Loan Scheme to promote the Concentrating Solar Thermal (CST) Projects in India for Industrial Process Heat Applications

Similar documents
Financing Norms and Schemes Dated 23 rd December, 2015

File No. 53/1/2008-WE Ministry of New and Renewable Energy Wind Power Division Block No.14, C.G.O. Complex, Lodi Road, New Delhi

FINANCING NORMS AND SCHEMES

FINANCING NORMS AND SCHEMES

FINANCING NORMS AND SCHEMES

Indian Banks Association IBA MODEL LOAN SCHEME FOR VOCATIONAL EDUCATION AND TRAINING

AGREEMENT FOR PLEDGE OF SHARES (BY THE POA HOLDER)

THE TAMILNADU INDUSTRIAL INVESTMENT CORPORATION LIMITED CITIZENS CHARTER

SIDBI s Initiatives in. Sustainable Finance WE EMPOWER MSME

Citizen's Charter February, 2018

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

Jawaharlal Nehru National Solar Mission

Financing Energy Efficiency Projects for SMEs

Scheme Financing Infrastructure Projects through the India Infrastructure Finance Company Limited (IIFCL)

Project Finance and Debt Equity Solar Thermal Projects

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

CREDIT GUARANTEE FUND SCHEME FOR EDUCATION LOANS (CGFSEL) CHAPTER I

No.32/ 76 / /PVSE Government of India Ministry of New and Renewable Energy ***

NBFC Prudential Norms & Compliances Important Aspects

Most Important Terms & Conditions

Provisions Applicable to Micro, Small and Medium

Policy on Lending to MSMEs and Rehabilitation of MSMEs

Implementation of Solar Based Projects in MP Dated 20 July, 2012

Checklist for Audit Report under CARO

RBI / /51 DNBS (PD-MGC) C.C. No. 14/ / July 1, The Chairman/CEOs of all Mortgage Guarantee Companies

Infomerics Valuation And Rating Pvt. Ltd.

Rakesh Jha. Role of Credit Risk Guarantee Facility in Result Based Incentive model for Distributed Generation Projects

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar

DRAFT (To be signed on Non-judicial stamp paper of Rs.100/-)

Government s Agricultural economic initiatives and challenges ahead

Wind Project Financing. Targets, Barriers & Challenges, Elements of Financing, Recommendations for Financing

A. Present Context. Page 1 of 7

OPERATIONAL GUIDELINES. For. Implementation of. ( Extension Scheme for Generation Based Incentive

Issues and Challenges for Integrating Renewable Energy Technologies in Building Design. Vishal Goyal Assistant General Manager National Housing Bank

IDMD.PCD. 04 / / July 2, 2012

`IREDA Public Issue of Tax Free Bonds

Reserve Bank of India Department of Non-Banking Supervision Central Office, Centre No 1 World Trade Centre Mumbai

ANDHRA PRAGATHI GRAMEENA BANK HEAD OFFICE :: KADAPA

Banks Offering Loans for Grid Connected Solar Rooftop Systems*

RBI/ /90 IDMD.PCD.5 / / July 1, 2011

FAQ s on Insurance Brokers Regulations FAQ 1, Whether an Insurance Broker can provide any additional services to its clients?

Legislative Brief The Micro Finance Institutions (Development and Regulation) Bill, 2012

e-circular SME BUSINESS UNIT. Sl. No. : 760/ Circular No. : NBG/SMEBU-SBI SMILE/72/ Saturday,February 13,2010..

[Chapter IX] Edition NBC, Chartered Accountants and member of Allinial Global Accounting Association. All Rights Reserved.

JHARKHAND GRAMIN BANK HEAD OFFICE

Regulatory regime for NBFCs

MOST IMPORTANT TERMS AND CONDITIONS - FOR HOME LOANS

BACK ENDED INTEREST SUBSIDY

SME Business Outsourcing & Training Solutions LLP

Basics of Company Audit, Documentation and Practical Aspects

MOST IMPORTANT TERMS AND CONDITIONS (MITC) FOR INDIVIDUAL HOUSING LOANS

BCA - Workshop on NBFC St Regis Hotel Palladium, Mumbai 4 August 2016

Following are the major Terms and conditions agreed between (Borrower) and the (Housing Finance Co)

CORPORATION BANK Policy for selection and appointment of Statutory Central Auditors (SCAs)

18th Year of Publication. A monthly publication from South Indian Bank.

GIC HOUSING FINANCE LTD

COMPOUNDING UNDER FEMA BY CA.SUDHA G. BHUSHAN. INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA 25 th July 2015

RBI/ /131 RPCD.PLNFS. BC.No.31/ / August 19, 2005

IDMD.PCD. 04 / / July 1, 2013

SPECIMEN APPLICATION FORM FOR REGISTRATION WITH RBI

NPA POLICY. 2) an asset that has remained sub-standard for a period exceeding 14 months for the

Issues in Audit and Tax Audit of Banks

MANAPPURAM ASSET FINANCE LTD AUCTION POLICY

Forthcoming Programmes. PCS Updates. SEBI Updates. RBI Updates

Role of Parliamentarians in Monitoring Climate Finance and Development

CA CHANDRASHEKHAR IYER

D S R M STEELS PRIVATE LIMITED INVITATION FOR EXPRESSIONS OF INTEREST FOR SUBMISSION OF RESOLUTION PLAN IN D S R M STEELS PRIVATE LIMITED

RURAL ELECTRIFICATION CORPORATION LIMITED (A Government of India Undertaking)

INTRODUCTION TO CROSS BORDER BANKING

ESCROW/SPECIAL ACCOUNT AGREEMENT

Public Issue of Tax Free Secured Redeemable Non-Convertible Bonds issued by

FORM OF APPLICATION FOR CERTIFICATE OF REGISTRATION TO COMMENCE THE BUSINESS OF A MORTGAGE GUARANTEE COMPANY

ALLAHABAD U P GRAMIN BANK HEAD OFFICE : D.M. COLONY CIVIL LINES BANDA

APPLICATION FORM FOR MSEs

Secretarial Checklist under Companies Act, 1956

ANNEXURE-VII. Electricity Regulatory Commission Accounts & Audit

India Ex-Post Evaluation of Japanese ODA Loan Project Micro, Small and Medium Enterprises Energy Saving Project

At a Glance Jun 2011 (Brief Updates from the world of Tax and Finance)

TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE 1)

No.21 Rural Electrification 1

ARTICLE. On Finance Bill (Budget) Proposals 2013 Income Tax Act, 1961 By CA. SATISH AGARWAL

Guidelines for submission and processing of GBI Claims (GBI I & II Scheme)

Indian Receivable Trust 2019 Series 5 (Originator: Reliance Home Finance Limited)

% 2161} Sf p , CIRCULAR. Subject: Implementation of NHB Schemes - Revised Operational Guidelines.

GURUJI24.COM EXPOSURES NORMS. Exposure

Chapter - RETURNS. 1. Form and manner of furnishing details of outward supplies

Segment -1 (Background)

Food Processing Fund Operational Guidelines

RBI /358 IDMD.PCD. 07 / / January 1, Guidelines for Issue of Commercial Paper (CP)

Bonanza Portfolio Ltd

Karmchari Sahakari Sakh Samiti Maryadit

F. No. 349/74/2017-GST (Pt.) Vol.-II Government of India Ministry of Finance Department of Revenue Central Board of Excise and Customs GST Policy Wing

F. No. 53/15/2016 -WE Ministry of New & Renewable Energy. Evaluation of Generation Based Incentives Scheme for Wind Power Projects

The Branch does not have any interest in insurance entities.

Infomerics Valuation And Rating Pvt. Ltd.

GUIDELINES OF INDIA MICROFINANCE EQUITY FUND

CONTENTS. FREQUENTLY ASKED QUESTIONS (FAQs) ON FCRA

Port Authority of the City of Saint Paul Property Assessed Clean Energy Program (PACE OF MN) ADMINISTRATIVE GUIDELINES

REQUEST FOR PROPOSAL (RFP) for. Appointment of Portfolio Managers for managing

The general terms and conditions of last Sale, e- auction held on are as under. The terms and conditions in future sales may be changed.

Transcription:

Loan Scheme to promote the Concentrating Solar Thermal (CST) Projects in India for Industrial Process Heat Applications SOFT LOAN (PART A) BRIDGE LOAN (PART B) Financial & Operational Guidelines September 2016 GEF UNIDO MNRE PROJECT The UNIDO s Solar project is designed to complement MNRE s support programme by helping to remove barriers associated with Concentrating Solar (CS) technology, its awareness, capacity building, market and financial barriers through innovative technical and financial support. It aims to create the necessary enabling environment for increasing penetration and Scaling up of CST Technology in India through an innovative financing mechanism; and to provide technology application information packages and standardization of CS performance measurement. Different concentrating solar technologies have been developed or are currently employed for various commercial and industrial applications for heating, cooling and tri-generation. Concentrating solar collectors such as parabolic trough or dish collectors, non-imaging concentrators or a Linear Fresnel system can be used to supply heat in the temperature range of 80 250 Deg. C. Applications of solar heat at such medium and high temperatures would be considered in the selected industrial sectors. The loan scheme developed under the framework of this project focuses on promotion of concentrating solar thermal system for process heating and cooling applications in selected industrial sectors to reduce greenhouse gas (CHG) emissions. CST equipment manufacturing and other CST ancillary activities may also be supported under this scheme. Page 1

Table of Contents 1. Objective of the Scheme 3 2. Benefits of the scheme 3 3. Important Information 3 4. Loan Scheme 3 5. Process Flow 5 6. Eligibility 6 7. Minimum Loan amount 7 8. Disbursement Schedule 8 9. Security and Guarantee requirements 8 10. Fees and Charges 9 11. Other Guidelines 9 Abbreviations: 1. CST Concentrated Solar Technology 2. MNRE Ministry of New & Renewable Energy 3. UNIDO United Nations Industrial Development Organization 4. IREDA - Indian Renewable Energy Development Agency 5 CFA Central Financial Assistance (Central Subsidy) 6. DPR Detailed Project Report 7. GEF Global Environment Facility 8. GHG Green House Gas Page 2

1. OBJECTIVE The Ministry of New & Renewable Energy (MNRE) in partnership with United Nation Industrial Development Organisation (UNIDO) and IREDA (Indian Renewable Energy Development Agency) under the GEF-UNIDO-MNRE project launches an innovative financing scheme to promote adoption and of Concentrated Solar Thermal (CST) Technologies for thermal applications in the specified industrial sectors. It aims to create the necessary enabling environment for increasing penetration and Scaling up of CST Technology in India through an innovative financing mechanism. 2. BENEFITS OF THE LOAN SCHEME Soft Loan Soft loan available at a low rate of interest for 7 years inclusive of 1 year moratorium. Single Window for multiple funding Single application to IREDA for MNRE subsidy, IREDA Soft Loan and Bridge Loan. Simpler processing and documentation Composite loan application form for Soft Loan and Bridge Loan 3. IMPORTANT INFORMATION This document will serve as the guide for the beneficiaries seeking loan for the installation of CST systems, and will also highlight the salient features of the scheme. The application for loans (Part A & Part B) are required to be submitted on-line at www.ireda.gov.in/cst 1 along with a copy of the DPR. Hard copies of the same along with all required documents and applicable fee should reach IREDA within 7 days of submission of the on-line application. Application formats for the loans along with the checklist of documents required to be submitted along with the application are available at the IREDA website www.ireda.gov.in/cst. It is recommended that the user downloads the application forms to get familiarised with the process of submitting the forms and the required documents including Detailed Project Report (DPR) for a CST project. Application form for MNRE Subsidy (CFA) only can be downloaded from the Ministry s website: www.mnre.gov.in Page 3

4. THE LOAN SCHEME The Loan scheme aims to provide upfront financial assistance to beneficiaries to overcome the financial constraints faced in the adoption and penetration of CST technologies. Under this scheme, financial assistance is available for up to 75 % of the CST project costs. 4.1 Scheme Highlights PART A: SOFT LOAN FROM IREDA Rate of Interest 7 % After considering UNIDO interest subvention Repayment Period 7 years 1 year moratorium + 6 years repayment PART B: BRIDGE LOAN AGAINST MNRE SUBSIDY Rate of Interest 12 % The rate is applicable till the project is commissioned. On commissioning, the MNRE subsidy will be passed to the project and the bridge loan will be closed Note: The Project would be eligible for interest rebate of 1 % in the event of Borrower furnishing security of Bank Guarantee/ Pledge of FDRs as the primary security, equivalent to the amount sanctioned by IREDA for both soft loan and bridge loan. Indicative Project Cost Structure: Minimum Promoters Contribution - 25 % Soft Loan - 45 % MNRE Subsidy - 30 % --------- Total - 100 % --------- Note: Quantum of Soft Loan will depend on the MNRE subsidy and approval by UNIDO-PMU. Note: The Project would be eligible for interest rebate of 1 % in the event of Borrower furnishing security of Bank Guarantee/ Pledge of FDRs as the primary security, equivalent to the amount sanctioned by IREDA from Scheduled Commercial Banks as described in RBI Act or Unconditional or Irrevocable guarantee from All India Public Financial Institutions with AAA or equivalent rating. Page 4

5. PROCESS FLOW 5.1 Loan Process Flow Project Identification & Screening Receipt of Loan Application and DPR at IREDA Screening by IREDA and UNIDO PMU (technical & financial due diligence) Financial Concurrence & Request for CFA Financial concurrence by IREDA and submission of documents to MNRE by IREDA for approval of Subsidy (Central Financial Assistance) Financial Closure & Disbursement Sanction of CFA from MNRE and sanction of loan from IREDA. Signing of loan agreements with beneficiaries Project Completion & Commissioning Closure of Bridge loan after adjustment of subsidy (after successful commissioning of project according to MNRE procedure) 1.2 PROCESS Project Monitoring FLOW: Financial monitoring of repayment by IREDA, Monitoring of energy savings & GHG emission reduction by UNIDO PMU 5.2 Loan Process Diagram Page 5

A. Submission of the loan application On completion and submission of Loan Application online, a confirmation will be generated and forwarded to the applicant via email. Hard copy of the application along with other required documents signed by the authorised person (all in duplicate) along with applicable fee are required to be submitted to the following address within 7 days of electronic submission. Chairman & Managing Director Indian Renewable Energy Development Agency (IREDA) Core 4-A, India Habitat Centre Lodhi Road, New Delhi 110003 Tel.: +91. 11. 2468 2201; Fax: +91. 11. 2468 2202; Email: cmd@ireda.gov.in B. Technical Evaluation Screening of the proposal and DPR to be conducted by the Project Appraisal Committee of IREDA and UNIDO PMU. Technical due diligence will be carried out by IREDA/ UNIDO PMU. Financial concurrence by IREDA. Sanction letter for CFA will be issued by Ministry and forwarded to IREDA. Applicants who are not successful will be intimated. Time duration: within 30 days from submission of hard copy of the required documents at IREDA. C. Financial Evaluation On receipt of the Sanction Letter from Ministry (MNRE), the financial evaluation will be conducted as per the norms of IREDA. Once the loan application is approved, sanction letter will be issued to beneficiary by IREDA under UNIDO project. D. Conclusion Time duration: 60 days Signing of Loan agreement and disbursement according to the agreed process and schedule. E. Closure of Bridge Loan The beneficiary will have to submit to IREDA (in hard copy) the request application for release of CFA along with the other following documents (available at www.mnre.gov.in) 15 days after the successful completion and installation of the CST project, Application for Release of CFA Audited Statement of Expenditure ( on the letter head of a Chartered Accountant) Joint Inspection Report Statement of Undertaking IREDA will forward the same to MNRE for approval of release of subsidy. On receipt of the letter for release of CFA, the bridge loan will be closed. Interest on the Bridge loan will be charged up to the date of the approval letter. Page 6

6. ELIGIBILITY 6.1 Projects Eligible for Assistance Any entity as per IREDA guidelines setting up a solar thermal heating/ cooling/ tri-generation project. 6.2 General Applicant Eligibility norms. Eligible Entities/ Categories as per IREDA norms shall include the following. Private Sector Companies/ firms Central Public Sector Undertaking (CPSU) State Utilities/ Discoms/ Transcos/ Gencos/ Corporations Joint Sector Companies Applicants, registered in India, falling under any of the above categories, with borrowing powers and powers to take up new and renewable energy and energy efficiency projects as per their Charter, are only eligible to apply for financial assistance from IREDA except for the following: a) Trusts, Societies, Individuals, Proprietary concerns and Partnership firms (other than Limited Liability Partnerships, LLPs). However, they can be considered for financing only if they provide Bank Guarantee / Pledge of FDR issued by Scheduled Commercial Banks as described in RBI Act for the entire loan. b) Loss making applicants and/ or, Applicants with accumulated losses (without taking in to account effect of revaluation of asset, if any) as per audited Annual Accounts of the immediate preceding financial year of operation. However, they can be considered for financing only if they provide security of Bank Guarantee/ Pledge of Fixed Deposit Receipt (FDR) issued by Scheduled Commercial Bank as described in RBI Act for the entire loan. c) Applicants who are in default in payment of dues to Financial Institutions, Banks, NBFCs and/or IREDA. d) Applicants/ Group Companies and/or Core promoters of the applicant company who, Default in payment of IREDA dues and/ or defaults of other banks/fi. Classified as willful defaulters as defined by RBI/ classified by other FIs and/ or, Had availed OTS from IREDA and/ or, from other Banks/FI. Convicted by court for criminal/ economic offences or under national security laws e) Greenfield Projects involving second-hand equipment and machinery. 7. MINIMUM LOAN AMOUNT The minimum loan eligibility from IREDA will be Rs. 50 lakhs. Page 7

8. DISBURSEMENT SCHEDULE The following disbursement schedule is applicable for both Part A (Soft Loan) and Part B (Bridge Loan) Instalment Percentage Terms 1 st instalment 30 % of loan amount On signing of the loan agreement and inflow of minimum 30 % share of promoters contribution 2 nd instalment 30 % of loan amount Inflow of additional 60% share of promoter s contribution and after delivery of all equipment at site 3 rd instalment 30 % of loan amount Inflow of minimum 90% share of promoter s contribution, On final installation of CST equipment at location 4 th instalment 10 % of loan amount On completion, commissioning, testing and inspection and utilization of 100% of the promoter s contribution. * NOTE Main loan and bridge loan will be disbursed proportionately as indicated in the table above. 9. GUARANTEE & SECURITY - As per IREDA s norms (Please see IREDA guidelines) - Additionally performance guarantee from supplier for a period of 7 years or until complete repayment of loan and payment guarantee from the beneficiary - The promoter shall give an undertaking that in case non release of Capital Subsidy, the company will bring in equity to repay IREDA Loan. 10.1 Processing Fees 10. FEES & CHARGES Loan Applied Registration Fee per application Up to 1 Crore Rs. 10,000 ( plus service tax and education cess as applicable ) Above 1 crore Rs. 30,000 ( plus service tax and education cess as applicable ) Page 8

10.2 Front-end Fees Front-end Fee: The borrowers will have to pay front-end fee as below after issuance of loan sanction letter and before signing of the loan agreement. Loan slab Up to 5 crores Above 5 crores Front-end Fee (% of loan amount) 0.50 % of the loan amount 1.0 % of the loan amount A rebate of 20 % is available to the beneficiary if the loan agreement is signed within 60 days of the sanction of loan. 11.1 Insurance 11. OTHER GUIDELINES The borrower will ensure insurance coverage of all works and equipment s during construction and also during operation. The cover should remain operative till the loan is fully repaid. 11.2 Others For all other terms not specifically mentioned in this document (please refer to the FINANCING NORMS AND SCHEMES (Doc no. IREDA / FG / Part 1 / Issue No. 2 / updated 29.06.2016, www.ireda.gov.in Financing Norms). The terms and conditions specifically enumerated in this document will override the terms mentioned in the Financing Norms and Schemes mentioned which are in variance. Page 9