Southern African Power Market Program Project Agreement. (Mozambique Component Mozambique-Malawi Transmission Interconnection Project) between

Similar documents
INTERNATIONAL DEVELOPMENT ASSOCIATION

Project Agreement. (Zanzibar Basic Education Improvement Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8655-YF. (Additional Financing for Corridor X Highway Project) between

Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized. Public Disclosure Authorized CREDIT NUMBER 5127-UG

Project Agreement. (WEST AFRICA REGIONAL FISHERIES PROGRAM REPUBLIC OF LIBERIA (Phase I)) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

Project Agreement CONFORMED COPY CREDIT NUMBER 4191-TA. (Financial Sector Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION.

Project Agreement CREDIT NUMBER 3991 MOZ. (Beira Railway Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

OFFICIAL DOCUMENTS. Project Agreement. Public Disclosure Authorized. GRANT NUMBER D336-GN CREDIT NUMBER 6261-GN Public Disclosure Authorized

Project Agreement. (West Beka a Emergency Water Supply Project) between

Project Agreement. (Private Sector Development Support Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Project Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized LOAN NUMBER 8457-CN. Public Disclosure Authorized. (Zhengzhou Urban Rail Project)

Project Agreement REPUBLIKA SRPSKA CREDIT NUMBER 4912-BA. (Additional Financing for Health Sector Enhancement Project) between

Project Agreement OFFICIAL DOCUMENTS LOAN NUMBER 8391-UA. Second Urban Infrastructure Project (Urban Infrastructure Project - 2) between

(Punjab Barrages Improvement Phase-II Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and PROVINCE OF PUNJAB

Haiti Education for All Multi-donor Trust Fund Grant Agreement

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Tamil Nadu Project Agreement

Restated and Amended Project Agreement

Financing Agreement. (Environmental and Social Capacity Building for the Energy Sector Project) between THE REPUBLIC OF CAMEROON.

Financing Agreement. (Uganda Public Service Performance Enhancement Project) between THE REPUBLIC OF UGANDA. and

Financing Agreement. (Additional Financing for Village Communities Support Program (Phase I)) between REPUBLIC OF GUINEA. and

Tazama Project Agreement

Development Financing Agreement

Multi Donor Trust Fund for the Zimbabwe Reconstruction Fund Project Agreement

between Republic of The Gambia and

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

Financing Agreement. (Additional Financing for Health Sector Development Project) between REPUBLIC OF DJIBOUTI. and

RECONSTRUCTION AND DEVELOPMENT

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6343-RW. Public Disclosure Authorized. (Housing Finance Project)

Financing Agreement OFFICIAL DOCUMENTS 1. (Amending and Restating the Development Credit Agreement) Public Disclosure Authorized

Loan Agreement. (Alma Electricity Transmission Project) between JOINT STOCK COMPANY KAZAKHSTAN ELECTRICITY GRID OPERATING COMPANY.

Financing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC.

Global Environment Facility Grant Agreement

Financing Agreement CONFORMED COPY GRANT NUMBER H732 -AF. (Financial Sector Rapid Response Project) between ISLAMIC REPUBLIC OF AFGHANISTAN.

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement. (Fourth Poverty Reduction Support Credit) REPUBLIC OF MOZAMBIQUE. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Project Agreement. (Indonesia Infrastructure Finance Facility Project) among INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

Financing Agreement. (Energy Community of South East Europe APL 3 Montenegro Project) between THE REPUBLIC OF MONTENEGRO. and

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Financing Agreement OFFICIAL DOCUMENTS GRANT NUMBER D004-FM FEDERATED STATES OF MICRONESIA INTERNATIONAL DEVELOPMENT ASSOCIATION

Project Agreement. OffICIAL OCUMENTS I LOAN NUMBER 8121-ID. Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) between

PAD Project Agreement. (Second Transport Sector Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and PORT AUTONOME DE DAKAR. Dated May 13, 1999

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Power System Improvement Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and ELECTROSTOPANSTVO NA MAKEDONIJA

Financing Agreement CREDIT NUMBER VN. (Ho Chi Minh City Green Transport Development Project) between SOCIALIST REPUBLIC OF VIETNAM.

Financing Agreement. (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between NEPAL. and

Global Environment Facility Trust Fund Grant Agreement

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA

IOFFICIAL. Financing Agreement DOCUMENTS. Public Disclosure Authorized GRANT NUMBER D0470-BI. Public Disclosure Authorized

Nile Basin Trust Fund Grant Agreement

Multi-Donor Trust Fund for the Malawi Public Finance and Economic Management Reform Program Grant Agreement

Development Credit Agreement. (Second National Water Development Project) between REPUBLIC OF MOZAMBIQUE. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Financing Agreement OFFICIM. DOCUMENTS1 CREDIT NUMBER 5283-IN. (Low Income Housing Finance Project) between INDIA. and

OFFICIAL MDTF-HRI GRANT NUMBER TF between REPUBLIC OF CAMEROON. and

Development Credit Agreement

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8734-GD. (OECS Regional Tourism Competitiveness Project) between GRENADA

Development Credit Agreement

Regional Project Agreement

HAINAN Project Agreement

OFFICIAL DOCUMENTS ZW4

Project Agreement LOAN NUMBER CN. (Second Liuzhou Environment Management Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

Financing Agreement CONFORMED COPY CREDIT NUMBER 4168-NI. (Rural Telecommunications Project) between REPUBLIC OF NICARAGUA. and

Multi-Donor Trust Fund for the Sahel Adaptive Social Protection Program Grant Agreement

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8715-ID

LOAN AGREEMENT. (Zhejiang Power Development Project) between PEOPLE S REPUBLIC OF CHINA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement OFFICIAL DOCUMENTS LOAN NUMBER 8658-CM. (Electricity Transmission and Reform Project) between. REPUBLIC OF CAMEROON and

OFFICIAL LvG-K DOCUMENTS

Project Agreement. Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 7792-IN. Public Disclosure Authorized

Project Agreement DOCUMENTS. Public Disclosure Authorized LOAN NUMBER PE. Public Disclosure Authorized. (Lima Metropolitan Development Project)

Project Agreement. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 775 SE. Public Disclosure Authorized. Public Disclosure Authorized

Liaoning Project Agreement

Development Grant Agreement

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

PEOPLE S REPUBLIC OF CHINA

OFFMCAL. olrakdocuments,

Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 5181-KE. Public Disclosure Authorized. (Judicial Performance Improvement Project)

Loan Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized LOAN NUMBER TR. Public Disclosure Authorized

cocumeasn Loan Agreement OFFICIAL LOAN NUMBER 8095-BR

MULTI-DONOR TRUST FUND GRANT AGREEMENT

Loan Agreement. (Indonesia Infrastructure Finance Facility Project) between REPUBLIC OF INDONESIA. and

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and

CONFORMED COPY LOAN NUMBER 3717 PE LOAN NUMBER 3717 PE

(Java-Bali Power Sector Restructuring and Strengthening Project) between REPUBLIC OF INDONESIA. and

Development Credit Agreement

Project Agreement. (Energy Efficiency Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

ECG Project Agreement

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between

Loans, Credits, and Grants Assumption and Amendment Agreement

Loan Agreement. (Power System Development Project-III) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

IDOCUMENTS. Loan Agreement OFFICIAL LOAN NUMBER 8354-CO. (Access with Quality to Higher Education Project-ACCES II-SOP Phase 2) between

Loan Agreement. (Low-Income Sanitation Technical Assistance Project) between FEDERATIVE REPUBLIC OF BRAZIL. and

Prqject Agreement. Public Disclosure Authorized. CREDIT NUMBER 2634 KG Public Disclosure Authorized. (Telecommunications Project)

Development Credit Agreement

, Honorable Tendai Biti Minister of Finance Ministry of Finance

Loan Agreement. (South East Europe and Caucasus Catastrophe Risk Insurance Facility Project) between REPUBLIC OF SERBIA. and

Financing Agreement,.

Loan Agreement. (Additional Financing for the Rural Poverty Reduction Project - Rio Grande do Norte) between

Transcription:

Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4354 - MOZ Public Disclosure Authorized Public Disclosure Authorized Southern African Power Market Program Project Agreement (Mozambique Component Mozambique-Malawi Transmission Interconnection Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION and ELECTRICIDADE DE MOCAMBIQUE, EP Public Disclosure Authorized Dated September 21, 2007

CREDIT NUMBER 4354 - MOZ PROJECT AGREEMENT AGREEMENT dated September 21, 2007, entered into between INTERNATIONAL DEVELOPMENT ASSOCIATION ( Association ) and ELECTRICIDADE DE MOCAMBIQUE, EP (EDM) ( Project Implementing Entity) ( Project Agreement ) in connection with the Financing Agreement ( Financing Agreement ) of same date between the REPUBLIC OF MOZAMBIQUE ( Recipient ) and the Association. The Association and EDM hereby agree as follows: ARTICLE I GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to the Financing Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the Financing Agreement or the General Conditions. ARTICLE II PROJECT 2.01. EDM declares its commitment to the objectives of the Project. To this end, EDM shall carry out the Project in accordance with the provisions of Article IV of the General Conditions, and shall provide promptly as needed, the funds, facilities, services and other resources required for the Project. 2.02. Without limitation upon the provisions of Section 2.01 of this Agreement, and except as the Association and EDM shall otherwise agree, EDM shall carry the Project in accordance with the provisions of the Schedule to this Agreement. ARTICLE III TERMINATION 3.01. For purposes of Section 8.05 (c) of the General Conditions, the date on which the provisions of this Agreement shall terminate is twenty years after the date of this Agreement. ARTICLE IV REPRESENTATIVE; ADDRESSES 4.01. The Project Implementing Entity s Representative is EDM s Chief Executive Officer.

- 2-4.02. The Association s Address is: International Development Association 1818 H Street, NW Washington, DC 20433 United States of America Cable: Telex: Facsimile: INDEVAS 248423(MCI) 1-202-477-6391 Washington, D.C. 4.03. The Project Implementing Entity s Address is: Electricidade de Mocambique, EP Avenue Agostinho Neto, 70 Maputo Republic of Mozambique Facsimile: 258 21 491048

- 3 - AGREED at Maputo, Mozambique, as of the day and year first above written. INTERNATIONAL DEVELOPMENT ASSOCIATION By /s/ Michael Baxter Authorized Representative ELECTRICIDADE DE MOCAMBIQUE, EP By /s/ Manuel João Cuambe Authorized Representative

- 4 - SCHEDULE Execution of the Project Section I. Implementation Arrangements A. Institutional Arrangements 1. EDM shall, at all times during the period of the Project implementation maintain: (a) (b) (c) active participation in the Joint Project Coordination Committee. To this end, the Joint Project Coordination Committee shall be responsible for, inter alia: (i) coordination of Project activities; and (ii) determining, making recommendations, or proposing any issues for review of the Joint Project Steering Committee; a Project Management Unit, including a project manager, engineer, social and environmental specialist, financial management specialist, and technical specialists among whom must be a transmission line and substation engineer, and an officer trained in procurement under the Procurement and Consultant Guidelines, respectively, all with qualifications, and terms of reference satisfactory to the Association; and the services of a design and supervision consultant. To this end, said design and supervision consultant shall be appointed in accordance with the provisions of Section III.C of Schedule 2 to the Financing Agreement. 2. EDM shall carry out: (a) the Project in accordance with the Project Implementation Plan; and (b) Part A of the Project in accordance with the terms and conditions set forth in the Key Agreements, and except as the Association shall otherwise agree, shall not assign, amend, abrogate or waive the Key Agreements or any provision of any one thereof. B. Anti-Corruption EDM shall ensure that the Project is carried out in accordance with the provisions of the Anti-Corruption Guidelines.

- 5 - C. Environmental and Social Safeguards 1. EDM shall: (a) (b) (c) carry out the Project in accordance with the environmental, social and resettlement guidelines, rules and procedures defined in the Resettlement Policy Framework, and the Environmental Impact Assessment Report; not amend or waive, or permit to be waived, the Environmental Impact Assessment Report, and the Resettlement Policy Framework, or any provision thereof; prior to construction of the Transmission Interconnection Line, which would result in displacement of any Affected Persons or adversely affect their standards of living, or their rights, usufructs or customary rights to land or other resources under the Project, ensure that: (i) (ii) (iii) an assessment is carried out in consultation with the Association to determine whether a Resettlement Action Plan would be required, and in the event that such Resettlement Action Plan is required, prepare and submit a detailed Resettlement Action Plan acceptable to the Association; all rights to land, usufructs or customary rights and other property are allocated or acquired, compensation therefore is paid and resettlement is carried out in accordance with the principles and institutional procedures established in the Resettlement Action Plan; Affected Persons shall be compensated, resettled and rehabilitated in accordance with the Resettlement Action Plan. To this end, EDM shall open and maintain an account in a commercial bank, acceptable to the Association, and deposit therein the amount adequate to cover all costs associated with the compensation and resettlement of the Affected Persons; (iv) the implementation arrangements for resettlement, including compensation, relocation and rehabilitation of Affected Persons are documented; and (v) the implementation of such Resettlement Action Plan is completed in a manner satisfactory to the Association. 2. Without limitation upon the provisions of Section I.C.1, EDM shall: (a) take all measures for carrying out the recommendations of the Environmental Impact Assessment Report,

- 6 - and the Resettlement Policy Framework in a timely and effective manner; and (b) include in the Project Reports referred to in Section II.A of this Schedule adequate information on monitoring the measures defined in the Environmental Impact Assessment Report, the Resettlement Policy Framework, and any Resettlement Action Plan. Section II. Project Monitoring, Reporting and Evaluation A. Project Reports 1. (a) EDM shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 4.08 of the General Conditions and on the basis of the indicators set forth below in subparagraph (b) of this paragraph. Each such Project Report shall cover the period of six months, and shall be furnished to the Recipient not later than two weeks after the end of the period covered by such report for incorporation and forwarding by the Recipient to the Association of the overall Project Report. (b) The performance indicators referred to above in sub-paragraph (a) consist of the following: (i) (ii) (iii) Annual volume of electricity traded between the Recipient and the Republic of Malawi (kwh/year); Key Agreements are signed and implementation is in compliance with their respective provisions; increased number of EDM customers served at Matambo substation; and (iv) current ratio (as defined in Section II.B.3 of this Schedule) for FY 2008, and following FYs is greater than or equal to 1.3. 2. EDM shall provide to the Recipient not later than October 31, 2009 for incorporation in the report referred to in Section 4.08 (c) of the General Conditions all such information as the Recipient or the Association shall reasonably request for the purposes of such Section. B. Financial Management, Financial Reports and Audits 1. EDM shall maintain a financial management system and prepare financial statements in accordance with consistently applied accounting standards acceptable to the Association, both in a manner adequate to reflect the operations and financial condition of the EDM, including the operations, resources and expenditures related to the Project.

- 7-2. EDM shall have its financial statements referred to above audited by independent auditors acceptable to the Association, in accordance with consistently applied auditing standards acceptable to the Association. Each audit of these financial statements shall cover the period of one fiscal year of EDM. The audited financial statements for each period shall be furnished to the Association not later than six months after the end of the period. 3. Except as the Association shall otherwise agree, EDM shall maintain: (a) (b) a current ratio greater than, or equal to 1.3 for FY 2008, and the following Fys; and a collection-generation ratio greater than, or equal to 71% for FY 2008, 73% for FY 2009, and 74% for FY 2010, respectively. For the purpose of this Section: (i) (ii) the term current ratio means current assets divided by current liabilities. the term collection-generation ratio means: (A) (B) (C) (D) energy collected by EDM divided by energy sent out by EDM; energy collected by EDM is equal to (energy sent out to EDM less transmission and distribution losses in EDM s system) multiplied by EDM s billing collection ratio; energy sent out from EDM s generation systems, or entering EDM s systems through purchases; and EDM billing collection ratio means energy collected divided by energy billed. 4. EDM shall, not later than three months after the Effective Date, appoint the independent auditors referred to in Section 4.09 (b) of the General Conditions, in accordance with the provisions of Section III of this Schedule.

- 8 - Section III. Procurement All goods, works and services required for the Project and to be financed out of the proceeds of the Financing shall be procured in accordance with the provisions of Section III of Schedule 2 to the Financing Agreement.