ASSET MANAGEMENT STRATEGY

Similar documents
Draft Strategic Asset Management Plan

our city our future DRAFT RESOURCING STRATEGY July 2014 FOR PUBLIC EXHIBITION 4 August - 15 September 2014

Draft Transport Asset Management Plan

Improving Financial Sustainability for Local Government

INTEGRATING FINANCIAL AND ASSET MANAGEMENT

DRAFT NATIONAL ASSESSMENT FRAMEWORK for Local Government Asset Management and Financial Planning IMPLEMENTATION DISCUSSION PAPER

Strategic Asset Management Policy

Section 5 Dollars and Cents

The City of Owen Sound Asset Management Plan

COUNCIL POLICY. Policy Framework. Approved by City Strategy Committee on: 28 September Next Review Date: 28 September 2012

Southern Metropolitan Regional Council

PART 3 Long Term Financial Plan

2017 ROAD MANAGEMENT REPORT

Finance Report June Quarter Review

MAXIMISE THE LEVEL OF SERVICE USING CROSS ASSET PORTFOLIO RENEWALS MANAGEMENT

National Farmers Federation. Submission to the Draft Great Artesian Basin Strategic Management Plan 2018

Key Words: Asset management plans, scenarios, long-term financial planning, financial sustainability, affordability, levels of service, consultation.

A BETTER BLUE MOUNTAINS

Risk Management Framework

Infrastructure Strategy:

achieving results in the public sector Wairarapa District Councils

Revenue and Financing Policy 2017

Performance Management. Framework

TOWN OF GAWLER POLICY

NOAC National Oversight and Audit Commission Statement of Strategic Intent

B.29[19a] Matters arising from our audits of the long-term plans

City of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By:

Stormwater System Asset Management Plan. June 2018

Asset Management Plan 2016 Township of King

Pathway Asset Management Plan

Asset Management Plan Public Works, Social Housing, Parks and Recreation Infrastructure City of Brantford, Ontario

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007

Rate Capping Information Session and Workshop. Melbourne, 29 th May 2015 Steve Verity Jeff Roorda & Associates JRA

STRATEGY NORGES BANK INVESTMENT MANAGEMENT

PDS-1. Planning & Development

Asset Management Investment Plan

Interim Report Review of the financial system external dispute resolution and complaints framework

Outline Capital Investment Strategy

Environment and Climate Protection Committee. Tax Supported Programs

ASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3

Long Term Financial Plan December 2013 Page 2

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY

A Letter From The Mayor

THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY

A Guide to Completing an Auditable Special Schedule 7

Flood Mitigation. Asset Management Plan (Concise)

North Ayrshire Council

AMP2016. i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m. The 2016 Asset Management Plan for the Township of Hamilton

Tax Supported Preliminary Operating Budget. Book 1. Budget Summary Report FCS17001

Performance Budgeting in Australia

Risk Management. Policy No. 14. Document uncontrolled when printed DOCUMENT CONTROL. SSAA Vic

Outcome Based Budgeting

Strategic flood risk management

RELATIONSHIP BETWEEN THE BUDGET AND THE IDP 28 FEBRUARY 2017

Risk Management Strategy

City of Markham Asset Management Plan

That the report from the Director of Finance regarding the Strategic Asset Management Policy, dated June 20, 2018, be received; and

Government Policy Statement on land transport 2018 release for public engagement

2017 ENTERPRISE ASSET MANAGEMENT PLAN

Multisector Asset Management Case Studies CHAPTER 5 THE PORTLAND, OREGON, EXPERIENCE

B.29[17d] Medium-term planning in government departments: Four-year plans

Asset Management Program. Background

Financial Performance

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices.

QUEENSLAND GOVERNMENT RELEASES STATE INFRASTRUCTURE PLAN

2 level set out in the Long Term Plan 2015/2025. We have been able to utilise our improved financial capacity and flexibility to further our current c

AMP2016. County of Grey. The 2016 Asset Management Plan for the. w w w. p u b l i c s e c t o r d i g e s t. c o m

Investing in the future

Appendix 5. Capital Strategy. 1. Strategic Context

Risk Management Procedure

Statement of Investment Principles

Upper Tukituki Flood Control Scheme. Asset Management Plan. October 2017 HBRC Plan Number 4559 HBRC Report Number AM 15-04

Asset Management Policy

PR19 Business Plan. Water Resources RCV Allocation Submission January 2018

Long Term Capital Planning

Stormwater System Development Charges

Approved by: Diocesan Council 17 December 2015

TOWN OF GAWLER FINANCIAL STATEMENTS

ACTIVITY MANAGEMENT PLAN

Development Contributions Guidelines

Audit and Risk Committee. Strategic Planner

Victoria City Council Budget Report

City of Prince Albert YEAR STRATEGIC PLAN

Manawatū District Council. Revenue and Financing Policy. Draft Long Term Plan

PEOPLE PLAN PROGRESS. Our Achievements

PROGRESS WITH THE NATIONAL INFRASTRUCTURE MAINTENANCE STRATEGY

Priorities. Vision and Mission Statements

COASTAL ASSET MANAGEMENT PLAN

MUNICIPALITY OF MISSISSIPPI MILLS. plan. December, 2016

Mayoral Intent for the 10-year Budget (Long-term Plan)

The DCA Certification Scheme: Guidelines for DATA CENTRES

Branch Buildings and Landscape Services

Town of Churchbridge Municipal Buildings & Equipment Asset Management Plan

THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER

A loyal three made stronger in one. Loyalist Township Strategic Plan ( )

Strategic Flood Risk Assessment for SDCC Development Plan

Introduction. Plan reflects the wider context. 21,000 Population growth over 5 years

Building Detail and Buy-in For Your Long-Term Multi-Asset Investment Plan

Review of TCorp s Report Financial Sustainability of the NSW Local Government Sector

Update on Municipal Asset Management Planning

Transcription:

ASSET MANAGEMENT STRATEGY Version 3 - Final Adopted 19 February 2013 Doc Code CD-WS-T-001 NAMS.PLUS Burnie City Council Asset Strategy

Document Control Document Control NAMS.PLUS Asset www.ipwea.org.au/namsplus Document ID: 59_xx_120515 nams.plus am strategy template v1 Rev No Date Revision Details Author Reviewer Approver 1 July 2012 First Draft G Neil 2 August 2012 Second Draft Transferred to new Template 3 October 2012 Third Draft Added Plant, Equipment + Waste. 3 February 2013 Third Version Adopted by Council on 19 February 2013 E Cumming E Cumming G Neil G Neil G Neil Council NAMS.PLUS & NAMS lite Asset The Institute of Public Works Engineering Australia. www.ipwea.org.au/namsplus Copyright 2012 All rights reserved. Burnie City Council Asset Strategy Adopted 19 February 2013

Contents Executive Summary... 1 1. Introduction... 4 1.1 Legislative reform... 5 1.2 Asset Planning Process... 6 2. What Assets do we have?... 7 3. Council s Assets and their management?... 9 3.1 State of the Assets... 9 3.2 Life Cycle Cost... 13 3.3 Asset Structure... 16 3.4 Corporate Asset Team... 17 3.5 Financial and Asset Core Competencies... 18 3.6 Strategy Outlook... 20 4. Where do we want to be?... 21 4.1 Council s Vision, Mission, Goals and Objectives... 21 4.2 Asset Policy... 22 4.3 Asset Vision... 22 5. How will we get there?... 23 6. Asset Improvement Plan... 25 Appendix A Asset Maturity Assessment... 29 Tables Table 1: Assets used for providing Services... 8 Table 2: Financial Status of the Assets... 9 Table 3: Life Cycle Cost for Council Services... 13 Table 4: Life Cycle Expenditure for Council Services... 13 Table 5: Life Cycle Sustainability Indicators... 14 Table 6: Goals and Objectives for Infrastructure Services... 21 Table 7: Asset Strategies... 24 Table 8: Asset Improvement Plan... 25 Figures Figure 1: Asset Replacement Values... 9 Figure 2: State of the Assets... 10 Figure 3: Core Asset Maturity... 19 Burnie City Council Asset Strategy Adopted 19 February 2013 Page iii

This page is left intentionally blank Burnie City Council Asset Strategy Adopted 19 February 2013 Page iv

Executive Summary This Asset Strategy is prepared to assist Council in improving the way it delivers services from infrastructure including transport, bridges and culverts, stormwater drainage, parks reserves and cemeteries, buildings and parking, waste management, vehicles plant and equipment. These infrastructure assets have an approximate replacement value of $430 Million. The Asset Strategy is to enable Council to show: how its asset portfolio will meet the service delivery needs of its community into the future, enable Council s asset management policies to be achieved, and ensure the integration of Council s asset management with its long term strategic plan. Adopting this Asset Strategy will assist Council in meeting the requirements of national sustainability frameworks. At present, there is no state legislation in Tasmania to mandate the development of asset management plans and long term financial planning by Councils. The Local Government Association of Tasmania has implemented a voluntary program to guide improved asset and financial management as a means to assist Council s to provide services needed by the community in a financially sustainable manner. This Asset Strategy has been prepared following a review of the Council s service delivery practices, financial sustainability indicators, asset management maturity and fit with Council s vision for the future outlined in the Burnie City Council s Corporate Plan. The Strategy outlines an asset management improvement plan detailing a program of actions to be completed and resources required to bring council to a minimum core level of asset maturity and competence. Strategy Outlook 1. Council has developed a range of Technical Levels of Service that reflect current practices in providing services and infrastructure to the community. The cost of meeting these levels of service has been built into Council s Financial Strategy and maintaining this level of service is achievable over the next 10 years. 2. Council s current asset management maturity is below core level; however the maturity gap is not significant. Council investment is needed to improve information management, governance arrangements, and a range of other actions to bridge this maturity gap. 3. Council has committed to ensuring that it focuses on asset renewals and will prioritise funding to address infrastructure that is not providing a suitable level of service. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 1

Asset Strategies High level Strategies to assist Council in progressing to core asset maturity are detailed in the table below. The Strategies will be delivered through the implementation of a range of improvement actions. Such actions have been identified in the Asset Maturity Audit Initial Assessment and within the Asset Plans. No Strategy Desired Outcome 1 Move from Annual Budgeting to Long Term Financial Planning. The long term implications of Council services are considered in annual budget deliberations. 2 Develop and annually review Asset Plans covering at least 10 years for all major asset classes (80% of asset value). 3 Develop Long Term Financial Plan covering 10 years incorporating Asset Plan expenditure projections with a sustainable funding position outcome. 4 Incorporate Year 1 of Long Term Financial Plan revenue and expenditure projections into annual budgets. 5 Review and update Asset Plans and long term financial plans after adoption of annual budgets. Communicate any consequence of funding decisions on service levels and service risks. 6 Report Council s financial position at fair value in accordance with Australian Accounting Standards, financial sustainability and performance against strategic objectives in Annual Reports. 7 Ensure Council s decisions are made from accurate and current information in asset registers, on service level performance and costs and whole of life costs. 8 Report on Council s resources and operational capability to deliver the services needed by the community in the Annual Report. 9 Ensure responsibilities for asset management are identified and incorporated into staff position descriptions. 10 Implement an Improvement Plan to realise core maturity for the financial and asset management competencies within 2 years. 11 Report six monthly to Council by Audit Committee / General Manager on development and implementation of Asset Strategy, AM Plans and Long Term Financial Plans. Identification of services needed by the community and required funding to optimise whole of life costs. Sustainable funding model to provide Council services. Long term financial planning drives budget deliberations. Council and the community are aware of changes to service levels and costs arising from budget decisions. Financial sustainability information is available for Council and the community. Improved decision making and greater value for money. Services delivery is matched to available resources and operational capabilities. Responsibility for asset management is defined. Improved financial and asset management capacity within Council. Oversight of resource allocation and performance. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 2

Asset Improvement Plan The program of actions and resources required to achieve a minimum core asset management maturity were identified during the conduct of an asset management maturity assessment. The actions that need to be implemented to improve upon current asset management practices are documented in Table 8 of this Strategy. A more detailed implementation plan will be developed, once asset management plans have been reviewed, to support the achievement of the improvement plan. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 3

1. Introduction Assets deliver important services to communities. A key issue facing local governments throughout Australia is the management of ageing assets and meeting expectations in regard to renewal and replacement. Infrastructure assets such as roads, drains, bridges, and public buildings present particular challenges. Their condition and longevity can be difficult to determine. Financing needs can be large, requiring planning for large peaks and troughs in expenditure for renewing and replacing such assets. Demand for new and improved services adds to the planning and financing complexity. The creation of new assets also presents challenges in funding the ongoing operating and replacement costs necessary to provide the needed service over the assets full life cycle. The national frameworks on asset planning and management and financial planning and reporting endorsed by the Local Government and Planning Ministers Council (LGPMC) require Councils to adopt a longer-term approach to service delivery and funding comprising: A strategic longer-term plan covering, as a minimum, the term of office of the councillors and: o bringing together asset management and long term financial plans, o demonstrating how Council intends to resource the plan, and o consulting with communities on the plan. Annual budget showing the connection to the strategic objectives, and Annual report with: o explanation to the community on variations between the budget and actual results, o any impact of such variances on the strategic longer-term plan, o report of operations with review on the performance of the Council against strategic objectives. Framework 2 Asset Planning and has seven elements to assist in highlighting key management issues, promote prudent, transparent and accountable management of Local Government assets and introduce a strategic approach to meet current and emerging challenges. Asset Policy, Strategy and planning, Asset Strategy, Asset Plan, Governance and management arrangements, Defining levels of service, Data and systems, Burnie City Council Asset Strategy Adopted 19 February 2013 Page 4

Skills and processes, and Evaluation. The Asset Strategy is to enable Council to show: how its asset portfolio will meet the service delivery needs of its community into the future, to enable Council s Asset Policies to be achieved, and to ensure the integration of Council s asset management with its long term Strategic Plan. The goal of asset management is to ensure that services are provided: in the most cost effective manner, through the creation, acquisition, maintenance, operation, rehabilitation and disposal of assets, for present and future consumers. The objective of the Asset Strategy is to establish a framework to guide the planning, construction, maintenance and operation of the infrastructure essential for Council to provide services to the community. 1.1 Legislative Reform There is no legislative or regulatory framework in Tasmania that requires Council to develop Asset Plans or a long term Financial Plan. However, Local Government, as a body, has recognised the importance of such planning and implemented the Local Government Financial and Asset Reform Project to assist member Councils to progress to a core position in respect to asset management. As detailed in the Asset Maturity Assessment (Appendix A), Burnie City Council is well progressed upon the asset management path and has in place asset management plans for major asset classes and a Financial Strategy (adopted April 2012) covering the next 10 years. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 5

1.2 Asset Planning Process Asset management planning is a comprehensive process to ensure that assets are managed and maintained in a way that enables affordable services from infrastructure to be provided in an economically optimal way. In turn, affordable service levels can only be determined by assessing Council s financially sustainability under scenarios with different proposed service levels. Asset management planning commences with defining stakeholder and legal requirements and needs, incorporating these needs into the organisation s Strategic Plan, developing an Asset Policy, Strategy, Asset Plan and Operational Plans, linked to a long-term financial plan with a funding plan. Asset Planning Process Burnie City Council Asset Strategy Adopted 19 February 2013 Page 6

2. What assets do we have? Council uses infrastructure assets to provide services to the community. The range of infrastructure assets and the services provided by the assets is shown in Table 1. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 7

Table 1: Assets used for providing Services Asset Class Description Services Provided Transport Assets Assets included road pavement, road surface, kerb and channel, footpaths, cycle ways, driveways, retaining walls and street furniture Transportation of goods and services from production to market and to consumers. Movement of people around the Council area for business, education, recreation and leisure. Bridges and Culverts Bridges (pedestrian and vehicular), jetties, boardwalks, viewing platforms and major culverts (as per Grants Commission definition). Provides for the safe passage of vehicles and pedestrians. Designed to permit the safe passage of storm and flood flows Buildings and Parking Public buildings, operational installations, cultural, recreational facilities and leased buildings. Supports the delivery of a range of services and infrastructure to the community. Facilitates a large range of culture and community activities. Stormwater drainage Underground and natural systems that convey storm water arising from urban and developed catchments. Underground pipe and pit network, open channels, detention basins, stormwater quality improvement devices. Parks and Reserves and Cemeteries A range of parks, reserves, sporting facilities and cemeteries. Provide undeveloped and developed open spaces for the community to use for a range of purposes. Waste A range of infrastructure to support waste recovery, waste acceptance and waste transfer activities. Assets to support the ongoing management of the Mooreville Road closed landfill site. Enable the community to dispose of waste materials in an appropriate manner. Support the recovery and re use Vehicles Plant and Equipment Plant and equipment used to support the operational activities of Council. Support the provision of a range of services to the community. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 8

3. Council s assets and their management? 3.1 State of the Assets The financial status of Council s assets is shown in Table 2. Table 2: Financial Status of the Assets Asset Class Replacement Cost ($000) Residual Value ($000) Depreciable Amount ($000) Depreciated Replacement Cost ($000) Depreciation Expense ($000) Transport 241,851 241,851 119,658 3,748 Bridges and Culverts 8,327 8,327 5,682 112 Buildings and Parking 67,024 67,024 60,501 1,136 Parks, Reserves and Cemeteries 29,526 29,526 19,270 489 Stormwater 69,664 69,664 40,766 795 Waste 4,276 4,276 1,782 76 Vehicles Plant and Equipment 9,943 9,943 5,191 903 Total 430,611 430,611 252,850 7,259 Figure 1 shows the replacement values of Council s assets. Figure 1: Asset Replacement Values Replacement Cost ($000) Transport 2% 15% 7% Bridges and Culverts 16% Buildings 1% 3% Parks, Reserves and Cemeteries Stormwater 56% Waste Vehicles Plant and Equipment Burnie City Council Asset Strategy Adopted 19 February 2013 Page 9

Transport Bridges and Culverts Buildings & Parking Parks, Reserves and Cemeteries Stormwater Waste Vehicles Plant and Equipment Total The asset consumption ratios of Council s assets (average proportion of as new condition left in assets) are shown in Figure 2. 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Asset Consumption Ratio Figure 2: State of the Assets At present, detailed condition information is only available for a number of asset classes. Work is ongoing to progressively capture relevant data to assist in forward work s programming and asset renewal. Below are comments on each of the asset classes. Transport Assets: In general, the transport asset base is in relatively good condition. Many concrete assets such as footpaths and kerb and channelling are relatively old and aesthetically may look poor to fair but from a functional perspective continue to provide a suitable level of service. A comprehensive assessment of retaining wall assets has recently been completed and the vast majority of assets are performing above expectation in terms of useful life, with limited replacement works identified. A back log in the renewal of road surfaces has been identified and progress is being made to address this backlog, generally though road surfaces are in fair to good condition. Road pavements comprise the majority of asset value and are long life assets. Renewal demand is manageable at this point in time. It is clear though that continued investment in transport assets is necessary to ensure service levels are maintained. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 10

Bridges and Culverts: Council s regular inspection regime has identified that the bridge stock is in relatively sound condition and a long term replacement program is in place. Buildings: With the exception of one facility (PCYC in Upper Burnie) there are no significant issues with Council buildings that are impacting on the intended use of the facility. A number of buildings / facilities have recently been released from long term leases and returned to Council control. There are backlog maintenance / renewal challenges that need to be addressed so that users needs can continue to be met in to the future. Stormwater: Some work has occurred to obtain objective condition information for storm water assets, mainly through the use of CCTV. This work is expensive and is used to resolve issues in the network as they arise. Over time a bank of condition information will be obtained. Generally these networks perform well and observations from field and technical staff would suggest that the current condition of the network and associated assets is fair to good, with limited current issues to address. As relatively passive assets, with a long useful life, renewal demands will not be significant for the foreseeable future. Parks, Reserves and Cemeteries: In first cut modelling for parks and reserves assets a renewal backlog was identified. Inspections of the assets found that the backlog was primarily related to the suitability of the useful life originally chosen for the various asset types. i.e. the life value chosen did not reflect in service life. As such the backlog has reduced considerably. However, it is noted that much of the asset stock is aging and appropriate funding of asset renewal will need to occur to maintain current levels of service. As asset condition information availability increases, modelling of condition profiles can occur. As with leased buildings, recreational facilities on Council land but managed by third parties, are ageing and increasingly Council is being requested to assist clubs in funding renewal works. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 11

Waste The vast majority of waste assets are located at the Mooreville Road Waste Centre and support the receival, processing and disposal / transfer of waste. In the main the assets are relatively recent in construction and present no significant issues for Council from an asset management perspective. Plant and Equipment Council has a 10 year plant replacement program and has established desirable replacement cycles for a range of plant. Due to recent budget pressure there has been a need to reduce funding for plant replacement. While this can be managed in the short term, operating outside the established replacement cycles in the longer term will lead to a replacement backlog. Resultant impacts can be reduced operating capacity, plant breakdown, production inefficiency and lower trade values for plant. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 12

3.2 Life Cycle Cost Life cycle costs (or whole of life costs) are the average costs that are required to sustain the service levels over the longest asset life. Life cycle costs include operating and maintenance expenditure and asset consumption (depreciation expense). The life cycle cost for the services covered in this asset management plan is shown in Table 3. Table 3: Life Cycle Cost for Council Services Service Previous Year Expenditure Previous Year Life Cycle Cost Operations Maintenance Depreciation Exp ($/yr) Transport 301,153 757,777 3,748,000 4,806,930 Bridges and Culverts 4,959 23,073 112,000 140,032 Buildings and Parking 89,309 661,588 1,136,000 1,886,897 Parks, Reserves and Cemeteries 131,115 324,406 489,000 944,521 Stormwater 49,931 67,537 795,000 912,468 Waste 60,610 15,452 76,000 152,062 Vehicles Plant and Equipment 15,000 557,000 902,585 1,474,585 TOTAL 652,077 2,406,833 7,258,585 10,317,495 Life cycle costs can be compared to life cycle expenditure to give an indicator of sustainability in service provision. Life cycle expenditure includes operating, maintenance and capital renewal expenditure in the previous year or preferably averaged over the past three years. Life cycle expenditure will vary depending on the timing of asset renewals. The life cycle expenditure at the start of the plan is shown in Table 4. Table 4: Life Cycle Expenditure for Council Services Service Previous Year Expenditure Cap Renewal Exp Life Cycle Exp Operations Maintenance ($/yr) ($/yr) Transport 301,153 757,777 1,894,339 2,953,269 Bridges and Culverts 4,959 23,073 116,295 144,327 Buildings 89,309 661,588 328,654 1,079,551 Parks, Reserves and Cemeteries 131,115 324,406 158,749 614,270 Stormwater 49,931 67,537 177,350 294,818 Waste 60,610 15,452 144,895 220,957 Vehicles Plant and Equipment 15,000 557,000 736,028 1,308,028 All Services 652,077 2,406,833 3,556,310 6,615,220 The life cycle costs and life cycle expenditure comparison highlights any difference between present outlays and the average cost of providing the service over the long term. If the life cycle expenditure is less than the life cycle cost, it is most likely that outlays will need to be increased or cuts in services made in the future. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 13

Knowing the extent and timing of any required increase in outlays and the service consequences if funding is not available will assist organisations in providing service to their communities in a financially sustainable manner. This is the purpose of the AM Plans and long term financial plan. A shortfall between life cycle cost and life cycle expenditure gives an indication of the life cycle gap to be addressed in the asset management and long term financial plan. The life cycle gap and life cycle indicator for services covered by this Asset Plan is summarised in Table 5. Table 5: Life Cycle Indicators Service Life Cycle Cost ($/yr) Life Cycle Expenditure ($/yr) Life Cycle Gap * ($/yr) Life Cycle Indicator Transport 4,806,930 2,953,269-1,853,661 61.4% Bridges and Culverts 140,032 144,327 4,295 103.1% Buildings 1,886,897 1,079,551-807,346 57.2% Parks, Reserves and Cemeteries 944,521 614,270-330,251 65.0% Stormwater 912,468 294,818-617,650 32.3% Waste 152,062 220,957 68,895 145.3% Vehicles Plant and Equipment 1,474,585 1,308,028-166,557 88.7% All Services 10,317,495 6,615,220-3,702,275 64.1% Note: * A life cycle gap is reported as a negative value. A life cycle gap of $3.7M per annum has been identified, reflecting that current renewal investment is less than current annual asset depreciation. The current service standards for Council s assets are considered appropriate, so the challenge in bridging the life cycle gap is related to renewal spending. In conjunction with this challenge, are the acknowledged renewal backlogs in a number of asset classes. Annual asset renewal demand for a given time period may be less than or greater than the annual depreciation provision. This will depend upon the in service performance of the assets and the actual performance of the assets within the overall asset stock life cycle. The current five year forward capital works program currently suggests an average renewal spend of around $6.0 m per annum over the life of the current program. Using the identified needs as the basis for funding, the gap is bridged slightly and reduces to $2.45 M. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 14

Council s Financial Strategy notes that funding for the forecast capital works program will grow for $5.4 m in 12 / 13 to around $8.6 m in five years time. This growth in funding provides an opportunity to assist in bridging the life cycle gap. The above discussion highlights the current strategy in place to begin to address backlog needs and forward renewal needs. A further issue to consider in respect to life cycle costs is the depreciation provision made for asset replacement and the merits of adopting a residual Value approach to valuing assets. Briefly discussing the residual value concept, a range of assets have the potential to be incorporated in to replacement assets or have value at the end of the assigned useful life. Examples can include eg road pavements, plant and equipment, buildings and constituent components, drainage pipes ( as conduits for trenchless technology). Recognising this residual value has the potential to reduce the quantum of annual depreciation provision and reflect actual asset management practice. In addition the theoretical life cycle gap will be further managed. It is understood that a review of asset management practices is being carried out on a state wide basis and the use of residual values will be addressed as part of this review. The modelling carried out in the development of the next generation of Asset Plans will assist in further identifying the current actual renewal demand. This approach is consistent with the Council s Asset Policy. At this point in time a key expenditure focus for Council needs to be transport assets. This asset class includes the majority of backlog works. The expenditure gap for building assets is quite large, however current renewal demand (with the exception of the PCYC) does not reflect this gap at this point in time. There needs to be a focus though on improving inspection regimes and prioritising asset renewal and addressing building compliance issues. While investment in storm water assets is well below depreciation, the current condition of the assets does not warrant significant investment at this point in time. As such portion of the desirable renewal funding could be redirected to address more urgent demands in the asset network. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 15

Council needs to commit to funding the renewal demand of the asset base and to provide additional funding to address backlog work, to ensure that the various assets meet with the expectation of the community and comply with the standards of the day. However, should appropriate renewal funding not be made available over time asset condition will deteriorate, leading to more service requests and an increasingly risky operating environment within which to manage. 3.3 Asset Structure Position Aldermen Role Ensure Council s assets management policy and principles are applied to relevant decisions making. Provide appropriate resources to maintain and renew infrastructure assets. Ensure the Financial Strategy is implemented annually. General Manager To ensure the Council infrastructure is maintained and operated in accordance with Council s adopted policies and procedures and in accordance with relevant legislation. Director Works and Services Financial and information Services Manager and Director of Corporate Services Overall control of AM and operational objectives. Responsible for development, implementation and review of the Financial Strategy and Financial Services input into the AM process. Manager Engineering Services of asset systems and data, data collection, coordination of condition assessments, development of AM processes and the design and programming of Capital Works and over view of operational program. Works Manager Responsible for coordinating Works program, ensuring standards are complied with and forward programs. Implement and review Service Level Standards associated with operational works. Throughout the organisation a range of staff provide support to the appropriate management of assets and implementation of Council s Asset Policy and Strategy. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 16

3.4 Corporate Asset Team A whole of organisation approach to asset management can be developed with a Corporate Asset Team. The benefits of a Corporate Asset Team include: demonstrate corporate support for sustainable asset management, encourage corporate buy-in and responsibility, coordinate strategic planning, information technology and asset management activities, promote uniform asset management practices across the organisation, information sharing across IT hardware and software, pooling of corporate expertise, championing of asset management process, wider accountability for achieving and reviewing sustainable asset management practices. The role of the Asset Team will evolve as the organisation maturity increases over several phases. Phase 1 Strategy development and implementation of asset management improvement program. Phase 2 Asset Plan development and implementation. Reviews of data accuracy, levels of service and systems plan development. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 17

Phase 3 Asset Plan operation. evaluation and monitoring of Asset Plan outputs. ongoing Asset Plans review and continuous improvement. The current positions on Council s Asset Team are: Director Works and Services Property Services Officer GIS / Asset Officer IT Systems Administrator Executive Manager Corporate Finance Financial Accountant Technical Administration Coordinator Works Manager Works Coordinator 3.5 Financial and Asset Core Competencies The National Frameworks on Asset Planning and and Financial Planning and Reporting define 10 elements. 11 core competencies have been developed from these elements to assess core competency under the National Frameworks. The core competencies are: Financial Planning and Reporting Strategic Longer Term Plan Annual Budget Annual Report Asset Planning and Asset Policy Asset Strategy Asset Plan Governance and Levels of Service Data and Systems Skills and processes Burnie City Council Asset Strategy Adopted 19 February 2013 Page 18

Evaluation Council s maturity assessment for the core competencies is detailed in Appendix A and summarised in Figure 4. The current maturity level is shown by the blue bars. The maturity gap to be overcome for Council to achieve a core financial and asset management competency is shown by the red bars. Figure 3: Core Asset Maturity Key: Y (Achieved), N (Not achieved), P (Partly Achieved) Burnie City Council Asset Strategy Adopted 19 February 2013 Page 19

3.6 Strategy Outlook 1. Council has developed a range of Technical Levels of Service that reflect current activities to provide a range of services and infrastructure to the community. The cost of meeting these levels of Service have been built in to Council Financial Strategy and maintaining this level of service is achievable over the next 10 years. 2. Council s current asset management maturity is below core level; however the maturity gap is not significant. Council investment is needed to improve information management, governance arrangements, and a range of other smaller issues to bridge this gap. 3. Council has committed to ensuring that it focuses on asset renewals and will prioritise funding to address infrastructure that is not providing a suitable level of service. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 20

4. Where do we want to be? 4.1 Council s Vision, Mission, Goals and Objectives Council has adopted a Vision for the future in the Corporate Plan 2012-2017. Making Burnie 2030: Our vision is to be: A vibrant, thriving beautiful place. A caring community. A regional leader engaged with the world. A city that lives its dreams. The Corporate Plan sets future directions and objectives to be achieved in the planning period. The future directions set out where Council wants to be. The objectives and underpinning strategies are the steps needed to get there. Objectives and strategies relating to the delivery of services from infrastructure are shown in Table 6. Table 6: Goals and Objectives for Infrastructure Services Future Direction Goals Objectives A Natural and built environment that is respected and cared for. An engaging and accountable leadership focused on a strong future. A built environment that is valued reflects our past and embraces our future. A sustainable long term future is planned through the management of Council s infrastructure and assets. Ensure the form and layout of settlement provides attractive, convenient, efficient, healthy, pleasant and safe urban and rural places in which people live, work and visit. Plan for or make available adequate community and utility infrastructure assets to support economic prosperity and liveable settlements. Strategies and plans are welldeveloped and guide the future allocation of Ensure assets are adequately maintained and renewed. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 21

4.2 Asset Policy Council s Asset Policy defines the council s vision and service delivery objectives for asset management in accordance with the Strategic Plan and applicable legislation. The asset management strategy is developed to support the asset management policy and is to enable Council to show: how its asset portfolio will meet the affordable service delivery needs of the community into the future, enable Council s asset management policies to be achieved, and ensure the integration of Council s asset management with its long term strategic plans. 4.3 Asset Vision To ensure the long-term financial sustainability of Council, it is essential to balance the community s expectations for services with their ability to pay for the infrastructure assets used to provide the services. Maintenance of service levels for infrastructure services requires appropriate investment over the whole of the asset life cycle. To assist in achieving this balance, Council aspires to: Develop and maintain asset management governance, skills, process, systems and data in order to provide the level of service the community need at present and in the futures, in the most cost-effective and fit for purpose manner. In line with the vision, the objectives of the asset management strategy are to: ensure that the Council s infrastructure services are provided in an economically optimal way, with the appropriate level of service to residents, visitors and the environment determined by reference to Council s financial sustainability, safeguard Council s assets including physical assets and employees by implementing appropriate asset management strategies and appropriate financial resources for those assets, adopt the long term financial plan as the basis for all service and budget funding decisions, meet legislative requirements for all Council s operations, ensure resources and operational capabilities are identified and responsibility for asset management is allocated, provide high level oversight of financial and asset management responsibilities through Audit Committee / CEO reporting to council on development and implementation of Asset Strategy, Asset Plan and Long Term Financial Plan. Strategies to achieve this position are outlined in Section 5. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 22

5. How will we get there? The Asset Strategy proposes strategies to enable the objectives of the Strategic Plan, Asset Policy and Asset Vision to be achieved. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 23

Table 7: Asset Strategies No Strategy Desired Outcome 1 Move from Annual Budgeting to Long Term Financial Planning The long term implications of Council services are considered in annual budget deliberations. 2 Develop and annually review Asset Plans covering at least 10 years for all major asset classes (80% of asset value). Identification of services needed by the community and required funding to optimise whole of life costs. 3 Develop Long Term Financial Plan covering 10 years incorporating asset management plan expenditure projections with a sustainable funding position outcome. Sustainable funding model to provide Council services. 4 Incorporate Year 1 of Long Term Financial Plan revenue and expenditure projections into annual budgets. Long term financial planning drives budget deliberations. 5 Review and update asset management plans and long term financial plans after adoption of annual budgets. Communicate any consequence of funding decisions on service levels and service risks. Council and the community are aware of changes to service levels and costs arising from budget decisions. 6 Report Council s financial position at Fair Value in accordance with Australian Accounting Standards, financial sustainability and performance against strategic objectives in Annual Reports. Financial sustainability information is available for Council and the community. 7 Ensure Council s decisions are made from accurate and current information in asset registers, on service level performance and costs and whole of life costs. Improved decision making and greater value for money. 8 Report on Council s resources and operational capability to deliver the services needed by the community in the Annual Report. Services delivery is matched to available resources and operational capabilities. 9 Ensure responsibilities for asset management are identified and incorporated into staff position descriptions. Responsibility for asset management is defined. 10 Implement an Improvement Plan to realise core maturity for the financial and asset management competencies within 2 years. Improved financial and asset management capacity within Council. 11 Report six monthly to Council by Audit Committee / General Manager on development and implementation of Asset Strategy, AM Plans and Long Term Financial Plans. Oversight of resource allocation and performance. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 24

6. Asset Improvement Plan The actions required to achieve a core financial and asset management maturity is shown in priority order in Table 8. The actions were derived from the maturity assessment attached as Appendix A. The tasks are the higher level actions required to progress to core maturity. Section 5 of the maturity assessment identifies a number of governance strategies that are recommended to be implemented. These strategies underpin the improvement actions and are necessary to reach the desired core maturity. In the implementation of the Asset Improvement Plan and more comprehensive task list will be developed as actions are progressed. Table 8: Asset Improvement Plan Ref Action Responsibility Target Date Budget 1. SLTP. Ensure Strategic Plan / Corporate Plan priorities and performance measures are linked to community and technical levels of service. 2. SLTP. Consider including in the next update of the Strategic Plan commentary on the important role infrastructure plays in achieving strategic objectives and the future outlook for this infrastructure (including challenges and risks). 3. Annual Budget. 4. Annual Report. Review the commentary in the budget following the completion of updated corporate plan to provide a statement of whether the budget will achieve the SP service objectives. Include State of the Assets reporting in annual report to show service levels trends e.g. % or assets at poor/fair/good condition, function and capacity. This will provide an annual snapshot of service level trends. EMT / Council. Annual plan review. Pre June each year. EMT / Council. When next review occurs. EMT. End June 2013. EMT / Director Works and Services. End June 2013. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 25

5. AM Policy. Use the NAMS. Plus policy template as the basis for the policy review. Asset Team. End December 2012. 6. AM Policy. Ensure the AM policy is implemented and communicated to key stakeholders. EMT. January 2013. 7. AM Strategy. Complete strategy using the template available through NAMS.Plus. Asset Team End December 2013. 8. AM Strategy. Ensure that this maturity improvement plan forms part of the ongoing strategy based on cost, benefit and risk Asset Team. Completed. No budget implication. 9. AM Plans. Update Asset Plans using scenario 2 as outlined in Appendix C (maturity assessment) following data review and update. Asset Team. End June 2013. 10. Gov and Mgt. Adopt a charter for the Asset Working Group / Committee refer to maturity assessment Appendix D for example. Asset Team. End December 2012. 11. Gov and Mgt. Ensure whole of life costing impacts from all capital upgrade/expansion projects have a feedback loop into AMP s and budget / long term financial strategy. Works and Services Director Works and Services. Review budget justification process. End December 2012. 12. Gov and Mgt. Set up a formal process for corporate risk reporting for any residual high risks from AMP s to audit committee and Council as per Appendix C (maturity assessment). Asset team - Director Works and Services. Link to Risk system when completed. 13. L of S. In developing levels of service for each of the updated AMP s ensure that service level targets for the next 10 years are achievable and make clear what Council can and cannot do for the likely budget / LTFP. Works and Services - Director Works and Services. End June 2013. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 26

14. L of S. Link community and technical service levels in AMP to the Community Strategic Plan and Corporate Plan. Asset Team. As part of review processes above. 15. L of S. Develop additional AMP scenarios as required to align with the LTFP and show service outcomes and risk consequences of LTFP resourcing levels. Asset Team. TBD following completion of AMP review. 16. Data and sys. Ensure the current register is kept up to date and asset condition is monitored and reported as part of the annual review of the works programme. GIS / Asset Officer. Ongoing. 17. Data and sys. Provide a data management improvement programme as part of the asset management improvement programme based upon benefit / cost / risk. GIS / Asset Officer. End June 2013. 18. Data and sys. Provide a knowledge management strategy to continue to identify skills and knowledge needed for the technology/data options and audit trail, security etc. The development of the strategy should be done in conjunction with the implementation of the AIM system. Asset Team. TBD. 19. Data and sys. Annual update of unit rates based on completed works program to update replacement cost and renewal cost rates. GIS/ Asset Officer. Financial Accountant. Ongoing (Unit rate incremented by indices periodic review). 20. Data and sys. Prepare inspection manual for undocumented asset classes. Works Services. and End June 2014. resources 21. Data and sys. The maturity assessment provides the capacity to benchmark asset management performance and practice. Review against other Councils as required. Asset Team. North / North west asset group. Quarterly meetings. Burnie City Council Asset Strategy Adopted 19 February 2013 Page 27

22. Skills and processes. Continue to review businesses processes and documents to ensure audit trail for financial transactions, asset register updates and annual reporting. Asset Team. Ongoing. 23. Skills and processes. Ensure any highest risks in each AMP be included in the corporate risk register and reported to executive /audit committee for acceptance of residual risk. Asset Team - Director Works and Services. Link to Risk system when completed. 24. Skills and processes. Utilise the Local Government reform fund training program and IPWEA professional development programs to further develop and broaden internal capacity. Asset Team. On going. Attending courses and accessing knowledge transfer opportunities. 25. Evaluation. Use the maturity report and AMIP to monitor and review national framework implementation. Asset Team. Review strategy implementation annually. 26. Evaluation. Service level reporting needs to be implemented using a state of the assets report, reporting trends for quality, function and capacity. Continue regular reporting on current maturity and status of AMIP implementation. Asset Team. End June 2014 Burnie City Council Asset Strategy Adopted 19 February 2013 Page 28

Appendix A - Asset Maturity Assessment Attach Maturity Assessment doc Burnie City Council Asset Strategy Adopted 19 February 2013 Page 29