Reserve Analysis Report

Similar documents
Reserve Analysis Report

Reserve Analysis Report

Reserve Analysis Report

Level 3 Reserve Study without a Site a Site Visit Visit

Full Reserve Study. Fox Creek Farm HOA. Longmont. Report #: For Period Beginning: January 1, 2012 Expires: December 31, 2012

VILLAGE AT LAKE CHELAN

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Full Reserve Study. The Ridge at Rock Creek Marysville, WA 11/13/2012

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111

Estates at River Ranch HOA

Update With Site-Visit Reserve Study

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Grand Firs HOA. Graham, WA

PROFESSIONAL RESERVE STUDY

Do-It-Yourself Reserve Study

Sunland Division 7 Condo

PROFESSIONAL RESERVE STUDY

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08

Bridgewood Manor HOA

Full Reserve Study. Twenty Four Neighborhood TOA. Carbondale, CO

Reserve Analysis Report

Reserve Analysis Report

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017

PROFESSIONAL RESERVE STUDY

Sun Peak Master Association

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Country Club Townhomes

RESERVE STUDY SPECIALISTS

Full Reserve Study. Kings Row HOA. Carbondale, CO. Report #: For Period Beginning: January 1, 2015 Expires: December 31, 2015

- RS. D e sig n atio n

FIR RIDGE II CONDOMINIUM

Update No Site-Visit Reserve Study

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Steven's Cove HOA.

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION")

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

Sample Community Association

RESERVE STUDY ANNUAL REPORT

2013 Reserve Study. Sea Havens Homeowners Association, Inc Florida Shores Boulevard Daytona Beach Shores, Florida Report No: 2713 Version 2

Kayscreek Estates HOA

Do-It-Yourself Reserve Study. Crown Ridge Estates HOA

Reserve Study Transmittal Letter

UPDATE - With Site Visit

CAPE GEORGE COLONY CLUB MARINA RESERVES

Reserve Analysis Report

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

PROFESSIONAL RESERVE STUDY

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

MILL CREEK CONDOMINIUMS RESERVE STUDY

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

Update With Site-Visit Reserve Study

Cottonwoods at Vine. Reserve Study. October 2012

TIMBERLAKE COMMUNITY ASSOCIATION

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

Arizona Nevada Texas Utah New Mexico

Floriston Property HOA

Calusa Point Association

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

Reserve Study Transmittal Letter

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. North Shore Terrace.

CAPITAL RESERVE STUDY

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

Update With Site-Visit Reserve Study

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Full Capital Replacement Plan

Do-It-Yourself Reserve Study Kit

RESERVE STUDY OTHER PROPERTY TYPES. Serving the Nation.

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

Do-It-Yourself Reserve Study. Green Valley Resort Homes

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017

RESERVE STUDY ANNUAL REPORT

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

PROFESSIONAL RESERVE STUDY

Meadows at Two Cedars

to Renovation Financing

Update With Site Visit

Indian Palms Country Club #14 Association Bergman and Cochran Drive Indio, California 92201

CAPITAL RESERVE STUDY

Sample Do-It-Yourself Reserve Study Sample Association Anywhere, USA

Pemberley at Robinsons Grove

LEVEL 3 RESERVE STUDY UPDATE For IRONWOOD AT TUKWILA HOMEOWNERS ASSOCIATION, INC.

PROFESSIONAL RESERVE STUDY

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina

LEVEL 2 RESERVE STUDY UPDATE POINTE WOODWORTH HOMEOWNERS ASSOCIATION

RESERVE STUDY ANNUAL REPORT

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

PROFESSIONAL RESERVE STUDY

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

Do-It-Yourself Reserve Study

RESERVE STUDY PRIVATE CLUBS and RECREATION CENTERS

Ashleigh Commons Condominiums Association, Inc.

Transcription:

Reserve Analysis Report Smoky Ridge 19902 E Red Fox Ln Centennial, CO Level I Study with Site Inspection Fiscal Year End Date: 12/31/2017 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com www.mccafferyreserveconsulting.com

Section Sections of This Report 1 Preface Written description of a reserve study and the figures in the report Includes glossary, preparer qualifications, and calculation description 2-7 Executive Summary Summarizes key findings of the report. Includes development description and lists the projected balance and percent funded. Summarizes the funding plans Includes category breakdown pie chart 2-8 Percent Funded Describes percent funded calculation and funding levels Includes current percent funded chart and 30 year percent funded projection chart 2-9 30 Year Projections Includes 30 year projection charts for annual expenses and reserve balance projections for each of the 3 funding plans 2-10 Category Significance Includes category percentage column charts for fully funded balance and annual depreciation 2-11 Theoretical 30 Year Funding Plan Lists details of each of the 3 funding plans (current, recommended, and threshold) over the next 30 years Charts of the figures in this table are located in the 30 year projections 2-12 Future Percent Funded Includes table and chart of percent funded for various levels of funding over the next 15 years 3 Component Summary & Component Significance Lists all components included in the study in table form Shows Depreciation and Fully Funded Balance Significance including quick glance graph These figures are the basis for all other calculations in the study 4 Annual Expenses by Component Lists all projected expenses for each component over the next 30 years in table form 5 Component Details Lists details of each individual component Includes notes and pictures of selected components if site inspection was conducted

Preface A reserve study is a detailed report that assists common interest developments (CID) in planning for long-term common area repair and replacement expenses. These common areas differ for every development. They can include streets, roofs, recreational facilities and many other items. A reserve study estimates the costs of common area repairs and replacements over a 30 year period. Each component is given a useful life, remaining life, and estimated cost. A reserve study then calculates the funds necessary to cover these expenses by creating funding plans. The Big Picture - What are the significant figures to look at in the report? The Component List What are our reserve components and when will they need maintenance Every reserve study must start with a list of the components. The component summary contains the list of all the components, their useful and remaining lives, and their estimated costs. These numbers are the building blocks for most of the figures in the study. Percent Funded - What is our current financial standing Probably the most important number in a reserve study is percent funded. It s almost like a credit score for an association. It tells them the current strength of their reserve fund. Over 70% = Well Funded Between 30-70% = Fairly Funded Below 30% = Poorly Funded The lower your percent funded the higher the risk of a special assessment. A low percent funded also increases the likelihood of deferred maintenance which can cause declining property values. Funding Plans - How much do we need to save for the future The next important part of the study is the theoretical 30 year funding plans. The study contains 3 funding plans. It projects what the percent funded will be over the next 30 years if the CID follows each of these plans. Current Funding Plan This plan is based on what the association is currently contributing to its reserve fund. This information is supplied by the board or management Recommended Funding Plan This is McCaffery s recommendation, if a CID follows the recommended plan they should end up well funded and near the 100% funded level. 5% Threshold Funding Plan - The threshold funding plan is a 30 year cash flow plan that calculates the minimum amount a CID should contribute so their reserve balance won t fall below 5% funded and cause the need for a special assessment. The percent funded will at some point fall into poorly funded levels but will never drop below 5%. If a CID has a funding plan that is below this threshold plan they should also plan on a future special assessment and/or a deferred maintenance. (Following this plan does carry higher risk of a special assessment if a component fails early or costs more than expected) 1-1

Why Should a Reserve Study be performed? Certain states, such as California, require that reserve studies be completed and updated annually and that the board of directors inform owners of the reserve status with their annual budget. In addition, the board of directors of a common interest development (CID) has a legal and fiduciary duty to maintain the community in a good state of repair. Property Values are directly affected by the level of maintenance and upkeep of the common area components. Reserve studies create a maintenance plan, which keeps a development in good condition, therefore increasing property appreciation and value. The amount of funds in the reserve account also greatly affects property values. Reserve studies inform CID s how much they should have in their reserve account, which eliminates costly special assessments. Over time each member of a CID should contribute their fair share to the reserve account so when expenses arise the required funds are available. Reserve Studies help board members fulfill their fiduciary duty and also help avoid litigation against an association. Where do Component Repair/Replacement Cost Estimates Come From? The most accurate cost source is actual bids from contractors or to look at contracts from when the repair/replacement was last performed. In most cases bids or contracts are not available so unit costs for similar work done in the same local area are used. In addition, it is helpful to talk to local vendors who have knowledge of the work and can help with a cost estimate. A third source is to use construction cost estimators such as RS Means. Many times the entire quantity of a component will not need to be replaced or repaired all at once. An example of this is concrete sidewalks. All sidewalks should never have to be replaced, but some sections may experience cracking. In this case an allowance can be created for their partial replacement. The cost source number for each component is provided in the component summary and details. An explanation of each follows: 1. Local Historical Cost Cost based on bids for similar work done in same area. 2. McCaffery Estimate Estimate or Allowance made by McCaffery Staff Member. 3. Board/Manager Direction Cost estimate provided by board member or property manager. 4. Bid/Contract Bid came from actual bid or contract. 5. Cost Manual Cost came from estimating manual. 6. Previous Study Cost came from previous reserve study. 1-2

Glossary of Terms: Contingency An allowance for miscellaneous components, unpredictable expenses and/or costs that were higher than expected. (5% of total current cost unless directed otherwise) Current Budgeted Reserve Assessment Amount currently being deposited into reserve account. Provided by Property Manager or Board Member. Depreciation This Year Amount that should be saved for component during current year. Provided for each component and summed for all components. If the association is 100% funded this is the amount they should contribute to the reserve fund annually. =(Total Current Cost / Normal Useful Life) Depreciation Percent A components percentage of the total depreciation of all components. =(Component Depreciation/Total Depreciation of all components) Fully Funded Balance The total depreciation over the life of the component. In other words, the amount that should have been saved during the life of the component. Provided for each component and summed for all components =((Useful Life Remaining Life) * Depreciation This Year) Full Funded Balance Percent A component s percentage of the total fully funded balance of all components. =(Component FFB/Total FFB of all Components) Monthly Contribution The amount that should be allocated to each component using the recommended funding plan. =((Component Depreciation/Total Depreciation)*Recommended Monthly Funding) Life Remaining Percent The percentage of life that a component has remaining =(Remaining Live/Useful Life) Normal Useful Life Typical useable life for a component. Percent Funded The percentage of the fully funded balance that the CID has in reserve fund. (Projected Balance/ Fully Funded Balance) Projected Balance Projected balance at fiscal year end with current funding plan. Calculated using current reserve balance, remaining contributions to reserves before year-end, and planned expenses before year-end. Supplied by board or management. Recommended Reserve Contribution Recommended amount that the CID should allocate into reserves to offset future expenses. 1-3

Remaining Life Expected remaining useable life of component. (0 year remaining life means the component will be serviced in the upcoming fiscal year) Replacement Year Year that component is projected to be replaced or repaired. Total Cost Total cost to replace or repair component in today s dollars. =(Quantity x Unit Cost) Total Future Cost - Current cost adjusted to future cost taking into account inflation and replacement year. =(Current Cost * (1+ inflation rate)^(replacement Year-Present Year)) Threshold Reserve Contribution Reserve contribution that should be allocated into reserves to keep reserve balance above a minimum amount during the next 30 years. (Minimum amount is 5% funded unless otherwise noted) Under Funded Amount association is short of fully funded balance; also known as a deficit. =(Fully Funded Balance Projected Balance) Unit Cost Cost per Unit. Unit of Measure Unit used to measure component. (Explanations shown below) SF Square Feet SY Square Yard LF Linear Feet Each Per Single Unit Lump Sum - Total cost for component Allowance Allowance for component repair or replacement Contract Cost obtained from actual contract or bid Useful Life Time in years component is expected to last. What Procedures were used for calculation and establishment of reserves? In this study the fully funded reserve balance for a component at a given time was computed using the component method. Using the component method the fully funded reserve balance equals the current cost of replacement or repair multiplied by the number of years the component has been in service divided by the useful life of the component. For example if the cost of a boiler is $10,000, the useful life is 10 years and the remaining life is 3 years. The recommended reserve balance would be: $10,000 x ((10-3)/10) = $7,000. 1-4

Preparer Qualifications Brian McCaffery, President and founder of McCaffery Reserve Consulting, earned his Bachelor of Science Degree in Architectural Engineering from the University of Colorado in Boulder. His degree program included coursework in Building Exterior, Lighting, Electrical Systems, Heating Ventilating and Air Conditioning, Concrete and Steel Design, Civil Engineering, Structural Engineering, and Estimating. He has worked in the Building Construction/Architectural Engineering industry for 11 years and has been performing reserve studies for the past 9 years. During his professional career, Brian has worked for multiple companies that perform reserve studies. He has performed over 3,000 reserve studies throughout the state of California and the United States. Brian is a certified Reserve Specialist, designated by the Community Associations Institute (CAI). The Reserve Specialist designation is awarded to experienced, qualified reserve specialists, who through years of specialized experience, can help ensure that your community association prepares its reserve budget as accurately as possible. Brian also has a permit to perform reserve studies in the state of Nevada (Reserve study permit #9). McCaffery understands that most homeowners, board members, and property managers can have a difficult time understanding all the numbers in a reserve study. That is why we make it a priority to make our report easy for anyone to understand. The layout of this report is set up with graphs, explanations and figures to make it easy to follow. If you read though the full report you should have a good understanding of the numbers and calculations. We strive to make sure our studies are second to none in the industry. The important figures are summarized in the executive summary and the supporting graphs and figures give a full explanation of how the findings were derived. Further descriptions are provided in the descriptions section. For more useful information on reserve studies please visit: www.mccafferyreserveconsulting.com For a quick video that highlights the main sections please see: http://www.mccafferyreserveconsulting.com/sample-reserve-study Or scan QR code below with a smart phone 1-5

One Page Description of how we come up with the Numbers in this Report The numbers in this report start with the components listed in the component summary. 1. Every component is given a useful life, remaining life, and an estimated cost We will use a boiler as an example. This boiler is expected to last 10 years and has been in use for 7 years. The estimated cost is $10,000. Component Useful Life Remaining Life Cost Boiler 10 3 $10,000 2. The fully funded balance is calculated Fully Funded Balance = (Useful life-remaining Life)/Useful Life * Cost (10-3)/10 * $10,000 = $7,000 The fully funded balance is then summed for all components and this is the total fully funded balance for the development. 3. Fully Funded Balance is then compared to the actual projected year-end balance that the development has saved for reserves This is called the percent funded. For our example let s say the development had $5,000 saved for their boiler. Their percent funded would be: Percent Funded = Projected Year End Reserve Balance/Fully Funded Balance $5,000/$7,000 = 71% 4. Next expenses are projected for each component for the next 30 years using the useful and remaining lives This information is shown in the annual expenses by component section. Inflation is included in these figures. 5. Using the projected expenses for the next 30 years the funding plans are created Funding plans are created so that the development has enough money to offset their projected expenses for the next 30 years. We try to create funding plans that have a uniform contribution over a 30 year period with a slight increase over time for inflation. 1-6

Executive Summary Smoky Ridge This is a Homeowners Association with 516 Homes. The common area components include: fencing, landscape, and mailboxes. A Full Study with an on-site inspection was performed on November 22nd, 2017 Number of Units 516 Year Built 1987 Fiscal Year End December 31, 2017 0% Percent Funded 100% 1.8 Poor Fair Well Reserve Fund Balance December 31, 2017 Fully Funded Reserve Balance $ 580,208 Projected Balance $ 10,501 Under Funded (Deficiency in Reserve Funding) $ 569,707 Deficiency in Reserve Funding Per Unit $ 1,104.08 Percent Funded 1.8% Funding Plans Annually Monthly Per Unit Monthly Depreciation of Components in 2017 $ 52,654 $ 4,388 $ 8.50 Budgeted Reserve Contribution 2017 $ 18,000 $ 1,500 $ 2.91 5% Threshold Reserve Contribution for 2018 $ 111,000 $ 9,250 $ 17.93 Recommended Reserve Contribution for 2018 $ 168,000 $ 14,000 $ 27.13 Funding Plans $180,000 $160,000 $140,000 $168,000 $120,000 $100,000 $80,000 $111,000 $60,000 $40,000 $52,654 $20,000 $- Depreciation of Components in 2017 $18,000 Budgeted Reserve Contribution 2017 5% Threshold Reserve Contribution for 2018 Recommended Reserve Contribution for 2018 www.mccafferyreserveconsulting.com 2-7

Percent Funded Percent Funded is probably the most important number in a reserve study Your current percent funded is: Year End Balance $ 10,501 = 2% Fully Funded Balance $ 580,208 Above 70% = Well Funded Between 30% and 70% = Fairly Funded Below 30% = Poorly Funded The higher your percent funded, the lower the risk of special assessments and deferred maintenance. Current Percent Funded $600,000 $500,000 $400,000 $300,000 $200,000 $100,000 $- Well Funded > 70% Fairly Funded 30% - 70% Poorly Funded < 30% 100% Funded Actual $10,501 If you follow one of the 3 funding plans in this reserve study this is what your percent funded may look like over the next 30 years. Anytime the Current line drops below 0% a special assessment is likely. Annually Monthly Per Unit Monthly Current Reserve Contribution 2017 $ 18,000 $ 1,500 $ 2.91 5% Threshold Reserve Contribution for 2018 $ 111,000 $ 9,250 $ 17.93 Recommended Reserve Contribution for 2018 $ 168,000 $ 14,000 $ 27.13 200% Percent Funded 30 Year Projection Below 30% Poor 30-70% Fair Above 70% Well Current Recommended Threshold 100% 0% -100% -200% -300% -400% www.mccafferyreserveconsulting.com 2-8

30 Year Projections Reserve expenses will vary from year to year. A reserve study predicts these expenses and offsets them by creating a uniform funding plan that increases slightly over time to keep up with inflation. $350,000 Projected Annual Expenses $300,000 $250,000 $200,000 $150,000 $100,000 $50,000 $- The green 100% funded shaded area shows the ideal balance over the next 30 years. It increases over time due to inflation and depreciation of your components. The 100% funded area will drop after years with large expenses. The recommend funding plan will keep you well funded. The threshold plan will approach $0 dollars, following this plan has a higher risk of special assessments or deferred maintenance. $1,500,000 $1,000,000 $500,000 100% Fully Funded Current Recommended Threshold 30 Year Reserve Balance Projection $- $(500,000) $(1,000,000) $(1,500,000) $(2,000,000) $(2,500,000) www.mccafferyreserveconsulting.com 2-9

Category Significance This chart breaks down the total fully funded balance for each category Painting Fully Funded Balance $ 8,099 = 1% Total Fully Funded Balance $ 580,208 Each Categories Percentage of the Fully Funded Balance 60% 59% 50% 40% 30% 28% 20% 10% 1% 7% 5% 0% This chart breaks down the total annual depreciation for each category Painting Annual Depreciation $ 7,924 = 15% Total Annual Depreciation $ 52,654 This chart may differ from the chart above because it does not account for remaining life Depreciation This Year 60% 52% 50% 40% 30% 23% 20% 15% 10% 5% 5% 0% www.mccafferyreserveconsulting.com 2-10

Theoretical 30 Year Funding Plans Before Tax Interest Rate 1.5% Smoky Ridge Annual Inflation Rate 3.0% Above 70% = Well Funded Between 30% and 70% = Fairly Funded Below 30% = Poorly Funded Annual Funding Increase 3.0% (Low Risk of Special Assessment) (Higher Risk of Special Assessment) Year Annual Fully Funded Current Funding Plan Recommended Funding Plan 5% Threshold Funding Plan End Expenses Balance Contribution Balance % Funded Contribution Balance % Funded Contribution Balance % Funded 2017 $ - $ 580,208 $ 18,000 $ 10,501 2% $ - $ 10,501 2% $ - $ 10,501 2% 2018 $ - $ 651,848 $ 18,540 $ 29,199 4% $ 168,000 $ 178,659 27% $ 111,000 $ 121,659 19% 2019 $ 6,953 $ 719,745 $ 19,096 $ 41,780 6% $ 173,040 $ 347,426 48% $ 114,330 $ 230,861 32% 2020 $ 274,776 $ 501,703 $ 19,669 $ (212,700) -42% $ 178,231 $ 256,093 51% $ 117,760 $ 77,308 15% 2021 $ 127,139 $ 438,517 $ 20,259 $ (319,579) -73% $ 183,578 $ 316,373 72% $ 121,293 $ 72,621 17% 2022 $ 178,959 $ 319,168 $ 20,867 $ (477,671) -150% $ 189,085 $ 331,246 104% $ 124,931 $ 19,683 6% 2023 $ 22,459 $ 367,326 $ 21,493 $ (478,637) -130% $ 62,872 $ 376,627 103% $ 128,679 $ 126,199 34% 2024 $ 177,770 $ 250,845 $ 22,138 $ (634,269) -253% $ 64,758 $ 269,265 107% $ 132,540 $ 82,862 33% 2025 $ 12,450 $ 311,606 $ 22,802 $ (623,918) -200% $ 66,700 $ 327,554 105% $ 136,516 $ 208,171 67% 2026 $ 12,668 $ 375,956 $ 23,486 $ (613,099) -163% $ 68,702 $ 388,501 103% $ 140,611 $ 339,237 90% 2027 $ 13,208 $ 443,712 $ 24,190 $ (602,117) -136% $ 70,763 $ 451,883 102% $ 144,830 $ 475,947 107% 2028 $ 39,475 $ 487,217 $ 24,916 $ (616,676) -127% $ 72,885 $ 492,071 101% $ 72,885 $ 516,497 106% 2029 $ - $ 576,905 $ 25,664 $ (591,013) -102% $ 75,072 $ 574,524 100% $ 75,072 $ 599,316 104% 2030 $ 28,691 $ 640,507 $ 26,434 $ (593,270) -93% $ 77,324 $ 631,775 99% $ 77,324 $ 656,939 103% 2031 $ - $ 739,366 $ 27,227 $ (566,043) -77% $ 79,644 $ 720,896 98% $ 79,644 $ 746,437 101% 2032 $ 30,438 $ 810,662 $ 28,043 $ (568,438) -70% $ 82,033 $ 783,304 97% $ 82,033 $ 809,229 100% 2033 $ 45,762 $ 869,984 $ 28,885 $ (585,316) -67% $ 84,494 $ 833,786 96% $ 84,494 $ 860,099 99% 2034 $ 16,047 $ 965,757 $ 29,751 $ (571,612) -59% $ 87,029 $ 917,274 95% $ 87,029 $ 943,982 98% 2035 $ 16,732 $ 1,066,274 $ 30,644 $ (557,700) -52% $ 89,640 $ 1,003,941 94% $ 89,640 $ 1,031,050 97% 2036 $ 17,024 $ 1,172,180 $ 31,563 $ (543,161) -46% $ 92,329 $ 1,094,305 93% $ 92,329 $ 1,121,820 96% 2037 $ 240,271 $ 1,042,591 $ 32,510 $ (750,922) -72% $ 95,099 $ 965,548 93% $ 95,099 $ 993,476 95% 2038 $ 53,051 $ 1,114,446 $ 33,485 $ (770,488) -69% $ 97,952 $ 1,024,931 92% $ 97,952 $ 1,053,279 95% 2039 $ 24,556 $ 1,222,212 $ 34,490 $ (760,554) -62% $ 100,890 $ 1,116,640 91% $ 100,890 $ 1,145,412 94% 2040 $ 304,665 $ 1,033,300 $ 35,525 $ (1,029,695) -100% $ 103,917 $ 932,642 90% $ 103,917 $ 961,845 93% 2041 $ - $ 1,171,334 $ 36,590 $ (993,105) -85% $ 107,035 $ 1,053,666 90% $ 107,035 $ 1,083,308 92% 2042 $ 323,219 $ 967,158 $ 37,688 $ (1,278,636) -132% $ 110,246 $ 856,497 89% $ 110,246 $ 886,584 92% 2043 $ 54,696 $ 1,050,572 $ 38,819 $ (1,294,514) -123% $ 113,553 $ 928,202 88% $ 113,553 $ 958,739 91% 2044 $ 321,072 $ 851,810 $ 39,983 $ (1,575,602) -185% $ 116,960 $ 738,012 87% $ 116,960 $ 769,008 90% 2045 $ 325,359 $ 645,956 $ 41,183 $ (1,859,779) -288% $ 120,469 $ 544,192 84% $ 120,469 $ 575,653 89% 2046 $ 205,913 $ 566,722 $ 42,418 $ (2,023,274) -357% $ 124,083 $ 470,524 83% $ 124,083 $ 502,456 89% 2047 $ 23,856 $ 685,729 $ 43,691 $ (2,003,440) -292% $ 127,805 $ 581,531 85% $ 127,805 $ 613,942 90% Note: All future projections are theoretical. The estimated lives and costs of components will likely change over time depending on factors such as inflation rates and levels of maintenance. Reserve analysis should be performed annually to account for these factors. www.mccafferyreserveconsulting.com 2-11

Future Percent Funded This table and chart shows where your percent funded will be over the next 15 years starting with different levels of funding. Keep in mind all figures assume a 3% annual increase in funding to keep up with inflation. Reserve Above 70% = Well Funded Between 30% and 70% = Fairly Funded Below 30% = Poorly Funded (Low Risk of Special Assessment) (Higher Risk of Special Assessment) Funding Plan Contribution Percent Funded 2018 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 110% Recommended $ 184,800 2% 30% 53% 62% 89% 133% 128% 145% 136% 129% 124% 122% 117% 115% 112% Recommended $ 168,000 2% 27% 48% 51% 72% 104% 103% 107% 105% 103% 102% 101% 100% 99% 98% 90% Recommended $ 151,200 2% 25% 43% 41% 56% 75% 108% 115% 111% 109% 106% 105% 103% 102% 100% 80% Recommended $ 134,400 2% 22% 39% 30% 39% 46% 77% 108% 105% 104% 102% 101% 100% 99% 98% 70% Recommended $ 117,600 2% 20% 34% 20% 23% 17% 46% 54% 87% 109% 107% 106% 104% 102% 101% 60% Recommended $ 100,800 2% 17% 29% 9% 7% -11% 16% 1% 36% 61% 79% 93% 104% 103% 101% 160% 140% 120% 100% 80% 60% 40% 20% 0% -20% 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 $184,800 $168,000 $151,200 $134,400 $117,600 $100,800 Note: All future projections are theoretical. The estimated lives and costs of components will likely change over time depending on factors such as inflation rates and levels of maintenance. Reserve analysis should be performed annually to account for these factors. www.mccafferyreserveconsulting.com 2-12

12/31/2017 Component Summary Smoky Ridge Category Approx. Unit of Useful Remaining Unit Total Cost Component Quantity Measure Life Life Cost Cost Source Painting Wood Fencing Himalaya 2500 LF 5 5 $ 3.70 $ 9,250 3 Wood Fencing Progress/Crestline 2736 LF 5 2 $ 3.70 $ 10,123 3 Wood Fencing Progress/Crestline 2736 LF 5 4 $ 3.70 $ 10,123 3 Wood Fencing Progress/Crestline 2736 LF 5 5 $ 3.70 $ 10,123 3 $ 39,620 Fencing/Rails Wood Fencing Himalaya 2500 LF 20 19 $ 50.76 $ 126,900 3 Wood Fencing Progress/Crestline 2736 LF 20 2 $ 50.76 $ 138,879 3 Wood Fencing Progress/Crestline 2736 LF 20 4 $ 50.76 $ 138,879 3 Wood Fencing Progress/Crestline 2736 LF 20 6 $ 50.76 $ 138,879 3 $ 543,538 Landscaping Irrigation System Upgrade 1 Allowance 25 2 $ 100,000 $ 100,000 1 Landscape Upgrades 1 Allowance 25 3 $ 80,000 $ 80,000 1 Tree Trimming 1 Allowance 2 2 $ 10,000 $ 10,000 1 Tree Trimming Included in Operating Budget 3 $ 190,000 Miscellaneous Cluster Mailboxes Newer 6 Each 24 21 $ 1,350 $ 8,100 1 Cluster Mailboxes 20 Each 24 3 $ 1,350 $ 27,000 1 Cluster Mailboxes 5 Each 24 1 $ 1,350 $ 6,750 1 Parcel Lockers Newer 6 Each 24 21 $ 850 $ 5,100 1 Parcel Lockers 11 Each 24 3 $ 850 $ 9,350 1 Individual Mailboxes Individual Owner Responsibility Entry Monuments 1 Allowance 20 15 $ 10,000 $ 10,000 3 $ 66,300 Contingency 5% 1 TOTALS $ 839,458 Notes: Any other items not listed are included in operating budget. www.mccafferyreserveconsulting.com 3-14

12/31/2017 Category Component Painting Wood Fencing Himalaya Wood Fencing Progress/Crestline Wood Fencing Progress/Crestline Wood Fencing Progress/Crestline Fencing/Rails Wood Fencing Himalaya Wood Fencing Progress/Crestline Wood Fencing Progress/Crestline Wood Fencing Progress/Crestline Landscaping Irrigation System Upgrade Landscape Upgrades Tree Trimming Tree Trimming Miscellaneous Cluster Mailboxes Newer Cluster Mailboxes Cluster Mailboxes Parcel Lockers Newer Parcel Lockers Individual Mailboxes Entry Monuments Contingency 5% Component Significance This table makes it easy to see what components are the most significant Fully Funded Balance Depreciation This Year Monthly $ Amount % Quick Glance Graph $ Amount % Quick Glance Graph Contribution $ - 0.00% $ $ 1,850 3.51% $ 491.89 $ 6,074 1.05% $ $ 2,025 3.85% $ 538.33 $ 2,025 0.35% $ $ 2,025 3.85% $ 538.33 $ - 0.00% $ $ 2,025 3.85% $ 538.33 $ 8,099 1.40% $ 7,924 15.05% $ 2,106.87 $ 6,345 1.09% $ $ 6,345 12.05% $ 1,687.05 $ 124,991 21.54% $ $ 6,944 13.19% $ 1,846.31 $ 111,103 19.15% $ $ 6,944 13.19% $ 1,846.31 $ 97,216 16.76% $ $ 6,944 13.19% $ 1,846.31 $ 339,655 58.54% $ 27,177 51.61% $ 7,225.98 $ 92,000 15.86% $ $ 4,000 7.60% $ 1,063.55 $ 70,400 12.13% $ $ 3,200 6.08% $ 850.84 $ - 0.00% $ $ 5,000 9.50% $ 1,329.43 0.00% $ $ 162,400 27.99% $ 12,200 23.17% $ 3,243.82 $ 1,013 0.17% $ $ 338 0.64% $ 89.74 $ 23,625 4.07% $ $ 1,125 2.14% $ 299.12 $ 6,469 1.11% $ $ 281 0.53% $ 74.78 $ 638 0.11% $ $ 213 0.40% $ 56.50 $ 8,181 1.41% $ $ 390 0.74% $ 103.59 $ 2,500 0.43% $ $ 500 0.95% $ 132.94 $ 42,425 7.31% $ 2,846 5.40% $ 756.67 $ 27,629 4.76% $ $ 2,507 4.76% $ 666.67 $ 580,208 100.00% 100% $ 52,654 100% 100% $ 14,000 www.mccafferyreserveconsulting.com 3-15

Painting Annual Expenses by Component 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Wood Fencing Himalaya $ - $ - $ - $ - $ - $ 10,723 $ - $ - $ - $ - Wood Fencing Progress/Crestline $ - $ - $ 10,740 $ - $ - $ - $ - $ 12,450 $ - $ - Wood Fencing Progress/Crestline $ - $ - $ - $ - $ 11,394 $ - $ - $ - $ - $ 13,208 Wood Fencing Progress/Crestline $ - $ - $ - $ - $ - $ 11,736 $ - $ - $ - $ - Fencing/Rails Wood Fencing Himalaya $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Wood Fencing Progress/Crestline $ - $ - $ 147,337 $ - $ - $ - $ - $ - $ - $ - Wood Fencing Progress/Crestline $ - $ - $ - $ - $ 156,310 $ - $ - $ - $ - $ - Wood Fencing Progress/Crestline $ - $ - $ - $ - $ - $ - $ 165,829 $ - $ - $ - Landscaping Irrigation System Upgrade $ - $ - $ 106,090 $ - $ - $ - $ - $ - $ - $ - Landscape Upgrades $ - $ - $ - $ 87,418 $ - $ - $ - $ - $ - $ - Tree Trimming $ - $ - $ 10,609 $ - $ 11,255 $ - $ 11,941 $ - $ 12,668 $ - Tree Trimming $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Miscellaneous Cluster Mailboxes Newer $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Cluster Mailboxes $ - $ - $ - $ 29,504 $ - $ - $ - $ - $ - $ - Cluster Mailboxes $ - $ 6,953 $ - $ - $ - $ - $ - $ - $ - $ - Parcel Lockers Newer $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Parcel Lockers $ - $ - $ - $ 10,217 $ - $ - $ - $ - $ - $ - Individual Mailboxes $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Entry Monuments $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Totals $ - $ - $ 6,953 $ 274,776 $ 127,139 $ 178,959 $ 22,459 $ 177,770 $ 12,450 $ 12,668 $ 13,208 www.mccafferyreserveconsulting.com 4-16

Painting Wood Fencing Himalaya Annual Expenses by Component 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 $ 12,431 $ - $ - $ - $ - $ 14,411 $ - $ - $ - $ - $ 16,707 Wood Fencing Progress/Cre$ - $ - $ 14,433 $ - $ - $ - $ - $ 16,732 $ - $ - $ - Wood Fencing Progress/Cre$ - $ - $ - $ - $ 15,312 $ - $ - $ - $ - $ 17,751 $ - Wood Fencing Progress/Cre$ 13,605 $ - $ - $ - $ - $ 15,772 $ - $ - $ - $ - $ 18,284 Fencing/Rails Wood Fencing Himalaya $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 222,520 $ - Wood Fencing Progress/Cre$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Wood Fencing Progress/Cre$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Wood Fencing Progress/Cre$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Landscaping Irrigation System Upgrade Landscape Upgrades Tree Trimming Tree Trimming $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 13,439 $ - $ 14,258 $ - $ 15,126 $ - $ 16,047 $ - $ 17,024 $ - $ 18,061 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Miscellaneous Cluster Mailboxes Newer Cluster Mailboxes Cluster Mailboxes Parcel Lockers Newer Parcel Lockers Individual Mailboxes Entry Monuments $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 15,580 $ - $ - $ - $ - $ - Totals $ 39,475 $ - $ 28,691 $ - $ 30,438 $ 45,762 $ 16,047 $ 16,732 $ 17,024 $ 240,271 $ 53,051 www.mccafferyreserveconsulting.com 4-17

Painting Wood Fencing Himalaya Annual Expenses by Component 2039 2040 2041 2042 2043 2044 2045 2046 2047 $ - $ - $ - $ - $ 19,367 $ - $ - $ - $ - Wood Fencing Progress/Cre$ - $ 19,397 $ - $ - $ - $ - $ 22,487 $ - $ - Wood Fencing Progress/Cre$ - $ - $ - $ 20,578 $ - $ - $ - $ - $ 23,856 Wood Fencing Progress/Cre$ - $ - $ - $ - $ 21,196 $ - $ - $ - $ - Fencing/Rails Wood Fencing Himalaya $ - $ - $ - $ - $ - $ - $ - $ - $ - Wood Fencing Progress/Cre$ - $ 266,107 $ - $ - $ - $ - $ - $ - $ - Wood Fencing Progress/Cre$ - $ - $ - $ 282,313 $ - $ - $ - $ - $ - Wood Fencing Progress/Cre$ - $ - $ - $ - $ - $ 299,506 $ - $ - $ - Landscaping Irrigation System Upgrade Landscape Upgrades Tree Trimming Tree Trimming $ - $ - $ - $ - $ - $ - $ 222,129 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 183,034 $ - $ - $ 19,161 $ - $ 20,328 $ - $ 21,566 $ - $ 22,879 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Miscellaneous Cluster Mailboxes Newer Cluster Mailboxes Cluster Mailboxes Parcel Lockers Newer Parcel Lockers Individual Mailboxes Entry Monuments $ 15,068 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 59,975 $ - $ - $ - $ - $ - $ - $ 14,133 $ - $ - $ - $ - $ 9,488 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 20,769 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Totals $ 24,556 $ 304,665 $ - $ 323,219 $ 54,696 $ 321,072 $ 325,359 $ 205,913 $ 23,856 www.mccafferyreserveconsulting.com 4-18

Component Details Painting Wood Fencing Himalaya Approximate Component Quantity - 2500 Estimated Current Unit Cost $ 3.70 Unit of Measure - LF Estimated Total Current Cost $ 9,250 Normal Useful Life (Years) - 5 Estimated Total Future Cost $ 10,723 Estimated Remaining Useful Life (Years) - 5 Fully Funded Balance $ - Estimated Replacement Year - 2023 Depreciation This Year $ 1,850 Cost Source - 3 Monthly Contribution $ 491.89 Depreciation Percent - 3.51% Fully Funded Balance Percent 0.00% Life Remainging Percent - 100% Painting Wood Fencing Progress/Crestline Approximate Component Quantity - 2736 Estimated Current Unit Cost $ 3.70 Unit of Measure - LF Estimated Total Current Cost $ 10,123 Normal Useful Life (Years) - 5 Estimated Total Future Cost $ 10,740 Estimated Remaining Useful Life (Years) - 2 Fully Funded Balance $ 6,074 Estimated Replacement Year - 2020 Depreciation This Year $ 2,025 Cost Source - 3 Monthly Contribution $ 538.33 Depreciation Percent - 3.85% Fully Funded Balance Percent 1.05% Life Remainging Percent - 40% 93 Painting Wood Fencing Progress/Crestline Approximate Component Quantity - 2736 Estimated Current Unit Cost $ 3.70 Unit of Measure - LF Estimated Total Current Cost $ 10,123 Normal Useful Life (Years) - 5 Estimated Total Future Cost $ 11,394 Estimated Remaining Useful Life (Years) - 4 Fully Funded Balance $ 2,025 Estimated Replacement Year - 2022 Depreciation This Year $ 2,025 Cost Source - 3 Monthly Contribution $ 538.33 Depreciation Percent - 3.85% Fully Funded Balance Percent 0.35% Life Remainging Percent - 80% www.mccafferyreserveconsulting.com 5-19

Painting Wood Fencing Progress/Crestline Approximate Component Quantity - 2736 Estimated Current Unit Cost $ 3.70 Unit of Measure - LF Estimated Total Current Cost $ 10,123 Normal Useful Life (Years) - 5 Estimated Total Future Cost $ 11,736 Estimated Remaining Useful Life (Years) - 5 Fully Funded Balance $ - Estimated Replacement Year - 2023 Depreciation This Year $ 2,025 Cost Source - 3 Monthly Contribution $ 538.33 Depreciation Percent - 3.85% Fully Funded Balance Percent 0.00% Life Remainging Percent - 100% Fencing/Rails Wood Fencing Himalaya Approximate Component Quantity - 2500 Estimated Current Unit Cost $ 50.76 Unit of Measure - LF Estimated Total Current Cost $ 126,900 Normal Useful Life (Years) - 20 Estimated Total Future Cost $ 222,520 Estimated Remaining Useful Life (Years) - 19 Fully Funded Balance $ 6,345 Estimated Replacement Year - 2037 Depreciation This Year $ 6,345 Cost Source - 3 Monthly Contribution $ 1,687.05 Depreciation Percent - 12.05% Fully Funded Balance Percent 1.09% Life Remainging Percent - 95% Fencing/Rails Wood Fencing Progress/Crestline Approximate Component Quantity - 2736 Estimated Current Unit Cost $ 50.76 Unit of Measure - LF Estimated Total Current Cost $ 138,879 Normal Useful Life (Years) - 20 Estimated Total Future Cost $ 147,337 Estimated Remaining Useful Life (Years) - 2 Fully Funded Balance $ 124,991 Estimated Replacement Year - 2020 Depreciation This Year $ 6,944 Cost Source - 3 Monthly Contribution $ 1,846.31 Depreciation Percent - 13.19% Fully Funded Balance Percent 21.54% Life Remainging Percent - 10% 97 www.mccafferyreserveconsulting.com 5-20

Fencing/Rails Wood Fencing Progress/Crestline Approximate Component Quantity - 2736 Estimated Current Unit Cost $ 50.76 Unit of Measure - LF Estimated Total Current Cost $ 138,879 Normal Useful Life (Years) - 20 Estimated Total Future Cost $ 156,310 Estimated Remaining Useful Life (Years) - 4 Fully Funded Balance $ 111,103 Estimated Replacement Year - 2022 Depreciation This Year $ 6,944 Cost Source - 3 Monthly Contribution $ 1,846.31 Depreciation Percent - 13.19% Fully Funded Balance Percent 19.15% Life Remainging Percent - 20% Fencing/Rails Wood Fencing Progress/Crestline Approximate Component Quantity - 2736 Estimated Current Unit Cost $ 50.76 Unit of Measure - LF Estimated Total Current Cost $ 138,879 Normal Useful Life (Years) - 20 Estimated Total Future Cost $ 165,829 Estimated Remaining Useful Life (Years) - 6 Fully Funded Balance $ 97,216 Estimated Replacement Year - 2024 Depreciation This Year $ 6,944 Cost Source - 3 Monthly Contribution $ 1,846.31 Depreciation Percent - 13.19% Fully Funded Balance Percent 16.76% Life Remainging Percent - 30% Landscaping Irrigation System Upgrade Approximate Component Quantity - 1 Estimated Current Unit Cost $ 100,000.00 Unit of Measure - Allowance Estimated Total Current Cost $ 100,000 Normal Useful Life (Years) - 25 Estimated Total Future Cost $ 106,090 Estimated Remaining Useful Life (Years) - 2 Fully Funded Balance $ 92,000 Estimated Replacement Year - 2020 Depreciation This Year $ 4,000 Cost Source - 1 Monthly Contribution $ 1,063.55 Depreciation Percent - 7.60% Fully Funded Balance Percent 15.86% Life Remainging Percent - 8% Landscaping Landscape Upgrades Approximate Component Quantity - 1 Estimated Current Unit Cost $ 80,000.00 Unit of Measure - Allowance Estimated Total Current Cost $ 80,000 Normal Useful Life (Years) - 25 Estimated Total Future Cost $ 87,418 Estimated Remaining Useful Life (Years) - 3 Fully Funded Balance $ 70,400 Estimated Replacement Year - 2021 Depreciation This Year $ 3,200 Cost Source - 1 Monthly Contribution $ 850.84 Depreciation Percent - 6.08% Fully Funded Balance Percent 12.13% Life Remainging Percent - 12% Landscaping Tree Trimming Approximate Component Quantity - 1 Estimated Current Unit Cost $ 10,000.00 Unit of Measure - Allowance Estimated Total Current Cost $ 10,000 Normal Useful Life (Years) - 2 Estimated Total Future Cost $ 10,609 Estimated Remaining Useful Life (Years) - 2 Fully Funded Balance $ - Estimated Replacement Year - 2020 Depreciation This Year $ 5,000 Cost Source - 1 Monthly Contribution $ 1,329.43 Depreciation Percent - 9.50% Fully Funded Balance Percent 0.00% Life Remainging Percent - 100% www.mccafferyreserveconsulting.com 5-21

Miscellaneous Cluster Mailboxes Newer Approximate Component Quantity - 6 Estimated Current Unit Cost $ 1,350.00 Unit of Measure - Each Estimated Total Current Cost $ 8,100 Normal Useful Life (Years) - 24 Estimated Total Future Cost $ 15,068 Estimated Remaining Useful Life (Years) - 21 Fully Funded Balance $ 1,013 Estimated Replacement Year - 2039 Depreciation This Year $ 338 Cost Source - 1 Monthly Contribution $ 89.74 Depreciation Percent - 0.64% Fully Funded Balance Percent 0.17% Life Remainging Percent - 88% Miscellaneous Cluster Mailboxes Approximate Component Quantity - 20 Estimated Current Unit Cost $ 1,350.00 Unit of Measure - Each Estimated Total Current Cost $ 27,000 Normal Useful Life (Years) - 24 Estimated Total Future Cost $ 29,504 Estimated Remaining Useful Life (Years) - 3 Fully Funded Balance $ 23,625 Estimated Replacement Year - 2021 Depreciation This Year $ 1,125 Cost Source - 1 Monthly Contribution $ 299.12 Depreciation Percent - 2.14% Fully Funded Balance Percent 4.07% Life Remainging Percent - 13% 94 www.mccafferyreserveconsulting.com 5-22

Miscellaneous Cluster Mailboxes Approximate Component Quantity - 5 Estimated Current Unit Cost $ 1,350.00 Unit of Measure - Each Estimated Total Current Cost $ 6,750 Normal Useful Life (Years) - 24 Estimated Total Future Cost $ 6,953 Estimated Remaining Useful Life (Years) - 1 Fully Funded Balance $ 6,469 Estimated Replacement Year - 2019 Depreciation This Year $ 281 Cost Source - 1 Monthly Contribution $ 74.78 Depreciation Percent - 0.53% Fully Funded Balance Percent 1.11% Life Remainging Percent - 4% 94 Miscellaneous Parcel Lockers Newer Approximate Component Quantity - 6 Estimated Current Unit Cost $ 850.00 Unit of Measure - Each Estimated Total Current Cost $ 5,100 Normal Useful Life (Years) - 24 Estimated Total Future Cost $ 9,488 Estimated Remaining Useful Life (Years) - 21 Fully Funded Balance $ 638 Estimated Replacement Year - 2039 Depreciation This Year $ 213 Cost Source - 1 Monthly Contribution $ 56.50 Depreciation Percent - 0.40% Fully Funded Balance Percent 0.11% Life Remainging Percent - 88% Miscellaneous Parcel Lockers Approximate Component Quantity - 11 Estimated Current Unit Cost $ 850.00 Unit of Measure - Each Estimated Total Current Cost $ 9,350 Normal Useful Life (Years) - 24 Estimated Total Future Cost $ 10,217 Estimated Remaining Useful Life (Years) - 3 Fully Funded Balance $ 8,181 Estimated Replacement Year - 2021 Depreciation This Year $ 390 Cost Source - 1 Monthly Contribution $ 103.59 Depreciation Percent - 0.74% Fully Funded Balance Percent 1.41% Life Remainging Percent - 13% www.mccafferyreserveconsulting.com 5-23

Miscellaneous Entry Monuments Approximate Component Quantity - 1 Estimated Current Unit Cost $ 10,000.00 Unit of Measure - Allowance Estimated Total Current Cost $ 10,000 Normal Useful Life (Years) - 20 Estimated Total Future Cost $ 15,580 Estimated Remaining Useful Life (Years) - 15 Fully Funded Balance $ 2,500 Estimated Replacement Year - 2033 Depreciation This Year $ 500 Cost Source - 3 Monthly Contribution $ 132.94 Depreciation Percent - 0.95% Fully Funded Balance Percent 0.43% Life Remainging Percent - 75% 92 www.mccafferyreserveconsulting.com 5-24

Disclaimer This report attempts to determine the estimated remaining useful life of the components that can be visually observed. This report is expressly for the use of the client and only for the purpose of establishing reserve funding requirements. The study is not a guarantee or warranty, or a recommendation to purchase. Estimated remaining useful lives are calculated with reasonable consideration for weather conditions. Natural disasters, including seismic activity will not be addressed in this report. Reserve Funding for earthquake damages and other disasters exceeds the scope of the study. We recommend the development consider additional insurance to cover unforeseen disasters. We assume the components of the association will receive proper maintenance. The report is expressly for the use of the client and only for the purpose of establishing reserve funding requirements. In providing the opinions of probable construction costs, the client understands that McCaffery Reserve Consulting (MRC) has no control over costs or the price of labor, equipment or materials, or over the contractor s method of pricing, and that the opinions of probable construction costs provided herein are to be made on the basis of MRC s qualifications and experience. MRC makes no warranty, expressed or implied, as to the accuracy of such opinions as compared to bid or actual costs. Because the reserve study is a projection, the estimated lives and costs of components will likely change over time depending on a variety of factors such as future inflation rates and levels of maintenance applied by future boards, unknown defects in materials that may lead to premature failures, etc. As a result, some components may experience longer lives while others will experience premature failures. Some components may cost less at the time of replacement due to changes in manufacturing methods while others may cost more due to material shortages or high demand. All future projections are therefore theoretical and reserve studies should be updated annually. MRC has made a reasonable effort to ensure that the report is accurate. This study does not preclude errors resulting from unforeseen conditions or circumstances. The scope of this report is expressly limited to the components described herein. MRC has obtained certain information, documentation and materials from the association agent and the reserve study is based upon the accuracy of such information. Material inaccuracies could adversely effect the reserve study. MRC is not responsible for such inaccuracies. This study is limited to a visual observation. There has been neither destructive testing nor inspection of the interior of private units; floors, wall or ceiling cavities, or structural elements. It is assumed that the components have been constructed per original construction documents and comply with applicable codes. This study in not designed to uncover latent or patent defects. Estimates represent replacement of a component with similar materials unless otherwise noted. Local building codes have not been researched to determine whether or not current ordinances will permit the replacement of any component with components of like material. The estimates do not take into account the abbreviated useful life of a component as a result of its original construction, installation, or design. MRC is not responsible for any claims, demands, or damages arising out of the discovery of asbestos, radon or any environmental claims, demands or damages. We do not assume any liability for damages which may result from this study. We are not responsible for conditions this report fails to disclose. The information contained in this study is deemed reliable as of the date of this study, but is not guaranteed. The Association, by accepting this study, agrees to release MRC from any claims, demands or damages. The Association, in consideration of MRC performing the reserve study, hereby agrees to indemnify, defend and hold harmless MRC from and against any and all liability, damages, losses, claims, demands, or lawsuits arising out of or relating to this reserve study. The information contained within the report is assembled in conjunction with the client and is intended to assist the client with its reserve planning. MRC does not guarantee, either explicitly or implied, that all repair and replacement items have been identified, the accuracy of the probable costs or the product lives associated with these items.