Capacity Performance Transition Incremental Auctions Rules, Schedule and Planning Parameters

Similar documents
FRR Alternative. Jeff Bastian Manager, Capacity Market Operations Market Implementation Committee April 10, 2019 PJM

Market Seller Offer Cap Balancing Ratio Proposal

Market Seller Offer Cap Balancing Ratio Issue

{TEXT OMITTED} 6. MARKET POWER MITIGATION. Sixth Revised Volume No. 1

2016/2017 RPM Capacity Performance Transition Incremental Auction Results

Balancing Ratio Proposals

Balancing Ratio Determination

Comparison of Performance-Based Capacity Models in ISO-NE and PJM June 2, 2016

This section addresses the specific timeline, format and mechanics for a base auction

PJM Reliability Pricing Model

1 Overview of the Alberta Capacity Market

Generation Production Costs, Scheduling & Operating Rate

DR CP Penalty Review. DRS July 20, 2016

Installed Capacity (ICAP) Market

Alberta Capacity Market

5.14 Installed Capacity Spot Market Auction and Installed Capacity Supplier Deficiencies LSE Participation in the ICAP Spot Market Auction

Installed Capacity (ICAP) Market

Balancing Ratio Determination Issue

Assessment of the Buyer-Side Mitigation Exemption Test for the Hudson Transmission Partners Project

5.2 Transmission Congestion Credit Calculation Eligibility.

Avoidable Cost Rate Template Version 14 Instructions

Operating Agreement Redlines

7.3 Auction Procedures Role of the Office of the Interconnection.

Installed Capacity (ICAP) Market Introduction

MEMORANDUM The FERC Order on Proposed Changes to ISO-NE s Forward Capacity Market

5.2 Transmission Congestion Credit Calculation Eligibility.

BUYER SIDE MITIGATION NARRATIVE AND NUMERICAL EXAMPLE

Assessment of the Buyer-Side Mitigation Exemption Test for the Hudson Transmission Partners Project

Exelon s Price-Based Materiality Screen. PJM CCPPSTF September 11 12, 2017

6 Rebalancing Auctions

Defining Generator Outage States DRAFT Tariff Proposed Amendments. Shaded material in blue text is updated since the 2/12/14 BIC.

Energy Efficiency in Wholesale Markets: ISO-NE, PJM, MISO

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2016

MISO Competitive Retail Solution: Analysis of Reliability Implications

Proposed Reserve Market Enhancements

h) Minimum Offer Price Rule for Certain Generation Capacity Resources for Generation Capacity Resources

Overview of the Forward Capacity Market ( FCM ) ISO New England Inc.

PJM Analysis. CCPPSTF July 17, PJM 2017

6 Rebalancing Auctions

D. RSCP SUPPLIER PAYMENTS AND CUSTOMER RATES

Financial Transmission and Auction Revenue Rights

ATTACHMENT Q PJM CREDIT POLICY

The deadline for stakeholder consensus on recommendations is August 31, 2014, with a FERC filing deadline of October 1, 2014.

Overview of the New ICAP In-City Mitigation Rules

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2018

Supply Participation. 2.1 Prequalification applications. Rationale

Assessment of the Buyer-Side Mitigation Exemption Test for the Berrians Facility

Best Practices in Resource Adequacy

2018/2019 Planning Resource Auction Results. Resource Adequacy Subcommittee May 9, 2018

AEP Ohio Competitive Bidding Process November 2017 Auction

GATS Subscriber Group Meeting

Georgia Power Company s Qualifying Facilities (QF) Fundamentals

Default Reference Price Reports / Buyer-Side Mitigation Processes (other than SCRs)

Attachment A: Glossary of Terms

Review of LADWP Feed-In-Tariff Proposal for City Council

Alberta Capacity Market

Market Settlements - Advanced

Capacity Market Power Mitigation

NYISO Administered ICAP Market Auctions

PRA Preliminary Data. Resource Adequacy Subcommittee February 7, 2018

ICAP Demand Curve. Zachary T. Smith Supervisor, ICAP Market Operations, NYISO. Intermediate ICAP Course. November 7-8, 2017 Rensselaer, NY 12144

Appendix B-2. Term Sheet for Tolling Agreements. for For

ARRs and FTRs MISO Training

Generation Adequacy through Call Option Obligations: Safe Passage to the Promised Land

COMMENTS OF NV ENERGY LOCAL MARKET POWER MITIGATION ENHANCEMENTS DRAFT FINAL PROPOSAL DATED JANUARY 31, 2019 CAISO STAKEHOLDER PROCESS

Organized Regional Wholesale Markets

Schedule LGS - X LARGE GENERAL SERVICE EXTRA LARGE

FTR Alignment. Joint Stakeholder Meeting June 6, 2008

Information Document Offers and Bids ID #[xxxx-xx]

Schedule 19 POWER PURCHASES FROM COGENERATION AND SMALL POWER PRODUCTION QUALIFYING FACILITIES

Financial Transmission and Auction Revenue Rights

Directed Contract Subscription Guidelines AIP-SEM

ATLANTIC CITY ELECTRIC COMPANY BPU NJ

PJM Analysis. CCPPSTF August 2, PJM 2017

BASICS OF COMPETITIVE MARKETS FOR ELECTRICITY AUCTIONS - INTENT AUCTIONS - COMPONENTS. Basic Definitions Transactions Futures

Comverge Qualifications

JOSEPH A. HOLTMAN - ELECTRIC. 1 Q. Please state your name, title, employer and business. 4 Electricity Supply for Consolidated Edison Company of

Delisting: Exit of capacity resources from the market. Eligibility WG October 24, 2017

Brooklyn Queens Demand Management Demand Response Webinar

Monitoring and Mitigation in Alberta s Capacity Market

CEO Presentation. Curt Morgan Chief Executive Officer

Congestion Revenue Rights Settlement Rule

Financial Transmission and Auction Revenue Rights

Technical Conference. August 3, 2009

Financial Transmission and Auction Revenue Rights

Five-Minute Settlements Education

15. Demand Response Service

Duke Energy Kentucky Request for Proposals for Backstand Energy for

CAISO. Settlements & Billing. Real Time Excess Cost for Instructed Energy Allocation CC 6486

EIPC Roll-Up Report & Scenarios

GreenHat Portfolio Liquidation Proposal for Consideration

NEAS ENERGY - Route to Market

Issues related to the demand curve in capacity markets

Rational Buyer. Ancillary Service Rational Buyer Adjustment. Description. Purpose. Charge Calculation and Calculation Components

LSE Perspective on FTR and ARR Surplus Funds. Jeff Whitehead Direct Energy

California ISO October 1, 2002 Market Design Elements

Capacity Auction Clearing with Resource Specific FRR

Southwest Power Pool, Inc. Policy Recommendation for the SPP Board of Directors and Members Committee. March 6, 2018 Mountain West Transmission Group

Key Processes in Power Exchange Presented By: Prasanna Rao Shalabh Shrivastava

IN THE MATTER OF THE BOARD S INVESTIGATION OF CAPACITY PROCUREMENT AND TRANSMISSION PLANNING BPU - Docket No. EO

Transcription:

Capacity Performance Transition Incremental Auctions Rules, Schedule and Planning Parameters Overview Capacity Performance Transition Incremental Auctions will be conducted for the 2016/2017 and 2017/2018 Delivery Years to procure Capacity Performance Resources in quantities up to 60% and 70%, respectively, of the updated Reliability Requirement for those Delivery Years. The Capacity Performance Transition Incremental Auctions will be conducted independently and sequentially over the two week period that immediately precedes the opening of the offer window for the 2018/2019 Base Residual Auction. Participation in each Transition Auction is voluntary and is open to any Generation Capacity Resource that can meet the requirements of a Capacity Performance Resource, regardless of whether the resource has already committed to provide capacity by clearing in a prior auction for the relevant Delivery Year. Participation is voluntary. A seller that does not participate will retain all prior commitments and revenues, if any, associated with clearing in any prior auctions for the relevant Delivery Year. The clearing price caps for the Transition Incremental Auctions of the 2016/2017 and 2017/2018 Delivery Years will be established as 50% and 60%, respectively, of the Net CONE of the PJM Region used in the BRA for those Delivery Years. The clearing price of each Transition Incremental Auction will not exceed the applicable clearing price caps. Resource Sell Offers are not subject to mitigation. Any resource offering into a Transition Incremental Auction may submit a sell offer at a sell offer price up to the applicable clearing price cap. Any sell offer in excess of the auction clearing price cap will not clear the auction. The non-performance charge/performance credit provisions of Section 10A of Attachment DD of the PJM OATT will apply to all Generation Capacity Resources committed as Capacity Performance Resources; however, the magnitude of non-performance charges for the 2016/2017 and 2017/2018 Delivery Years is reduced to 50% and 60 %, respectively, of the non-performance charges that become effective with the 2018/2019 Delivery Year implementation of these provisions.

Schedule 1. The Capacity Performance Transition Incremental Auctions will be conducted independently and sequentially over the two week period that immediately precedes the opening of the offer window for the 2018/2019 Base Residual Auction. a. The sell offer window for the 2016/2017 Transition Auction opens on Monday, July 27, and closes at 4 PM on Tuesday, July 28. Auction results will be posted after 4:00 PM on Thursday, July 30. b. The sell offer window for the 2017/2018 Transition Auction opens on Monday, August 3, and closes at 4 PM on Tuesday, August 4. Auction results will be posted after 4:00 PM on Thursday, August 6. Eligibility Requirements 2. Participation in each Transition Incremental Auction is voluntary and is open to any Generation Capacity Resource that can meet the requirements of a Capacity Performance Resource, regardless of whether the resource has already committed to provide capacity by clearing in a prior auction for the relevant Delivery Year. Prior resource commitment quantities, if any, will be replaced by any MW quantity cleared by the resource in the Transition Incremental Auction (see #13 for further detail on the determination of RPM Auction Credits for resources that clear in a Transition Incremental Auction). 3. The Generation Capacity Resource must be capable of meeting the Capacity Performance requirements on a stand-alone basis, i.e., the aggregate sell offer of resources that cannot meet the Capacity Performance requirements on a stand-alone basis is effective with the 2018/2019 Delivery Year and cannot be utilized in the Transition Auctions. 4. Sell offers will be accepted from any Generation Capacity Resource that can meet the requirements of a Capacity Performance Resource, including: a. External Generation Capacity Resources that have an accepted CIL exception prior to the opening of the auction provided the resource is reasonably expected to be pseudo-tied by the applicable Delivery Year, b. Planned Generation Capacity Resources that have an executed Interconnection Service Agreement prior to the opening of the auction, c. Intermittent Resources and Capacity Storage Resources for that MW quantity that the seller can demonstrate can meet the requirements of a Capacity Performance PJM 2015 www.pjm.com 2 Page

Resource. The average expected output over peak-hour periods 1 provides an acceptable Capacity Performance sell offer quantity for such resources. Using this approach, however, may result in significant non-performance risk for the seller of an Intermittent Resource or Capacity Storage Resource for which the average expected output for individual hours or seasons within the peak-hour period vary significantly from the average expected output across all hours in peak-hour period. Auction Parameters and Auction Clearing 5. Capacity Performance Transition Incremental Auctions will be conducted for the 2016/2017 and 2017/2018 Delivery Years to procure Capacity Performance Resources in quantities up to 60% and 70%, respectively, of the updated Reliability Requirement for those Delivery Years. The target quantity of Capacity Performance Resources to be procured for the 2016/2017 and 2017/2018 Delivery Years is 95,097 MW and 112,194 MW, respectively. 6. No locational requirements will be modeled in the Capacity Performance Transition Incremental Auctions. PJM will procure a percentage of the PJM Region s Reliability Requirement for each Delivery Year as Capacity Performance Resources without regard for where the resource is located. 7. The clearing price cap and the market seller offer cap for resources that offer into the Capacity Performance Transition Incremental Auction for the 2016/2017 Delivery Year is $165.27/MW-Day (established as 50 percent of the Net CONE of the PJM Region used in the 2016/2017 BRA). The auction clearing price cannot exceed the clearing price cap and any resource offering into the auction may submit sell offers at an offer price up to this market seller offer cap. 8. The clearing price cap and the market seller offer cap for resources that offer into the Capacity Performance Transition Incremental Auction for the 2017/2018 Delivery Year is $210.83/MW-Day (established as 60 percent of the Net CONE for the PJM Region for the 2017/2018 BRA). The auction clearing price cannot exceed the clearing price cap and any resource offering into the auction may submit sell offers at an offer price up to this market seller offer cap. 9. The clearing price for each Capacity Performance Transition Incremental Auction will be set by the marginal resource offers when PJM procures the target amount of Capacity Performance Resources. If the target amount of Capacity Performance Resources is not cleared, then the clearing price will equal the clearing price cap. 10. If two or more sell offers submitted into the auction include the same offer price, and some, but not all of the Unforced Capacity is required to clear the auction, then the auction will be cleared to minimize total costs including make-whole payments by first clearing such offers 1 Expected peak-hour periods include hours ending 6 through 9 and hours ending 18 through 21 in the months of January and February, and hours ending 15 through 20 in the months of June, July and August. PJM 2015 www.pjm.com 3 Page

that have a flexible MW quantity and therefore require no make-whole. When some but not all of such equal-priced flexible quantities are required to clear the auction, such offers will clear pro-rata based on the flexible MW quantities offered. Performance Assessment of CP Resources for 2016/2017 & 2017/2018 Delivery Years 11. The non-performance charge/performance credit provisions of Section 10A of Attachment DD of the PJM OATT will apply to all Generation Capacity Resources committed as Capacity Performance Resources; however, the magnitude of non-performance charges for the 2016/2017 and 2017/2018 Delivery Years is reduced to 50% and 60%, respectively, of the non-performance charges that become effective with the 2018/2019 Delivery Year implementation of these provisions. a. For 2016/2017, the Non-Performance Charge Rate is $1,896.30/MWhr (established as (50%)*($311.72/MW-day)*(365 days)/30 hours); and, the annual stop-loss is $85,333.70 times the resource s committed CP UCAP MW (established as (50%)*(1.5)*($311.72/MW-day)*(365 days)]. b. For 2017/2018, the Non-Performance Charge Rate is $2,420.23/MWhr (established as (60%)($331.54/MW-day)*(365 days)/30 hours); and the annual stop-loss is $108,910.23 times the resource s committed CP UCAP MW (established as (60%)*(1.5)*($331.54/MW-day)*(365 days)]. PJM 2015 www.pjm.com 4 Page

12. The total revenues collected from Non-Performance Charges for a Performance Assessment Hour will be allocated only to over-performing Generation Capacity Resources that have a Capacity Performance commitment. Auction Credit Determination for Resources that Clear a CP Transition Auction 13. A Generation Capacity Resource that clears in a Capacity Performance Transition Incremental Auction will receive payment for each MW cleared in the auction based on the Resource Clearing Price established in the Transition Incremental Auction. A resource that cleared in a prior RPM auction(s) for the relevant Delivery Year and that also clears in the Transition Incremental Auction for that same Delivery Year will have all or a portion of the prior committed MWs replaced by any MW quantity cleared in the Transition Incremental Auction. a. A resource that clears in a Transition Auction at a MW quantity that exceeds the total cleared MW quantity from all prior auctions conducted for the relevant Delivery Year will receive a payment for each MW cleared in the Transition Auction based on the Resource Clearing Price established in the Transition Incremental Auction; and, the cleared MW quantity for all prior auctions conducted for that Delivery Year will be set to zero MW. Example: A resource clears 90 MW in the 2016/2017 BRA, 5 MW in the 2016/2017 1 st Incremental Auction and 5 MW in the 2016/2017 2 nd Incremental Auction, for a total commitment level of 100 MW. The resource subsequently clears 110 MW in the 2016/2017 Capacity Performance Transition Incremental Auction. The resource will receive a payment for the 110 MW Capacity Performance commitment based on the Resource Clearing Price established in the Transition Incremental Auction and the cleared MWs for all prior auctions conducted for the Delivery Year will be set to zero. b. A resource that clears in a Transition Auction at a MW quantity that is less than the total cleared MW quantity from all prior auctions conducted for the relevant Delivery Year will receive a payment for each MW cleared in the Transition Auction based on the Resource Clearing Price established in the Transition Incremental Auction; and, the cleared MW quantity for all prior auctions conducted for that Delivery Year will be reset in proportion to each prior auction s share of the original Commitment quantity in a manner that maintains the original total commitment level of the resource. Example: A resource clears 90 MW in the 2016/2017 BRA, 5 MW in the 2016/2017 1 st Incremental Auction and 5 MW in the 2016/2017 2 nd Incremental Auction, for a total commitment level of 100 MW. The resource subsequently clears 60 MW in the 2016/2017 Capacity Performance Transition Incremental Auction. The resource will receive a payment for the 60 MW Capacity Performance commitment based on the Resource Clearing Price established in the Transition Incremental Auction and the PJM 2015 www.pjm.com 5 Page

cleared MWs for all prior auctions conducted for the Delivery Year will be reset to a total of 40 MW: 36 MW for the 2016/2017 BRA (90% of original commitment level), 2 MW for the 2016/2017 1 st Incremental Auction (5% of original commitment level) and 2 MW for the 2016/2017 2 nd Incremental Auction (5% of the original commitment level), The resource will receive a payment for each prior auction based on the reset MW quantities and the Resource Clearing Price applicable to each prior auction. 14. The Final Zonal Capacity Price for the 2016/2017 and 2017/2018 Delivery Years will reflect the results of all auctions, including Capacity Performance Transition Auctions, conducted for that delivery Year; therefore, the cost of the Transition Auctions for the 2016/17 and 2017/18 Delivery Years will be recovered in the same manner that the costs of the BRA and Scheduled Incremental Auctions are recovered. Transaction Auction Credit Requirement for Planned Generation Capacity Resources 15. The pre- and post-auction Credit Rates for Planned Generation Capacity Resources that offer into the Capacity Performance Transition Incremental Auctions will be $25,010.15/MW-year and $31,957.28/MW-year for the 2016/2017 and 2017/2018 Transition Incremental Auctions, respectively. The pre- and post-auction Credit Rates for the Transition Auctions were established using the post-auction credit rate formula of Attachment Q for Capacity Performance Resources adjusted to reflect the reduced non-performance charge rates and stop-loss values described in #11 above, and are based on the clearing price cap for each auction. 16. A Planned Generation Capacity Resource with an existing commitment and associated credit requirement due to clearing prior auctions for these Delivery Years that wishes to participate in the Transition Incremental Auctions will be required to provide additional credit equal to the incremental difference between the Transition Auction credit requirement and the resources existing credit requirement. 17. The post-auction Credit Rates are fixed at the pre-auction Credit Rate values. Replacement of CP Commitments in Delivery Years 2016/2017 and 2017/2018 18. All Scheduled Incremental Auctions for the 2016/2017 and 2017/2018 Delivery Years that are conducted subsequent to the Capacity Performance Transition Auctions will provide only for the buying and selling of existing capacity products, i.e., Annual, Extended Summer and Limited Capacity. Participant buy bids for Capacity Performance products are not provided in Scheduled Incremental Auctions. 19. A Capacity Performance commitment from a Transition Auction may be replaced by available, uncommitted MWs from a Generation Capacity Resource that can meet the requirements of a Capacity Performance Resource. Such replacement may be submitted into the erpm system after the final EFORd values for a Delivery Year are known and finalized in that system. PJM 2015 www.pjm.com 6 Page