CONNECTED TRANSACTION CONSTRUCTION AGREEMENT

Similar documents
CONNECTED TRANSACTION SUBSCRIPTION OF SHARES IN A JOINT VENTURE

CONNECTED TRANSACTIONS

LETTER FROM THE BOARD

CHEUNG KONG INFRASTRUCTURE HONGKONG ELECTRIC HOLDINGS LIMITED

CHEUNG KONG INFRASTRUCTURE HOLDINGS LIMITED (Incorporated in Bermuda with limited liability) (Stock Code: 1038)

CORPORATE GOVERNANCE. Corporate Governance Practices. Board of Directors

PROPOSAL TO MERGE CKI AND PAH TO CREATE A WORLD CLASS, DIVERSIFIED INFRASTRUCTURE COMPANY

MAJOR TRANSACTION ACQUISITION OF THE ENTIRE ISSUED SHARE CAPITAL IN BARRA TOPCO II LIMITED

(Stock Code: 1038) (Stock Code: 006)

CONNECTED TRANSACTION FRAMEWORK AGREEMENT FOR PROPOSED HOTEL DEVELOPMENT

JOINT ANNOUNCEMENT RELATING TO ECONOMIC BENEFITS AGREEMENTS CONNECTED TRANSACTIONS

NOTES TO THE FINANCIAL STATEMENTS (Expressed in Hong Kong dollars unless otherwise indicated)

CORPORATE GOVERNANCE REPORT

CONTINUING CONNECTED TRANSACTIONS ACQUISITION OF CONNECTED DEBT SECURITIES

CHEUNG KONG (HOLDINGS) LIMITED

THIS CIRCULAR IS IMPORTANT AND REQUIRES YOUR IMMEDIATE ATTENTION

CONTINUING CONNECTED TRANSACTIONS SUPPLEMENTAL NOTICE OF ANNUAL GENERAL MEETING

FINANCIAL HIGHLIGHTS. Six months ended 30 June Change HK$ million HK$ million Restated

FINANCIAL HIGHLIGHTS. Six months ended 30 June Change HK$ million HK$ million

THIS CIRCULAR IS IMPORTANT AND REQUIRES YOUR IMMEDIATE ATTENTION

PLACING OF EXISTING SHARES, SUBSCRIPTION FOR NEW SHARES AND RESUMPTION OF TRADING

Power Assets Holdings Limited 電能實業有限公司 2018 年中期報告 Interim Report 2018 Interim Report 2018 年中期報告

e-kong Group Limited (Incorporated in Bermuda with limited liability) (Stock Code: 524)

CONTINUING CONNECTED TRANSACTIONS TENANCY AGREEMENTS

VOLUNTARY ANNOUNCEMENT UPDATE ON FORMATION OF JOINT VENTURE

(incorporated in Hong Kong with limited liability) (Stock Code: 13) CONNECTED TRANSACTIONS PROVISION OF FINANCIAL ASSISTANCE

PROPOSED LISTING OF SHUI ON LAND LIMITED

CONTINUING CONNECTED TRANSACTIONS

(Incorporated in Hong Kong with limited liability) (Stock Code: 13) OVERSEAS REGULATORY ANNOUNCEMENT

CONTINUING CONNECTED TRANSACTIONS

REVISION OF ANNUAL CAP AMOUNTS FOR CONTINUING CONNECTED TRANSACTIONS UNDER THE GAS PURCHASE MASTER AGREEMENT

Stella International Holdings Limited

DISCLOSEABLE TRANSACTION IN RELATION TO GRANT OF CALL OPTION

PACIFIC CENTURY PREMIUM DEVELOPMENTS LIMITED *

DISCLOSEABLE AND CONNECTED TRANSACTIONS

DISCLOSEABLE TRANSACTION RELATING TO ACQUISITION OF SHARES IN LOUIS XIII HOLDINGS LIMITED

CWT INTERNATIONAL LIMITED

ATS is a wholly-owned subsidiary of the HEH. It was established in 1975 as an engineering consultancy firm serving the electricity supply industry.

TRANSPORT INTERNATIONAL HOLDINGS LIMITED

GUOTAI JUNAN INTERNATIONAL HOLDINGS LIMITED (incorporated in Hong Kong with limited liability) (Stock Code: 1788)

JOINT ANNOUNCEMENT CHEUNG KONG INFRASTRUCTURE HOLDINGS LIMITED VERY SUBSTANTIAL DISPOSAL HUTCHISON WHAMPOA LIMITED DISCLOSEABLE TRANSACTION

CONNECTED TRANSACTIONS BUILDING IMPROVEMENTS AT BANK PROPERTIES

REPORT OF THE DIRECTORS

CONTINUING CONNECTED TRANSACTIONS

ENTERING INTO OF MANAGEMENT AGREEMENT FOR MANAGEMENT OF HOTEL

DISCLOSEABLE AND CONNECTED TRANSACTIONS ACQUISITION OF ADDITIONAL SHARE CAPITAL OF A SUBSIDIARY

CONTINUING CONNECTED TRANSACTION SUPPLY AGREEMENT WITH TVBC

Hong Kong Stock Exchange announcement from China Pioneer

Kingsoft Corporation Limited 金山軟件有限公司

CONNECTED TRANSACTION IN RELATION TO THE FORMATION OF A CONSORTIUM FOR THE ACQUISITION OF A MINORITY STAKE IN AN OFFSHORE WINDFARM

Melco International Development Limited (Incorporated in Hong Kong with limited liability) Website : (Stock Code : 200)

TRANSPORT INTERNATIONAL HOLDINGS LIMITED ( 載通國際控股有限公司 )*

POSSIBLE DISCLOSEABLE TRANSACTION POSSIBLE FORMATION OF A JOINT VENTURE AND POSSIBLE PROVISION OF FINANCIAL ASSISTANCE

CONTINUING CONNECTED TRANSACTIONS

PROPOSED SPIN-OFF AND SEPARATE LISTING OF HUTCHISON PORT HOLDINGS TRUST ON THE MAIN BOARD OF SINGAPORE EXCHANGE SECURITIES TRADING LIMITED

DISCLOSEABLE AND CONNECTED TRANSACTION IN RESPECT OF THE PROPOSED DISPOSAL OF 100% INTEREST IN A WHOLLY-OWNED SUBSIDIARY

Directors The Directors of the Company in office at the date of this Annual Report are listed on page 214 and their biographical information is set ou

DESIGNATION OF VICE CHAIRMAN AND MANAGING DIRECTOR

CONNECTED TRANSACTION ACQUISITION OF NON WHOLLY-OWNED SUBSIDIARY

China Resources Power Holdings Company Limited (Incorporated in Hong Kong with limited liability under the Companies Ordinance)

CHINA RUIFENG RENEWABLE ENERGY HOLDINGS LIMITED

CONTINUING CONNECTED TRANSACTIONS LICENSING AGREEMENT AND SUPPLY AGREEMENT WITH TVBC AND EXISTING ARRANGEMENTS WITH TVB (OVERSEAS)

REVISION OF ANNUAL CAP OF EXISTING CONTINUING CONNECTED TRANSACTIONS

CONTINUING CONNECTED TRANSACTIONS THE NEW MASTER SALES AGREEMENT

HKT Trust. HKT Limited

CONNECTED TRANSACTION ISSUE OF CONVERTIBLE BONDS

CONNECTED TRANSACTION DISPOSAL OF INTELLECTUAL PROPERTY RIGHTS

JOINT ANNOUNCEMENT CONTINUING CONNECTED TRANSACTIONS

GCL-Poly Energy Holdings Limited 保利協鑫能源控股有限公司

CHINA ENVIRONMENTAL RESOURCES GROUP LIMITED

威雅利電子 ( 集團 ) 有限公司 WILLAS-ARRAY ELECTRONICS (HOLDINGS) LIMITED

CONNECTED TRANSACTIONS AND CONTINUING CONNECTED TRANSACTIONS IN RELATION TO HONG KONG AND MACAU DISTRIBUTION AGREEMENTS

GUOTAI JUNAN INTERNATIONAL HOLDINGS LIMITED

NOT FOR PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN OR INTO THE UNITED STATES

CONNECTED TRANSACTION: DISPOSAL OF SUBSIDIARIES

CONNECTED TRANSACTION: DISPOSAL OF SUBSIDIARY

JOINT ANNOUNCEMENT CONNECTED TRANSACTION FORMATION OF JOINT VENTURE AND INCREASE OF TOTAL CAPITAL COMMITMENT

OP FINANCIAL LIMITED *

ANNOUNCEMENT CONNECTED TRANSACTIONS PROVISION OF LOAN FACILITIES TO A FELLOW SUBSIDIARY

(stock code: 78) CONNECTED TRANSACTION DEVELOPMENT CONSULTANCY SERVICES

CONNECTED TRANSACTION Acquisition of 8% interest in a non wholly owned subsidiary

DISCLOSEABLE TRANSACTION DISPOSAL OF WUHAN BRIDGE COMPANY

DESON DEVELOPMENT INTERNATIONAL HOLDINGS LIMITED

DISCLOSEABLE TRANSACTION IN RELATION TO PROVISION OF LOAN FACILITY

GENERAL MANDATES TO REPURCHASE SHARES AND TO ISSUE SHARES

CONTINUING CONNECTED TRANSACTION SUB-LICENSE AGREEMENT

(incorporated in Hong Kong with limited liability) (Stock Code: 13) ANNOUNCEMENT RECENT OPERATIONAL DATA AND UNAUDITED FINANCIAL INFORMATION

兗州煤業股份有限公司 YANZHOU COAL MINING COMPANY LIMITED

e-kong Group Limited (Incorporated in Bermuda with limited liability) (Stock Code: 524)

ANNOUNCEMENT RE-ENTERING INTO THE JOINT VENTURE ENTERPRISE AGREEMENT WITH GENERAL ELECTRIC (CHINA) CO., LTD.

ANNOUNCEMENT ACQUISITION OF HIGH ROLLER GAMING BUSINESS

Shui On Land Limited

GCL New Energy Holdings Limited

CONNECTED TRANSACTIONS

LI TZAR KUOI, VICTOR Chairman

(Incorporated in Hong Kong with limited liability) (Stock Code: 966)

ROAD KING INFRASTRUCTURE LIMITED (Incorporated in Bermuda with limited liability)

PANTRONICS HOLDINGS LIMITED

PLACING AND ISSUE OF SHARES UNDER GENERAL MANDATE

CONNECTED TRANSACTION ACQUISITION OF A HOTEL MANAGEMENT COMPANY

Transcription:

Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. CONNECTED TRANSACTION CONSTRUCTION AGREEMENT The Board announces that on 8 June 2018, TOA, an indirect wholly-owned subsidiary of AEO, and Energy Solutions entered into the Construction Agreement in connection with the augmentation of the Elaine Terminal Station and the design and construction of the Connection Assets for the Elaine Wind Farm. Energy Solutions is considered an indirectly non wholly-owned subsidiary of the Company under the Listing Rules. AEO is indirectly held as to 50% by CKI, a substantial shareholder of the Company, and is therefore an associate of CKI and a connected person of the Company. Therefore, the Construction Agreement constitutes a connected transaction of the Company. As the relevant percentage ratios in respect of the consideration to be received by Energy Solutions under the Construction Agreement exceed 0.1%, but all of them are less than 5%, the Construction Agreement is subject to the reporting and announcement requirements under Chapter 14A of the Listing Rules but exempt from the independent shareholders approval requirement. INTRODUCTION The Board announces that on 8 June 2018, TOA, an indirect wholly-owned subsidiary of AEO, and Energy Solutions entered into the Construction Agreement in connection with the augmentation of the Elaine Terminal Station and the design and construction of the Connection Assets for the Elaine Wind Farm. THE CONSTRUCTION AGREEMENT Set out below is a summary of the Construction Agreement: Date : 8 June 2018 Parties : TOA Energy Solutions - 1 -

Pursuant to the Construction Agreement, Energy Solutions will augment the Elaine Terminal Station and design and build the Connection Assets for the Elaine Wind Farm at a consideration of A$15 million (equivalent to approximately HK$89.62 million). The consideration is payable by TOA to Energy Solutions in cash by monthly progress payments for works executed and materials, goods and equipment delivered. The consideration was determined having regard to the costs of sub-contracts, materials, manpower and overheads required for undertaking and completing the works under the agreement. Practical completion of the works is expected to be in April 2019. Under the agreement, Energy Solutions will provide TOA with irrevocable unconditional undertakings from a financial institution for a total of approximately A$0.75 million (equivalent to approximately HK$4.48 million) as security for any payment and other obligations on the part of Energy Solutions. REASONS FOR AND BENEFITS OF THE TRANSACTION AEO is a joint venture between the Company and CKI (as to 50% interest each) in the business of providing transmission augmentations in Australia. TOA and TOA2, indirect wholly-owned subsidiaries of AEO, currently operate transmission lines and terminal stations to transport the electricity generated respectively from the Mt Mercer Wind Farm and the Ararat Wind Farm in Victoria, Australia to the main power grid. AEO has, through TOA, agreed with EWPL to provide connection service enabling the transmission of electricity generated from the Elaine Wind Farm to the Network for a term of 25 years from the commencement date of the connection service, which may be extended for a further term of up to 30 years at the option of EWPL. Energy Solutions has extensive experience in the construction, commissioning and maintenance of electricity network facilities in Australia, and AEO has worked with Energy Solutions, formerly integrated into its sister entity Powercor Network Services Pty Ltd, on similar projects in the past, including the Mt Mercer Wind Farm and the Ararat Wind Farm connection projects. Their experience in the delivery and operation of similar electricity network infrastructure makes them highly suitable to work on the projects in connection with the Elaine Wind Farm as contemplated under the Construction Agreement. The entering into of the Construction Agreement is in the ordinary course of business of Energy Solutions, and the terms are reached between the parties on arm s length basis. The Directors (including the Independent Non-executive Directors) consider that the Construction Agreement was entered into in the ordinary and usual course of business of the Group, on normal commercial terms and in the interests of the Company and its shareholders as a whole, and that its terms are fair and reasonable. INFORMATION ON THE PARTIES INVOLVED IN THE TRANSACTION The principal activities of the Group are investment in energy and utility-related businesses in the United Kingdom, Hong Kong, Australia, New Zealand, mainland China, Thailand, the Netherlands, Portugal and Canada. The principal business of Energy Solutions is the design, supply, construction, operation and maintenance of electricity networks. The principal business of AEO and its subsidiaries, including TOA and TOA2, is the construction and ownership of transmission assets in Australia. - 2 -

LISTING RULES IMPLICATIONS Energy Solutions is considered an indirectly non wholly-owned subsidiary of the Company under the Listing Rules. AEO is indirectly held as to 50% by CKI, a substantial shareholder of the Company, and is therefore an associate of CKI and a connected person of the Company. Therefore, the Construction Agreement constitutes a connected transaction for the Company under the Listing Rules. As the relevant percentage ratios in respect of the consideration to be received by Energy Solutions under the Construction Agreement exceed 0.1% but all of them are less than 5%, the Construction Agreement is subject to the reporting and announcement requirements of Chapter 14A of the Listing Rules but exempt from the independent shareholders approval requirement. None of the Directors has any material interest in the Construction Agreement and the transactions contemplated thereunder, and no Director was required to abstain from voting on the board resolutions for such transactions. DEFINITIONS In this announcement, unless the context requires otherwise, the following terms have the meanings set out below: AEO Ararat Wind Farm associate(s) Board CKI Company connected person(s) Connection Assets Construction Agreement Australian Energy Operations Pty Ltd, a company incorporated in Australia with limited liability and indirectly held as to 50% each by the Company and CKI a wind farm located near Ararat, Victoria, Australia the board of Directors of the Company CK Infrastructure Holdings Limited, a company incorporated in Bermuda with limited liability, the shares of which are listed on the Main Board of the Stock Exchange (Stock Code: 1038) Power Assets Holdings Limited, a company incorporated in Hong Kong with limited liability, the shares of which are listed on the Main Board of the Stock Exchange (Stock Code: 6) a 33kV switchboard, a 33kV-220kV transformer and all associated equipment and infrastructure to be constructed for enabling the transmission of electricity generated by Elaine Wind Farm to the Network the contract dated 8 June 2018 for the augmentation of the Elaine Terminal Station and the design and construction of the Connection Assets for the Elaine Wind Farm - 3 -

Director(s) Elaine Terminal Station Elaine Wind Farm Energy Solutions EWPL Group Hong Kong Listing Rules Mt Mercer Wind Farm Network substantial shareholder Stock Exchange TOA TOA2 the director(s) of the Company the terminal station owned by TOA constructed at Elaine, Victoria, Australia for the connection of the transmission line connecting generators and/or loads to the Network a wind farm to be built in Elaine, Victoria, Australia Energy Solutions Pty Ltd, trading as Beon Energy Solutions, is a company incorporated in Australia with limited liability, which notwithstanding it is indirectly held as to 51% by a company which is in turn indirectly held as to 54.76% by the Company (hence technically considered as a non wholly-owned subsidiary of the Company within the definition of subsidiary under the Listing Rules), since the Company has no effective control over its board composition and decision making on significant matters, is accounted for as an associate in the Group s financial statements Elaine Windfarm Pty Ltd, a company incorporated in Australia with limited liability and the developer of the Elaine Wind Farm the Company and its subsidiaries the Hong Kong Special Administrative Region of the People s Republic of China the Rules Governing the Listing of Securities on the Stock Exchange a wind farm in Victoria, Australia an existing 220kV transmission network in Victoria, Australia The Stock Exchange of Hong Kong Limited Transmission Operations (Australia) Pty Ltd, a company incorporated in Australia with limited liability, and an indirect wholly-owned subsidiary of AEO Transmission Operations (Australia) 2 Pty Ltd, a company incorporated in Australia with limited liability, and an indirect wholly-owned subsidiary of AEO - 4 -

A$ HK$ Note: Australian dollars, the lawful currency of Australia Hong Kong dollars, the lawful currency of Hong Kong The figures in A$ are converted into HK$ at the rate of A$1.00 : HK$5.9748 throughout this announcement for indicative purpose only, and should not be construed as a representation that any amount has been, could have been or may be, exchanged at this or any other rate. By Order of the Board Alex Ng Company Secretary Hong Kong, 8 June 2018 As at the date of this announcement, the directors of the Company are: Executive directors : Mr. FOK Kin Ning, Canning (Chairman), Mr. TSAI Chao Chung, Charles (Chief Executive Officer), Mr. CHAN Loi Shun, Mr. Andrew John HUNTER, Mr. Neil Douglas MCGEE and Mr. WAN Chi Tin Non-executive director : Mr. LI Tzar Kuoi, Victor Independent non-executive directors : Mr. IP Yuk-keung, Albert, Mr. Ralph Raymond SHEA, Mr. WONG Chung Hin and Mr. WU Ting Yuk, Anthony - 5 -