WARE COUNTY FACILITIES COORDINATOR

Similar documents
INVITATION TO BID COMMERCIAL FLOORING CONTRACTORS

April 15, 2013 PEST CONTROL BID Page 1 of 13

Request for Proposal for Natural Gas Supply

INVITATION TO BID. If you have any questions concerning this bid, you may call Elizabeth Hope at (912)

Ware County Recreation Department 2110 Cecil Brown Drive Waycross, GA Ph: Fax:

INVITATION TO BID PEST CONTROL SERVICES

Ware County Recreation Department 2110 Cecil Brown Drive Waycross, Ga Ph: Fax:

INFORMATION FOR BID. Tee Shirts (School Nutrition)

County of Gillespie. Bid Package for GRAVEL. Bid No November 2018

County of Gillespie. Bid Package for FUEL - BOBTAIL DELIVERY. Bid No November 2018

BOARD OF EDUCATION DEPEW UNION FREE SCHOOL DISTRICT COUNTY OF ERIE STATE OF NEW YORK LEGAL NOTICE REQUEST FOR BID PROPOSALS

County of Gillespie. Bid Package for COLD MIX LAY ASPHALT. Bid No November 2018

PUBLIC NOTICE NOTICE OF REQUEST FOR BIDS CITY OF HIGHWOOD, ILLINOIS ROADWAY SNOW REMOVAL AND SALT APPLICATION

CITY OF LOS BANOS PUBLIC WORKS DEPARTMENT INVITATION FOR SEALED BIDS PROPOSAL FOR THE PURCHASE OF ONE NEW 2018/2019 MODEL BRUSH CHIPPER

BID RECEIVING OFFICE: Forsyth County Public Library, Administrative Offices, 585 Dahlonega Street, Cumming, GA 30040

PURCHASING DEPARTMENT 151 Willowbend Road Peachtree City, GA Phone: Fax:

THE CITY OF FOREST PARK PLANNING, BUILDING AND ZONING DEPARTMENT JONATHAN JONES, DIRECTOR 785 Forest Parkway Forest Park, GA 30297

CITY OF GAINESVILLE REQUEST FOR PROPOSAL

INVITATION TO BID. If you have any questions concerning this bid, you may call Elizabeth Hope at (912)

County of Gillespie. Bid Package for CONCRETE. Bid No November 2018

BROWNSVILLE NAVIGATION DISTRICT OF CAMERON COUNTY, TEXAS PORT OF BROWNSVILLE. Specifications for Bid. Crushed Limestone

Replace Transmission - Bulldozer

BID DOCUMENTS For. Printing for PEEF Scholarship Forms

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA PROJECT: BACKFLOW TESTING BID#P

Request for Proposal. Internal Connections - Network Switch Equipment. Houston County Public Library. Erate Funding Year. July 1, 2017 through

INSTRUCTIONS TO BIDDERS

BIDDER S QUALIFICATION AND EXPERIENCE STATEMENT

City of Forest Park Request for Proposals. Secure Access Control Systems

City of Bowie Private Property Exterior Home Repair Services

B. The Bid is made in compliance with the Bidding Documents.

POCATELLO/CHUBBUCK SCHOOL DISTRICT NO. 25 Bannock County. Administration Office 3115 Pole Line Road Pocatello, Idaho SPECIFICATIONS FOR

(SECCRA) SECCRA COMMUNITY LANDFILL LONDON GROVE TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

City of Forest Park Request for Proposals Concrete Driveway Replacement Fire Station # Jonesboro Rd., Forest Park, Georgia,

PURCHASING DEPARTMENT 151 Willowbend Road Peachtree City, GA Phone: Fax:

City of Forest Park Request for Proposals Fence Installation Police Department Firing Range 2020 Anvil Block Road, Forest Park, Georgia,

Convert Six East/West Tennis Courts to a North/South Orientation

CHEROKEE NATION BUSINESSES, L.L.C. REQUEST FOR PROPOSAL ( RFP ) PROJECT NAME: CNE Ad Agency RFP NUMBER: DATED: TABLE OF CONTENTS

TOWN OF ERWIN REQUEST FOR PROPOSALS FOR GRASS MOWING SERVICES - ADDENDUM

UNIVERSITY OF ROCHESTER INSTRUCTIONS TO BIDDERS

INVITATION FOR BID. Furnish: Installation of One (1) Security Cage for a Rooftop Heating and Air Conditioning Unit. Company Name:

AIA Document A701 TM 1997

construction plans must be approved for construction by the City PBZ department.

City of Portsmouth Portsmouth, New Hampshire Department of Public Works. Plumbing and Heating Repair Services

The Minnesota Workers Compensation Assigned Risk Plan (MWCARP) Legal Defense Services Request For Proposals

Request for Proposal

City of Anaheim. Request for Bids # 8081 Two-way Radio and Repeater Maintenance Services. December 5, Pre-bid Conference: None

DAWSON COUNTY BOARD OF COMMISSIONERS DAWSONVILLE, GEORIGA

County of Rockwall State of Texas

GUILFORD COUNTY SCHOOLS Invitation for Bids

PURCHASING DEPARTMENT 151 Willowbend Road Peachtree City, GA Phone: Fax:

VENDING MACHINE SERVICES FOR THE BOONE COUNTY FISCAL COURT

Bulloch County Board of Commissioners 115 N Main Street Statesboro, GA NOTICE OF SOLICITATION INVITATION TO BID

City of New Rochelle New York

City of Portsmouth Portsmouth, New Hampshire Department of Public Works. Boilers and Cooling Towers Equipment Treatment Programs INVITATION TO BID

BID NUMBER FROM: City of Branson Date: March 6, W. Maddux St., Suite 200 3:00 p.m., April 30, 2014

JEKYLL ISLAND STATE PARK AUTHORITY Request For A Sealed Quotation. Date Released June 30, 2016 Bid Opening: Tuesday July 26, :00PM ET

Document A701 TM. Instructions to Bidders

St. Charles City County Library District Invitation for bid HVAC Replacement at Winghaven Branch

REQUEST FOR BIDS. MCC HVAC Replacement Units

TCL&P Facilities HVAC Improvements (specifications attached)

If you have any questions contact Jeff Eady of the City of Forest Park Public Works Department at (404)

PARTNERS PROJECT IDENTIFICATION PROJECT IDENTIFICATION

TOWN OF BURLINGTON PURCHASING DEPARTMENT New Four Stage Breathing Air Compressor Contract #17S

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR FIRE SPRINKLER SYSTEM INSPECTIONS ITB NO.: DMS-14/15-004

REQUEST FOR QUOTATION For CHAIRS FOR THE CHATHAM COUNTY E911 CALL CENTER QUOTE NUMBER:

INVITATION TO BID ASPHALT SURFACE TREATMENT (TRIPLE TREATMENT TYPE I) IFB:

CHEROKEE NATION ENTERTAINMENT, L.L.C. REQUEST FOR PROPOSAL ( RFP )

Sand Purchase for Golf Course Bunker Renovation. Hoffman Estates Park District

INSTRUCTIONS TO BIDDERS

The Minnesota Workers Compensation Assigned Risk Plan (MWCARP) Actuarial Services Request For Proposals

PLEASANTVILLE HOUSING AUTHORITY

Company: Legal Status: Sole Proprietor Non-Profit Corp. Profit Corp. Partnership Gov. Ordering Address: Phone: Remit Address:

CHARLOTTE PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS ("RFP")

CITY OF MOBILE REQUEST FOR QUOTES. April 25, Service Contract - Escalator Inspections and Preventative Maintenance

City of Albany, New York

JEFFERSON COUNTY DRAINAGE DISTRICT NO. 6 Karen J. Stewart, MBA, CTP Business Manager: Purchasing Agent

INVITATION TO BID. Transportation Department 145 Dodd Street Marietta, GA (770)

Document A701 TM. Instructions to Bidders. for the following PROJECT: (Name and location or address)address): Orig A

FLORIDA KEYS AQUEDUCT AUTHORITY INVITATION TO BID: COMMODITIES/SERVICES (BIDDERS ACKNOWLEDGMENT)

SUMNER COUNTY BOARD OF EDUCATION REQUEST FOR QUOTATION

REQUEST FOR SEALED BID PROPOSAL

Putnam Valley Central School District Bid # Athletic Uniform Cleaning Putnam Valley, N.Y NOTICE TO BIDDERS

HABERSHAM COUNTY Office of County Commissioners 555 Monroe Street, Unit 20, Clarkesville, GA

PART INSTRUCTIONS TO BIDDERS

Finance & Technology Administrator (815) ext 223

CITY OF GALESBURG. PURCHASING 55 W Tompkins St Galesburg, IL Phone: (309)

Invitation to Bid BOE. Diesel Exhaust Fluid

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1606 FOR SALE OF SURPLUS GRAVEL

COUNTY OF COLE JEFFERSON CITY, MISSOURI

FLOYD COUNTY BOARD OF COMMISSIONERS PURCHASING DEPARTMENT #12 East 4 th Ave. Ste. 106 ROME, GA (706) FAX (706)

SAN DIEGO CONVENTION CENTER CORPORATION

PROPOSALS MUST BE RECEIVED BY: 10:00 AM (CST) ON FRIDAY, FEBRUARY 1, 2019

IFB NUMBER: BID NUMBER, FISCAL YEAR NO Pre Bid needed for this solicitation IFB QUESTION DEADLINE January 24 th, 2014

FIELD SAMPLING SERVICES & LABORATORY ANALYSIS

CONSTRUCTION CONTRACT EXAMPLE

INVITATION FOR BID. Furnish: Provide Labor, Materials and Equipment for Removal and Installation of a New Gas Boiler

INVITATION FOR BID ATTENTION: This is not an order. Read all instructions, terms and conditions carefully.

GAINESVILLE CITY SCHOOL SYSTEM

Request for Proposal RFP # SUBJECT: Ergotron LX

City of Newnan, Georgia

Transcription:

WARE COUNTY FACILITIES COORDINATOR 800 Church Street, Suite 218, Waycross, GA 31501 Phone: (912) 287-4480 Cellular: (912) 281-0215 Fax: (912) 287-4482 Email: clarke@warecounty.com REQUEST FOR BIDS GENERATOR MAINTENANCE CONTRACTORS The Ware County Board of Commissioners is seeking bids from Contractors for annual maintenance and load bank testing of emergency backup generators and 24-hour emergency repair services throughout the year. Scope of work shall include: Provide labor, materials, and equipment necessary to perform annual Preventative Maintenance and load bank testing for emergency generators in the month of May. The annual maintenance shall include; check overall condition of the unit, check for proper operation of unit, drain and replace engine oil and engine oil filter, replace engine air and fuel filters, check all belts and hoses and replace as necessary, check radiator coolant and antifreeze levels and replenish as required, and all other items needed to Perform a complete generator maintenance service. The Contractor will be required to provide 24-hour emergency response services and to make approved repairs that are required or recommended. Contract Time: Term of one calendar year with annual maintenance Performed in the month of May, and the option to renew, at the County s discretion, for a 3-year period. Obtaining Proposals Specifications: The bid package and specifications cost $0.00 (nonrefundable) and may be picked up at the Ware County Commission Office, 800 Church Street, Suite 223, Waycross, GA 31501, Phone: (912) 287-4300, or downloaded from the County website at www.warecounty.com. To ask questions, examine the site and the work involved, bidders should contact, Clarke Lee, Facilities Coordinator for Ware County, GA. Phone: (912) 287-4480. Bonds and Insurance: 1. Contractor must provide proof of General Liability Insurance in the amount specified or greater. 2. Contractor must provide proof of Worker s Compensation Insurance Coverage as required by law or a Worker s Compensation Exemption Affidavit. Submitting Bids: Bids shall be received until 10:30 AM, Wednesday, November 06, 2013, in the Office of Board of Commissioners, Attention: Clarke Lee located at 800 Church Street, Suite 223, Waycross, GA 31501, and shall be opened after that time. No bids received after this date and time shall be opened or considered. Preservation of Rights: The Owner reserves the right to reject any and/or all bids and waive all minor technicalities, informalities, and irregularities. The Owner reserves the right to accept the bid, which in the judgment of the Owner, is in his best interest. November 06, 2013 GENERATOR MAINTENANCE BID Page 1 of 20

INSTRUCTIONS TO BIDDERS It is the intent of Ware County to award this contract based upon the lowest and/or best bid price that is in the best interest of Ware County. Ware County is asking for Unit Prices in the event that items may be deleted or changed, or additional work is added which will change the contract value. Each bidder shall include all costs for equipment, labor and materials, fees and other cost factors in their bid price. Ware County reserves the right to negotiate with the successful bidder before, or after, award of the contract for any value engineering that may save Ware County money and attain the same goal. Each Bidder shall submit, with their bid: 1- A Schedule of Values for unit price breakdowns to demonstrate bid pricing that will allow changes in work to be added or deducted. 2- Executed Contract Form 3- Executed Contractor s Warranty 4- Proof of insurance coverage meeting requirements 5- Proof of Workman s Compensation Insurance coverage or executed Exemption Form 6- E-verify documentation 7- Copy of current valid business license. Bids will be opened and read as stated in the Invitation to Bid. All bids must be submitted on the same Form as the specimen shown on pages 11 through 20 of this document and must be signed. All blanks on the Bid Form must be filled in. The completed Form shall be without interlineations, alteration or erasure. Failure to submit a bid in the Form requested may render the bid irregular and shall be considered sufficient cause for rejection of a bid. Bids shall be received until 10:30 AM, Wednesday, November 06, 2013, in the County Commission Office, Attention: Clarke Lee located at 800 Church Street, Suite 223, Waycross, GA 31501, and shall be opened after that time. No bids received after this date and time shall be opened or considered. Bids are to reach the address designated in the Invitation to Bid no later than the time and date named in the Invitation to Bid. Bids may be withdrawn by Contractors prior to the time set for official opening. After time has been called, no proposal may be withdrawn for a period of sixty (60) calendar days. Negligence or error on the part of any bidder in preparing his proposal confers no right of withdrawal or modification of his proposal after time has been called. NEGOTIATION November 06, 2013 GENERATOR MAINTENANCE BID Page 2 of 20

Ware County reserves the right to negotiate with the lowest and/or best bidder for value engineering changes, after bid opening and establishment of the lowest and/or best bid, before the contract is awarded and/or after contract award. Negotiations will not be made to increase the contract price except in the instance of additional work added to the contract. ADDITIONAL WORK Ware County reserves the right to make additions of work to this contract per the contract unit pricing structure and the contract documentation and through negotiations with the Contractor for work on this or other projects, for a period of one year, and any subsequent renewals thereof. BONDS & INSURANCE No Bonds are required, because the Owner is paying by approved invoices, for work completed in place and approved by the Owner only. Contractor must provide proof of General Liability Insurance in the amount of $1,000,000.00 and insurance for vehicles at $500,000.00. Contractor must provide proof of Worker s Compensation Insurance coverage as required by law, or a properly completed Worker s Compensation Exemption Affidavit. (Page 11 of this document) AWARD OF CONTRACT The Owner reserves the right to reject any or all bids and to waive all minor technicalities, informalities and irregularities. Owner reserves the right to accept the bid, which in the judgment of the Owner is in his best interest. SUBMITTALS Within ten (10) calendar days after receipt of the Notice of Award of the contract and before proceeding to work, the Contractor must provide the following information to the Owner s representative, Clarke Lee, Facilities Coordinator, 800 Church Street, Suite 218, Waycross, GA 31501. 1. Provide certification of all personnel who will be Performing maintenance and repairs. 2. If required, provide the company s contractual, maintenance or service agreement that has been modified to be in agreement with the terms and conditions of the County s bid documents, specifications and attachments or negotiated changes thereto. Include a statement in that agreement that this bid package is precedent in all areas of conflict or difference in contract language. November 06, 2013 GENERATOR MAINTENANCE BID Page 3 of 20

3. Provide proof that the company can meet the required time limits set forth in the contract for response time. (E.g. give address of technicians that will be responding to calls or map showing distance and response time.) The Owner must approve all submittal data before work proceeds. You should have submitted with your bid these items: Each Bidder shall submit, with their bid: 1- A Schedule of Values for unit price breakdowns to demonstrate bid pricing that will allow changes in work to be added or deducted. 2- Executed Contract Form 3- Executed Contractor s Warranty 4- Proof of insurance coverage meeting requirements 5- Proof of Workman s Compensation coverage or executed Exemption Form 6- E-verify documentation 7- Copy of current valid business license. NOTICE TO PROCEED Upon receiving and approving all the submittal data required, the Owner shall issue (in writing by letter, fax or email) a Notice to Proceed and the Contractor may then begin work in accordance with an approved work schedule being established. SCHEDULING OF WORK The Contractor shall schedule work, with the Owner and the entities involved, insuring that work flows smoothly without damage or hindrance to the Contractor or entities involved. TIME ALLOWANCE The Contractor shall complete the annual maintenance and load bank test in the month of May, unless preapproved by the Facilities Coordinator. CALL BACK AND OTHER REPAIR WORK The Contractor shall submit with their bid a completed Schedule of Values that list all their charges for work other than the annual maintenance work to be performed. This shall include service charges, mileage or travel rates, hourly cost for technician with service vehicle and tools included, and any other charges that may apply. APPLICATIONS FOR PAYMENT Annual maintenance may be billed after fulfillment of all contract obligations on all generators is completed. Subsequent repairs and other repairs shall be billed upon completion. November 06, 2013 GENERATOR MAINTENANCE BID Page 4 of 20

The Contractor shall submit to the Owner an itemized invoice, for approval and payment, for work in place completed and accepted. All invoices shall list the items and quantities of work done, and list the unit cost per the contract pricing. Invoices shall be accompanied by a completed work order or other appropriate Form signed by the technician that includes all services Performed that are being billed for. SCHEDULE OF VALUES Complete the Schedule of Values provided, fill in all blanks and return with the bid Form. E-Verify E-Verify Requirements for Contractors (O.C.G.A. 13-10-90; 13-10-91) E-Verify Requirements All companies and persons that contract with Ware County Board of Commissioners shall be in compliance with the current E-Verify Federal Work Authorization Program laws and standards. All are required to execute the attached compliance or non-compliance Forms supplied in the bid package as is applicable. Current Law: Current law requires that any Contractor who contracts with a public employer for the physical Performance of services is required to sign and submit an E- Verify affidavit to the County. If the Contractor has no employees, they are not required to sign an affidavit, but are required to present an approved state issued identification card/driver's license from an approved state as provided on the Attorney General's website. Subcontractors and Sub-subcontractors are also required to follow these requirements. The Attorney General's Office has advised that "physical Performance of services" includes public works and public works related contracts including repair, maintenance and operations. It does not apply to goods or to most professional services. The definition of public employer only applies if your government has more than one employee. While this applies to all County governing authorities, it may not apply to all County authorities. SB 160: Requires any Contractor that contracts with a County for the physical Performance of services in which the labor or services exceed $2499.99 to sign and submit an E-Verify to the County unless (1) the Contractor has no employees (in which case they must present an approved state issued identification card/driver's license from an approved state as provided on the Attorney General's website) or, (2) the contract is with an individual licensed under Title 26, Title 43, or the State Bar of Georgia who is in good November 06, 2013 GENERATOR MAINTENANCE BID Page 5 of 20

standing and that individual is Performing that service. Subcontractors and sub- Subcontractors are also required to follow these requirements. GENERAL REQUIREMENTS The annual maintenance inspection and service shall be performed in the month of May and shall include, but is not limited to the following items: 1. Change the engine oil and replace the engine oil filter. 2. Replace the engine air filter, check the air inlets and outlets and clean as necessary. 3. Grease and lubricate as required. 4. Replace fuel filter, inspect fuel system. 5. Check the battery, battery posts, battery cables, and battery charger and connections, for loose connections, corrosion and proper operation. 6. Check the unit wiring for loose connections, corrosion and/or damage and repair. 7. Check the engine thermal protection levels, coolant and antifreeze, and correct as necessary. 8. Check block heater 9. Check the engine fan belts for wear, weather cracking and damage. 10. Inspect muffler system 11. Test the engine and transfer switch safety devices. 12. Visually inspect unit for leaks, wear or damage, loose connection or abnormal operating conditions. 13. Start and exercise the unit looking for leaks, loose connections or components, and abnormal operating conditions. Initiate an automatic start and transfer the load to insure all components are working proper and make adjustments and repairs as needed. 14. Inspect rotor and stator. 15. Check and adjust governor system and AC output frequency. 16. Check and adjust voltage output. 17. Inspect automatic transfer switch. 18. Perform simulated power outage test. 19. Submit report to customer. 20. Perform a 2-hour full load bank test 21. Perform any other test as may be required by law, code or ordinance for the generators to be certified at their level of classification of use. 22. Perform any other normal maintenance that is normal whether listed or not. 23. Return the unit to stand-by setup for operation when required. 24. Immediately notify the Owner of any repairs that should be made to be followed by a written quote as soon as possible. 25. Provide the Owner with copies of all reports (field and office generated), of all visits to each site, detailing the work done, noting completed work and deficiencies and needed repairs, and the time spent on site. November 06, 2013 GENERATOR MAINTENANCE BID Page 6 of 20

Repairs that need to be done immediately shall be presented to the Facilities Coordinator along with an estimate and must be approved before proceeding. Any items found that will need repair in the near future shall be brought to the attention of the Facilities Coordinator along with an estimate so they can be budgeted. PARTS AND REPAIRS INCULDED IN THE CONTRACT The following items shall be included in the annual maintenance contract amount: Engine oils, oil filters, air filters, fuel filters, antifreeze and coolants, grease and other lubricants, other necessary engine fluids (excluding fuel only), and any other parts that are considered normal maintenance items. PARTS & REPAIRS NOT INCLUDED IN THE CONTRACT All repairs and parts not included in the contract amount shall be quoted and approved by the Owner s representative before they are replaced. The Contractor is expected to provide parts that are normal stock items and those needed to remedy emergency situations in the most efficient manner at the minimal cost. Nonemergency parts should be quoted on a repair quotation. The County reserves the right to get quotes and supply the parts if they can purchase them at a better price in a timely manner. If the County elects to get other quotes, the Contractor shall be required to supply the Owner with the information needed to get quotes. If the Contractor adds any extra charges to parts above their invoiced price, the percentage shall be shown in the appropriate place in the schedule of values. All charges for parts shall be supported by an invoice from the supplier, showing the amount charged to the Contractor, and a copy attached to the Contractor s invoice for payment. SERVICE CALL CHARGES Ware County expects the service call charge to include all charges the company requires, including mileage charges and travel time charges, with hourly rates beginning when the technician arrives on site and begins work. For each call or repair, or grouped repairs, Ware County expects that it will only have one service charge included. Repairs requiring more than one trip shall have only one service charge and subsequent trips shall not reflect service charges. TRAVEL TIME AND MILEAGE November 06, 2013 GENERATOR MAINTENANCE BID Page 7 of 20

Travel time may be charged for subsequent trips from a previous service call. However, the total of travel time charges and mileage charges combined shall not exceed a normal service charge and is expected to be somewhat less than a normal service call. Travel time and mileage may be charged when the technician is picking up parts when on an onsite call. HOURLY RATES Except in the case of emergencies, the Contractor shall coordinate the work to be accomplished in their regular scheduled working hours and should not incur overtime rates. Exception is when the repair may be accomplished with minimal overtime and save an extra trip. Coordinate with the Owner for exceptions. OVERTIME RATES Calls for emergency repairs that are received after/outside the normal business hours, requiring on site response by a technician, may be billed at overtime rates for all hours the technician is on site outside normal business hours. Should response to a call move into regular business hours the rates shall return to normal hourly rates and overtime rates shall only be charged for hours outside of normal hours of operation. 24/7 SERVICE The Contractor shall be required to provide 24 hours per day service every day with no exceptions. Ware County has to provide emergency services 24 hours a day every day and must be supported in the event of generator problems at any time. CALLS DURING NORMAL BUSINESS HOURS During normal business hours, the County expects to have one phone number, no more than 2, to call that will go directly to a person who shall answer and respond as needed. If the call goes to a beeper or voice mail and is not answered by a person, there must be verbal response within 5 minutes of the placed call. CALLS OUTSIDE NORMAL BUSINESS HOURS Outside of normal business hours, the County expects to have one phone number, no more than 2, to call that will go directly to a person who shall answer and respond as needed. If the call goes to a beeper or voice mail and is not answered by a person, there must be verbal response within, prefer 5 minutes, no more than 15 minutes of the placed call. RESPONSE TIME The Contractor shall be required to provide verbal response to any call any time within 15 minutes of a call being placed to them. November 06, 2013 GENERATOR MAINTENANCE BID Page 8 of 20

The company shall be required to have competent certified personnel within a 75 mile driving distance of the Ware County sites and be able to have a technician on site within a maximum of 1-½ hours (90 minutes) of the time of call. TECHNICIANS AND CERTIFICATION All technicians shall be competent and certified for the duties they perform. They should be competent in understanding what the problem is, finding the problem, and fixing the problem in a minimal amount of time. Technicians should be furnished with dependable travel, the tools, diagnostic equipment, common parts, and means to carry all these items with them, on each service call. They should have at their disposal any testing or diagnostic equipment that is not normally carried with them. CLEAN UP & DISPOSAL The Contractor is required to keep the generator and work area clean and free of any debris and to legally dispose of all waste materials including all petroleum, oils, grease, byproducts, parts and etc., including cleanup and disposal of any spills of hazardous materials. DAMAGE The Contractor shall be fully responsible for the safety and good condition of all work and materials and shall take care to not damage existing items to remain or new items installed, other components, and all persons (employees or visitors) and personnel involved in the fulfillment of the contract. Damaged items shall be repaired or replaced to the Owner s satisfaction as recommended by the Owner s representative, Clarke Lee, Facilities Coordinator, or his designee. DAMAGE COST All restoration of damages shall be done without any cost to the Owner. If Ware County has to expend any funds for council or lawsuit to collect the monies due, the Contractor agrees to reimburse Ware County all restoration and legal cost. CONTRACTURAL AGREEMENT The Contractor, awarded the bid, shall be bound by and agrees to all the conditions set forth in this bid package, specifications, and any attachments thereto. The Contractor agrees to complete and sign the contract agreement included in this bid package and be bound thereunto. Should the contracting company have a requirement that Ware County sign their own contractual, maintenance or service agreement, the company agrees to, and shall modify their contractual, maintenance or service agreement to be in agreement with the terms of this bid document, specifications, negotiated changes and attachments thereto, including a November 06, 2013 GENERATOR MAINTENANCE BID Page 9 of 20

statement that the Ware County contract documents take precedent in case of dispute or contradictions in language. TERMINATION OF CONTRACT Ware County may, at any time they deem necessary, terminate this agreement with written notice, for any justifiable reason, such as incompetence in performing the contract requirements. Payment shall be made for all approved work in place and approved materials on site. No payment shall be made for unapproved or unacceptable work in place or materials on site. WARRANTY Manufacturer s Warranty Replacement parts shall be provided with the manufacturer s standard warranty. In the event that replacement parts fail during the warranty period they shall be replaced free of charge. Note on the field work order and billing invoice the warranty time for each replacement part and/or provide a written warranty for each item used. Contractor s Warranty The Contractor shall warrant all work and materials to be free from defects and failure. Should work or materials fail during the warranty period the Contractor agrees to replace said failures at no cost to Ware County and in a timely manner. Should the Contractor fail to fulfill the warranty obligations, Ware County may use any means necessary to make the work right and charge all costs to the Contractor, who agrees to pay all such costs. November 06, 2013 GENERATOR MAINTENANCE BID Page 10 of 20

WORKER S COMPENSATION EXEMPTION AFFIDAVIT Form should be completed by an officer of a sole proprietorship or a corporation with three (3) or less employees. Form must be signed and notarized. This is to verify that Company Name: Address: City, State, Zip Code: is a (Circle One) Sole Proprietorship or Corporation/Partnership and has employees, other than his/her self. Under the terms of Georgia Worker s Compensation regulations, it is NOT necessary for the above named company to carry Worker s Compensation Insurance. Approved by Authorized Representative of Contractor Company Name: Address: City, State, Zip Code: Authorized Signature: Printed Signature: Printed Title of Signer: Date of Signature: Notary Printed Name & Signature Date of Expiration Seal November 06, 2013 GENERATOR MAINTENANCE BID Page 11 of 20

BID FORM SCHEDULE OF VALUES SCHEDULE OF VALUES, Page 1 of 2 Item 1 Annual service including parts, labor, tools, equipment, inspections, changing oil, oil filter, air & fuel filters, greasing and lubricating, and other annual services. Include all service charges, mileage charges and other fees. Generator Location Unit Size Annual Cost Court House, 800 Church Street, Waycross GA 31501 Public Works, 3699 Harris Road, Waycross GA 31503 Fire Station 1, 3411 Harris Road, Waycross GA 31503 County Jail, 3489 Harris Road, Waycross GA 31503 Cummins: 20 kw Cummins: 50 kw Cummins: 125 kw Cummins: 200 kw 911 Center, 3395 Harris Road, Waycross GA 31503 Cummins: 230 kw Item 2 Annual Load Bank 2-Hour Test including parts, labor, tools, equipment, inspections, all service charges, mileage charges and other fees. Court House, 800 Church Street, Waycross GA 31501 Public Works, 3699 Harris Road, Waycross GA 31503 Fire Station 1, 3411 Harris Road, Waycross GA 31503 County Jail, 3489 Harris Road, Waycross GA 31503 Cummins: 20 kw Cummins: 50 kw Cummins: 125 kw Cummins: 200 kw 911 Center, 3395 Harris Road, Waycross GA 31503 Cummins: 230 kw Total of Annual Maintenance and Load Bank Test Item 3: 24-hour Emergency Services Response Time Item description Unit Time 24-hour emergency response service REQUIRED Verbal Response time. 24-hour emergency response service REQUIRED On Site Response time. Maximum of 15 minutes Maximum of 1.5 hours Item 4: Scheduled Repairs and 24-hour Emergency Services Charges Item description Unit Unit Cost Service Call including travel time and mileage charges Mileage rates not included in service charge Technician hourly rates Helper hourly rates (If Required) Technician overtime hourly rates Helper overtime hourly rates (If Required) Parts markup, if any (percentage rate) November 06, 2013 GENERATOR MAINTENANCE BID Page 12 of 20

SCHEDULE OF VALUES, Page 2 of 2 Item 5: Questions about services and charges Item description Does your company assign particular technician/s to this Yes contract? (circle one) What is the driving distance from 800 Church Street, Waycross GA to the physical address of the technician/s assigned to this contract? Insert miles What is the driving distance from 800 Church Street, Waycross GA to the physical address of business office assigned to this contract? Insert miles Do calls outside normal business hours go to a technician/s assigned to this contract, beeper, voicemail, other? Insert response Are mileage charges, not included in the service charge, based on where the technician/s responds from? Circle Yes one. Are mileage charges, not included in the service charge, based on where the technician/s lives? Circle one. Yes Are mileage charges, not included in the service charge, from the place of business? Circle one Yes Response No Miles Miles No No No Do you charge travel time both ways? Circle one. Yes No Do you charge travel mileage both ways? Circle one. Yes No Does your company require us to sign a standard form of agreement/contract? Circle one Yes No Is your company willing to amend your standard form of agreement/contract to meet the specifications of this contractual bid? Circle one Yes No Item 5: Attachments and Clarifications Item description Should you need to show examples or make clarifying statements to any part of your bid you may do so. Please note the number of clarifications or attachments. Response Complete Schedule of Values and return with Bid. November 06, 2013 GENERATOR MAINTENANCE BID Page 13 of 20

GENERATOR MAINTENANCE BID It is the intent of these specifications to describe the items needed and requirements to be met to provide Ware County with the generator maintenance and 24/7 emergency services as outlined in the bid documents, specifications, and attachments thereto. Ware County will not be responsible for any charges not shown on this contract, without prior approval from the Facilities Coordinator or his designee. Having carefully examined the specifications entitled GENERATOR MAINTENANCE BID, dated November 06, 2013, as well as inspecting the premises and conditions affecting the work, the undersigned proposes to furnish all services, equipment, materials and labor called for by them, for the annual maintenance and load bank testing, for the sum of Dollars (WRITE OUT AMOUNT) $ which (AMOUNT IN NUMBERS) sum is hereinafter called the Base Bid. The undersigned hereby agrees that this bid may not be revoked or withdrawn after the time set for the opening of bids, but shall remain open for acceptance for a period of sixty (60) calendar days following such time. Upon notification by mail, facsimile, delivery, phone or email of the acceptance of this proposal the undersigned agrees to execute within ten (10) calendar days all contract documents for the completion of all work specified. Award of the contract shall be made by Ware County and the Contractor will be notified in writing by letter, fax, or email, and will have no more than ten (10) days to produce all submittal items required to issue a Notice to Proceed. By submitting this proposal, Contractor certifies this proposal is made without prior understanding, agreement or connection with any corporation, firm or individual submitting a proposal for the same materials, supplies or equipment, and is in all respects fair and without collusion or fraud. Contractor further agrees that he understands collusive bidding is a violation of State and Federal law and can result in fines, prison sentences and civil damage awards. By submitting this proposal Contractor agrees to abide by all conditions of this proposal. November 06, 2013 GENERATOR MAINTENANCE BID Page 14 of 20

BID FORM Sign below in ink in the space provided. Unsigned bids will be considered incomplete and will be subject to rejection. It is agreed by the undersigned bidder that the signing and delivery of this bid represents the bidder s acceptance of the terms and conditions of the specifications and provisions, and if awarded this bid, will perform in accordance with this agreement. BID SUBMITTED BY: Acknowledgement of Addenda: Company Name: Address: City: State: Zip Code: Phone: Fax: Email: Authorized Signature: Printed Signature: Title of Signer: Date of Signature: November 06, 2013 GENERATOR MAINTENANCE BID Page 15 of 20

Is any Owner or officer of the bidder an employee of Ware County or related as close as third cousin to a Ware County Commissioner or other elected official? CHECK ONE: YES or NO Waycross and Ware County Vendors submitting a bid MUST have valid City and/or County business license. COMPLY: YES NO EXPIRATION DATE City License No. County License No. NOTE: Any bid not containing this information will NOT be considered. November 06, 2013 GENERATOR MAINTENANCE BID Page 16 of 20

Ware County Contract Agreement Sign, date, notarize, and return this page with the bid documents. This page will be signed, dated, and notarized by the County after approval of the bid. Signing this document thereby binds the Contractor to all items included in the bid package. The bid documents, amendments and attachments are a part of the contract and the Contractor agrees to be bound and to perform in accordance with all the content therein. Approved by Authorized Representative of Contractor Company Name: Address: City, State, Zip Code: Authorized Signature: Printed Signature: Printed Title of Signer: Date of Signature: Notary Printed Name & Signature Date of Expiration Seal Approved by Authorized Representative of Ware County Ware County Board of Commissioners, 800 Church Street, Suite 223, Waycross, GA 31501 Printed Title of Signer: Chairman of the Ware County Board of Commissioners Authorized Signature: Printed Name of Signature: Jimmy Brown Date of Signature: Notary Printed Name & Signature Date of Expiration Seal November 06, 2013 GENERATOR MAINTENANCE BID Page 17 of 20

Contractor s Warranty Agreement The Contractor hereby agrees to immediately remedy any failures in materials or workmanship, throughout the term of the contract, until the approved effective date shown below. Restorations shall be in conformance with the original bid documents for said project and at no cost to Ware County. Should Contractor fail to fulfill the obligations of this warranty in a timely manner, said Contractor grants Ware County the right to have the warranty work accomplished by others and the warranting Contractor shall pay all cost associated for the restoration work, damaged items and legal cost. Sign, date, notarize, and return this page in the bid package. Upon completion and acceptance of the project the warranty ending date will be entered and this page will be signed by Ware County s representative and a completed copy returned to the Contractor. Effective Warranty Period Ending Date: December 31, 2014 Approved by Authorized Representative of Contractor Company Name: Address: City, State, Zip Code: Authorized Signature: Printed Signature: Printed Title of Signer: Date of Signature: Notary Name Date of Expiration Seal Approved by Authorized Representative of Ware County Ware County Board of Commissioners, 800 Church Street, Suite 223 Waycross, GA 31501 Printed Title of Signer: Facilities Coordinator, Ware County Authorized Signature: Printed Name of Signature: Clarke Lee Date of Signature: November 06, 2013 GENERATOR MAINTENANCE BID Page 18 of 20

STATEMENT OF NO BID Company Name: Authorized Signature: Phone: Date of Signature: Please explain your reason for not bidding below. This will help us improve our Bidding Process. November 06, 2013 GENERATOR MAINTENANCE BID Page 19 of 20

E-Verify Form Contractor Affidavit under O.C.G.A. 13-10-91(b)(1) By executing this affidavit, the undersigned Contractor verifies its compliance with O.C.G.A. 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical Performance of services on behalf of Ware County Board of Commissioners has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. 13-10-91. Furthermore, the undersigned Contractor will continue to use the federal work authorization program throughout the contract period and the undersigned Contractor will contract for the physical Performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows: Federal Work Authorization User Identification Number Date of Authorization Name of Contractor Name of Project Ware County Board of Commissioners Name of Public Employer I hereby declare under penalty of perjury that the foregoing is true and correct. Executed on (month, day, year) in (city), (state). Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent SUBSCRIBED AND SWORN BEFORE ME ON (month, day, year) NOTARY PUBLIC My Commission Expires: (month, day, year) November 06, 2013 GENERATOR MAINTENANCE BID Page 20 of 20