DOCUMENTS THE WORLD BANK. Letter No. CD-163/JUFMP/X/ October 2015

Similar documents
OFFICAL. THE WORLD BANk IBRD. Letter No. CD-287/WB/XI/2014 November 27, 2014

THE WORLD BANK I BANK DUNIA. Stefan G. Koeberle Lt. 8 tit- Country Director, Indonesia

6FFICIAL DOCUMENTS THE WORLD BANK IBRD - DA I RLDBANKGROUP. May 9, Letter No. CD-089/WB/DOISP II/V/2017

Letter No. CD-220/PFM/V/2011 May 25, 2011

THE WORLD BANK IBRD IDA WORLDBANKGROUP OFFICIAL DOCUMENTS

OFFICL DOCUMEN. Letter No. CD-188 /MEH/IV/2013 April 30, 2013

Letter No. CD-166/RISET/IV/2013 April 12, 2013

Letter No. CD-268/TF PNPM Rural III/VI/2011 June 20, 2011

THE WORLD BANK OFFICIAL IBRD IDA WORLDBANKGROUP O C ALNTS

OFF10A. 1i'L. 11 September 2014

THE WORLD BANK V I BIRD*- IDA I WORI.DBANK GROUP

"'530-8E OFFICIAL DOCUMENTS

THE WORLD BA IBRD* IDA I WORLDBANKGROUP. Cable Address: INTBAFRAD U.S.A.

O FFICIAL October 12, 2017 DOCUMENTS

The World Bank. May 16, 2016

I OFFICIAL DOCUMENTS. December 27, H.E. Radoje Zugic Minister of Finance Ministry of Finance Stanka Dragojevica Podgorica Montenegro

THE WORLD BANK IBRD * IDA I WORLD BANKGROUP

OFFICIAL DOCUMENTS. ron'

H.E. Sufian Ahmed, Minister, Ministry of Finance and Economic Development P. 0. Box 1905 Addis Ababa Federal Democratic Republic of Ethiopia

P24 JUIN 2015, * Reimbursement * Advance * Direct Payment * Special Commitment

OFFICIAL DOCUMENTS. L-,v 83a-)I-JeP. V(taWh o2,2014

_%E, C4WHCIA. A[hrd IS H.E. Saidou Sidibe Minister of Finance and Economy Ministry of Finance and Economy BP 389 Niamey Republic of Niger

April 11, Additional Instructions: Disbursement. Excellency:

November 5, Dear Secretary Azam:

QFICIAL LZ4,1 5,2014. H.E. Patrice Kitebi Minister of Finance Boulevard du 30 Juin Commune de la Gombe Kinshasa 1, Democratic Republic of Congo

OFFICIAL DOCUMENTS. Public Disclosure Authorized. Public Disclosure Authorized

I OFFICItAL ct 3, DOGIJNMTS

OFFICIAL DOCUMENTS. July 15, 2014

Re: IDA Credit 5801-CV (Competitiveness for Tourism Development Project) Additional Instructions: Disbursement

(i) Disbursement Methods (section 2). The following Disbursement Methods may be used under the Loan:

(OFFICIAL 'f 3 -- DOCUMENTS

THE WORLD BANK. IBRD * IDA I WoRLDBANKGROUP , 2016

THE WOR4q*& IBRD* IDA I WORLDBANKGROUP 7

His Excellency M. Patrice Kitebi Minister of Finance Ministry of Finance Kinshasa-Gombe Democratic Republic of Congo

OFFICIAL DOCUMENTS. July 1, 2015

OFFICIAL LN DOCUMENTS

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

OFFICIAL DOCUMENTS. re4yua- 2,2017

December 15, I. Disbursement Arrangements. (i) Disbursement Methods (section 2). The following Disbursement Methods may be used under the Loan:

I DOCUMENTS! Letter No. CD-249/JSDF/VIII2012 August16, 2012

THE WORLD BANK IBRD - IDA I WORLDBANKGROUP OFFICIAL LN

OFFICIAL DOCUMENTS i. Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

OF FICIAL 9 - VA" The World Bank 1818 H StrieQ CUMEN

Re: IBRD Loan 8520-IQ (Emergency Infrastructure and Services Restoration Project) Additional Instructions: Disbursement - First Restatement

Re: IDA Financing 5376-IN (Accelerating Universal Access to Early and Effective Tuberculosis Care Project) Additional Instructions: Disbursement

DOCUMENTS OFFICIAL. June 24, 2016

DOCUMENTS. June 17, Honourable Don Pomb Polye, MP Ministry for Treasury Vulupindi Haus 4 th Floor P.O. Box 542 Waigani, 131 NCD Papua New Guinea

THE WORLD BANK IBRD * IDA I WORLD BANKGROUP

OFFICIAL. BANCO MUNDIWCUME0i BIRD * AID I GRUPO BANCO MUNDI. November 4, 2014

OFFICIAL DOCUM ENTS THE WORLD BANK IBRD IDA I WORLD BANKGROUP. ume&.s,2016

OFFICIAL 9, 8~~' -O)k DOCUMENTS

I OFFICIAL. tks DOCUMENTS. The

The following Disbursement Methods may be used

THE WORLD BANK IBRD IDA I WORLD ANKOROUP

OFFE4. c('g~ 7-ZJ _T 2014

July 16, Re: Saint Lucia: IDA Credit No LC (Disaster Vulnerability Reduction Project) Additional Instructions: Disbursement.

Re: IDA Financing No VN (Enhancing Teacher Education Program), Additional Instructions: Disbursement

The World Bank. Honorable Peter O'Neill, CMG MP Minister for Treasury and Finance PO Box 542 Waigani National Capital District Papua New Guinea

OFFICIAL Ca.- q DOCUMENTS a C

OFFICIAL DOCUMENTS. Public Disclosure Authorized

May 5, Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

OFFICIAL L '39v us DOCUMENTS

OFFICIAL DOCUMENTS. Re: Liberia Grant Number TFOA1263-LR - Public Sector Modernization Project Additional Instructions: Disbursement

DOCUMENTS. June 9, 2014

OFFICIAL DOCUMENTS. THE WORLD BANK IBRD * IDA I Wom.D BANKROUP. Page 1 of 21. Public Disclosure Authorized

QFICIAL THE WORLD BANK IBRD *IDA I WORLD BANKGROUP. July 1, 2016

OFFICIAL UWW- 7 DOCUMENTS

Re: Loan No Amendment of Additional Instructions: Disbursement

OFFICIAL e DOCUMENTS

Re: Loans No and Amendment of Additional Instructions: Disbursement

OFFMCAL. June 27, 2012

Re: Loans No and Amendment of Additional Instructions: Disbursement

Re: Loan No.: Amendment of Additional Instructions: Disbursement

OFFICIAL M A O, The World Bank

Re: IBRD Loan 8349-TR (Gas Sector Development Project Additional Finance) Additional Instructions: Disbursement

The World Bank 1818 H Street N.W. (202) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOfICIA6shington, D.C

THE WORLD BANK IBRD * IDA I WORLD BANKGROUP

21 A rd,2015. Gabriel Vallejo L6pez Ministro Ministerio de Ambiente y Desarrollo,ostenible Calle 37 No 8-40 Bogota, D.C., Colombia

OFFICIAL DOCUMENTS. Re: IBRD Loan 8397-MA (Rural Water Supply Project) Additional Instructions: Disbursement - Restatement

THE WORLD BANK IBRD* IDA I WORLD BANKGROUP

O FFICIAL DO CUM ENTS

May 7, His Excellency Ivan Acosta Montalvan Minister of Finance and Public Debt Ministry of Finance and Public Debt Managua, Nicaragua

LatinAmeria & h Carbbee

OiVAL A_ (t 9 The World Bank I 1 (202) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

OF-1:CCAL 6 J 531/6" - '

OFFICIAL Le & L DOCUMENTS THE WORLD BANK Bouchard 547, 29th floor Tel.: (54-11) / 44

Re: IBRD Loan 8074-BR (Brazil - Federal Integrated Water Sector Project - Interaguas) Additional Instructions: Disbursement Letter

Letter No. CD-380/IIGF/XI/2012 tember 19, 2012

DOCUM ENTS THE WORLD BANK IBRD IDA I WOM MBANKGROUP

~OUMENTV. February 11, 2015

DOCUMENTS THE WORLD BANK IBRD * IDA I WORLD BANK ROUP. March 3, 2017

OFFICIAL Ly p,'r ipd DOCUMENTS

No.: S- 4838/A.6/12Z August 30, 2002

Disbursement Guidelines For Projects

December 11, Re: IBRD Loan No UY (OSE Sustainable and Efficient Project) Additional Instructions: Disbursement Letter

R(: IDA Grant Number H997-BF Urban Water Sector Project Additional Financing Additional Instructions: Disbursement

DO CUM ENTS THE WORLD BANK IBRD* IDA I WORLDBANKGROUP. 43 i. Aojgfe,6, 2016

Re: Grant No. TFOA0590 (Enha'Icing the International Infrastructure Support System Projec ) Additional Instructions: Disbursement Letter

MINISTRY OF FINANCE OF TILE REPUBLIC OF INDONESIA DIRECTORATE GENERAL OF BUDGET

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RODRIGO A. CHAVES Country Director, Indonesia THE WORLD BANK IBRD* IDA I WORLDBANKGOFFICIAL L 12.1 DOCUMENTS Letter No. CD-163/JUFMP/X/2015 12 October 2015 Mr. Marwanto Harjowiryono Director General of Treasury Ministry of Finance Gd. Prijadi Praptosuhardjo I, 2nd Floor Jl, Lapangan Banteng Timur No. 2-4 Jakarta Pusat Dear Mr. Harjowiryono: Re: IBRD Loan 8121-ID Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) Additional Instructions: Disbursement (First Amendment) I refer to the Loan Agreement between Republic of Indonesia (the "Borrower") and the International Bank for Reconstruction and Development (the "Bank") for the above-referenced project, dated February 17, 2012. The Agreement provides that the Bank may issue additional instructions regarding the withdrawal of the proceeds of Loan 8121-ID ("Loan"). This letter ("Disbursement Letter"), as revised from time to time, constitutes the additional instructions and replaces the disbursement letter dated February 17, 2012 by changing the Minimum Value of Applications as set forth in paragraph I(v) below. The attached World Bank Disbursement Guidelines for Projects, dated May 1, 2006, ("Disbursement Guidelines") (Attachment 1), are an integral part of the Disbursement Letter. The manner in which the provisions in the Disbursement Guidelines apply to the Loan is specified below. Sections and subsections in parentheses below refer to the relevant sections and subsections in the Disbursement Guidelines and, unless otherwise defined in this letter, the capitalized terms used have the meanings ascribed to them in the Disbursement Guidelines. I. Disbursement Arrangements (i) Disbursement Methods (section 2). The following Disbursement Methods may be used under the Loan: * Reimbursement * Advance * Direct Payment (ii) DisbursementDeadline Date (subsection 3.7). The Disbursement Deadline Date is four (4) months after the Closing Date specified in the Loan Agreement. Any changes to this date will be notified by the Bank. ISEB Tower 2, 12 th Floor. JI. Jend. Sudirman Kay. 52-53, Jakarta 12190 8 +6221 5299 3000 6 +6221 5299 3111 0 www.worldbank org/id

Mr. Mawanto Harjowiryono Page 2 of 4 12 October 2015 II. Withdrawal of Loan Proceeds (i) Authorized Signatures (subsection 3.1). Applications for this Loan will be signed by the officials authorized to sign Applications as indicated in the Ministry of Finance letter No.S4881/PB/2013, dated July 16, 2013, and S-6027/PB/2014 dated September 18, 2014. Please notify us promptly should there be any change in the authorized officials in this regard. (ii) Applications (subsections 3.2-3.3). Please provide completed and signed applications for withdrawal, together with supporting documents, to the address indicated below: The World Bank Office Jakarta (WBOJ) Jakarta Stock Exchange Building, Tower 2, 1 2 th Floor Jl. Jenderal Sudirman Kay. 52-53, Jakarta 12190, Indonesia Attention: Disbursement Team (iii) Electronic Delivery (subsection 3.4) The Bank may permit the Borrower to electronically deliver to the Bank Applications (with supporting documents) through the Bank's Client Connection, webbased portal. The option to deliver Applications to the Bank by electronic means may be effected if: (a) the Borrower has designated in writing, pursuant to the terms of subparagraph (i) of this Section, its officials who are authorized to sign and deliver Applications and to receive secure identification credentials ("SIDC") from the Bank for the purpose of delivering such Applications by electronic means; and (b) all such officials designated by the Borrower have registered as users of Client Connection. If the Bank agrees, the Bank will provide the Borrower with SIDC for the designated officials. Following which, the designated officials may deliver Applications electronically by completing Form 2380, which is accessible through Client Connection (https://clientconnection.worldbank.org). The Borrower may continue to exercise the option of preparing and delivering Applications in paper form. The Bank reserves the right and may, in its sole discretion, temporarily or permanently disallow the electronic delivery of Applications by the Borrower. (iv) Terms and Conditions of Use of SIDC to Process Applications. By designating officials to use SIDC and by choosing to deliver the Applications electronically, the Borrower confirms through the authorized signatory letter its agreement to: (a) abide by the Terms and Conditions of Use of Secure Identification Credentials in connection with Use of Electronic Means to Process Applications and Supporting Documentation ("Terms and Conditions of Use of Secure Identification Credentials") provided in Attachment 2; and (b) to cause such official to abide by those terms and conditions. (v) Minimum Value of Applications (subsection 3.5). The Minimum Value of Applications for reimbursement and direct payment is $200,000. (vi) Advances (sections 5 and 6). * Type of Designated Account (subsection 5.3). Segregated. One segregated designated account will be established for the project and managed by the Treasury Department of the Ministry of Finance. * Currency of Designated Account (subsection 5.4): (United States Dollar). * Financial Institution at which the Designated Account Will Be Opened (subsection 5.5): Bank Indonesia or another financial institution acceptable to the Bank. ISEB Tower 2, 12th Floor. Ji. Jend. Sudirman Kay. 52-53, Jakarta 12190 3 +6221 5299 3000 0 +6221 5299 3111 O www.worldbank.org/id

Mr. Mawanto Harjowiryono Page 3 of 4 12 October 2015 * Ceiling (subsection 6.1): $5,000,000. III. Reporting on Use of Loan Proceeds (i) Supporting Documentation (section 4). Supporting documentation should be provided with each application for withdrawal as set out below: * For requests for Reimbursement and for reporting eligible expenditures paid from the Designated Account: o List of payments against contracts that are subject to the World Bank's prior review, in the form attached (Attachment 3, Form 1-B), together with records evidencing eligible expenditures (e.g. copies of receipts, supplier invoices, etc); and o Statement of Expenditure in the form attached (Attachment 3, Form 1-C and 1 -C2) for all other expenditures. * For requests for Direct Payment: Records evidencing eligible expenditures, e.g., copies of receipts, supplier invoices, etc. (ii) Frequency of Reporting Eligible Expenditures Paid from the Designated Account (subsection 6.3): Monthly. (iii) Other Supporting Documentation Instructions: Copies of bank statement of the designated account and Designated Account Reconciliation Statement (Attachment 3, Form 1-A) should be attached to the Application for Withdrawal for replenishment of the designated account. IV. Other Important Information For additional information on disbursement arrangements, please refer to the Disbursement Handbook available on the Bank's public website at https://www.worldbank.org and its secure website "Client Connection" at https://clientconnection.worldbank.or. Print copies are available upon request. If you have not already done so, the Bank recommends that you register as a user of the Client Connection website (https://clientconnection.worldbank.org). From this website you will be able to prepare and deliver Applications, monitor the near real-time status of the Loan, and retrieve related policy, financial, and procurement information. All Borrower officials authorized to sign and deliver Applications by electronic means are required to register with Client Connection before electronic delivery can be effected. For more information about the website and registration arrangements, please contact the Bank by email at <clientconnection@"worldbank.org>. If you have any queries in relation to the above, please contact Chau-Ching Shen, Senior Finance Officer at loaeap(aworldbank.org or the Disbursement Team in WBOJ using the above reference. Yo I i cere, Rodrig.Chaves Country Direct Indo e ISEB Tower 2, 12th Floor, JI. Jend. Sudirman Kay., akarta 12190 8 +6221 5299 00+6221 3 5299 3111 O www.worldbank.org/id

Mr. Mawanto Harjowiryono Page 4 of 4 12 October 2015 Enclosures: 1. World Bank Disbursement Guidelines for Projects, dated May 1, 2006 2. Terms and Conditions of Use of Secure Identification Credentials in connection with Use of Electronic Means to Process Applications and Supporting Documentation, dated March 1, 2013 3. Form of Interim Financial Report Cc: Ministry of Finance - Mr. Robert Pakpahan, DG of Budget Financing and Risk Management - Mrs. Ayu Sukorini, Director of Loan and Funds, DG of Budget Financing and Risk Management - Mr. Widjanarko, Director of Evaluation, Accounting and Settlements, DG of Budget Financing and Risk Management - Mrs. An Wahyuni, Director of Investment Management System, DG Treasury BAPPENAS - Mr. Donny Azdan, Director of Water and Irrigation - Mr. R.M. Dewo Broto Joko P., Director of Multilateral Foreign Funding Ministry of Public Works and Public Housing - Mr. Taufik Widjoyono, Secretary General - Mr. Mudjiadi, Director General, DG of Water Resources - Mr. Andreas Suhono, Director General, DG of Human Settlements - Mr. Widiarto, Director of Program Development, DG of Water Resources - Mr. Imam Santoso, Director of Rivers and Coasts, DG of Water Resources - Mr. Muhammad Maliki Moersid, Director of PPLP, DG of Human Settlements - Mr. Antonius Budiono, Director, Program Development, DG of Human Settlements - Mr. Hasanudin, Head, Bureau of Planning and International Cooperation - Mr. T. Iskandar, Head of BBWSCC, DG of Water Resources - Mr. Heru Setiawan, Head of Sub Directorate of Foreign Cooperation, DG of Water Rersorces Provincial of DKI Jakarta - Mr. Saefullah, Secretary - Mr. Tri Djoko Sri Margianto, Head of Water Management Department - Mr. Andi Baso M., Head of BPLHD - Mrs. Tuty Kusumawati, Head of Planning Agency/Bappeda - Mr. Gamal Sinurat, Assistant for Development and Environment ISEB Tower 2, 12t* Floor, J. Jend Sudirman Kay. 52-53, Jakarta 12190 X +6221 5299 3000 * +6221 5299 3111 ff www.woridbank.org/id

Attachment 2 Terms and Conditions of Use of Secure Identification Credentials in connection with Use of Electronic Means to Process Applications and Supporting Documentation March 1, 2013 The World Bank (Bank)' will provide secure identification credentials (SIDC) to permit the Borrower' to deliver applications for withdrawal and applications for special commitments under the Agreement(s) and supporting documentation (such applications and supporting documentation together referred to in these Terms and Conditions of Use as Applications) to the Bank electronically, on the terms and conditions of use specified herein. SIDC can be either: (a) hardware-based (Physical Token), or (b) software-based (Soft Token). The Bank reserves the right to determine which type of SIDC is most appropriate. A. Identification of Users. 1. The Borrower will be required to identify in a completed Authorized Signatory Letter (ASL) duly delivered to and received by the Bank each person who will be authorized to deliver Applications. The Bank will provide SIDC to each person identified in the ASL (Signatory), as provided below. The Borrower shall also immediately notify the Bank if a Signatory is no longer authorized by the Borrower to act as a Signatory. 2. Each Signatory must register as a user on the Bank's Client Connection (CC) website (https://clientconnection.worldbank.org) prior to receipt of his/her SIDC. Registration on CC will require that the Signatory establish a CC password (CC Password). The Signatory shall not reveal his/her CC Password to anyone or store or record the CC Password in written or other form. Upon registration as a CC user, the Signatory will be assigned a unique identifying account name. B. Initialization of SIDC. 1. Prior to initialization of SIDC by a Signatory, the Signatory will acknowledge having read, understood and agreed to be bound by these Terms and Conditions of Use. 2. Where a Physical Token is to be used, promptly upon receipt of the Physical Token, the Signatory will access CC using his/her account name and CC Password and register his/her Physical Token and set a personal identification number (PIN) to be used in connection with the use of his/her '"Bank" includes IBRD and IDA. 2 "Borrower" includes the borrower of an IBRD loan, IDA credit, or Project Preparation Facility advance and the recipient of a grant. Page 1 of 3

5.2. The Bank reserves the right, in its sole discretion, to temporarily or permanently disable a SIDC, de-activate a SIDC User's Account or both. 6. Care of Physical Tokens 6.1. Physical Tokens will remain the property of the Bank. 6.2. The Bank will physically deliver a Physical Token to each Signatory designated to receive one in a manner to be determined by and satisfactory to the Bank. 6.3. Physical Tokens contain delicate and sophisticated instrumentation and therefore should be handled with due care, and should not be immersed in liquids, exposed to extreme temperatures, crushed or bent. Also, Physical Tokens should be kept more than five (5) cm from devices that generate electromagnetic radiation (EMR), such as mobile phones, phone-enabled PDAs, smart phones and other similar devices. Physical Tokens should be carried and stored separate from any EMR device. At close range (less than 5 cm), these devices can output high levels of EMR that can interfere with the proper operation of electronic equipment, including the Physical Token. 6.4. Without derogating from these Terms and Conditions of Use, other technical instructions on the proper use and care of Physical Tokens are available at http://www.rsa.com. 7. Replacement 7.1. Lost, damaged, compromised (in terms of 4.5, above) or destroyed Physical Tokens will be replaced at the expense of the Borrower. 7.2. The Bank reserves the right, in its sole discretion, not to replace any Physical Token in the case of misuse, or not to reactivate a SIDC User's Account. Page 3 of 3

DESIGNATED ACCOUNT (DA) RECONCILIATION STATEMENT 1-A Aplication No. Credit/Loan/Grant TF No. Account No. with Bank 1. Amount advanced by World Bank 2. Less total amount recovered to date I 3. Outstanding amount advanced to DA (substract 1-2) Z (1-2) 4. Amount in DA as per attached Bank Statement (dated ) l 5. Amount claimed in attached Application L (a) Deduction to App/n. No.... (WBOJ use only) (i) Refund due to SA (ii) To be re-claimed: (b) Deduction to previous Application(s) (i) Refund due to SA (ii) To be re-claimed: 6. Amounts claimed but not yet credited to DA per attached Bank Statement APPIn. No.(s) Total: 1 Total: 1 Us$ 7. Total expenditures withdrawn from SA not yet claimed for replenishment: 8. Total Advance Documented (add 4+5+6+7) (4+5+6+7) 9. Explanation of discrepancy between amounts in Line No. 3 and 8: 3-8

DESIGNATED ACCOUNT (DA) RECONCILIATION STATEMENT 1-A Aplication No. Credit/Loan/Grant TF No. Account No. with Bank 1. Amount advanced by World Bank 2. Less total amount recovered to date l 3. Outstanding amount advanced to DA (substract 1-2) (1-2) 4. Amount in DA as per attached Bank Statement (dated ) 5. Amount claimed in attached Application (a) Deduction to Appln. No.... (WBOJ use only) (i) Refund due to SA (ii) To be re-claimed: (b) Deduction to previous Application(s) (i) Refund due to SA (ii) To be re-claimed: Total: 1 Total: 1 6. Amounts claimed but not yet credited to DA per attached Bank Statement AppIn. No.(s) Us$ 1 7. Total expenditures withdrawn from SA not yet claimed for replenishment: 1 8. Total Advance Documented (add 4+5+6+7) (4+5+6+7) 9. Explanation of discrepancy between amounts in Line No. 3 and 8: 3-8

1-B #REFI Summary Sheet for Payments of Contracts Subject to Prior Review Quarter: -- Ln/CrlTF No. : Sheet No. : 1 2 3a 3b 4 5 6 7 8 9 10 11 12 13 Item Disbursement Category Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount WB's No. Issuing SP2D Payment No. Contractor Value Paid to Financing WB portion Rate Charged contract Cat No. Description SP2D No. (SP2D) and Date Name (incl. Add) Contractor paid Applied to SA ref. l(goi+ibrd+ppn) (USD eqv) **I 1 2 3 4 5 6 7 8 9 10 11 12 (1) Category 1 *I (2) Category 2 (3) Category 3 (4) Category 4 GRAND TOTAL must reconcile with / Please have a seperate line item if the WB' financing percentage is different Form 1A item 5 **/ Please check these ref. through Client Connection

1-C #REF! Summary Statement of Expenditures (Sum-SOE) for those NOT Subject to Prior Review Quarter: -- LnlCr/TF No. : Sheet No. 1 2 3 4 5 6 7 8 9 10 Item Disbursement Category Threshold Number of Country of Total Paid WB Amount of Average Amount No. for SP2D supplierl to Contractors/ Financing WB portion Exchange Charged Cat No. Description SOEs covered consultant/ Expenditures % paid Rate to SA (USD eqv) training (GOl+1BRD+PPN) (USD eqv) (1) Category 1 */ (2) Category 2 (3) Category 3 (4) Category 4 GRAND TOTAL must reconcile with Form */ Please have a seperate line item if the WB' financing percentage is different 1A Item 5

1-C #REFI Summary Statement of Expenditures (Sum-SOE) for those NOT Subject to Prior Review Quarter: -- Ln/CrITF No. : Sheet No.: 1 2 3 4 5 6 7 8 9 10 Item Disbursement Category Threshold Number of Country of Total Paid WB Amount of Average Amount No. for SP2D) supplierl to Contractors/ Financing WB portion Exchange Charged Cat No. Description SOEs covered consultant/ Expenditures % paid Rate to SA (USD eqv) training (GOl+IBRD+PPN) (USD eqv) (1) Category 1 */ (2) Category 2 (3) Category 3 (4) Category 4 GRAND TOTAL must reconcile with Form */ Please have a seperate line item if the WB' financing percentage is different 1A Item 5

1-C2 #REF! Statement of Expenditures for those NOT Subject to Prior Review Quarter: -- Ln/CrrTF No. : Sheet No. : 1 2 3a 3b 4 5 6 7 8 9 10 11 12 Item Disbursement Category Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount No. Issuing SP2D Payment No. Contractor Vau Paid to Financing WB portion Rate Charged Cat No. Description SP2D No. (SP2D) and Date Name (incl. Add) Contractor % paid Applied to SA l(goi+ibrd+ppn) (USD eqv) 1 2 3 4 5 6 7 8 9 10 11 12 (1) Category 1 */ (2) Category 2 (3) Category 3 (4) Category 4 GRAND TOTAL */ Please have a seperate line item if the WB' financing percentage is different

1-C2 #REF! Statement of Expenditures for those NOT Subject to Prior Review Quarter: -- Ln/Cr/TF No. : Sheet No. 1 2 3a 3b 4 5 6 7 8 9 10 11 12 Item Disbursement Category Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount No. Issuing SP2D Payment No. Contractor Value Paid to Financing WB portion Rate Charged Cat No. Description SP2D No. (SP2D) and Date Name (incl. Add) Contractor % paid Applied to SA l(goi+ibrd+ppn) (USD eqv) 1 2 3 4 5 6 7 8 9 10 11 12 (1) Category 1 */ (2) Category 2 (3) Category 3 (4) Category 4 GRAND TOTAL */ Please have a seperate line item if the WB' financing percentage is different