CONTENTS. Unique Identifier: Revision: 3 Page: 2 of 9. Demand Charge Exemption Policy. Page

Similar documents
ESKOM S DEMAND EXEMPTION POLICY. This document may be updated from time to time, please refer to for the latest version.

NOTIFICATION OF DEMAND OR CHANGES TO NOTIFIED MAXIMUM DEMAND (NMD) RULES

Brochure on Eskom s Policy for granting the benefit of diversity. July 2013

ESKOM S CONNECTION CHARGES METHODOLOGY

The South African Grid Code. Transmission Tariff Code. Version 9.0

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY

SURPLUS ENERGY PROGRAM TERMS AND CONDITIONS

CONTROL AREA SERVICES AND OPERATIONS TARIFF OTTER TAIL POWER COMPANY

ONTARIO ENERGY BOARD. Distribution System Code. Last revised on April 1, 2011 (Originally Issued on July 14, 2000)

Schedule of Standard Fees 2018/19

Electricity blackouts in South Africa: proximate and ultimate causes & recommendations for the future

MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA

Dr Willem J. De Beer, Chief Operations Officer, EDI Holdings (Pty) Ltd, South Africa 23November 2010

DESIGN OF ESKOM DISTRIBUTION SERVICE INCENTIVE SCHEME FOR MYPD2 (2010/ /13) (IDMS no: 47217v1)

NATIONAL ENERGY REGULATOR. Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14)

Waipa Networks Ltd. UNMETERED SUPPLY Daily Fixed Price WAUM c/d c/d c/d

CHAPTER I: PRELIMINARY Short title, commencement and interpretation

RE: Consultation Paper for Water Services Code of Conduct (Customer Service Standards) 2013

APPLICATION PROVISIONS

Code Subsidiary Document No. 0007: Business Continuity Management

ENTERGY LOUISIANA, LLC

MYPD 3 (Year 2014/15) Regulatory Clearing Account Submission to NERSA

Distributed Generation Connection Standard ST B Planning Engineer. Network Planning Manager. General Manager Network

9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

Direction To ESB Public Electricity Supplier On Electricity Tariff Charges for 2003

April 9, ADVICE 2099-E (Pacific Gas and Electric Company ID U 39 E) Public Utilities Commission of the State of California

MYPD3 Application January 2013

SECTION 2 REGULATIONS (cont'd)

NATIONAL ENERGY REGULATOR. Eskom MYPD2 Regulatory Clearing Account (RCA) and RCA Balance THE DECISION

Electricity supply contract (deemed)

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

Energex. Statement of expected price trends. 1 July 2016 to 30 June /15 Statement of expected price trends

Eskom Presentation Standing Committee on Appropriations

Station Power Standby Service Schedule Designation R3 Standard Contract Rider No. 3

SECTION III RATE SCHEDULES Page 14.1

DRAFT LICENCE CONDITIONS

2. IDENTITY AND LOCATION OF GC

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

Please Refer to Attached Sample Form

COMMERCIAL CIRCULAR No. 80

ENERGY REGULATION BOARD

MYPD Methodology Eskom Response to Consultation Paper

THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA. NOTIFICATION Shimla, the 22 nd November, 2018

RATE RTPD REAL TIME PRICING - DAY AHEAD (RESTRICTED)

ELECTRICITY INDUSTRY CODE QUARTERLY REPORT JULY TO SEPTEMBER 2007 ENERGEX LIMITED ABN

RATE 734 RATE FOR ELECTRIC SERVICE INDUSTRIAL POWER SERVICE FOR AIR SEPARATION & HYDROGEN PRODUCTION MARKET CUSTOMERS

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

Taunton Municipal Lighting Plant. This INTERCONNECTION & NET METERING AGREEMENT 1. CUSTOMER ELECTRIC GENERATING SYSTEM

Contents Introduction Chapter 1 - Security Policy... 6

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

BANDERA ELECTRIC COOPERATIVE, INC. Tariff for Electric Service. Sheet No. Section III 1.0

Public Utility District No. 1 Of Jefferson County

Please Refer to Attached Sample Form

Compensation for damage and loss following electricity outage September 2015

ENTERGY NEW ORLEANS, INC. STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES LOCATED IN ORLEANS PARISH

MYPD3 Application Gauteng January 2013

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005

Eskom 2018/19 Revenue Application

Distributed Generation Procedures and Guidelines Manual for Members

Material and Service Guarantees and Liquidated Damages

CHARGES APPLICABLE 9 TH OCTOBER 2008

NOTIFICATION. No.HPERC/dis/479: Shimla the 30 th March, 2012

Regional Network Tariffs applicable commenting

Registration application fee to be paid by Small-Scale Embedded Generator Applicants

AGREEMENT FOR CONNECTION TO EASTERN POWER NETWORKS PLC S DISTRIBUTION SYSTEM

Annexure V: Tariff Schedule

Annexure III: Tariff Schedule GIGAPLEX ESTATE PRIVATE LIMITED. SCHEDULE OF ELECTRICITY TARIFFS (Effective from 1 April, 2018)

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

PUBLIC SERVICE COMPANY OF NEW MEXICO ELECTRIC SERVICE AGREEMENT NO.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

BELMONT MUNICIPAL LIGHT DEPARTMENT NET METERING AND BUYBACK TARIFF FOR EMISSION FREE RENEWABLE GENERATING FACILITIES SERVING CUSTOMER LOAD

BARBADOS LIGHT & POWER COMPANY LTD RENEWABLE ENERGY RIDER AGREEMENT

Transpower Individual Price-Quality Path Determination NZCC XX

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY GENERAL DELIVERY SERVICE SCHEDULE GD

NATIONAL ENERGY REGULATOR OF SOUTH AFRICA

Basic Connection Service Connection of Micro Embedded Generator (less than or equal to 5kW)

BRIEF ANALYSIS ON NEW OPEN ACCESS REGULATIONS IN THE STATE OF MAHARASHTRA

TRIEAGLE COMMERCIAL CUSTOMER AGREEMENT FIXED RATE PRODUCT

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY QUALIFYING FACILITY POWER PURCHASE RATE P

ARKANSAS PUBLIC SERVICE COMMISSION

FY2017/18, Year 5 of MYPD 3 Period

Access Arrangement Information. Standard Access Contract Demonstration of Code Compliance

Medium General Service Time-of-Use Transition

Group Interim results for the six months ended 30 September Cover slide (same as IR cover)

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

October 24, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Please Refer to Attached Sample Form

Appendix B-2. Term Sheet for Tolling Agreements. for For

East Central Energy. Rate schedule C&I. C&I Interruptible Service Effective: March 2018 revenue month Energy bills due in April

Contributions Policy

Cover slide (same as IR cover)

SPP Reserve Sharing Group Operating Process

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language

RATE ILD INCREMENTAL LOAD - DAY AHEAD (RESTRICTED)

Default Price-Quality Path Compliance Statement

Residential tariff increases and restructuring for MYPD3 explained. Brochure

Old Dominion Power Company One Quality Street Lexington, Kentucky ELECTRIC SERVICE VIRGINIA STATE CORPORATION COMMISSION

ISO Tariff Original Sheet No. 637 ISO TARIFF APPENDIX L. Rate Schedules

Branch Procedure Document No Amendment No Approved By

Transcription:

Page: 2 of 9 CONTENTS 1. INTRODUCTION... 3 2. POLICY CONTENT... 3 2.1 POLICY STATEMENT... 3 2.2 POLICY PRINCIPLES OR RULES... 3 3. SUPPORTING CLAUSES... 5 3.1 SCOPE... 5 3.2 NORMATIVE/INFORMATIVE REFERENCES... 5 3.3 DEFINITIONS... 6 3.4 ABBREVIATIONS... 7 3.5 ROLES AND RESPONSIBILITIES... 7 3.6 PROCESS FOR MONITORING... 7 4. AUTHORIZATION... 7 5. REVISIONS... 8 6. DEVELOPMENT TEAM... 9 7. ACKNOWLEDGEMENTS... 9 Page

Page: 3 of 9 1. INTRODUCTION Eskom s retail tariffs consist of three components: network, energy and retail components. At times, customer s plants may undergo abnormal events outside their normal operation, including Eskom and/or customer induced-events, which could potentially lead to customer incurring additional charges. When these events occur at the customers plant, a customer may require concession from Eskom or alternatively Eskom may consider providing concession in terms of additional charges in terms of this policy. This policy is compiled to complement Eskom s Notified Maximum demand (NMD) and Maximum Export Capacity (MEC) Rules approved by NERSA. 2. POLICY CONTENT 2.1 POLICY STATEMENT Eskom shall grant demand charge exemptions to qualifying Eskom direct customers on demand- related tariff components. 2.2 POLICY PRINCIPLES OR RULES 2.2.1 Eskom will consider customer applications made in writing in accordance with the criteria, conditions and rules set out in this policy and aligned to the conditions stipulated in Eskom s Notified Maximum demand (NMD) and Maximum Export Capacity Rules (MEC) rules. 2.2.2 Except in circumstances where it is not possible for the customer to plan in advance, the customer is required to apply in advance for a demand charge exemption. 2.2.3 Upon granting demand exemptions, Eskom will consider revenue recovery for Eskom and unjustifiable penalties to customers on demand related tariff components under the following conditions: Eskom-induced supply interruptions, Eskom forced outages (unplanned load shedding events) and Force Majeure (i.e. uncontrollable events). A new customer without any previous electricity consumption and electricity generation record with Eskom requesting a commissioning agreement. An existing customer requesting an exemption due to testing of new plant and equipment. An existing customer requesting concession due to refurbishment of existing plant and equipment. An existing customer requesting concession during testing of new and existing plant and equipment exceeding the current NMD and/or MEC. An existing customer requesting concession on chargeable demand (network demand charge) for business start-up. An existing customer with planned once-off annual event that results in a once-off exceedance of the NMD in 12 month rolling period (excluding own generator related events).

Page: 4 of 9 An existing customer that is exceeding the NMD but has applied for a supply upgrade through temporary increase in NMD. Demand charge exemptions due to changes in network configuration for Transmission connected customers. Demand charge exemptions for load-to-load wheeling (Eskom wheeling through customer network) where Eskom exceeds NMD at the wheeling point. An existing customer with a generation facility requests concession due to a generation facility not being in operation resulting in the exceedance of the current NMD An existing generator customer is unable to generate electricity due to an Eskom induced network event, is requesting waiver of the network charges. An existing customer requests concession as a result of a metering/billing error which results in NMD/MEC excess charges being payable. An existing customer is requesting concession to exceed NMD/MEC during periods at which Eskom is able to allow such exceedance and will pay the additional chargeable demand in the month in which the exceedance occurs. Customers voluntarily participating in Eskom s demand management initiatives. Demand charge exemption requests due to failure of meter pulses or failure of load management systems (including power factor correction equipment). An exemption granted to an existing generator customer exceeding its NMD when consuming power from the Eskom grid but providing voltage support to Eskom. Customer request for an early reduction of the NMD/MEC in cases of hardship experienced (i.e. severe downturn of economy, bankruptcy). 2.2.4 Demand exemptions will be granted to customers where demand is measured (typically large power user tariffs) and on the following tariff components: Charges linked to the chargeable demand/capacity value o Network demand charge (NDC)- only for charges raised in kva; o Energy demand charge (EDC); and o Maximum export capacity (MEC); Charges based on annual utilised capacity (AUC) o Network capacity charge (NCC); o Urban low voltage subsidy charge; Monthly utilised capacity (MUC); o Service charges (charged per account); and o Administration charges (charged per premise Reactive energy Charges

Page: 5 of 9 2.2.5 Should an exemption be granted on demand/capacity, the demand/capacity relating to any of the tariff components as set out above will be adjusted to determine the resultant tariff component charges after an exemption. 2.2.6 Eskom s Notified Maximum demand (NMD) and Maximum Export Capacity Rules (MEC) rules will apply for restating the NMD and/or MEC. 2.2.7 Demand charge exemptions in line with this policy are to be viewed on a case-by-case basis in accordance with paragraph 3.5. A customer may apply for an exemption for each individual demand that have been affected by the incident that gave rise to the exemption request. 2.2.8 Eskom will not grant exemptions to customers currently exceeding their contracted NMD/MEC. 2.2.9 Eskom will not grant exemptions to customers as a result of natural disaster-related incidents unless specifically provided for in terms of the procedure relating to force majeure incidents. 2.2.10 Depending on the scenario an administration fee may be payable for demand charge exemption applications arising from customer-induced incidences. 3. SUPPORTING CLAUSES 3.1 SCOPE 3.1.1 Purpose The document outlines the policy principles when considering granting demand charge exemption to customers. 3.1.2 Applicability This policy shall apply throughout Eskom Holdings SOC Limited Divisions. 3.1.3 Effective date This procedure shall be effective from the date indicated on page 1 of this document. 3.2 NORMATIVE/INFORMATIVE REFERENCES Parties using this policy/directive shall apply the most recent edition of the documents listed in the following paragraphs. 3.2.1 Normative [1] 240-56403554, Demand charge exemption procedure [2] Group Customer Service Division Delegation of Authority - [3] Eskom s Standard Conditions of Supply Annexure - Ref Jan 05 [4] Policy on Power Quality and Customer Claims PBAAS9 [5] 240-58853865, Connection charges for customers connected to Eskom s distribution network (Policy)

Page: 6 of 9 [6] 32-18, Pricing for the recovery of capital costs (Manual) [7] Eskom s Notified Maximum demand (NMD) and Maximum Export Capacity Rules (MEC) rules [8] Electricity Pricing Definitions document (Ref 34-359(0) [9] DUoS charges Policy 34-141 and Procedure 34-142. 3.2.2 Informative [10] ISO 9001 Quality Management Systems [11] The Electricity Regulation Act as amended [12] The Distribution Licence [13] The Distribution Code and the SA Grid Code. 3.3 DEFINITIONS Definition Chargeable demand Maximum Export Capacity Explanation The highest average demand as measured in kva in a 30-minute integrating period, per point of delivery/premise during the chargeable time periods for the applicable tariff. The network demand charge is recovered on the chargeable demand. The maximum capacity measured in 30 (thirty) minute integrating periods at the Point(s) of Supply notified by the customer and accepted by ESKOM for the transmission of electrical energy between the Facility and the Distribution System. Monthly capacity utilised Higher of the customer s notified maximum demand or maximum demand and the actual maximum demand, measured in kva or kw, registered during the billing month.

Page: 7 of 9 3.4 ABBREVIATIONS Abbreviation AUC DMP DSM EDC GCSPC MEC MUC NCC NDC NERSA NMD SOC UC Description Annual Utilised Capacity Demand Market Participation Demand-side management Energy Demand Charge Group Customer Service Pricing Committee Maximum Export Capacity Monthly Utilised Capacity Network Capacity Charge Network Demand Charge National Energy Regulator of South Africa Notified Maximum Demand State Owned Company Utilised Capacity 3.5 ROLES AND RESPONSIBILITIES 3.5.1 Eskom will consider customer applications made in writing in accordance with the criteria, conditions and rules set out in the policy principles and aligned to the conditions stipulated in Eskom s Notified Maximum demand (NMD) and Maximum Export Capacity Rules (MEC) rules. All applications will be processed through the operating unit pricing manager. 3.5.2 Except in circumstances where it is not possible for the customer to plan in advance, the customer is required to apply in advance for a demand charge exemption through the operating unit pricing manager. 3.6 PROCESS FOR MONITORING Eskom s internal auditors will, from time to time, conduct internal audits to ensure compliance with this policy. 4. AUTHORIZATION This document has been seen and accepted by: Name Deon Conradie Shirley Salvoldi Designation Senior Manager: Electricity pricing Corporate Specialist: Retail Pricing Group Customer Service Pricing committee Regulation, Policy & Economic committee

Page: 8 of 9 5. REVISIONS Date Rev. Remarks October 2005 1 Previous revision had passed its revision date and policy had changed April 2009 2 Added section 2.7. Demand Exemption at the time of load shedding, to differentiate between planned and unplanned load shedding events. Also updated all other sections in the document. January 2010 0 Previous revision had passed its revision date. April 2013 1 Previous revision had passed its revision date. Incorporation of demand charge exemptions for generators. Incorporation of planned once-off annual events. June 2016 2 Incorporation of the following scenarios: 1.Treatment of existing customer that is exceeding the NMD but has applied for a supply upgrade through temporary increase in NMD. 2. Demand charge exemption due to changes in network configuration for direct Transmission connected customers 3. Demand charge exemptions for load-to-load wheeling (Eskom loads wheeling through customer network) energy to Eskom customers where Eskom exceeds NMD at the wheeling point. 4. Existing customer requests concession due to own generation facility not being in operation resulting in the exceedance of the current NMD. 5. Existing customers requesting concession as a result of a metering error which results in NMD/MEC excess charges being payable. 6. An existing generator customer is unable to generate electricity due to an Eskom induced network event, is requesting waiver of the network and other fixed charges. 7. Existing customers requesting or concession on chargeable demand (network demand charge) for business start-up. 8. Clarification of how early reduction of NMD is granted. 9. Incorporation of meter pulses policy 10. Incorporation of policy position regarding natural disasters. 11. In general clarification of all scenarios.

Page: 9 of 9 November 2017 3 1. Incorporation of the following scenario: An exemption granted to an existing generator customer exceeding its NMD when consuming power from the Eskom grid due to providing voltage support to Eskom. 2. Clarified exemption granted due to Eskom induced or Force Majeure Events that result in the demand that is lower than the customer s normal demand. 3. Updated section dealing with concession due to a generation facility not being in operation to cater for unplanned events. 4. Included conditions for customers intending to resume normal operations after a Force Majeure Event or where a plant is in business rescue under the early reduction of NMD section. 5. In general clarification of all scenarios and updating all the figures. 6. DEVELOPMENT TEAM The following people were involved in the development of this document: Name Wiets Botes, Dirk Opperman, Wessel Steffens, Thulani Sibisi, Sindiswa Rubushe, Hannes Bekker and Cishimpi Mabasa Gift Moima, Lolo Buys, Onicah Rantwane Thea Naude Designation Operation Unit Pricing Managers Senior Pricing Advisors Key customer executive Are van Zyl, Bradley Box Grid Access Unit 7. ACKNOWLEDGEMENTS Not applicable.