Organizations shall be accredited by TSSA to perform repairs without the acceptance of a TSSA Inspector pursuant to the provisions set forth below.

Similar documents
Guide for Completing Form AB-83

COLORADO DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY BOILER AND PRESSURE VESSEL REGULATIONS

Industrial Legislation

4101: Existing boilers and pressure vessels.

The amendments to these regulations are created pursuant to , and (1)(a) of the Colorado Revised Statutes (CRS).

The Boiler and Pressure Vessel Fees Regulations, 1981

13 NCAC is amended with changes as published in 31:09 NCR as follows:

IN THE MATTER OF: THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 (the Act ) - and -

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE MICHIGAN BOILER RULES

The amendments to this rule are created pursuant to , and (1)(a) of the Colorado Revised Statutes (CRS).

Boilers & Unfired Pressure Vessels

Guide for the Extension of Boiler Internal Inspections

Harmonized Requirements for Historical Boilers

BOILER AND UNFIRED PRESSURE VESSEL LAW Act of Jun. 18, 1998, P.L. 655, No. 85 AN ACT Regulating the construction, equipment, maintenance, operation

13 NCAC is amended with changes as published in 29:10 NCR 1197 as follows:

American Petroleum Institute Purchasing Guidelines Purchase API Spec 8C online at Table of Contents

TECHNICAL SAFETY BC FEE SCHEDULE: BOILERS and PRESSURE VESSELS

Labor Chapter ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER GENERAL PROVISIONS TABLE OF CONTENTS

DURATION: Permanent; until later amended, repealed or replaced. [1-1-98; NMAC - Rn, 14 NMAC 9.4.4, ]

PROCEDURE TO ESTABLISH OPERATING CERTIFICATION FOR STEAM BOILER OPERATORS

IC Chapter 6. Regulated Boilers and Pressure Vessels; Boiler and Pressure Vessel Inspectors

The National Board Pressure Equipment Inspector Program

BOILER LAW Health and Safety Code, Chapter 755 Administered by the Texas Department of Licensing and Regulation (Effective September 1, 2009)

Labor Chapter ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER ADMINISTRATION TABLE OF CONTENTS

ONTARIO REGULATION to be made under the. TECHNICAL STANDARDS AND SAFETY ACT, 2000 Amending O. Reg. 220/01 (BOILERS AND PRESSURE VESSELS)

KEEPING JURISDICTIONAL INSPECTIONS ON COURSE:

PASSENGER BOATS AND MASTERS

Recommended Rules for the Care and Operation of Heating Boilers

REVISED REGULATIONS OF SASKATCHEWAN

The Boiler and Pressure Vessel Regulations, 2017

CONSTRUCTION CONTRACT

1 of 13 DOCUMENTS. NEW JERSEY REGISTER Copyright 2015 by the New Jersey Office of Administrative Law. 47 N.J.R. 3041(a)

APPLICATION FOR LICENSE SERVICE WARRANTY ASSOCIATION MANUFACTURER OR AFFILIATE

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address

VII. Recommended Guidelines for the Care of Power Boilers. ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE

UL Qualified Firestop Contractor Program and Requirements

Boiler Inspection Program Colorado Division of Oil and Public Safety

ACCREDITATION CRITERIA FOR FIRE PREVENTION AND LIFE SAFETY DEPARTMENTS AC426. April 2017 (Effective June 1, 2017) PREFACE

LICENCE CONDITIONS FOR TRADING IN GAS BY NGV GAS (PTY) LTD

Statutory Requirements for Pressure Vessels and Systems in Singapore & Introduction of the Workplace Safety and Health Act 2006

ATTACHMENT C-1 CONTRACTOR QUALIFICATIONS FOR CONSTRUCTION OF ELECTRIC AND NATURAL GAS FACILITIES

Maxville Sports Complex REQUEST FOR TENDER

Florida Green Commercial Building Designation Standard

Lessons Learned from Pipeline Construction Cases

OWNER/PROFESSIONAL SERVICES CONSULTANT AGREEMENT PROJECT TITLE UNIVERSITY OF ILLINOIS

SCHEDULE 72 INTERCONNECTIONS TO NON-UTILITY GENERATION

Administrative Rules

City of Corpus Christi Housing and Community Development

Company Certificates. Licence to Operate

Business Management Manual Number: POL Version: 2 Effective Date: 3/2/2018

City of Portsmouth Portsmouth, New Hampshire Department of Public Works. Plumbing and Heating Repair Services

CITY OF KELOWNA BYLAW NO. 9316

Boilers and Pressure Vessels Regulatory Review Round Table Panel Final Report

HYDROSTATIC TEST PLAN

CONTRACT AGREEMENT FOR PARKING AREA CONSTRUCTION. THIS AGREEMENT, made this day of, 2018,

ENAO Risk Analysis Process. Contents Page

CURB CUTS SPECIFICATIONS AND STANDARDS

Stainless Pipe & Tubing

Report on Inspection of Albert Wong & Co. LLP (Headquartered in New York, New York) Public Company Accounting Oversight Board

Guaranteed Energy Savings Contract

In accordance with 61 O.S. 108 and 115, a sworn statement shall accompany any competitive bid submitted for a public construction contract.

LEED for HOMES QUALITY ASSURANCE MANUAL

2016 Futura Spas Limited Warranty

SPECIFICATIONS AND BIDDING DOCUMENTS USED ASPHALT PAVER

EXPEDITED REVIEW PROGRAM MANUAL

Warranty Certificate

WHITE PLAINS MECHANICAL CODE PART 1. GENERAL REQUIREMENTS

INVITATION FOR BIDS SUPERIOR COURT OF CALIFORNIA COUNTY OF STANISLAUS. REGARDING: IFB Title: Courthouse Signage IFB No

DIVISION OF HOUSING AND COMMUNITY RESOURCES WEATHERIZATION ASSISTANCE PROGRAM

Deep Panuke. Third Party Inspection Services Prequalification Questionnaire EOI Z

REQUEST FOR PROPOSAL FINANCIAL AUDIT SERVICES RETURN TO:

Public Review Draft PORT OF HOOD RIVER RULE PUBLIC PRIVATE PARTNERSHIPS FOR BRIDGE PROJECTS AND BRIDGE PROJECT ACTIVITIES

Checklist for Contractor. FHA 203Ks Program

B. The Bid is made in compliance with the Bidding Documents.

Boiler Care Products. Terms and Conditions

WARRANTY INFORMATION

AWS B5.1:2013 An American National Standard Specification for the Qualification of Welding Inspectors

Development and Implementation of a High Energy Piping Program. Prepared by: Matthew C. Dowling

Governing Code Section VIII Division Edition. 1. Pressure Vessels and Subcontracted Parts. 3. Identical Replacement Parts

ROOFING PERMIT APPLICATION

Northeast Process Controls Tel: Fax:

In accordance with 61 O.S. 108 and 115, a sworn statement shall accompany any competitive bid submitted for a public construction contract.

MOHAWK RETURN MATERIAL AUTHORIZATION (RMA) POLICY Effective January 1, 2013

Terms and Conditions for. Christchurch City Council Approved Polyethylene (PE) Welders

APPLICATION PACKAGE FOR LISTING AS A PROVIDER FOR WATER SERVICE CONNECTIONS (DRILLERS) TO THE MANAGING NEW DEVELOPMENTS PROCESS

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR FIRE SPRINKLER SYSTEM INSPECTIONS ITB NO.: DMS-14/15-004

REQUEST FOR QUALIFICATIONS (RFQ) FOR DSA INSPECTOR OF RECORD (IOR) SERVICES

The Boiler and Pressure Vessel Act

RIGHT-OF-WAY PERMIT APPLICATION

City of Coquitlam. Request for Proposals RFP No Cathodic Protection Inspection and Testing. Issue Date: September 7, 2018

LEED for HOMES QUALITY ASSURANCE MANUAL

STRUCTURAL STEEL. The attached Non-Collusion Statement must be signed and attached to the bid.

OPTION A: 2 BITUMINOUS PAVING WITH SHOULDERS OPTION B: SCRATCH COURSE BITUMINOUS PAVING WITHOUT SHOULDERS

ACCELERANT VENTURES, L.P. AUGUST, (the Company ) a. The closing is expected to occur on or before, 2014 (the Closing ).

Prime Contractor Requirements Revised: April 2015

Request for Quotation

Residential and Small-Scale Biomass Heating Program Participant s Agreement

REVISOR SGS/JC AR4353

APPLICATION FOR LICENSE SERVICE WARRANTY ASSOCIATION

Limited Warranty for NexPower Thin Film Photovoltaic Modules

Transcription:

BOILERS AND PRESSURE VESSELS SAFETY DIVISION December 1, 1999 Rev. 2 ACCREDITATION OF OWNER/USER SELF-INSPECTION REPAIR PROGRAM Administrative Requirements Organizations shall be accredited by TSSA to perform repairs without the acceptance of a TSSA Inspector pursuant to the provisions set forth below. 1. SCOPE OF ACCREDITATION (a) The TSSA Certificate of Authorization shall identify the location for which accreditation is granted to permit specified repairs without the presence and acceptance of the TSSA Inspector or the insurer. No self-inspections of alterations or additions to existing piping systems are permitted under this Scope. (b) Certificates of Authorization are issued for a 3 year period. TSSA may, at its discretion, limit or extend the scope of repairs. (c) TSSA may audit the Program at any time during the period for which a Certificate is in force. Any associated costs for the audit shall be paid by the Certificate Holder. (d) TSSA may, at any time, make regulations concerning the issuance and use of TSSA certificates as it deems appropriate, and all regulations shall become binding upon the holder of TSSA certificates. 2. PREREQUISITES FOR ACCREDITATION Before an applicant can qualify to perform specified repairs without the presence and acceptance of the TSSA Inspector, or the insurer, the organization shall: (a) Demonstrate that it operates 24 hours a day for 7 days a week. (b) Own and operate pressure retaining items regulated under the Boilers & Pressure Vessels Act. (c) Have a documented Quality Program that supports the repair and inspection process. (d) Employ inspection staff able to demonstrate a knowledge of the applicable Codes and Standards, welding and repair practises and NDE procedures. (e) Meet the requirements of the Boilers & Pressure Vessels Act and Regulations. (f) Have its inspection program and facilities reviewed by TSSA. (g) Have an organizational structure and inspection program that supports the repair process. (h) Have a current edition of the National Board Inspection Code (NBIC), CSA B51, and the referenced ASME Codes. 1 of 6

3. PROCEDURE FOR OBTAINING OR RENEWING A TSSA CERTIFICATE OF AUTHORIZATION (a) (b) (c) (d) (e) (f) (g) Prior to issuance or renewal of a TSSA owner/user Certificate of Authorization, the organization and its facilities are subject to a review of its Quality Program. The implementation of the Quality Program must be satisfactorily demonstrated by the organization. TSSA reserves the right to cancel, refuse to issue, or renew the Certificate. Applicants desiring to obtain a TSSA Certificate of Authorization shall submit a written application to the Chief Inspector, along with a copy of the Q.C. Manual and a completed checklist (see attached). The review shall be conducted by TSSA audit personnel and the Authorized Inspector. The review team shall conduct an evaluation of the organization s Quality Program. The organization shall demonstrate sufficient implementation of the Quality Program to provide evidence of the organization s knowledge of welding, non-destructive examination, postweld heat treatment, and other activities performed using current work, a demonstration mock-up, or a combination of both. A recommendation to issue, renew or withhold the TSSA Certificate of Authorization shall be included in a Review Report. The completed report shall be forwarded to the Chief Inspector, TSSA. If proper administrative fees are paid, and all other requirements are met, a Certificate of Authorization will be issued. The Certificate will expire on the triennial anniversary date. TSSA may audit the Quality Program and the activities of the Certificate Holder annually, or at any frequency determined by the Chief Inspector. The fees for such audits shall be charged to the Certificate Holder. 4. QUALITY SYSTEM The following is a guide to some of the features of a Quality Program that shall be included in the organization s Quality Program Manual. Each applicant should address the features as needed for the scope of work to be performed. (a) Title Page The name and complete address of the company to which the TSSA Certificate of Authorization is issued shall be included on the Title Page of the Quality Program Manual. (b) Contents Page The Manual shall contain a page listing the contents of the Manual by subject, number (if applicable) and revision number of each document. 2 of 6

(c) Scope of Work The Manual shall clearly indicate the scope and type of repairs that the applicant is capable of and intends to perform on pressure retaining items owned or operated by the organization. The locations where the repairs are to be performed shall be identified. Appendix 6 of the NBIC provides guidelines for determining the scope of repairs permitted under the certification. (d) Statement of Authority and Responsibility A dated Statement of Authority, signed by an officer of the organization, shall be included in the Manual. Further, the Statement of Authority shall include: (1) The title of the individual who will be responsible to maintain and implement the program. (2) A statement that, if there is internal disagreement in the implementation of the Quality System, the matter is to be referred for resolution to a higher authority in the company. (3) A statement that all repairs carried out by the organization shall meet the requirements of the Ontario Boilers & Pressure Vessels Act, TSSA and the applicable sections of the National Board Inspection Code. (e) Manual Control The Manual shall include the necessary provisions for revising and issuing documents to maintain the Manual current. The title of the individual authorized to approve revisions shall be included in the Manual. Revisions must be accepted and signed by TSSA prior to issuance of the Manual and implementation. (f) Organization (i) An organizational chart or description of the organizational structure shall be included in the Manual. The line authority of the company s inspection organization shall be independent of those responsible for the execution of the repair program work. (ii) The Manual shall identify those individuals responsible for preparation, implementation, or verification of the Quality Program. The responsibilities shall be clearly defined and the individuals shall have the organizational freedom and authority to fulfill those responsibilities. 3 of 6

(g) Drawings, Designs and Specifications The Manual shall contain controls to ensure that all design information, applicable drawings, calculations, specifications and instructions are prepared or obtained, controlled and interpreted in accordance with the original Code of Construction. (h) Repair Methods The Manual shall include controls for repairs, including the selection of the welding procedure specification, materials, non-destructive examination methods, preheat and postweld heat treatment. The Manual shall describe the methods for performing and documenting repairs in sufficient detail to determine at what stages specific inspections are to be performed. (i) Materials The Manual shall describe the method used to assure that only acceptable materials (including welding material) are used for repairs. The Manual shall include a description of how existing material is identified and new material is ordered, received, verified and identified. The Manual shall identify the title of the individual(s) responsible for each function and a brief description of how the function is to be performed. (j) Method of Performing Work The Manual shall describe the methods for performing and documenting repairs in sufficient detail to permit the Certificate Holder s inspection staff to determine at what stages specific inspections are to be performed. (k) Welding The Manual shall describe suitable controls for welding. The Manual is to indicate the title of the individual(s) responsible for the welding procedure specification and its qualification, and the qualification of welders and welding operators or brazers and brazing operators. It is essential that only welding/brazing procedure specifications and welders or welding operators and brazers or brazing operators registered with TSSA are used in the repair of pressure retaining items. Welders or welding operators and brazers or brazing operators shall maintain their qualification(s) by annual tests, in accordance with the requirements of ASME Section IX. (l) Non-Destructive Examination The Manual shall describe suitable controls for non-destructive examinations. Provisions shall exist to ensure that NDE personnel are qualified in accordance with the applicable CGSB requirements and that NDE procedures are performed in accordance with written procedures. All reports and RT films shall be retained for review by TSSA. 4 of 6

(m) Heat Treatment The Manual shall describe controls to assure that all heat treatment is carried out in accordance with the applicable Code of Construction. Measures shall be established to assure proper placement of thermocouples and the use of charts. All reports shall be retained and filed for review by TSSA. (n) Examinations and Tests (i) (ii) reference shall be made in the Manual for examinations required upon completion of a repair; a description shall be provided in the Manual for the performance of pressure tests upon completion of the repair. (o) Calibration The Manual shall describe a system for the calibration of examination, measuring, and test equipment used in the performance of repairs, including the appropriate documentation and records. (p) Repair Inspections The Manual shall make provisions for the organization s inspector to authorize a repair prior to starting. He/she shall have access to all drawings, design calculations, specifications, procedures, process sheets, repair procedures, test results, and other documents as necessary. It shall also describe who has the responsibility for preparing and certifying the TSSA Owner/User Repair Report. (q) Non-Conforming Items There shall be a system for correction of non-conformities. A non-conformity is any condition which does not comply with the applicable rules of the Construction Code, jurisdictional requirements or the Quality Program. Non-conformities must be corrected or eliminated before the repaired component can be considered in compliance with the Quality Control Program. (r) Training and Qualification of Personnel The Certificate Holder shall establish a documented in-house training program. The program shall establish training objectives and provide methods of evaluating training effectiveness. As a minimum, training objectives for knowledge level shall include: (i) (ii) (iii) CSA B51, applicable ASME Code and NBIC requirements; responsibilities within the Quality Program; knowledge of the technical aspects and mechanical skills for the applicable position. 5 of 6

The following qualifications may be used, if desired, as proof of compliance with (iii) above: (a) (b) A valid API 510 Authorized Inspector Certificate for repair work within the petrochemical industry. A valid National Board Owner/User Commission for repair work in all other industries. (s) Reporting A description of the process used by the Certificate Holder s inspector to take necessary action if an unsafe condition is encountered, and to resolve conflicts by referring to a higher authority of the organization in accordance with 4 (d) 2 shall be included. (t) Control of Contracted Services A description of the process for contracting and control of services such as NDE, welding etc., if applicable. (u) Records Each boiler, pressure vessel or pressure piping repair shall be documented on a Repair Report, under the Certificate Holder s letterhead, in a format identical to that shown in Appendix 1. Reports shall be made available for audit at any time by TSSA. Each report shall be sequentially numbered with no gaps in numbering. Each Repair Report shall include any manufacturer s partial data reports for boilers, pressure vessels or piping, securely attached. The Manual shall indicate the title of the individuals responsible for preparing, signing, distributing and maintaining Repair Report forms. All Repair Reports shall be retained by the Certificate Holder for audit by TSSA. These records shall be maintained for the lifetime of the system, boiler or pressure vessel. (v) Exhibits Any forms referenced in the Manual shall be included. The form may be a part of the referencing document or included as an Appendix. For clarity, the forms shall be completed and identified as examples. A sample of a completed Repair Report shall be included, showing the company name. 6 of 6

ADD COMPANY LETTERHEAD IN THIS SPACE APPENDIX 1 O.I.N. 5. OWNER/USER SELF-INSPECTION REPAIR REPORT Report # Note: This report shall be completed and signed by the person responsible, in whole or in part, for the repair of the item and kept on file for audit by TSSA 1. Work done by: 2. Owner: 3. Location of Installation: 4. Unit Description: Manufacturer Name: 5. Serial No: National Board No.: CRN No.: Year built: 6. Maximum Allowable Shell or Piping System Pressure: psi at a temperature of F Maximum Allowable Vessel Tube or Jacket Pressure: psi at a temperature of F 7. ASME Code Section: NBIC Edition & Addenda: Htg. Surface: sq.ft. Piping or Shell Diameter or Width: ins. X Length: ins. Safety Valve Setting: psi Repair Materials used: (size, specification, grade) 8. Description of Defects: 9. Description of Repair( Draw sketch on back page)

O.I.N. 5. 9. (cont.) Sketch showing repair defects OWNER/USER SELF-INSPECTION REPAIR REPORT (Back) Report No. 10. Radiography: 11. Other N.D.E.: 12. Postweld Heat Treatment: 13. Hydrostatic Test Pressure for Piping System or Shell: psi Vessel Tubes or Jacket: psi 14. Welding Procedure(s) Provincial registration No.(s): 15. Welders [Name(s)]: Symbols: Remarks: Attached are Manufacturer s Partial Data Reports properly identified and signed by Authorized inspectors for the following items of this report: OWNER/USER CERTIFICATION I the undersigned certify that the statements made in this report are correct and accurate and that all design, material, construction, inspection and workmanship on this unit conforms to the requirements of Ontario s Boilers and Pressure Vessels Act, Regulations, CSA-B51 Code and all other applicable Codes and/or Standards. TSSA Certificate of Authorization No: Expires on: Signature: Title: Date: Owner/User Name: Owner/User Address: