SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

Similar documents
THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

Reserve Study Transmittal Letter


RESERVE STUDY SPECIALISTS

RESERVE STUDY UPDATE SUMMARY. for. Vista Tassajara HOMEOWNERS ASSOCIATION

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

RESERVE STUDY UPDATE SUMMARY

Reserve Analysis Report

BUDGET APPROVED. GENERAL EXPENSES (158 Units)

TANGLEWOOD HILLS CONDOMINIUM

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

The Vineyards at Dublin Greene Owners Association

Reserve Analysis Report

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

Reserve Analysis Report

Level 3 Reserve Study without a Site a Site Visit Visit

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

Brookwood Homeowners Association, Inc.

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

Urban Heights Condominium

Reserve Study Transmittal Letter

COMSTOCK HOA. Enclosed are two packets of information. The first is the Annual Operating Budget which includes:

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014

Agenda Item # 5b Page 1 of 43

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Cottonwoods at Vine. Reserve Study. October 2012

R E S E R V E S T U D Y

Commercial Assessments

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

CAPITAL RESERVE STUDY

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Vallarta Community Association

Ashleigh Commons Condominiums Association, Inc.

- RS. D e sig n atio n

Do-It-Yourself Reserve Study

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

Reserve Study Executive Summary

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

Update With Site-Visit Reserve Study

Calusa Point Association, Inc. Miami, Florida File #

November 22, Boca Rio Condominium Homeowners Association Board of Directors Blossom Valley Road El Cajon, CA Attn: Robin Clegg

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

MILL CREEK CONDOMINIUMS RESERVE STUDY

Reserve Analysis Report

RESERVE STUDY ANNUAL REPORT

GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION")

PROFESSIONAL RESERVE STUDY

UPDATE - With Site Visit

Arizona Nevada Texas Utah New Mexico

Hyde Park Place Owners' Association, Inc.

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016

Sample Community Association

Sun Peak Master Association

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017

VILLAGE AT LAKE CHELAN

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003

CAPITAL RESERVE STUDY

Update With Site Visit

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

FINANCIAL STATEMENTS and Supplementary Information. For the Years Ended DECEMBER 31, 2013 AND 2012

SURFSIDE HOMEOWNERS ASSOCIATION RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2016

ASSOCIATION OF APARTMENT OWNERS OF HALE KAMAOLE

Reserve Study Transmittal Letter

August 19, Raintree HOA Attn: Emily Bresina HOA Simple PO Box Denver, CO Regarding: Reserve Study Draft.

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

HARBOR POINTE CONDOMINIUM ASSOCIATION INC CONDOMINIUM APPROVED BUDGET YEAR ENDING DECEMBER 31, 2017

Depreciation Report Level I

PROFESSIONAL RESERVE STUDY

GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012

BUDGET ACTUAL ACTUAL ACTUAL ACTUAL

Pemberley at Robinsons Grove

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224

Update "With-Site-Visit" Reserve Study

PROFESSIONAL RESERVE STUDY

OAK CREEK CONDOMINIUMS

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY

Reserve Analysis Report

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

Pacific Tower Condominium Association

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by:

What are Capital Reserves?

Update With Site-Visit Reserve Study

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017

Reserve Fund Study My Condominium Plan

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp.

** DRAFT - DISCUSSION COPY **

Transcription:

SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite 151 San Jose, CA 95124 PH: (408) 306 0145 www.smareserves.com RESERVE STUDIO 1.0

Property Description Level of Service General Information The following reserve study assessment is based upon information and data available to us during the course of the study. Factual information provided by the association, managing agent, and association contracted service providers, regarding past or current reserve projects, financial data, physical characteristics, component quantities, or historical issues are assumed to be correct and complete. The initial reserve fund cash balance is derived from the Association's balance sheet as provided by the Association or managing agent. The conclusions and recommendations presented in this report have been based on visual observations and opinion of the reserve inspector at the time of inspection. Miramar Plaza is a 17 building, 139 condo/townhome project located in Santa Clara, CA. The property features buildings which contain a mix of townhomes and condominiums, with garage parking. The townhomes have wood deck porch entries, and the condo entries feed off of a common covered stairwell. The project contains concrete pathways, garden areas, and a swimming pool with restrooms. This reserve study has been prepared to meet California Civil Code section 5570, and the National Reserve Study Standards published by the Community Associations Institute (CAI). The level of service performed in this reserve study was a Reserve Study Update w/o Visual Inspection, in which the following three objectives were performed: Updated Life and Valuation Estimates Reserve Fund Status Funding Plan This study is not intended for the purpose of performing quality/forensic analyses, background check of historical records, or an audit or review of a previous reserve study. No visual inspection was included in this report. No invasive or destructive testing has been performed as a part of this study. Since no destructive testing was undertaken, this study does not purport to address any latent and/or patent defects, nor does it address any life expectancies, which are abnormally short due to either improper design or installation, or to subsequent improper maintenance. Additionally, an components not accessible to the inspector have been omitted from this study. This study assumes that all components will be properly maintained for the remainder of their life expectancy. Page 1 of 23 7/15/2014

Reserve Study Goals and Objectives This reserve study financial update includes a financial analysis of the associations reserve fund only. All association information in this report has been taken from the previous reserve study report dated 09/11/2013 by SMA Reserves. SMA Reserves has only updated the unit cost for inflation and the Remaining Life to reflect the new Fiscal Year. All updated component costs and remaining life has been provided by the association's manager or primary contact. The financial analysis is a determination and opinion of the current or projected status of the Association's reserve fund cash balance. The financial analysis includes a reserve funding plan which may have been modified by the Association's board or managing agent as a part of this study. The funding plan included in this report should reflect the Association's anticipated annual reserve contributions and anticipated special assessments, if applicable, as of the date of the report. The funding plan included herein is evaluated based on a cash flow method, whereby contribution to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved. The funding goal selected in this report is designed to maintain a minimum threshold balance equal to 5% of the total replacement cost of all components included in the study. The reserve funding plan provides a 5 year reserve fund contribution schedule and anticipated special assessments, if applicable, in order to meet an adequate reserve funding level. Basis for Life Expectancies and Cost Estimates Life expectancy and cost estimates are prepared based on information available to the reserve preparer and the most recent reserve study that included an on site visual inspection. Costs and life expectancies are generally updated based on additional expired age and inflationary increases from the previous reserve study, unless a more accurate means of analysis has been provided from information derived by the board or managing agent. In preparing this level 3 reserve study update the component inventory, life expectancies, and unit costs have been imported from the previous reserve study or update prepared by SMA Reserves dated September 11, 2013. No independent review of the components, life expectancies, or unit costs were performed as a part of this study. The projected life expectancy of the major components and the funding needs of the reserves of the Association are based upon the Association performing appropriate routine and preventative maintenance for each major component. Failure to perform such maintenance can negatively impact the remaining useful of the major components and dramatically increase the funding needs of the reserves of the Association. Page 2 of 23 7/15/2014

Status of the Reserve Fund The status of the reserve fund cash balance is evaluated as either adequate or inadequate. The reserve fund cash balance is considered adequate if the anticipated cash balance of the reserve fund is greater than or equal to a threshold balance of 5% for each year over the next thirty years without the anticipated need for a special assessment or increase greater than inflation. The Association's current reserve fund cash balance is inadequate. It is recommended that the Association increase their reserve contribution in order to fund anticipated future repairs. Agent Involvement This reserve study was prepared by David Hodges and reviewed by Erik Sundquist. David Hodges is a graduate of the Orfalea College of Business at Cal Poly San Luis Obispo with over 8 years experience in finance, accounting and business management. Erik Sundquist has been certified as a Reserve Specialist (RS) by the Community Associations Institute (CAI), graduated with highest honors from UC Berkeley, and has over 25 years experience in construction, construction management, estimating, and design. Terms and Definitions COMPONENT: The individual line items in the Reserve Study, developed or updated in the Physical Analysis. These elements form the building blocks for the Reserve Study. Components typically are: 1) Association responsibility, 2) with limited Useful Life expectancies, 3) predictable Remaining Useful Life expectancies, 4) above a minimum threshold cost, and 5) as required by local codes. FULLY FUNDED: 100% Funded. When the actual (or projected) Reserve balance is equal to the Fully Funded Balance. REMAINING USEFUL LIFE (RUL): Also referred to as Remaining Life (RL). The estimated time, in years, that a reserve component can be expected to continue to serve its intended function. Projects anticipated to occur in the initial year have zero Remaining Useful Life. USEFUL LIFE (UL): Total Useful Life or Depreciable Life. The estimated time, in years, that a reserve component can be expected to serve its intended function if properly constructed in its present application or installation. PROJECT MANAGEMENT AND ADMINISTRATION (PM&A): It is added to each component to account for additional costs beyond the base component cost such as construction management fees, expansion of project scope, hidden damage, additional association management costs, etc. DEFERRAL (DEF): Deferrals allow an association to extend repairs to a component beyond the recommended useful life. Page 3 of 23 7/15/2014

Three Year Projects Summary Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2014/15 Anticipated Reserve Projects Schedule 2015/16 Anticipated Reserve Projects Schedule 9 Landscape Landscaping Enhancements 5,464 13 Patching, Minor - Replacement Allowance 4,761 14 Asphalt Pavement, Seal Coat, Paint Curbs, Str 8,776 20 Pool & Spa Pool Filter, Pump (1) Replacement Allowance 1,030 51 Pathway Bollards, Allowance 1,061 51 Exterior Lighting Pathway Bollards, Allowance 1,030 66 Circulating Pump - Replacement Allowance 1,238 67 Hot Water Heater & Damper - Replacement All 7,649 66 Plumbing Circulating Pump Replacement Allowance 1,202 2015/16 Total Anticipated Expenditure 23,485 67 Plumbing Hot Water Heater & Damper Replacement Allowance 7,426 2015/16 Anticipated Beg. Cash Balance 459,731 2014/15 Total Anticipated Reserve Expenditure 16,152 2014/15 Anticipated Reserve Fund Beg. Cash Balance 318,200 2016/17 Anticipated Reserve Projects Schedule 8 Irrigation Controllers 4,371 9 Landscaping Enhancements 5,796 49 Tile Roofing, Inspection & Repairs 8,115 51 Pathway Bollards, Allowance 1,093 66 Circulating Pump - Replacement Allowance 1,275 67 Hot Water Heater & Damper - Replacement All 7,879 68 Water Heater, 40 gal 1,159 2016/17 Total Anticipated Expenditure 29,688 2016/17 Anticipated Beg. Cash Balance 602,223 Page 4 of 23 7/15/2014

Miramar Plaza Homeowners' Association Report Date: 7/15/2014 Santa Clara, CA Reserve Study Financial Summary Fiscal Year End: 9/30/2014 Status of the Reserve Fund as of September 30, 2014 Reserve Fund Cash Balance as of September 30, 2014 318,200.00 Anticipated Interest Revenue prior to September 30, 2014 0.00 Community Information Anticipated Reserve Fund Contribution prior to September 30, 2014 0.00 Fiscal Year Start Anticipated Reserve Fund Expenditures prior to September 30, 2014 Fiscal Year End Projected Reserve Fund Cash Balance 318,200.00 Community Type Projected Fully Funded Balance 1,306,009.06 Number of Units Percent Funded 24% Year Built October 1, 2014 September 30, 2015 Townhomes - Condo 139 1985 Avg. Reserve Fund Surplus / (Deficit) per Member (7,106.54) Last Inspected *FYE cash balance estimated by manager as of 6/16/2014 June 1, 2012 Five Year - Cash Flow Funding Plan Summary Fiscal Year Ending Reserve Contribution Special Assessment Percent Funded Computation Parameters 2014/15 151,642-32% Inflation Rate 3.00 % 2015/16 157,252-37% Interest Rate 2.00 % 2016/17 163,071-42% Threshold Factor 5.00 % 2017/18 169,104-47% 2018/19 175,361-39% Prior Year Fund Contribution $146,231 Summary Notice: This five year funding plan summary is provided in accordance with California Civil Code Section 5570. The full reserve study plan is available and will be provided, by the Association, to any member upon request. Page 5 of 23 7/15/2014

Cash Flow Funding Plan Miramar Plaza Homeowners' Association Report Date: 7/15/2014 Fiscal Year Annual Reserve Contribution Monthly Reserve Assessment Percent Increase Anticipated Beginning Cash Balance Estimated Interest Anticipated Reserve Expense Anticipated Special Assessment Anticipated FYE Cash Balance Fully Funded Balance Surplus/ (Deficit) of FFB Projected FYE Percent Funded 2014/15 151,642 90.91 3.70% 318,200 6,041 16,152 459,731 1,457,222 (997,492) 32% 2015/16 157,252 S 94.28 3.70% 459,731 8,725 23,485 602,223 1,609,279 (1,007,057) 37% 2016/17 163,071 97.76 3.70% 602,223 11,451 29,688 747,056 1,763,484 (1,016,429) 42% 2017/18 169,104 101.38 3.70% 747,056 14,311 31,531 898,940 1,924,513 (1,025,573) 47% 2018/19 175,361 105.13 3.70% 898,940 9,592 419,356 664,537 1,695,131 (1,030,594) 39% 2019/20 181,849 109.02 3.70% 664,537 0 680,404 165,982 1,194,332 (1,028,350) 14% 2020/21 188,578 113.06 3.70% 165,982 2,959 18,056 339,462 1,365,202 (1,025,740) 25% 2021/22 195,555 117.24 3.70% 339,462 3,910 143,956 394,972 1,416,131 (1,021,159) 28% 2022/23 202,791 121.58 3.70% 394,972 6,141 87,923 515,980 1,531,049 (1,015,068) 34% 2023/24 210,294 126.08 3.70% 515,980 10,068 12,602 723,740 1,731,885 (1,008,145) 42% 2024/25 218,075 130.74 3.70% 723,740 6,207 413,391 534,631 1,530,970 (996,339) 35% 2025/26 226,144 135.58 3.70% 534,631 9,702 49,510 720,967 1,704,013 (983,046) 42% 2026/27 234,511 140.59 3.70% 720,967 2,212 610,351 347,340 1,309,924 (962,584) 27% 2027/28 243,188 145.80 3.70% 347,340 3,889 152,867 441,550 1,380,724 (939,174) 32% 2028/29 252,186 151.19 3.70% 441,550 7,697 56,679 644,755 1,558,392 (913,637) 41% 2029/30 261,517 156.78 3.70% 644,755 10,983 95,628 821,626 1,707,109 (885,483) 48% 2030/31 271,193 162.59 3.70% 821,626 3,783 632,471 464,130 1,313,354 (849,223) 35% 2031/32 281,227 168.60 3.70% 464,130 8,574 35,416 718,515 1,528,947 (810,431) 47% 2032/33 291,632 174.84 3.70% 718,515 13,343 51,384 972,106 1,740,941 (768,835) 56% 2033/34 302,423 181.31 3.70% 972,106 18,642 39,982 1,253,190 1,977,611 (724,421) 63% 2034/35 313,612 188.02 3.70% 1,253,190 22,205 142,922 1,446,086 2,122,122 (676,036) 68% 2035/36 325,216 194.97 3.70% 1,446,086 26,741 109,054 1,688,989 2,312,823 (623,834) 73% 2036/37 337,249 202.19 3.70% 1,688,989 23,086 534,665 1,514,660 2,078,047 (563,388) 73% 2037/38 349,727 209.67 3.70% 1,514,660 27,962 116,545 1,775,804 2,274,288 (498,484) 78% 2038/39 362,667 217.43 3.70% 1,775,804 34,362 57,697 2,115,136 2,544,647 (429,511) 83% 2039/40 376,086 225.47 3.70% 2,115,136 40,477 91,302 2,440,397 2,796,351 (355,954) 87% 2040/41 390,001 233.81 3.70% 2,440,397 48,156 32,612 2,845,942 3,124,139 (278,197) 91% 2041/42 404,431 242.46 3.70% 2,845,942 55,967 47,596 3,258,743 3,454,651 (195,908) 94% 2042/43 419,395 251.44 3.70% 3,258,743 46,406 938,419 2,786,126 2,886,106 (99,980) 97% 2043/44 434,913 260.74 3.70% 2,786,126 55,267 22,760 3,253,545 3,252,464 1,081 100% Page 6 of 23 7/15/2014

Cash Flow Funding Plan Miramar Plaza Homeowners' Association Report Date: Fiscal Year End: 7/15/2014 Santa Clara, CA 9/30/2014 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 500,000 0 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 2040/41 2041/42 2042/43 2043/44 Anticipated Reserve Expense Threshold Min. Balance Fully Funded Balance Anticipated FYE Cash Balance Page 7 of 23 7/15/2014

Component Inventory Detail Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 See General Information for Definitions R.L. U.L. Def. Quantity Unit Cost PM&A Anticipated Total Cost Site Systems Steel Fences & Railing 1 Chain Link, 6' w/top Rail 25 50 724 Ln.Ft. $19.19 3% 2 Chain Link, 6' w/privacy Slats 15 40 570 Ln.Ft. $11.96 3% 3 Steel Fence, Pool Area 16 45 284 Ln.Ft. $53.05 3% 4 Steel Gates, Pool Area 16 45 2 Each $891.71 3% 5 Steel Fence, SE and NW Corners 11 40 354 Ln.Ft. $53.05 3% 6 Steel Railings, Pathways 21 50 271 Ln.Ft. $53.05 3% 7 Steel Railings, Stairwells 21 50 1125 Ln.Ft. $53.05 3% Landscape 8 Irrigation Controllers 2 5 4 Each $1,000.00 3% 9 Landscaping Enhancements 0 2 1 Fund $5,304.50 3% 10 Backflow Preventer 3 25 1 Each $2,121.80 3% 11 Tree Trimming 4 4 1 Fund $12,875.00 3% Asphalt and Concrete 12 Patching, Major - Replacement Allowance 13 24 9747 Sq.Ft. $4.49 3% 13 Patching, Minor - Replacement Allowance 1 6 1000 Sq.Ft. $4.49 3% 14 Asphalt Pavement, Seal Coat, Paint Curbs, Stripe Stalls 1 6 38988 Sq.Ft. $0.21 3% 15 Pathways, Pavers, Bricks, Walls - Repair Allowance 5 5 1 Fund $5,304.50 3% Pool & Spa 16 Concrete Deck 21 30 3280 Sq.Ft. $10.11 3% 17 Mastic 3 5 120 Ln.Ft. $9.50 3% 18 Pool Plaster 14 20 720 Sq.Ft. Surf $12.45 3% 19 Tile & Coping 23 30 120 Ln.Ft. $42.20 3% 20 Pool Filter, Pump (1) Replacement Allowance 0 5 1 Each $1,000.00 3% 21 Shower Tower, pool area 18 25 1 Each $3,182.70 3% 22 Drinking Fountain 10 40 1 Each $1,366.44 3% 23 Chaises, Tables, Chairs 14 20 1 fund $12,730.80 3% 24 Trash Cans 10 40 2 Each $937.76 3% 25 Pool Solar Heater 28 30 1 Each $7,000.00 3% Appurtenant Structure 26 Metal Dumpster Area Gates 23 40 7 Each $1,494.54 3% 27 Mail Kiosks 12 40 5 Sq.Ft. $4,243.60 3% 28 Dumpster Arbor, Bldg 1904 16 25 1 Fund $2,121.80 3% 29 Trellis, Pool Area - Repair Allowance 23 25 1 Fund $5,304.50 3% 14,312 7,020 15,517 1,837 19,341 14,806 61,466 4,120 5,464 2,185 13,261 45,053 4,622 8,521 5,464 34,157 1,174 9,237 5,216 1,030 3,278 1,407 13,113 1,932 7,210 10,776 21,855 2,185 5,464 Page 8 of 23 7/15/2014

Component Inventory Detail Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 See General Information for Definitions R.L. U.L. Def. Quantity Unit Cost PM&A Anticipated Total Cost Building Systems Miscellaneous 30 Stairwell Landing Recoat 7 25 4363 Sq.Ft. $18.35 3% 31 Stairwell Landings and treads- Replacement Allowance 8 20 1 Fund $15,913.50 3% 32 Interior Building Repair Fund 3 5 1 Fund $10,300.00 3% 33 Mailboxes, Economy, 12-Unit 10 40 139 Each $122.33 3% 34 Benches, Garden Quad 10 40 4 Each $708.89 3% Exterior Doors 35 Balcony Closet Doors - Replacement Allowance 4 6 1 Fund $5,304.50 3% 36 Crawl Space Doors 30 60 50 Each $348.00 3% 37 Entry Doors, Pool House 5 35 4 Each $348.00 3% 38 Water Heater Fireproof Doors 30 60 17 Each $530.45 3% 39 Utility Closet Doors 3 20 17 Each $298.62 3% Exterior Siding, Trim & Floorboards 40 Stucco Siding & Steel Fences, Paint 4 12 1 Fund $106,090.00 3% 41 Exterior Wood Trim, Paint 4 6 1 Fund $106,090.00 3% 42 Wood Trim &/or Stucco - Repair Allowance 4 6 1 Fund $74,263.00 3% 43 Wood Floorboards, Balconies & Landings, Stain/Repair 4 6 1 Fund 42,436.00 3% Roofing 44 Downspouts 12 30 5754 Ln.Ft. $4.24 3% 45 Gutters 5 30 4344 Ln.Ft. $10.61 3% 46 Tile Roof South-Facing, Replace 30% 37 40 39000 Sq.Ft. $8.49 3% 47 Tile Roof East & West Facing, Replace 40% 5 40 52000 Sq.Ft. $8.49 3% 48 Tile Roof North Facing, Replace 30% 12 40 39000 Sq.Ft. $8.49 3% 49 Tile Roofing, Inspection & Repairs 2 5 1 Fund $7,426.30 3% 50 Chimney Caps and Spark Arrestors 20 40 90 Each $477.41 3% 82,479 16,391 10,609 17,514 2,921 5,464 17,922 1,434 9,288 5,229 109,273 109,273 76,491 43,709 25,150 47,468 340,931 454,574 340,931 7,649 44,255 Page 9 of 23 7/15/2014

Component Inventory Detail Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 See General Information for Definitions R.L. U.L. Def. Quantity Unit Cost PM&A Anticipated Total Cost Mechanical / Electrical Systems Exterior Lighting 51 Pathway Bollards, Allowance 0 1 1 Fund $1,000.00 3% 52 Lights, Garages 15 40 145 Each $100.53 3% 53 Lights, Stairwells 15 40 224 Each $100.53 3% 54 Lights, Townhouse Landings 5 30 41 Each $121.82 3% 55 15' Pole Lights 5 30 12 Each $1,208.37 3% 56 Victorian Light, Garden Quad 16 40 1 Each $884.74 3% 57 Lights, Balconies 10 40 139 Each $121.82 3% Fire Alarm / Security System 58 Fire Alarm Control Panels 13 20 5 Each $4,749.17 3% 59 Fire Alarm Bells 10 28 90 Each $106.09 3% 60 Fire Extinguisher Cabinets 8 40 1 Fund $1,867.18 3% 61 Firesprinklers 5 35 190 Each $45.83 3% 62 Heat Detectors 22 30 350 Each $47.74 3% 63 Intercom Entry System 8 15 2 Each $5,304.50 3% 64 Manual Pull Station 11 40 35 Each $187.72 3% 65 Pumps/Valves/Switches/Guages 5 35 1 Fund $37,131.50 3% Plumbing 66 Circulating Pump - Replacement Allowance 0 1 1 Fund $1,166.99 3% 67 Hot Water Heater & Damper - Replacement Allowance 0 1 1 Fund $7,210.00 3% 68 Water Heater, 40 gal 2 14 1 Each $1,060.90 3% Total 1,030 15,014 23,194 5,145 14,935 911 17,441 24,458 9,835 1,923 8,969 17,210 10,927 6,767 38,245 1,202 7,426 1,093 2,315,703 Page 10 of 23 7/15/2014

Accountants Breakout Miramar Plaza Homeowners' Association Santa Clara, CA Report Date: 7/15/2014 Fiscal Year End: 9/30/2014 The accountants breakout gives a detailed analysis of the associations funding for each component. Fully Funded Balance (FFB): (Unit Cost/Useful Life*Remaining Life) Current Fund Balance: (Component's FFB/(sum(FFB))*Reserve Balance Annual Accrual: Current Cost/Useful Life Annual Contribution: Component's Annual Accrual/(sum(annual accrual)*annual Contribution Current Unit Cost Fully Funded Balance Current Fund Balance Annual Accrual % of Annual Accrual/ Contribution Annual Contribution Contribution per Unit per Month Accountants Breakout Steel Fences & Railing 1 Chain Link, 6' w/top Rail 14,312 7,156 1,743 286 0.23% 347.45 0.21 2 Chain Link, 6' w/privacy Slats 7,020 4,387 1,069 175 0.14% 213.02 0.13 3 Steel Fence, Pool Area 15,517 10,000 2,436 345 0.28% 418.57 0.25 4 Steel Gates, Pool Area 1,837 1,184 288 41 0.03% 49.55 0.03 5 Steel Fence, SE and NW Corners 19,341 14,022 3,416 484 0.39% 586.95 0.35 6 Steel Railings, Pathways 14,806 8,588 2,092 296 0.24% 359.47 0.22 7 Steel Railings, Stairwells 61,466 35,650 8,686 1,229 0.98% 1,492.26 0.89 Landscape 8 Irrigation Controllers 4,120 2,472 602 824 0.66% 1,000.25 0.60 9 Landscaping Enhancements 5,464 5,464 1,331 2,732 2.19% 3,316.13 1.99 10 Backflow Preventer 2,185 1,923 469 87 0.07% 106.12 0.06 11 Tree Trimming 13,261 0 0 3,315 2.65% 4,024.43 2.41 Asphalt and Concrete 12 Patching, Major - Replacement Allowance 45,053 20,649 5,031 1,877 1.50% 2,278.72 1.37 13 Patching, Minor - Replacement Allowance 4,622 3,852 938 770 0.62% 935.15 0.56 14 Asphalt Pavement, Seal Coat, Paint Curbs, Stripe Stalls 8,521 7,101 1,730 1,420 1.14% 1,723.86 1.03 15 Pathways, Pavers, Bricks, Walls - Repair Allowance 5,464 0 0 1,093 0.87% 1,326.45 0.80 Pool & Spa 16 Concrete Deck 34,157 10,247 2,497 1,139 0.91% 1,382.09 0.83 17 Mastic 1,174 469 114 235 0.19% 284.92 0.17 18 Pool Plaster 9,237 2,771 675 462 0.37% 560.61 0.34 19 Tile & Coping 5,216 1,217 297 174 0.14% 211.06 0.13 20 Pool Filter, Pump (1) Replacement Allowance 1,030 1,030 251 206 0.16% 250.06 0.15 21 Shower Tower, pool area 3,278 918 224 131 0.10% 159.17 0.10 22 Drinking Fountain 1,407 1,056 257 35 0.03% 42.71 0.03 23 Chaises, Tables, Chairs 13,113 3,934 958 656 0.52% 795.87 0.48 24 Trash Cans 1,932 1,449 353 48 0.04% 58.62 0.04 25 Pool Solar Heater 7,210 481 117 240 0.19% 291.74 0.17 Page 11 of 23 7/15/2014

Accountants Breakout Miramar Plaza Homeowners' Association Santa Clara, CA Report Date: 7/15/2014 Fiscal Year End: 9/30/2014 The accountants breakout gives a detailed analysis of the associations funding for each component. Fully Funded Balance (FFB): (Unit Cost/Useful Life*Remaining Life) Current Fund Balance: (Component's FFB/(sum(FFB))*Reserve Balance Annual Accrual: Current Cost/Useful Life Annual Contribution: Component's Annual Accrual/(sum(annual accrual)*annual Contribution Current Unit Cost Fully Funded Balance Current Fund Balance Annual Accrual % of Annual Accrual/ Contribution Annual Contribution Contribution per Unit per Month Appurtenant Structure 26 Metal Dumpster Area Gates 10,776 4,580 1,116 269 0.22% 327.01 0.20 27 Mail Kiosks 21,855 15,298 3,727 546 0.44% 663.23 0.40 28 Dumpster Arbor, Bldg 1904 2,185 787 192 87 0.07% 106.12 0.06 29 Trellis, Pool Area - Repair Allowance 5,464 437 106 219 0.17% 265.29 0.16 Miscellaneous 30 Stairwell Landing Recoat 82,479 59,385 14,469 3,299 2.64% 4,004.81 2.40 31 Stairwell Landings and treads- Replacement Allowance 16,391 9,835 2,396 820 0.66% 994.84 0.60 32 Interior Building Repair Fund 10,609 4,244 1,034 2,122 1.70% 2,575.63 1.54 33 Mailboxes, Economy, 12-Unit 17,514 13,136 3,200 438 0.35% 531.51 0.32 34 Benches, Garden Quad 2,921 2,190 534 73 0.06% 88.63 0.05 Exterior Doors 35 Balcony Closet Doors - Replacement Allowance 5,464 1,821 444 911 0.73% 1,105.38 0.66 36 Crawl Space Doors 17,922 8,961 2,183 299 0.24% 362.59 0.22 37 Entry Doors, Pool House 1,434 1,229 299 41 0.03% 49.73 0.03 38 Water Heater Fireproof Doors 9,288 4,644 1,132 155 0.12% 187.91 0.11 39 Utility Closet Doors 5,229 4,445 1,083 261 0.21% 317.36 0.19 Exterior Siding, Trim & Floorboards 40 Stucco Siding & Steel Fences, Paint 109,273 72,848 17,749 9,106 7.29% 11,053.75 6.63 41 Exterior Wood Trim, Paint 109,273 36,424 8,875 18,212 14.58% 22,107.51 13.25 42 Wood Trim &/or Stucco - Repair Allowance 76,491 25,497 6,212 12,748 10.21% 15,475.26 9.28 43 Wood Floorboards, Balconies & Landings, Stain/Repair 43,709 14,570 3,550 7,285 5.83% 8,843.00 5.30 Roofing 44 Downspouts 25,150 15,090 3,677 838 0.67% 1,017.65 0.61 45 Gutters 47,468 39,557 9,638 1,582 1.27% 1,920.70 1.15 46 Tile Roof South-Facing, Replace 30% 340,931 25,570 6,230 8,523 6.82% 10,346.31 6.20 47 Tile Roof East & West Facing, Replace 40% 454,574 397,753 96,910 11,364 9.10% 13,795.09 8.27 48 Tile Roof North Facing, Replace 30% 340,931 238,652 58,146 8,523 6.82% 10,346.31 6.20 49 Tile Roofing, Inspection & Repairs 7,649 4,589 1,118 1,530 1.22% 1,857.03 1.11 50 Chimney Caps and Spark Arrestors 44,255 22,128 5,391 1,106 0.89% 1,343.03 0.81 Page 12 of 23 7/15/2014

Accountants Breakout Miramar Plaza Homeowners' Association Santa Clara, CA Report Date: 7/15/2014 Fiscal Year End: 9/30/2014 The accountants breakout gives a detailed analysis of the associations funding for each component. Fully Funded Balance (FFB): (Unit Cost/Useful Life*Remaining Life) Current Fund Balance: (Component's FFB/(sum(FFB))*Reserve Balance Annual Accrual: Current Cost/Useful Life Annual Contribution: Component's Annual Accrual/(sum(annual accrual)*annual Contribution Current Unit Cost Fully Funded Balance Current Fund Balance Annual Accrual % of Annual Accrual/ Contribution Annual Contribution Contribution per Unit per Month Exterior Lighting 51 Pathway Bollards, Allowance 1,030 1,030 251 1,030 0.82% 1,250.31 0.75 52 Lights, Garages 15,014 9,384 2,286 375 0.30% 455.64 0.27 53 Lights, Stairwells 23,194 14,497 3,532 580 0.46% 703.89 0.42 54 Lights, Townhouse Landings 5,145 4,287 1,045 171 0.14% 208.17 0.12 55 15' Pole Lights 14,935 12,446 3,032 498 0.40% 604.33 0.36 56 Victorian Light, Garden Quad 911 547 133 23 0.02% 27.65 0.02 57 Lights, Balconies 17,441 13,081 3,187 436 0.35% 529.30 0.32 Fire Alarm / Security System 58 Fire Alarm Control Panels 24,458 8,560 2,086 1,223 0.98% 1,484.48 0.89 59 Fire Alarm Bells 9,835 6,322 1,540 351 0.28% 426.36 0.26 60 Fire Extinguisher Cabinets 1,923 1,539 375 48 0.04% 58.36 0.03 61 Firesprinklers 8,969 7,688 1,873 256 0.21% 311.07 0.19 62 Heat Detectors 17,210 4,589 1,118 574 0.46% 696.39 0.42 63 Intercom Entry System 10,927 5,099 1,242 728 0.58% 884.30 0.53 64 Manual Pull Station 6,767 4,906 1,195 169 0.14% 205.36 0.12 65 Pumps/Valves/Switches/Guages 38,245 32,782 7,987 1,093 0.87% 1,326.45 0.80 Plumbing 66 Circulating Pump - Replacement Allowance 1,202 1,202 293 1,202 0.96% 1,459.10 0.87 67 Hot Water Heater & Damper - Replacement Allowance 7,426 7,426 1,809 7,426 5.94% 9,014.71 5.40 68 Water Heater, 40 gal 1,093 937 228 78 0.06% 94.75 0.06 Totals $2,315,703 $1,306,009 $318,200 $124,922 100.00% $151,642 $90.91 Page 13 of 23 7/15/2014

Future Capital Needs Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Annual Expense Totals: 16,152 23,485 29,688 31,531 419,356 680,404 18,056 143,956 87,923 12,602 Steel Fences & Railing 1 Chain Link, 6' w/top Rail 0 0 0 0 0 0 0 0 0 0 2 Chain Link, 6' w/privacy Slats 0 0 0 0 0 0 0 0 0 0 3 Steel Fence, Pool Area 0 0 0 0 0 0 0 0 0 0 4 Steel Gates, Pool Area 0 0 0 0 0 0 0 0 0 0 5 Steel Fence, SE and NW Corners 0 0 0 0 0 0 0 0 0 0 6 Steel Railings, Pathways 0 0 0 0 0 0 0 0 0 0 Landscape 8 Irrigation Controllers 0 0 4,371 0 0 0 0 5,067 0 0 9 Landscaping Enhancements 5,464 0 5,796 0 6,149 0 6,524 0 6,921 0 10 Backflow Preventer 0 0 0 2,388 0 0 0 0 0 0 11 Tree Trimming 0 0 0 0 14,926 0 0 0 16,799 0 Asphalt and Concrete 12 Patching, Major - Replacement Allowance 0 0 0 0 0 0 0 0 0 0 13 Patching, Minor - Replacement Allowance 0 4,761 0 0 0 0 0 5,685 0 0 14 Asphalt Pavement, Seal Coat, Paint Curbs 0 8,776 0 0 0 0 0 10,479 0 0 15 Pathways, Pavers, Bricks, Walls - Repair A 0 0 0 0 0 6,334 0 0 0 0 Pool & Spa 16 Concrete Deck 0 0 0 0 0 0 0 0 0 0 17 Mastic 0 0 0 1,282 0 0 0 0 1,487 0 18 Pool Plaster 0 0 0 0 0 0 0 0 0 0 19 Tile & Coping 0 0 0 0 0 0 0 0 0 0 20 Pool Filter, Pump (1) Replacement Allowan 1,030 0 0 0 0 1,194 0 0 0 0 21 Shower Tower, pool area 0 0 0 0 0 0 0 0 0 0 22 Drinking Fountain 0 0 0 0 0 0 0 0 0 0 23 Chaises, Tables, Chairs 0 0 0 0 0 0 0 0 0 0 24 Trash Cans 0 0 0 0 0 0 0 0 0 0 25 Pool Solar Heater 0 0 0 0 0 0 0 0 0 0 Appurtenant Structure 26 Metal Dumpster Area Gates 0 0 0 0 0 0 0 0 0 0 27 Mail Kiosks 0 0 0 0 0 0 0 0 0 0 28 Dumpster Arbor, Bldg 1904 0 0 0 0 0 0 0 0 0 0 29 Trellis, Pool Area - Repair Allowance 0 0 0 0 0 0 0 0 0 0 Page 14 of 23 7/15/2014

Future Capital Needs Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Miscellaneous 30 Stairwell Landing Recoat 0 0 0 0 0 0 0 101,439 0 0 31 Stairwell Landings and treads- Replacemen 0 0 0 0 0 0 0 0 20,764 0 32 Interior Building Repair Fund 0 0 0 11,593 0 0 0 0 13,439 0 33 Mailboxes, Economy, 12-Unit 0 0 0 0 0 0 0 0 0 0 34 Benches, Garden Quad 0 0 0 0 0 0 0 0 0 0 Exterior Doors 35 Balcony Closet Doors - Replacement Allow 0 0 0 0 6,149 0 0 0 0 0 36 Crawl Space Doors 0 0 0 0 0 0 0 0 0 0 37 Entry Doors, Pool House 0 0 0 0 0 1,662 0 0 0 0 38 Water Heater Fireproof Doors 0 0 0 0 0 0 0 0 0 0 39 Utility Closet Doors 0 0 0 5,714 0 0 0 0 0 0 Exterior Siding, Trim & Floorboards 40 Stucco Siding & Steel Fences, Paint 0 0 0 0 122,987 0 0 0 0 0 41 Exterior Wood Trim, Paint 0 0 0 0 122,987 0 0 0 0 0 42 Wood Trim &/or Stucco - Repair Allowance 0 0 0 0 86,091 0 0 0 0 0 43 Wood Floorboards, Balconies & Landings, 0 0 0 0 49,195 0 0 0 0 0 Roofing 44 Downspouts 0 0 0 0 0 0 0 0 0 0 45 Gutters 0 0 0 0 0 55,028 0 0 0 0 46 Tile Roof South-Facing, Replace 30% 0 0 0 0 0 0 0 0 0 0 47 Tile Roof East & West Facing, Replace 40% 0 0 0 0 0 526,976 0 0 0 0 48 Tile Roof North Facing, Replace 30% 0 0 0 0 0 0 0 0 0 0 49 Tile Roofing, Inspection & Repairs 0 0 8,115 0 0 0 0 9,407 0 0 50 Chimney Caps and Spark Arrestors 0 0 0 0 0 0 0 0 0 0 Exterior Lighting 51 Pathway Bollards, Allowance 1,030 1,061 1,093 1,126 1,159 1,194 1,230 1,267 1,305 1,344 52 Lights, Garages 0 0 0 0 0 0 0 0 0 0 53 Lights, Stairwells 0 0 0 0 0 0 0 0 0 0 54 Lights, Townhouse Landings 0 0 0 0 0 5,964 0 0 0 0 55 15' Pole Lights 0 0 0 0 0 17,314 0 0 0 0 56 Victorian Light, Garden Quad 0 0 0 0 0 0 0 0 0 0 57 Lights, Balconies 0 0 0 0 0 0 0 0 0 0 Page 15 of 23 7/15/2014

Future Capital Needs Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Fire Alarm / Security System 58 Fire Alarm Control Panels 0 0 0 0 0 0 0 0 0 0 59 Fire Alarm Bells 0 0 0 0 0 0 0 0 0 0 60 Fire Extinguisher Cabinets 0 0 0 0 0 0 0 0 2,436 0 61 Firesprinklers 0 0 0 0 0 10,398 0 0 0 0 62 Heat Detectors 0 0 0 0 0 0 0 0 0 0 63 Intercom Entry System 0 0 0 0 0 0 0 0 13,842 0 64 Manual Pull Station 0 0 0 0 0 0 0 0 0 0 65 Pumps/Valves/Switches/Guages 0 0 0 0 0 44,337 0 0 0 0 Plumbing 66 Circulating Pump - Replacement Allowance 1,202 1,238 1,275 1,313 1,353 1,393 1,435 1,478 1,523 1,568 67 Hot Water Heater & Damper - Replacemen 7,426 7,649 7,879 8,115 8,358 8,609 8,867 9,133 9,407 9,690 68 Water Heater, 40 gal 0 0 1,159 0 0 0 0 0 0 0 Page 16 of 23 7/15/2014

Future Capital Needs Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 Annual Expense Totals: 413,391 49,510 610,351 152,867 56,679 95,628 632,471 35,416 51,384 39,982 Steel Fences & Railing 1 Chain Link, 6' w/top Rail 0 0 0 0 0 0 0 0 0 0 2 Chain Link, 6' w/privacy Slats 0 0 0 0 0 10,936 0 0 0 0 3 Steel Fence, Pool Area 0 0 0 0 0 0 24,900 0 0 0 4 Steel Gates, Pool Area 0 0 0 0 0 0 2,948 0 0 0 5 Steel Fence, SE and NW Corners 0 26,773 0 0 0 0 0 0 0 0 6 Steel Railings, Pathways 0 0 0 0 0 0 0 0 0 0 Landscape 8 Irrigation Controllers 0 0 5,874 0 0 0 0 6,810 0 0 9 Landscaping Enhancements 7,343 0 7,790 0 8,264 0 8,768 0 9,301 0 10 Backflow Preventer 0 0 0 0 0 0 0 0 0 0 11 Tree Trimming 0 0 18,907 0 0 0 21,280 0 0 0 Asphalt and Concrete 12 Patching, Major - Replacement Allowance 0 0 0 66,162 0 0 0 0 0 0 13 Patching, Minor - Replacement Allowance 0 0 0 6,788 0 0 0 0 0 8,105 14 Asphalt Pavement, Seal Coat, Paint Curbs 0 0 0 12,513 0 0 0 0 0 14,941 15 Pathways, Pavers, Bricks, Walls - Repair A 7,343 0 0 0 0 8,512 0 0 0 0 Pool & Spa 16 Concrete Deck 0 0 0 0 0 0 0 0 0 0 17 Mastic 0 0 0 1,723 0 0 0 0 1,998 0 18 Pool Plaster 0 0 0 0 13,971 0 0 0 0 0 19 Tile & Coping 0 0 0 0 0 0 0 0 0 0 20 Pool Filter, Pump (1) Replacement Allowan 1,384 0 0 0 0 1,605 0 0 0 0 21 Shower Tower, pool area 0 0 0 0 0 0 0 0 5,581 0 22 Drinking Fountain 1,891 0 0 0 0 0 0 0 0 0 23 Chaises, Tables, Chairs 0 0 0 0 19,834 0 0 0 0 0 24 Trash Cans 2,596 0 0 0 0 0 0 0 0 0 25 Pool Solar Heater 0 0 0 0 0 0 0 0 0 0 Appurtenant Structure 26 Metal Dumpster Area Gates 0 0 0 0 0 0 0 0 0 0 27 Mail Kiosks 0 0 31,159 0 0 0 0 0 0 0 28 Dumpster Arbor, Bldg 1904 0 0 0 0 0 0 3,507 0 0 0 29 Trellis, Pool Area - Repair Allowance 0 0 0 0 0 0 0 0 0 0 Page 17 of 23 7/15/2014

Future Capital Needs Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 Miscellaneous 30 Stairwell Landing Recoat 0 0 0 0 0 0 0 0 0 0 31 Stairwell Landings and treads- Replacemen 0 0 0 0 0 0 0 0 0 0 32 Interior Building Repair Fund 0 0 0 15,580 0 0 0 0 18,061 0 33 Mailboxes, Economy, 12-Unit 23,538 0 0 0 0 0 0 0 0 0 34 Benches, Garden Quad 3,925 0 0 0 0 0 0 0 0 0 Exterior Doors 35 Balcony Closet Doors - Replacement Allow 7,343 0 0 0 0 0 8,768 0 0 0 36 Crawl Space Doors 0 0 0 0 0 0 0 0 0 0 37 Entry Doors, Pool House 0 0 0 0 0 0 0 0 0 0 38 Water Heater Fireproof Doors 0 0 0 0 0 0 0 0 0 0 39 Utility Closet Doors 0 0 0 0 0 0 0 0 0 0 Exterior Siding, Trim & Floorboards 40 Stucco Siding & Steel Fences, Paint 0 0 0 0 0 0 175,351 0 0 0 41 Exterior Wood Trim, Paint 146,853 0 0 0 0 0 175,351 0 0 0 42 Wood Trim &/or Stucco - Repair Allowance 102,797 0 0 0 0 0 122,745 0 0 0 43 Wood Floorboards, Balconies & Landings, 58,741 0 0 0 0 0 70,140 0 0 0 Roofing 44 Downspouts 0 0 35,858 0 0 0 0 0 0 0 45 Gutters 0 0 0 0 0 0 0 0 0 0 46 Tile Roof South-Facing, Replace 30% 0 0 0 0 0 0 0 0 0 0 47 Tile Roof East & West Facing, Replace 40% 0 0 0 0 0 0 0 0 0 0 48 Tile Roof North Facing, Replace 30% 0 0 486,086 0 0 0 0 0 0 0 49 Tile Roofing, Inspection & Repairs 0 0 10,906 0 0 0 0 12,643 0 0 50 Chimney Caps and Spark Arrestors 0 0 0 0 0 0 0 0 0 0 Exterior Lighting 51 Pathway Bollards, Allowance 1,384 1,426 1,469 1,513 1,558 1,605 1,653 1,702 1,754 1,806 52 Lights, Garages 0 0 0 0 0 23,392 0 0 0 0 53 Lights, Stairwells 0 0 0 0 0 36,136 0 0 0 0 54 Lights, Townhouse Landings 0 0 0 0 0 0 0 0 0 0 55 15' Pole Lights 0 0 0 0 0 0 0 0 0 0 56 Victorian Light, Garden Quad 0 0 0 0 0 0 1,462 0 0 0 57 Lights, Balconies 23,440 0 0 0 0 0 0 0 0 0 Page 18 of 23 7/15/2014

Future Capital Needs Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 Fire Alarm / Security System 58 Fire Alarm Control Panels 0 0 0 35,918 0 0 0 0 0 0 59 Fire Alarm Bells 13,217 0 0 0 0 0 0 0 0 0 60 Fire Extinguisher Cabinets 0 0 0 0 0 0 0 0 0 0 61 Firesprinklers 0 0 0 0 0 0 0 0 0 0 62 Heat Detectors 0 0 0 0 0 0 0 0 0 0 63 Intercom Entry System 0 0 0 0 0 0 0 0 0 0 64 Manual Pull Station 0 9,367 0 0 0 0 0 0 0 0 65 Pumps/Valves/Switches/Guages 0 0 0 0 0 0 0 0 0 0 Plumbing 66 Circulating Pump - Replacement Allowance 1,615 1,664 1,714 1,765 1,818 1,873 1,929 1,987 2,046 2,108 67 Hot Water Heater & Damper - Replacemen 9,980 10,280 10,588 10,906 11,233 11,570 11,917 12,275 12,643 13,022 68 Water Heater, 40 gal 0 0 0 0 0 0 1,754 0 0 0 Page 19 of 23 7/15/2014

Future Capital Needs Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 2040/41 2041/42 2042/43 2043/44 Annual Expense Totals: 142,922 109,054 534,665 116,545 57,697 91,302 32,612 47,596 938,419 22,760 Steel Fences & Railing 1 Chain Link, 6' w/top Rail 0 0 0 0 0 29,965 0 0 0 0 2 Chain Link, 6' w/privacy Slats 0 0 0 0 0 0 0 0 0 0 3 Steel Fence, Pool Area 0 0 0 0 0 0 0 0 0 0 4 Steel Gates, Pool Area 0 0 0 0 0 0 0 0 0 0 5 Steel Fence, SE and NW Corners 0 0 0 0 0 0 0 0 0 0 6 Steel Railings, Pathways 0 27,544 0 0 0 0 0 0 0 0 Landscape 8 Irrigation Controllers 0 0 7,894 0 0 0 0 9,152 0 0 9 Landscaping Enhancements 9,868 0 10,469 0 11,106 0 11,783 0 12,500 0 10 Backflow Preventer 0 0 0 0 0 0 0 0 5,000 0 11 Tree Trimming 23,951 0 0 0 26,957 0 0 0 30,341 0 Asphalt and Concrete 12 Patching, Major - Replacement Allowance 0 0 0 0 0 0 0 0 0 0 13 Patching, Minor - Replacement Allowance 0 0 0 0 0 9,678 0 0 0 0 14 Asphalt Pavement, Seal Coat, Paint Curbs 0 0 0 0 0 17,840 0 0 0 0 15 Pathways, Pavers, Bricks, Walls - Repair A 9,868 0 0 0 0 11,440 0 0 0 0 Pool & Spa 16 Concrete Deck 0 63,542 0 0 0 0 0 0 0 0 17 Mastic 0 0 0 2,316 0 0 0 0 2,685 0 18 Pool Plaster 0 0 0 0 0 0 0 0 0 0 19 Tile & Coping 0 0 0 10,295 0 0 0 0 0 0 20 Pool Filter, Pump (1) Replacement Allowan 1,860 0 0 0 0 2,157 0 0 0 0 21 Shower Tower, pool area 0 0 0 0 0 0 0 0 0 0 22 Drinking Fountain 0 0 0 0 0 0 0 0 0 0 23 Chaises, Tables, Chairs 0 0 0 0 0 0 0 0 0 0 24 Trash Cans 0 0 0 0 0 0 0 0 0 0 25 Pool Solar Heater 0 0 0 0 0 0 0 0 16,496 0 Appurtenant Structure 26 Metal Dumpster Area Gates 0 0 0 21,267 0 0 0 0 0 0 27 Mail Kiosks 0 0 0 0 0 0 0 0 0 0 28 Dumpster Arbor, Bldg 1904 0 0 0 0 0 0 0 0 0 0 29 Trellis, Pool Area - Repair Allowance 0 0 0 10,783 0 0 0 0 0 0 Page 20 of 23 7/15/2014

Future Capital Needs Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 2040/41 2041/42 2042/43 2043/44 Miscellaneous 30 Stairwell Landing Recoat 0 0 0 0 0 0 0 0 0 0 31 Stairwell Landings and treads- Replacemen 0 0 0 0 0 0 0 0 37,501 0 32 Interior Building Repair Fund 0 0 0 20,938 0 0 0 0 24,273 0 33 Mailboxes, Economy, 12-Unit 0 0 0 0 0 0 0 0 0 0 34 Benches, Garden Quad 0 0 0 0 0 0 0 0 0 0 Exterior Doors 35 Balcony Closet Doors - Replacement Allow 0 0 10,469 0 0 0 0 0 12,500 0 36 Crawl Space Doors 0 0 0 0 0 0 0 0 0 0 37 Entry Doors, Pool House 0 0 0 0 0 0 0 0 0 0 38 Water Heater Fireproof Doors 0 0 0 0 0 0 0 0 0 0 39 Utility Closet Doors 0 0 0 10,320 0 0 0 0 0 0 Exterior Siding, Trim & Floorboards 40 Stucco Siding & Steel Fences, Paint 0 0 0 0 0 0 0 0 250,008 0 41 Exterior Wood Trim, Paint 0 0 209,378 0 0 0 0 0 250,008 0 42 Wood Trim &/or Stucco - Repair Allowance 0 0 146,564 0 0 0 0 0 175,006 0 43 Wood Floorboards, Balconies & Landings, 0 0 83,751 0 0 0 0 0 100,003 0 Roofing 44 Downspouts 0 0 0 0 0 0 0 0 0 0 45 Gutters 0 0 0 0 0 0 0 0 0 0 46 Tile Roof South-Facing, Replace 30% 0 0 0 0 0 0 0 0 0 0 47 Tile Roof East & West Facing, Replace 40% 0 0 0 0 0 0 0 0 0 0 48 Tile Roof North Facing, Replace 30% 0 0 0 0 0 0 0 0 0 0 49 Tile Roofing, Inspection & Repairs 0 0 14,656 0 0 0 0 16,991 0 0 50 Chimney Caps and Spark Arrestors 79,930 0 0 0 0 0 0 0 0 0 Exterior Lighting 51 Pathway Bollards, Allowance 1,860 1,916 1,974 2,033 2,094 2,157 2,221 2,288 2,357 2,427 52 Lights, Garages 0 0 0 0 0 0 0 0 0 0 53 Lights, Stairwells 0 0 0 0 0 0 0 0 0 0 54 Lights, Townhouse Landings 0 0 0 0 0 0 0 0 0 0 55 15' Pole Lights 0 0 0 0 0 0 0 0 0 0 56 Victorian Light, Garden Quad 0 0 0 0 0 0 0 0 0 0 57 Lights, Balconies 0 0 0 0 0 0 0 0 0 0 Page 21 of 23 7/15/2014

Future Capital Needs Report Miramar Plaza Homeowners' Association Report Date: 7/15/2014 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 2040/41 2041/42 2042/43 2043/44 Fire Alarm / Security System 58 Fire Alarm Control Panels 0 0 0 0 0 0 0 0 0 0 59 Fire Alarm Bells 0 0 0 0 0 0 0 0 0 0 60 Fire Extinguisher Cabinets 0 0 0 0 0 0 0 0 0 0 61 Firesprinklers 0 0 0 0 0 0 0 0 0 0 62 Heat Detectors 0 0 32,977 0 0 0 0 0 0 0 63 Intercom Entry System 0 0 0 21,566 0 0 0 0 0 0 64 Manual Pull Station 0 0 0 0 0 0 0 0 0 0 65 Pumps/Valves/Switches/Guages 0 0 0 0 0 0 0 0 0 0 Plumbing 66 Circulating Pump - Replacement Allowance 2,171 2,236 2,303 2,372 2,443 2,517 2,592 2,670 2,750 2,833 67 Hot Water Heater & Damper - Replacemen 13,413 13,815 14,230 14,656 15,096 15,549 16,015 16,496 16,991 17,501 68 Water Heater, 40 gal 0 0 0 0 0 0 0 0 0 0 Page 22 of 23 7/15/2014

Assessment and Reserve Funding Disclosure Summary Miramar Plaza Homeowners' Association Report Date: 7/15/2014 Assessment and Reserve Funding Disclosure Summary For the Fiscal Year Ending September 30, 2015 (1) The current assessment per ownership interest is per month. Note: If assessments vary by the size or type of ownership interest, the assessment applicable to this ownership interest may be found on page of the attached summary. (2) Additional regular or special assessments that have already been scheduled to be imposed or charged, regardless of the purpose, if they have been approved by the board and/or members: Date assessment will be due: Amount per ownership interest month. Note: If assessments vary by the size or type of ownership interest, the assessment applicable to this ownership interest may be found on page of the attached report. (4) If the answer to (3) is no, what additional assessments or other contributions to reserves would be necessary to ensure that sufficient reserve funds will be available each year during the next 30 years that have not yet been approved by the board or the members: Yes Purpose of the assessment: (3) Based upon the most recent reserve study and other information available to the board of directors, will currently projected reserve account balances be sufficient at the end of each year to meet the association's obligation for repair and/or replacement of major components during the next 30 years. (5) All major components are included in the reserve study and are included in its calculations. (6) Based on the method of calculation in paragraph (4) of subdivision (b) of Section 5570, the estimated amount required in the reserve fund at the end of the current fiscal year is $1,306,009.06, based in whole or in part on the last reserve supdate prepared by SMA Reserves as of July 15, 2014. The projected reserve fund cash balance at the end of the current fiscal year is $318,200.00, resulting in reserves being 24 percent funded at this date. (7) Based on the method of calculation in paragraph (4) of subdivision (b) of Section 5570 of the Civil Code, the estimated amount required in the reserve fund at the end of each of the next five budget years is (below), and the projected reserve fund cash balance in each of those years, taking into account only assessments already approved and other known revenues, is (below), leaving the reserve at (below) percent funding. If the reserve fundingproved by the association is implemented, the projected reserve fund cash balance in each of those years will be (below), leaving the reserve at (below) percent funding. Fully Funded Projected Reserve FY Ending Balance Fund Balance 2014/15 1,457,222 459,731 2015/16 1,609,279 602,223 2016/17 1,763,484 747,056 2017/18 1,924,513 898,940 2018/19 1,695,131 664,537 Percent Funded 32% 37% 42% 47% 39% Approximate date assessment will be due: Amount per ownership interest Note: The financial representations set forth in this summary are based on the best estimates of the preparer at that time. The estimates are subject to change. At the time this summary was prepared, the assumed long-term before-tax interest rate earned on reserve funds was 2 percent per year, and the assumed long-term inflation rate to be applied to major component repair and replacement costs was 3 percent per year. Page 23 of 23 7/15/2014