December 11, Re: IBRD Loan No UY (OSE Sustainable and Efficient Project) Additional Instructions: Disbursement Letter

Similar documents
LatinAmeria & h Carbbee

May 7, His Excellency Ivan Acosta Montalvan Minister of Finance and Public Debt Ministry of Finance and Public Debt Managua, Nicaragua

OFFICIAL Le & L DOCUMENTS THE WORLD BANK Bouchard 547, 29th floor Tel.: (54-11) / 44

Re: IBRD Loan 8074-BR (Brazil - Federal Integrated Water Sector Project - Interaguas) Additional Instructions: Disbursement Letter

July 16, Re: Saint Lucia: IDA Credit No LC (Disaster Vulnerability Reduction Project) Additional Instructions: Disbursement.

~OUMENTV. February 11, 2015

OFF10A. 1i'L. 11 September 2014

"'530-8E OFFICIAL DOCUMENTS

THE WORLD BANK IBRD * IDA I WORLD BANKGROUP

THE WORLD BA IBRD* IDA I WORLDBANKGROUP. Cable Address: INTBAFRAD U.S.A.

I OFFICIAL DOCUMENTS. December 27, H.E. Radoje Zugic Minister of Finance Ministry of Finance Stanka Dragojevica Podgorica Montenegro

OFFICIAL DOCUMENTS. L-,v 83a-)I-JeP. V(taWh o2,2014

QFICIAL LZ4,1 5,2014. H.E. Patrice Kitebi Minister of Finance Boulevard du 30 Juin Commune de la Gombe Kinshasa 1, Democratic Republic of Congo

The World Bank. May 16, 2016

OFFICIAL. BANCO MUNDIWCUME0i BIRD * AID I GRUPO BANCO MUNDI. November 4, 2014

OF-1:CCAL 6 J 531/6" - '

H.E. Sufian Ahmed, Minister, Ministry of Finance and Economic Development P. 0. Box 1905 Addis Ababa Federal Democratic Republic of Ethiopia

O FFICIAL October 12, 2017 DOCUMENTS

OFFICIAL DOCUMENTS. ron'

Re: IBRD Loan 8520-IQ (Emergency Infrastructure and Services Restoration Project) Additional Instructions: Disbursement - First Restatement

OFFICIAL DOCUMENTS. Public Disclosure Authorized. Public Disclosure Authorized

(i) Disbursement Methods (section 2). The following Disbursement Methods may be used under the Loan:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

P24 JUIN 2015, * Reimbursement * Advance * Direct Payment * Special Commitment

Re: IDA Credit 5801-CV (Competitiveness for Tourism Development Project) Additional Instructions: Disbursement

His Excellency M. Patrice Kitebi Minister of Finance Ministry of Finance Kinshasa-Gombe Democratic Republic of Congo

OFFICIAL DOCUMENTS. re4yua- 2,2017

December 15, I. Disbursement Arrangements. (i) Disbursement Methods (section 2). The following Disbursement Methods may be used under the Loan:

April 11, Additional Instructions: Disbursement. Excellency:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

(OFFICIAL 'f 3 -- DOCUMENTS

O FFICIAL DO CUM ENTS

OFFICIAL DOCUMENTS. July 1, 2015

I OFFICItAL ct 3, DOGIJNMTS

THE WORLD BANK IBRD * IDA I WORLD BANKGROUP

OFFICIAL DOCUMENTS. July 15, 2014

OFFMCAL. June 27, 2012

OFFICIAL LN DOCUMENTS

Letter No. CD-220/PFM/V/2011 May 25, 2011

DOCUMENTS OFFICIAL. June 24, 2016

THE WORLD BANK. IBRD * IDA I WoRLDBANKGROUP , 2016

OFFICIAL DOCUMENTS i. Public Disclosure Authorized

21 A rd,2015. Gabriel Vallejo L6pez Ministro Ministerio de Ambiente y Desarrollo,ostenible Calle 37 No 8-40 Bogota, D.C., Colombia

THE WORLD BANK IBRD * IDA I WORLD BANKGROUP

Letter No. CD-268/TF PNPM Rural III/VI/2011 June 20, 2011

DOCUMENTS. June 17, Honourable Don Pomb Polye, MP Ministry for Treasury Vulupindi Haus 4 th Floor P.O. Box 542 Waigani, 131 NCD Papua New Guinea

The World Bank. Honorable Peter O'Neill, CMG MP Minister for Treasury and Finance PO Box 542 Waigani National Capital District Papua New Guinea

_%E, C4WHCIA. A[hrd IS H.E. Saidou Sidibe Minister of Finance and Economy Ministry of Finance and Economy BP 389 Niamey Republic of Niger

DOCUMENTS. June 9, 2014

THE WORLD BANK IBRD* IDA I WORLD BANKGROUP

Re: IDA Financing 5376-IN (Accelerating Universal Access to Early and Effective Tuberculosis Care Project) Additional Instructions: Disbursement

OFFE4. c('g~ 7-ZJ _T 2014

November 5, Dear Secretary Azam:

OF FICIAL 9 - VA" The World Bank 1818 H StrieQ CUMEN

OFFICIAL - DOCUMENTS L4

THE WORLD BANK IBRD IDA WORLDBANKGROUP OFFICIAL DOCUMENTS

The following Disbursement Methods may be used

I OFFICIAL. tks DOCUMENTS. The

6FFICIAL DOCUMENTS THE WORLD BANK IBRD - DA I RLDBANKGROUP. May 9, Letter No. CD-089/WB/DOISP II/V/2017

THE WORLD BANK OFFICIAL IBRD IDA WORLDBANKGROUP O C ALNTS

Re: Loans No and Amendment of Additional Instructions: Disbursement

OFFICIAL DOCUMENTS. Public Disclosure Authorized

Re: Loans No and Amendment of Additional Instructions: Disbursement

Re: Loan No Amendment of Additional Instructions: Disbursement

Re: Loan No.: Amendment of Additional Instructions: Disbursement

OFFICIAL L '39v us DOCUMENTS

OFFICL DOCUMEN. Letter No. CD-188 /MEH/IV/2013 April 30, 2013

OFFICIAL Ca.- q DOCUMENTS a C

QFICIAL THE WORLD BANK IBRD *IDA I WORLD BANKGROUP. July 1, 2016

OFFICAL. THE WORLD BANk IBRD. Letter No. CD-287/WB/XI/2014 November 27, 2014

THE WORLD BANK IBRD IDA I WORLD ANKOROUP

Re: IDA Financing No VN (Enhancing Teacher Education Program), Additional Instructions: Disbursement

OFFICIAL DOCUM ENTS THE WORLD BANK IBRD IDA I WORLD BANKGROUP. ume&.s,2016

THE WORLD BANK I BANK DUNIA. Stefan G. Koeberle Lt. 8 tit- Country Director, Indonesia

OFFICIAL e DOCUMENTS

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

OFFICIAL UWW- 7 DOCUMENTS

OFFICIAL DOCUMENTS. Re: Liberia Grant Number TFOA1263-LR - Public Sector Modernization Project Additional Instructions: Disbursement

DOCUMENTS THE WORLD BANK. Letter No. CD-163/JUFMP/X/ October 2015

Guarantee Agreement. Public Disclosure Authorized LOAN NUMBER 2033 UR. Public Disclosure Authorized. (First Telecommunications Project)

OFFICIAL 9, 8~~' -O)k DOCUMENTS

-rhe WORLD BANK. c#l IB3RD -IDA IWORLD BANKGROUP ~)CJE. December 22, 2014

Letter No. CD-166/RISET/IV/2013 April 12, 2013

May 5, Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

OFFICIAL DOCUMENTS. THE WORLD BANK IBRD * IDA I Wom.D BANKROUP. Page 1 of 21. Public Disclosure Authorized

Re: IBRD Loan 8349-TR (Gas Sector Development Project Additional Finance) Additional Instructions: Disbursement

OFFICIAL DOCUMENTS. Re: IBRD Loan 8397-MA (Rural Water Supply Project) Additional Instructions: Disbursement - Restatement

Disbursement Guidelines For Projects

OFFICIAL M A O, The World Bank

I DOCUMENTS! Letter No. CD-249/JSDF/VIII2012 August16, 2012

DOCUMENTS OFFICIAL THE WORLD BANK IBRD * IDA I WORILDBANKGROUP. rembr O \5,2017. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL Ly p,'r ipd DOCUMENTS

Re : Loan 3767-BR (Espírito Santo Water and Coastal Pollution Management Project) Amendment to the Loan Agreement

OFFICIAL, '. (, DOCUMENTS. IllitD I womsalareup C1106ABG Fax: (54-11) Ciudad Aut6noma de Buenos Aires Argentine Republic

Loan Agreement. (National Pension Administration Technical Assistance Project) between ARGENTINE REPUBLIC. and

November 13, Dear Sirs:

UNITED MEXICAN STATES

THE WORLD BANK IBRD* IDA I WORLD BANKOROUP

THE WOR4q*& IBRD* IDA I WORLDBANKGROUP 7

The World Bank 1818 H Street N.W. (202) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOfICIA6shington, D.C

Transcription:

IOFFICtAL LO 8 U8 f The World Bank 1A4A H.,treAt hi W, 0. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL DEVELOPMENT ASSOCIATIO 4 U.S.A. Cable Address: INDEVAS December 11, 2012 Mr. Milton Eduardo Machado Lens President Administraci6n de Las Obras Sanitarias del Estado Carlos Roxlo 1275 Montevideo, Uruguay Dr. Gustavo Antonio P6rez Vilche Secretary General Administraci6n de Las Obras Sanitarias del Estado Carlos Roxlo 1275 Montevideo, Uruguay Cc: Femando Lorenzo Estefan Ministro de Economia y Finanzas Ministerio de Economia y Finanzas Colonia 1089 Piso 3 Montex ideo Repi6bhca Oriental del Uruguay Dear Sirs: Re: IBRD Loan No. 8183-UY (OSE Sustainable and Efficient Project) Additional Instructions: Disbursement Letter I refer to the Loan Agreement ("Agreement") between the International Bank for Reconstruction and Developmeni ("World Bank") and the Administraci6n de las Obras Sanitarias del Estado (the "Borrower") for the above-referenced project, dated December 11, 2012. The Agreement provides that the World Bank may issue additional instructions regarding the withdrawal of the proceeds of Loan No. 8183-UY ("Loan"). This letter ("Disbursement Letter"), as revised from time to tine, constitutes the additional instructions. The attached World Bank Disoursement Guidelines for Projects, dated May 1, 2006, ("Disbursement Guidelines") (Attachment 1), are an integral part of the Disbursement Letter. The manner in which :he provisions in the Disbursement Guidelines apply to the Loan is specified below. Sections and subsections in parentheses below refer to the relevant sections and subsections in the Disbursement Guidelines and, unless otherwise defined in this letter, the capitalized terms used have the me mnis ascribed to them in the Disbursement Guidelines.

I. Disbursement Arrangements (i) Disbursement Methods (secti6n 2,1. under the Loan: The following Disbursement Methods may be used * Advance * Direct Payment * Reimbursemeni to OSE for Rctroactive Financing (ii) Disbursement Deadline Date (subsection 3.7). The Disbursement Deadline Date is four months after the Closing Date spec,fied in Section IV.B.2. of Schedule 2 to the Loan Agreement. Any changes to this date will be no ified by the World Bank. (iii) Disbursement Conditions (suseclion 3.8). Please refer to the Disbursement Condition of Section IV.B. 1. in Schedule 2 to the Loan Agreement. II. Withdrawal of Loan Proceeds (i) Authorized Signatures (subsecion 3.1). An authorized signatory letter in the form attached (Attachment 2) should b. furnished to the World Bank at the address indicated below providing the name(s) and specimen signature(s) of the official(s) authorized to sign Applications: The World Bank Torcn Bouchard Bouchard 547 Buenos Aires, Argentina Atter.tion: Penelope J. Brook Country Director Argentina, Paraguay and Uruguay (ii) Applications (subsections 3.2-3.3). Please provide completed and signed applications for withdrawal, together wit4 supporting documents, to the address indicated below: Banco Mindial Setoi Comercial Norte, Quac ra 02, Lote A Edificio Corporate Finance Center 70 andar 70712-900 Brasilia, D.F. Braz 1 Attention: Loan Department (iii) Electronic Delivery (subsectim 3.4) The Bank may permit the Borrower to electronically delive:- to the Bank Applications (with supporting documents) through the Bank's Client Connection, web-based portal. The option to deliver Applications to the Bank by electronic means may be effected if: (a) the Borrower has designated in writing, pursuant to the terms of the Page 2 of 5

subparagraph (i) of this Section, its officials who are authorized to sign and deliver Applications and to receive secure identification devices ("Tokens") from the Bank for the purpose of delivering such Applications by electronic means; and (b) all such officials designated by the Borrower have registered as users of Client Connection. If the Bank agrees, the Bank will provide the Borrower with Tokens for :he designated officials. Following which, the designated officials may deliver Applications electronically by completing Form 2380, which is accessible through Client Connection (http s://clientconnection.worldbank.org). The Borrower may continue to exercise the option of pre-:aring and delivering Applications in paper form. The Bank reserves the right and may, i i its sole discretion, temporarily or permanently disallow the electror,ic delivery of Applications by the Borrower. (iv) Terms and Conditions of Use of Tokens to Process Applications. By designating officials to accept Tokens and by choosir,g to deliver the Applications electronically, the Borrower confirms, through the authorized signatory letter, its agreement to: (a) abide by the Terms and Conditions of Use of Secure Identi6cation Devices in connection with Use of Electronic Means to Process Applications and Supporting Documentation ("Terms and Conditions of Use of Tokens") provided in Attachment 3; and (b) to deliver the Terms and Conditions of Use of Tokens to each such official and to cause such official to abide by those terms and conditions. (v) Minimum Value ofapplicatioas (subsection 3.5). The Minimum Value of Applications for reimbursements is USD $1,700,000. (vi) Advances (sections. and 6) * Type of Designated Acco!nt (subsection 5.3): Segregated. * Currency of Designated Account (subsection 5.4): United States Dollars (USD). * Financial Institution at which the Designated Account Will Be Opened (subsection 5.5): Banco Central del Uruguay (the Borrower's Central Bank). * Ceiling (subsection 6.1).: USD $8,400,000. III. Reporting on Use of Loan Pr>ceeds (i) Supporting Documentation (section 4). Supporting documentation should be provided with each a:)plication for withdrawal as 3et out below: For reporting eligible expenditures paid from the Designated Account: o Records evidenci,g eligible expenditures (e.g., copies of receipts, supplier invoices) for payments for (i) Goods against contracts valued at USD $1,500,)00 or more; (ii) Works against contracts valued at USD $3,000,000 or more; 'iii) Consulting Firms against contracts valued at USD $250,000 equivalent or more; and (iv) Individual Consultants against contracts valued at USD $50,000 equivalent or more, in the form attached (Attachment 4A - Statement of Exypenditures with supporting documentation); Page 3 of 5

o o Stateme at of Expe aditures in the form attached (Attachment 4B - Statement of Expenditure without supporting documentation) for all other expenditures / contracts below the above mentioned thresholds, including Non-consulting services, Training nd Operating cost; List of payments igainst contracts that are subject to the World Bank's prior review, in the forr attached (Attachment 5); and o A Designated Ac :ount activity reconciliation statement and bank Statement should be submittod with each withdrawal application reporting on the use of Loan proceeds from the Designated Account (Attachment 6). (ii) Frequency of Reporting Eligible Expenditures Paid from the Designated Account (subsection 6.3): Minimum freque icy: quarterly. IV. Other Important Informatioi For additional informaticn on disbursement arrangements, please refer to the Disbursement Handbook available on the World Bank's public website at https://www.worldbank.org and its secure website "Client Connection" at https://clientconnection.vorldbank.or. Print copies are available upon request. If you have not already dore so, the World Bank recommends that you register as a user of the Client Connectio:a website (https://clientconnection.worldbank.org). From this website you will be able to prepare and deliver Applications, monitor the near real-time status of the Loan, and retrieve related policy, financial, and procurement information. All Borrower officials authorized to sign and deliver Applications by electronic means are required to register with Client Connection before electron c delivery can be affected. For more information about the websit': and registra:ion arrangements, please contact the Bank by email at <clieni connection@worldbank.org:>. If you have any queries in rela:ion to the above, please contact Victor Ordonez Conde, Finance Officer at vcondeaworldbank.org using the above reference. Yours sincerely, By Penelope rook Director Arg;entina, Paraguay and Uruguay Latin America and the Caribbean Region Page 4 of 5

Attachmwents 1. World Bank Disbursement Guidelines for Projects, dated May 1, 2006 2. Authorized Signatory Lettei (format) 3. rerms and Conditions of U ;e of Secure Identification Devices in connection with Use of Electronic Means to Process Applications and Supporting Documentation, dated January 202010 4A. Statement of Exp.nditures with supporting documentation, above SOE thresholds 4B. Statement of Exp.-nditures without supporting documentation, below SOE thresholds 5. Form - List of Payments Against Contracts Subject to the Bank's Prior Review 6. Format - Designated Accou At Activity Reconciliation Cc with. copies: NaLan Wajner Ge rente Programas con Fi:ianciamiento Externo Administracion de las Obras Sanitarias del Estado Ca-los Roxlo 1275 Piso 3 Montevideo Rep?ablica Oriental del Uruguay Prepared by Victor Ordofiez, CTRLN Cleared with and cc: Fabiola Altimnari, Giovanni Bo (LEGLA) Carlos Velei;, Carmen Yee-Batista (LCSUW) Daniel Chalupowicz, LCSFM Page 5 of 5