement arrangements for updated EU marketing standards on Olive Oil October 2013

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET EXECUTIVE 18 th September Flood Risk Management Plan (FRMP)

Turriff (Potentially Vulnerable Area 06/07) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Deveron Backgrou

2007 No. 871 ENVIRONMENTAL PROTECTION The Producer Responsibility Obligations (Packaging Waste) Regulations 2007 CONSOLIDATED VERSION

Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Do

Arbroath (Potentially Vulnerable Area 07/07) Local Plan District Local authority Main catchment Tay Estuary and Montrose Basin Angus Council Brothock

Protocol for the maintenance of flood and coastal risk management assets (England only) Version 4, 27/01/2014 UNCLASSIFIED

Ross of Mull (Potentially Vulnerable Area 01/30) Local authority Main catchment Argyll and Bute Council Island of Mull coastal Background This Potenti

2012 No EDUCATION, ENGLAND

Newton Stewart (Potentially Vulnerable Area 14/12) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Cree Council

Resilience to Flooding of Grid and Primary Substations

Nairn Central (Potentially Vulnerable Area 01/18) Local authority Main catchment The Highland Council Moray coastal Background This Potentially Vulner

Flood Risk Management Planning in Scotland: Arrangements for February 2012

EXPLANATORY MEMORANDUM TO THE LOCAL GOVERNMENT PENSION SCHEME (MANAGEMENT AND INVESTMENT OF FUNDS) REGULATIONS No. 946

Oban (Potentially Vulnerable Area 01/31) Local authority Main catchment Argyll and Bute Council Knapdale coastal Background This Potentially Vulnerabl

Glasgow City centre (Potentially Vulnerable Area 11/16) Local Plan District Local authority Main catchment Clyde and Loch Lomond Glasgow City Council

Charity Law and Governance

Background to the PFRA European Overview - UC9810.5b

Environmental Authorisations (Scotland) Regulations 2018 GUIDANCE FOR SEALED SOURCE PERMIT APPLICATION FORM

Conon Bridge and Muir of Ord (Potentially Vulnerable Area 01/16) Local authority Main catchment The Highland Council River Conon Background This Poten

Clyde south - Port Glasgow to Inchinnan (Potentially Vulnerable Area 11/09) Local Plan District Clyde and Loch Lomond Local authority Inverclyde Counc

Stirling (Raploch and Riverside) (Potentially Vulnerable Area 09/07) Local Plan District Local authority Main catchment Forth Stirling Council Stirlin

Stirling (Cornton and Causewayhead) (Potentially Vulnerable Area 09/05) Local Plan District Forth Local authority Clackmannanshire Council, Stirling C

Forres (Potentially Vulnerable Area 05/06) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council Moray

Ellon (Potentially Vulnerable Area 06/12) Local Plan District North East Local authority Aberdeenshire Council Main catchment River Ythan, Buchan coas

Dunblane and Bridge of Allan (Potentially Vulnerable Area 09/03) Local Plan District Local authority Main catchment Forth Stirling Council Allan Water

Introduction. The Bank s role as regulator and the objectives of the Regime

Nairn East and Auldearn (Potentially Vulnerable Area 05/08) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Hi

RIVER LUGG INTERNAL DRAINAGE BOARD. Statement on Water Level and Flood Risk Management

Kirkwall (Potentially Vulnerable Area 03/05) Local Plan District Local authority Main catchment Orkney Orkney Islands Council Orkney coastal Backgroun

November 2016 Revision

River Findhorn (Potentially Vulnerable Area 05/07) Local Planning District Local authority Main catchment Findhorn, Nairn and The Highland Council, Ri

Providing intelligent legal solutions T F

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba

Abstraction Charges Scheme 2017/18

Student Loans Company. Repaying your student loan

Elgin (Potentially Vulnerable Area 05/05) Local Planning District Local authority Main catchment Findhorn, Nairn and Speyside The Moray Council River

Transparency and Access in Motor and Travel Insurance for Older People An Agreement on Age and Insurance. Version 2.1

Aberfeldy and Pitlochry (Potentially Vulnerable Area 08/03) Local Plan District Local authority Main catchment Tay Perth and Kinross Council River Tay

Dornoch (Potentially Vulnerable Area 01/07) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Dornoch coasta

THE FOOD STANDARDS AGENCY S PREPARATIONS FOR THE UK S EXIT FROM THE EUROPEAN UNION

Environmental Liability Directive 2004/35/EC- UK report to the European Commission on the experience gained in the application of the Directive

Hillfoots Villages (Potentially Vulnerable Area 09/04) Local Plan District Forth Local authority Clackmannanshire Council, Stirling Council Main catch

MEMORANDUM OF UNDERSTANDING BETWEEN NDA AND SEPA

Fort William (Potentially Vulnerable Area 01/25) Local authority Main catchment The Highland Council Appin coastal Background This Potentially Vulnera

Alyth (Potentially Vulnerable Area 08/04) Local Plan District Local authority Main catchment Tay Perth and Kinross Council Alyth Burn (River Tay) Back

ENVIRONMENT AGENCIES GUIDANCE ON SUITABILITY OF RADIOACTIVE WASTE ADVISERS

Wales Coastal Flooding Review Project 5 Report Recommendations 25 & 26

Auditor Regulatory Sanctions Procedure

REQUEST FOR INFORMATION

Reservoir safety risk assessment a new guide

Castle Douglas (Potentially Vulnerable Area 14/11) Local Plan District Local authority Main catchment Dumfries and Galloway Solway River Dee (Solway)

CONSULTATION ON BRINGING FORWARD EU EMISSIONS TRADING SYSTEM 2018 COMPLIANCE DEADLINES IN THE UK

1. Background The Department of the Environment NI has issued a consultation paper titled Policy options for a Bill to introduce recycling targets.

Petroleum Legislation Amendment Bill 2018

Development and Flood Risk - the Environment Agency s approach to PPS25. scrutinised before planning decisions are made

Water and Sewerage Services

Flood Investigation Report

Response by ADA (Association of Drainage Authorities)

Good Practice Guide. Technical guidance: Flood risk activity definitions October GPG 220 Document Owner: Flood Risk Strategy.

STATUTORY INSTRUMENTS. S.I. No. 122 of EUROPEAN COMMUNITIES (ASSESSMENT AND MANAGEMENT OF FLOOD RISKS) REGULATIONS 2010.

Indicators and trends

DriverProtect Cover in association with RAC Legal Services

THE RIVER STOUR (KENT) INTERNAL DRAINAGE BOARD. Policy Statement on Water Level and Flood Risk Management

LOW. Overall Flood risk. Flood considerations. Specimen Address, Specimen Town. Rivers and the Sea Low page 4. Historic Flood.

2010 No CLIMATE CHANGE. The Aviation Greenhouse Gas Emissions Trading Scheme Regulations 2010

Environmental Permitting Charging Guidance

Flood Risk Management Strategy Orkney Local Plan District This section is the most relevant for individuals, communities and businesses seeking to und

Caol and Inverlochy (Potentially Vulnerable Area 01/24) Local Plan District Highland and Argyll Local authority The Highland Council Main catchment Fo

Response to the HM Revenue & Customs consultation on whether to bring illegal waste sites within the scope of the Landfill Tax, March 2017

Financial Regulations

The Producer Responsibility Obligations (Packaging Waste) Regulations 2007 (as amended) SEPA Monitoring Plan 2017

The Producer Responsibility Obligations (Packaging Waste) Regulations 2007

Board of Management Audit Committee

Terms and Conditions.

Explanatory Memorandum to the Planning (Hazardous Substances) (Amendment) (Wales) Regulations 2010.

River Lugg Internal Drainage Board. Policy Statement on Flood Protection and Water Level Management

Saturday, 14 April 2012

BRITISH COLUMBIA DAM SAFETY REGULATION 44/2000

Terms and Conditions relating to the provision of Childcare Vouchers by Computershare Voucher Services Limited

The Producer Responsibility Obligations (Packaging Waste) Regulations 2005

Anti-Money Laundering - A Practical Guide 27th September Doug Hopton Director DTH Associates Limited

Proposer Details. Application Form for Professional Indemnity and Liability Insurances Surveyors

2015 No. 484 (W. 41) EDUCATION, WALES. The Education (Induction Arrangements for School Teachers) (Wales) Regulations 2015

DEPARTMENT OF WATER AFFAIRS. No. R February 2012 NATIONAL WATER ACT, 1998

ARUN DISTRICT COUNCIL POLICY STATEMENT ON FLOOD AND COASTAL DEFENCE. 12 January 2004

Commissioners for Revenue and Customs Bill

SAMSUNG S9 / S9+ UPGRADE PROGRAMME TERMS AND CONDITIONS

Strategic Flood Risk Management

FILE: and EFFECTIVE DATE: September 1, 2009 AMENDMENT NO: 3 (December 1, 2013)

Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina

Life of a company part 2 event driven filings

inconsistency, lack of co-ordination on the ground and penalties that were cumbersome and ineffective.

(24 February to date) NATIONAL WATER ACT 36 OF (Gazette No , Notice No See Act for commencement dates)

CRC Energy Efficiency Scheme. Charging Scheme and Guidance

FG18/6: Helping tenants find alternatives to high-cost credit and what this means for social housing landlords

Transcription:

RESERVOIR LEGISLATION IN WALES BASIC LEGAL FRAMEWORK The United Kingdom comprises four regional administrations, England, Wales, Scotland and Northern Ireland. Reservoirs in England and Wales are regulated under the, as amended by the Flood and Water Management Act 2010, and this is enforced by Natural Resources Wales, in Wales. SUMMARY OF RELEVANT SECTIONS OF THE ACT, as amended by the Flood and Water Management Act 2010 Summary Table Topics Law Applicable section(s) of Act A B C D E F G H A1 & 5: Define a large raised reservoir subject to regulation 1, 21 24: Role and responsibilities of the reservoir undertaker 4: Establish engineer panels and appoint suitably competent engineers 6 9, 21: Define construction works and provide administrative procedure to certify such works 10 12, 19: Inspection & supervision requirements for high risk reservoirs 2 3, 15 18, 25 26: Regulatory powers and duties to require and carry out works to a reservoir 12A, 12AA 12B, 20 21: Other requirements, flood plans, maintenance of records, reports and incident reports 13 14: Discontinuance or Abandonment A. Reservoirs subject to Regulation B. Entities concerned C. Reservoir projects D. Construction and first filling E. Reservoir operation F. The repair of reservoirs G. Rules for the protection of the population H. Reservoir decommissioning These topics are covered in detail below. 1

RESERVOIR LEGISLATION IN WALES RESERVOIRS SUBJECT TO REGULATION In Wales, reservoirs that are capable of holding 10,000m³ or more of water are regulated under the. The undertakers (the legal terms for the reservoir owners or operators) of these reservoirs are required to register them with Natural Resources Wales (NRW). NRW has a duty to designate reservoirs as high risk reservoirs where they consider, in the event of an uncontrolled release of water, human life could be endangered. Reservoirs designated high risk are subject to inspection and supervision by reservoir engineers. Reservoirs not considered to be high risk remain registered but are not subject to the same degree of inspection and supervision. ENTITIES CONCERNED Administrative organisation The is also the principal legislation in Wales which sets the minimum standards for the construction, supervision, maintenance, inspection and ultimately reservoir decommissioning activities. The same system of panel engineers is used as in England. Natural Resources Wales (NRW) is the enforcement authority in Wales, which seeks to ensure that undertakers observe and comply with the law. NRW maintains a public register of reservoir information, and monitors the actions required by undertakers. The law provides powers for NRW to act in default of an undertaker or in an emergency. NRW reports to the Welsh Ministers every two years on the steps taken in fulfilling its role. Owners A reservoir undertaker is the legal term for the operators of the reservoir, where they have the authority to manage or control the reservoir. Where there is no operator, the owners are the undertakers. Undertakers are responsible for day to day monitoring and maintenance of the reservoir and compliance with the law, which entails the appointment of engineers and implementing their recommendations. Undertakers of high risk reservoirs must ensure that the reservoir is under the supervision of a Supervising Engineer at all times. They are also required to commission an Inspecting Engineer from the appropriate panel of engineers to inspect the reservoir at intervals not exceeding 10 years. The reservoir undertaker of a not high risk reservoir is not required to commission a Supervising Engineer or an Inspecting Engineer. Reservoir Engineers These are qualified civil engineers who are appointed by Defra with the agreement of Welsh Ministers to reservoir engineer panels, based on recommendations of suitability and competence provided by the Institution of Civil Engineers. The reservoir engineers inspect and supervise reservoirs and where appropriate design and supervise the construction or enlargement of new or existing reservoirs or the decommissioning or abandonment of existing reservoirs. Engineers are commissioned to perform a variety of key reservoir activities, which are detailed below. RESERVOIR PROJECTS The does not attempt to set in law such technical standards that may be liable to change as a result of research or recommendations for best practice. The Act does however require the reservoir undertaker to commission reservoir panel engineers for certain works and activities specified by the law. These engineers are familiar with the latest technical guidance relating to reservoir construction as published by various professional bodies and apply these to the reservoirs to which they are appointed. CONSTRUCTION AND FIRST FILLING The requires those who wish to construct a reservoir to commission the services of a reservoir Construction Engineer from the panel of reservoir engineers established by the Defra. 2

RESERVOIR LEGISLATION IN WALES A Construction Engineer must be appointed for the initial construction or subsequent alteration of a large raised reservoir. This engineer is responsible for safety throughout the construction period and until he is satisfied that the reservoir is performing correctly. He provides certificates at various stages to permit filling of the reservoir and will notify completion of works. Once construction has advanced to a state where the reservoir can be safely filled, or partially filled; the reservoir Construction Engineer will provide a preliminary certificate which sets out the level to which the reservoir can be filled and any further recommendations in relation to the safety of the reservoir that are appropriate. This certificate can be revised and re issued as often as the Construction Engineer considers necessary until the reservoir construction is complete. The commission of the Construction Engineer terminates with the issue of the final certificate, which normally will be issued three years after the preliminary certificate. This final certificate starts a two year monitoring period, at the end of which the reservoir must be inspected by a reservoir Inspecting Engineer. NRW ensures all certificates are supplied by the engineer to the reservoir undertaker prior to each stage of construction and filling. RESERVOIR OPERATION Amendments to the in Wales places a new duty on NRW to designate reservoirs as high risk reservoir where it considers, in the event of an uncontrolled release of water, human life would be endangered. The designation considers the consequences of a flood from the reservoir but does not consider the likelihood of a dam failure. High risk reservoirs must be supervised by a reservoir Supervising Engineer at all times. The Supervising Engineer, guided by recommendations that may be made by an Inspecting Engineer, will advise and direct the undertakers to perform various monitoring and maintenance operations as appropriate to the reservoir. The Supervising Engineer provides the undertakers and NRW with an annual statement detailing the overall behaviour of the reservoir and any actions taken, or not taken, by the undertakers. The Supervising Engineer may also provide directions to the undertakers and may recommend a statutory inspection by an Inspecting Engineer these are enforceable recommendations. High risk reservoirs must be inspected by an Inspecting Engineer, at intervals not exceeding ten years, to provide a condition assessment of the impounding structures, spillways, outlet and inlet facilities. The inspection encompasses the whole reservoir basin, with consideration for the water body catchment. The Inspecting Engineer provides a report to the undertakers and a copy to NRW. The report may include the Inspecting Engineer s recommendations as to measures to be taken in the interests of safety and maintenance, which become statutory duties on the undertakers. Reservoirs which are not designated as high risk reservoirs are not formally monitored, but their designation can be reviewed at any time when NRW considers the designation may have ceased to be appropriate. All reservoir undertakers must report incidents that may affect the safety of their reservoir to NRW THE REPAIR OF RESERVOIRS The recognises various types of work that may be undertaken on a reservoir: Construction or alteration works that reduce or enlarge the capacity of a reservoir must be undertaken under the supervision of a Construction Engineer commissioned from the approved panel of Inspecting Engineers. Completion of this type of work is certified by the construction engineer. Repair works recommended by an Inspecting Engineer as a result of a periodic inspection must be supervised by a Qualified Civil Engineer who will supply a certificate once satisfied that the works have been successfully completed. Maintenance works are supervised by the Supervising Engineer who will report on this type of work in the annual statement. This type of work is ongoing and as such does not require a completion certificate. 3

RESERVOIR LEGISLATION IN WALES Where works of any type are not undertaken as required or completed to the satisfaction of the reservoir engineer, NRW has powers to require the undertakers to implement the works or recommendation. In extreme cases, or emergency situations, NRW can undertaker the works or take other appropriate action, under the supervision of a Qualified Civil Engineer, to ensure the safety of the reservoir. RULES FOR THE PROTECTION OF THE POPULATION NRW uses reservoir flood maps to identify the potential consequences of a reservoir flood. These flood maps are shared with local authority emergency planners to inform their emergency (off site) plans. The makes reference to the need for reservoir undertakers to prepare emergency (onsite) plans but this is not a legal requirement under the. Such plans set out the actions to be taken by the reservoir undertaker in order to respond to and mitigate the effects of a flood from the reservoir. These plans will be specific to each reservoir. Inspecting engineers may also recommend undertakers prepare an onsite flood plan and in these circumstances it becomes a statutory requirement. Reservoir flood maps also provide detail to inform reservoir risk designation. RESERVOIR DECOMMISSIONING The, within its definition of construction or alteration of a reservoir, includes the term discontinuance which is where the reservoir is altered so that it is incapable of holding 10,000m³ of water. It also includes the term abandonment which is where the reservoir is altered so that it is incapable of filling accidentally or naturally of any water to such an extent that it poses a risk. Such works are to be conducted under the supervision of a Qualified Civil Engineer who will certify completion. Other approvals may be required from environmental and planning authorities and the engineer is expected to be competent with these to provide advice to their client. 4

COMPARISON OF RESERVOIR LEGISLATION IN ENGLAND, WALES, SCOTLAND AND NORTHERN IRELAND. Regulatory Authority Registration Threshold Originally Local Authorities as amended for England Environment Agency (EA) 25,000 m 3 25,000 m 3 (Further evidence gathering, in 2016/17, to take place before Ministers decide on any changes to this threshold and inclusion of cascades) as amended for Wales Natural Resources Wales (NRW) 10,000 m 3 New threshold came into force 1 April 2016 Reservoirs (Scotland) Act 2011 Scottish Environment Protection Agency (SEPA) 10,000 m 3 Includes connected storages (cascades etc) but to be phased in. Initially 25000m 3 from 1 April 2016. Reservoirs over 10,000m 3 will be brought under regime at a later date. (Northern Ireland) 2015 Department of Agriculture and Rural Development (DARD). Department for Infrastructure from May 2016. 10,000m 3 Includes connected storages (cascades etc) Fees No Still to be determined To be determined Yes Yes. While the Act makes provision for the charging of fees there is no intention to do so at present. Risk Designation Responsible party Inspection Reports No accounting for risk within legislation High Risk only, assessed on probability of failure = 1 & consequence. High risk only, assessed on probability of failure = 1 & consequence. High, Medium & Low assessed on probability of failure = 1 & consequence. High, Medium & Low Consequence assessed primarily on the impact of an uncontrolled release of water due to dam failure. Undertaker Undertaker(s) Undertaker(s) Reservoir Manager(s) Reservoir Manager(s) Section 10 Report Section 10 Report Section 10 Report Section 47 Report *Section 35 Report 5

COMPARISON OF RESERVOIR LEGISLATION IN ENGLAND, WALES, SCOTLAND AND NORTHERN IRELAND. Inspecting Engineer Supervising Statements Supervising Engineer All sites No time limit on production of report Report only copied to Enforcement Authority when MIoS contained in report No time limits on MIoS Section 12 Statement All sites Not required to send statement to Enforcement Authority as amended for England High risk sites Inspection report to be sent within 6 months of inspection date to Undertaker All reports copied to EA Time limits on MIoS as amended for Wales High risk reservoirs Inspection report to be sent within 6 months of inspection date to Undertaker All reports copied to NRW Time limits on MIoS Reservoirs (Scotland) Act 2011 High risk sites Medium risk sites, only when requested by supervising engineer Inspection report to be sent within 9 months of inspection date to Reservoir Manager All reports copied to SEPA within 28 days of sending to Reservoir Manager Time limits on MIoS (Northern Ireland) 2015 High and Medium Consequence reservoirs. Inspection report to be sent within 6 months of inspection date to Reservoir Manager. All reports copied to the Department within 28 days. Time limits on MIoS Section 12 Statement Section 12 Statement Section 50 Statement *Section 26 Statement High risk sites 12 monthly written statements produced for undertaker and all copied and sent to EA High risk reservoirs 12 monthly written statements produced for undertaker and all copied and sent to NRW High & Medium risk sites 12 monthly written statements produced for reservoir manager and all copied and sent to SEPA within 28 day of sending to reservoir manager. High & Medium Consequence reservoirs 12 monthly written statements produced for Reservoir Manager and copied to Department 6

COMPARISON OF RESERVOIR LEGISLATION IN ENGLAND, WALES, SCOTLAND AND NORTHERN IRELAND. as amended for England On site Plans No Termed flood plan in Act Maintenance items Incident Reporting Enforcement Powers Not statutory - Minister has powers to make this a statutory requirement by issuing further regulations Statutory included in Inspecting engineer reports as amended for Wales Termed flood plan in Act - Minister has powers to make this a statutory requirement by issuing further regulations - No intention to make further regulations at this time Statutory included in Inspecting engineer reports Reservoirs (Scotland) Act 2011 Termed flood plan in Act, Scottish Ministers have powers to make this a statutory requirement by issuing further regulations Statutory will be included in Inspecting engineer reports Voluntary Statutory Statutory Scottish Ministers have powers to make this a statutory requirement by issuing further regulations. (Northern Ireland) 2015 Yes termed flood plan in the Act. Yes statutory. Works will be included in Inspecting engineer reports. Statutory, details will be set out in regulations. Only criminal Criminal Criminal Civil Sanctions & Criminal Civil and Criminal Sanctions Public Register Yes limited Yes expanded requirements. All engineer reports, certificates & written statements to be included, as well as outline inundation map for each reservoir Yes expanded requirements. All engineer reports, certificates & written statements to be included. Yes expanded requirements. All engineer reports, certificates & written statements to be included, as well as outline inundation map for each reservoir Yes extent to be specified by regulations. 7

COMPARISON OF RESERVOIR LEGISLATION IN ENGLAND, WALES, SCOTLAND AND NORTHERN IRELAND. as amended for England as amended for Wales Reservoirs (Scotland) Act 2011 (Northern Ireland) 2015 Reservoir Flood (Inundation) Maps No Yes. EA currently updating maps (produced in 2009) to reflect new legislation requirements Yes. EA produced them for all sites covered by Act as registered in 2009. New reservoirs between 10,000 and 25,000m 3 to be mapped by NRW to inform risk designation and emergency planning Yes. SEPA has produced them for all sites covered by Act and will do so in due course for existing sites over 10,000 m 3 when the Act applies to such reservoirs. Reservoir Managers of new sites will be required to produce them & supply them as part of registration requirement. Yes. The publication of reservoir flood maps will be consistent with the terms of the National Protocol. *Northern Ireland: It should be noted that Sections 26 and 35 of the (Northern Ireland) 2015 have not yet been commenced 8